Document 9JwvepGbm2JdvnzVdXv9XDxEp
674
CHAPTER 29
1956 Guide
are not as highas desired, higher pressures can be obtained by use of a steam
coImtpirse,sssoomr.e2 tim' es :desirable to install a separate high-pressure line from the boiler plant for steam supply to laundries or other high-pressure equip ment rather than to operate the entire distribution system at higher pres
sures. BOILER PLANTS
In the design of a plant for district heating, consideration should be given
to the following factors:
1. Annual loadfactor. The ratio of the average hourly plant send-out (defined as rate of flow to the distribution system) to the maximum hourly send-out, which is a direct measure of the extent to which investment in facilities is used. This factor is often employed to determine savings by equipment offering higher efficiency. The load factor for space heating is usually between 10 and 30 percent. For space heating
Table 3. Load Duration for Typical District-Heating System {Cumulative Hours of Plant Send-out per Year at Various Loads Expressed in Percent
of Peak Hourly Load*)
%Load
of
Peak
100 95 90 85 80 75
Houbs per I Load % op
Year
Peak
5' 70
: 40 90
65 60
150 1 . 55
300 50
500 40
Hours per Year
750 1050 1400 1800 2200 3100
:
Load % of Peak
* Hours per Year
I 30 20 15 10 6
4100 5150 5700 6400 8760
L
*NBoates:eAd bpnlacnutrvheavoinngpaagpee8a9k. tsHenitdri-cotuHt oefa1ti0n0g,00H0alnbdbpoeorkh, rTwhiirldt sEendditioount,8109,0501.0 (80 percent of 100,000) tb.
per hr or more for 300 hr per yr.
plus additional steam requirements such as water heating, cooking, or laundry, it is between 15 and 40 percent. Load factors for various types of buildings are given in
Ta2b. lDeu1r0a,tiConhaopftleorad1.8. The cumulative number of hours for the various plant sendouts, is used to determine the number and sizes of boilers in order to effect most effi cient loading of individual units and of the plant as a whole. The cumulative number of hours a typical district heating plant will send out steam at various loads, with loads expressed in percentage of maximum hourly rate, is given in Table 3. It will be noted that the duration of load for the higher send-outs is very low.
3. Peed-water treatment. This is desirable in plants to prevent corrosion and scale
form4.aStimonok.e dbaternent. This is a modern requirement. The installation of suitable fuel-burning and dust-collecting equipment to limit the emission of smoke and fly
as.h5.isPulasunat llloycanteiocens. saAry.boiler plant should be situated where fuel deliveries, water supply, and other utility services are convenient and should be as near as possible to the distribution center in order to simplify and shorten the distribution piping.
STEAM DISTRIBUTION PIPING The methods used in district heating: work for the distribution of steam, are applicable, to any problem involving the supply of steam to a group of buildings.; The first step is to establish the route of the pipes which is in
fluenced .by local conditions and investment. Important points in laying out distribution piping are:
1. The depth of the conduit should be, kept at a minimum. Excavation costs are a
District Heating
075
large factor`in the total cost. On the other hand, institutional lawns will be dam aged if steam conduit is too close to the surface.
2. The use of basement or sub-sidewalk space for the distribution piping where feasible may reduce the cost of installation and maintenance.
.3. In some industrial and institutional applications, the distribution piping may be installed, entirely or in part, above ground. This method of construction has the advantage of requiring no excavation and permits easy maintenance but it may in troduce freeze-up problems. Thin corrugated aluminum sheets are available for covering the insulation on lines exposed to the weather.
4. Piping routed in loops with suitable valves to provide alternate feeds for major loads, allows service to be maintained despite trouble in any one feeder.
PIPE SIZES
After establishing the route of the pipes, the next step is to determine the pipe sizes. In district heating work it is common practice to design the piping system on the basis of pressure drop. The initial pressure and the minimum permissible terminal pressure are specified, and toe pipe sizes are so chosen that toe required amount of steam, with suitable allowances for future increases, will be transmitted without exceeding this pressure drop. The steam velocity is therefore almost disregarded and may be very high. Velocities of 35,000 fpm are not considered high. By toe use of high velocities the pipe sizes are kept to a minimum with consequent savings in investment. Some lines in a loop system may need to be in-, creased in size in order to handle reverse-direction flow in emergencies.
The steam flowing through any section of the piping can be computed from a study of the hourly steam requirements of the several buildings served. Steam requirements for ventilation-air heating, water heating, laundering, cooking, or processing, should be individually calculated and added to the heating load. Unusual features, such as large heaters for swimming pools, should not be overlooked.
When toe lengths of pipe, steam quantities, and initial and terminal pressures have been chosen, the pipe sizes can be calculated by means of Babcock's pressure drop formula given in Table 2 of Chapter 21. The district-heating industry uses Unwin's formula for determining pipe sizes because pressure drops can be determined simply and directly from a chart. This formula has been checked by tests, and found correct within ranges of velocity used in district heating. A. convenient chart developed from this formula is available from the National District Heating Association;1 and provides a simple yet accurate means for determining pipe sizes.
CONDUITS FOR PIPING
Conduits for underground steam pipes should be reasonably waterproof and able to withstand earth and traffic loads.
Since it is difficult to make a concrete or masonry conduit absolutely watertight, provision should be made for some seepage. The pipe should be protected by a waterproof jacket over toe insulation, unless subject w actual submersion, and toe seepage should be drained from the inside of the conduit. Underdrainage of the conduit is generally obtained by means of a tile drain laid in gravel underneath the conduit. The tile underdrain should discharge to a sewer or some other drainage point. Manholes are required at intervals for access to valves, traps, and some types of expansion joints.
There are many types of conduits, some of which are prefabricated prod-