Document 9Jz9LxO5MBdxd594d0VM3Nkj7

To Fhom 0.0 ETHYL CORPORATION JNTEH-OFFICE Mr. M. M. Koenecke G. A. Address cc: Messrs. E.Feierubend C.Holthaus F. Lawton H.Loflln J.McE Ideny /ydteheii " D. Park R.Wolber H .Smith Subject Project 20281 Sdnedule y A JLJL -- t2u-^ *- ' Date */ May 3, 1977-. , 2. /OckfiA^. ,0-fi ^ ,,___^ n 0 dh^^quWt'.'Xhove*X$<i- djZ^JZX. ^ Zcxr, accordance with your request, we have reviewed the VCI Emission Reduction ^-- . L^O^project schedule expenditure forecast. Listed below as Case I is the expenditure forecast for 1977 on a monthly basis based on the schedule transmitted to EPA. This forecast is based on engineering, purchasing, and construction continuing on all items in accordance with the EPA schedule^ assuming funds will be appropriated per the original plan. If approval is obtained to continue per this schedule but only use the Part 1 appropriated funds ($600 M), then funds would be expended by early- September. Case II is the expenditure forecast based on continuing engineering in accor dance with the original schedule, purchasing long delivery items only and delaying all construction until January, 1978. This is contrary to the schedule submitted to the EPA and would require subsequent approval by the EPA. Any construction delay beyond January would probably delay completion of the project past October, 1978 because of the large manpower build-up required which may not be available. Bas d on this revised schedule, the Part 1 appropriated funds ($600 M) would be expended in January, 1978. In both cases, appropriated funds must be approved at the time the Part 1 funds are expended to avoid "shut-down" of engineering, purchasing, and construction in mid-stream of the required items. At the time the $600 M is expended, work could be In progress on a large number of items but only a few would be complete in Case I and none complete in Case II. Because of the uncertainty of this project, we have presently delayed construc tion of all items and are only purchasing long delivery items. Engineering is continuing per the schedule. We need "direction" and approval by the latter part of May if there is to be a change in implementation of the program scope. Also attached is an updated cost projection of each item based on process scopes received to-date. /mbt Attmts. cc: Messrs. FC 7681 EXPENDITURE FORECAST - PROJECT 20281 $M Expenditures thru April 30 May CASE 1 Monthly Expenditure N.A. 73 Accumulative Total 60 133 June 125 258 1977 July Aug 111 176 369 545 Sept Oct 106 83 651 734 ' ~ ~~ 1978 Nov Dec Jan Feb 105 137 135 132 839 976 1111 1243 CASE II Monthly Expenditure Accumulative Total N.A. 60 73 125 78 83 38 20 30 24 100 150 133 258 336 419 457 477 507 531 631 781 G. A. Hinz 5/3/77 Item No. Title Appropriation Request No. Current Cost Projection HC-1 HC-2 HC-3 HC-4 HC-5 HC-6 HC-7 HC-8 PVC-1 Backup Stripper EDC Dryer Column Vent Recovery Syst. Flare Seal Pump Seals Relief Valves Fume Scrubber Emission Monitoring Reduce Fugitive Emissions from Storage Tanks Autoclave Steam Purge Sydem PVC-2 PVC-3 Autoclave Pressure Alarm System Autoclave to Degasser Slurry T ransfer PVC-3A PVC-4 PVC-5 PVC-6 PVC-7 PVC-8 PVC-8A PVC-9 PVC-10 pvc-n PVC-12 Emulsion Autoclave Batch Sampling Gasholder Over-Under Pressure Protection Flare Stack for Incinerator Back-up Mechanical Seals - Nash Pumps Rupture Discs - VCI Safety Valves Continuous Sampling--Incinerator Stack Gases PVC Plant Leak Detection VCI Water Stripper for PVC Plant Waste Water Pilot Plant Vent Testing Incinerator Stack Gases VCI Evacuation Reserve and Escalation G .A.Hinz 5/3/77 2 $285 M 2 200 M 1 53 M 1 45 M Del eted from this project I 210 M 2 120 M 4 80 M De leted from this project; wil be insta!lied as part of the OS project . 4 15 M Deleted from this project; wil be insta lied as part of the OS p roje ct . 3 20 M 3 15 M 3 140 M 2 33 M 3 30 M 1 44 M 1 17 M 4 640 M 1 1 2 Total 22 M 5M 38 M 338 M $2,350 M FC 2683