Document 9Jrawn4n3Jwz9zwneJNKqqdre
L. E. Clark -
486-5593 9000 - Cost
HGMciL
FAIRFIELD STEEL -
OPEN HEARTH - REPLACE BOTTOM #3 O.H
Quigley Company 415 Madison Ave. New York, N.Y.
o
3 - copies L. E. Clark. 7- copies J. B. Mays.
486-90114 January II, 1966
Fairfield Steel Fairfield, Alabama T. H. walker #1 Storehouse
\ 140
\
Tons Etearthcrete "B" (Do Not Substitute)
Note: Vendor to hold material until released by Fairfield Works Engineering Dept.
To be developed 486-5593 - 9000 - Cost
486-90114
L* E. Clark -
486-5593 9000 - Cost
HGMcsL
FAIRFIELD STEEL -
OPEN HEARTH DEPT. - REPLACE BOTTOM #3 O.H. FURNACE.
Harbison-Walker Refractories Co
3 - copies L. E. Clark. 7 - copies J. B. Mays.
486-90122
January 17, 1966
Fairfield Steel Fairfield, Alabama T. H. Walker #1 Storehouse
48,300 1,350 618 613
4FSRZCIASB" HIGH MoO BRICKt
9" 3x 4-1/2" x 3* Straights
3 ' O Cu-iTicuc)
9" si 6--3/4** sc 3" Straights C
^
^
9- sc 4-1/2" x 1-1/2" Straights
Critic* uj
9" x 2-1/4" x 3" Straights
(Z&iTfc-t. ,
Note* VENDOR TO HOLD MATERIAL UNTIL RELEASED BY FAIRFIELD WORKS ENGINEERING DEFT.
SEE ABOVE
486-5593 - 9000 - Cost
486-90122
L. E. Clark -
486-5593 9000 - Cost
HGMc/JHSL pAIRFIELD STEEL -
O.H. DEPT. - REPLACE BOTTOM #3 O.H. FURNACE.
Corhart Refractories Co.
3 - Copies L. E. Clark. 7 - Copies J. B. Mays.
486-90282
February 9, 196
Fairfield Steel Fairfield. Alabama
T. H. Walker #1 Storehouse (See Below)
5832 2296 2584
1368 184 184
1200 100
3-1-66
CORHART RFG METAL ENCASED BRICKs 13-1/2 x (4-1/2 - 4-5/16) x 3" #5 Key 13-1/2 x (4-1/2 - 3-3/4) x 3" #7 Key 15 x (4-1/2 - 4-5/16) x 3" #5 Key with pressed hole. 15 x (4-1/2 - 3-3/4) x 3" #7 Key Skewblocks - Dwg. TCI-138. Skew Blocks - Bwg. TCI-140. 18 x 4-1/2 x 3 Straights 18 x 6-3/4 x 3 Straights
2
486-5593 - 9000 - Cost
486-90282
Sheet 2 of 2
s
3 1/2 Pallets 13-1/2" Random Key Up Stock. 2 1/2 Pallets 15" Random Key Up Stock. 1 13-1/2" Pressure Block Dwg. 1R4-9
58 250 1300
CONTOUR CONTROL STEEL DRAWING 1U3-16 T-Beams 16*-4" radius 12*-0" long. Clips Tie Wires
' The above brick to be palletized and shipped via \ truck to Fairfield Open Hearth Mixer Brick Shed.
\ DO HOT SUBSTITUTE
486-90282
486-90282
1-0508 9000 Cost Lo Cldrkj Jr. HGM/JHS/aa FAIRFIELD STEEL REPLACE BOTTOM - HO. 3 OPEN HEARTH
Corhart Refractories Company
486-90495 March 16, 1966
Fairfield Steel Fairfield, Alabama T. H. Walker Mo. 1 Storehouse
1200 100
CORHART RFC PETAL ENCASED BRICK 18 x 4-1/2 x 3 Straights 18 x 6-3/4 x 3 Straights
SO NOT SUBSTITUTE
Mote: These brick were ordered on 486-90282 but were deleted by Purchasing.
