Document 9Jx2Q8p7Y9R5r8Oe4kQ0rnazq

3MPAIIY Wonsan to & ,FROM (NAME location ' Krull, M. A. Plerlo, Krummrlch COMFIDgNTi DATE : ' August 3, 1970 ' ' ' ~W7~R. Richard - TTO. CC: J. R. Savage G.O. P. B. Hodges G.O. SUBJECT : Aroclor Air Pollution1 Control F. McDonald Newport H. L. Williams Anniston REFERENCE : D. Wo Jackson... TO m. : , Mr. W. B. Papageorge ' B. W. Corlew C. F. Buckley General Offices " R. M. McCutchan B. Young W. C. Engman A. L. Rasmussen' As a first* step, all points of potential Aroclor air emission were Identified. These are summarized in the attached list. Observations made at the time of inspection are included. The plant pollution group has received equipment which should enable us to quantify this amount of Aroclor being lost to the atmosphere from all points where a flow is occurring. Sources like Therrainol vent lines that are only breathing will be sampled, but data will be more qualitative than quantitative. Sampling will also be done at various plant locations to determine whether or not there Is a detectable amount outside using or producing areas. Sampling will begin in August. Level of air losses will be determined and a reduction program laid out by the end of the month. Obvious problem areas such as the Therminol furnaces in Departments 239, 245, 248 and 255 will receive Immediate attention. /gjs attachment W. A. Krull M. A. Pierle DSW 296155 X STLCOPCB4066099 The following are points of Aroclor vapor losses within Dept. -246. , Source . Estimated Loss 1. Drowning jet stack 0. l#/day 2. Fume removal stack Unknown 3. Vacuum jets (6) ,, Unknown 4. Therminol furnace Unknown iI 5. Storage tanks (9) 6. Tank, car loading (2) 0.5#/day 0.25#/day , 7. Trailer loading (l) 0.25#/day 8. Finished product tanks (4) < 0.l#/day 9. Blend tanks (2) * 0.1#/day 10. Surge tanks (2) < 0.l#/day 11. #6, #7* #8 chlorinator sampling points - Unknown 12. Mix tanks (3) ' 0.25#/day 13* Intermediate storage tank 0.1#/day i 1h^i i ! Iii: * DSW 296156 STLCOPCB4066100 The following are potential sources of Aroclor atmospheric emissions from non-Aroclor producing departments at W.G.K. Source . Remarks 1. Dept. 222 cooling system vent. Low probability due to low operating temp. 2. Dept. 222 heating vent. * * 3. Dept. 248 cooling system vent on surge tank. System not yet in operation. Low prob. due to low temp. No noticeable odors or fumes upon inspection. 4. ' Dept. 248 heating system vent on surge tank. Material leaking from vent to 55 gal. drum. Odors present in area. 5. Dept. 239 surge tank vent. Heavy fumes and odors readily noticeable in area. 6. Dept. 245 surge tank vent. Fuming heavily from corroded ven Material visible on concrete and chat around unit. Odors in immediate area. 7. Dept. 273 surge tank vent. Vent is rigid pipe to sewer. System not operating at time of inspection. 8. Dept. 270 surge tank vent. Vent discharge to chat. Visible signs of material on chat beneati vent. No odors or fumes at inspection. 9. Dept. 243 tank vents. System used for chlorinator cooling. Vents are covered with loosely fitting caps. No noticeable funu or odors. 10. Dept. 244 pump tank vents. Fumes and odors present during ut and transfers. 11. Dept. 273 surge tank vent. Vents to collection bucket at ground. No fumes, odors, or material noticeable at unit. 12. Dept. 258 surge tank vent. Tank vents to room on third flooj in operating dept. Unit used. on3 during DDS production. . 13. Dept. 255 surge tank vent. Vents to either 8" sewer pipe or to air considerable fuming due tc 300C temperature. DSW 296157 STLCOPCB4066101