April 1, 1966
1-0508 - 9CCG Cost
486-90495
_\ i7 1 -1
JD5VX I
L. E. Clark -
1-0508 9000 - Cost
HOMcjL pairfieLD STEEL OPEN HEARTH - REPLACE BOTTOM #2 O.H. FCE.
3 - Copies L. So Clark. 7 - Copies J. B. Mays.
486-90336
February 25, 1966
Quigley Company 415 Madison Ave. New York, N.Y.
Fairfield Steel Fairfield, Alabama
T. H Walker #1 Storehouse
140 V
Tons Hearthcrete "B`!. (Do Not Substitute}
Note: Vendor to hold material until released by Fairfield works Engineering Dept.
To be developed 1-0508- 9000 - Cost
486-90336
L,, E. Clark -
1-0508 9000 - Coat
HGMCtL FAIRFIELD STEEL REPLACE BOTTOM #2 OPEN HEARTH FCE,
GENERAL REFRACTORIES
3 - Copies L. E. Clark. 7 - Copies J. B. Mays.
486-90371 March 9, 1966
Fairfield Steel Fairfield, Alabama
T. H. Walker #1 Storehouse
48,300 1,350 618 618
5-1-66
PERICLASE HIGH MoQ BRICK8 9" X 4-1/2" X 3" Straights 9" X 6-3/4" X 3" Straights O" X 4-1/2" X 1-1/2" Straights 9" X 2-1/4" X 3" Straights DO NOT SUBSTITUTE
Vendor to hold material until released by Fairfield Works Engineering.
BRICK TO BE PALLITIEED
1-0508 - 9000 - Cost
486-90371
L. E. Clark
1-0508 9000 - Cost
HGMctL
FAIRFIELD STEEL -
REPLACE BOTTOMS #2 & #3 OPEN HEARTHS
Dixie Division A P. Green Co. Birmingham, Alabama
3 - Copies L. E. Clark. 7 - Copies J. B. Mays.
486-90648
April 13, 1966
Fairfield Steel Fairfield, Alabama
T. H. Walker #1 Storehouse
\
1 3
Tons Johns Manville "C3" Cement.
June 1, 1966
1-0508 - 9000 - Cost
486-90648
c
1-0508 9000 - Cos
L. E* Claris -
HGMCtL
FAISP1EllD STEEL
OPES HEARTH - REPLACE BOTTOM - #2 O.H. FCE .
May 24, 1966
Corhart Refractories Company Louisville, Kentucky
Fairfield Steel
Fairfield, Alabama #1 Storehouse
T. H, walker
CORHART 104 REFRACTORIES s \ 1092 15" #1 Wedge - drilled
936 15" #2 Wedge - drilled 78 15" #3 wedge
2560 1440
80 1 4
13-1/2" #1 Wedge 13-1/2" #2 Wedge 13-1/2" #3 Wedge 13-1/2" Pressure Block - Bwg. 1R4-9 1/2 Pallets 13-1/2" Key Up Stock
3 1/2 Pallets 15" Key Up Stock
7-1-66
<.
1-0503 - 90G0 - Cost
48S--90786
Sheet. 2 of 2
486-90786
1344 1728
608 304
2 1 322 186
60 24 325 2400
CORBONP RFG-104 REFRACTORIES; 12" #6 Key - Metal Encased - 3" Series 12" #5 Key - Metal Encased - 3" Series
15" #5 Key - Metal Encased - 3" Series 15" #7 Key - Metal Encased - 3" Series 1/2 Pallets 12" Key Up Stock
with hole
1/2 Pallets 15" Key UP Stock
Skews - TCI--138 Skews - TCI-140
COSTOUR COHTROL STEEL XU3-16f.
Tee Beams -- 16*-4" radius - 12* long. Tee Beams - 19*-2" radius - 9*-9" long.
Clips
Tie Wires
The above in accordance with Corhart quotation dated 4-1-66 #3645 A & B.
BRICK TO BE PALLETIZED.
BO EOT SUBSTITUTE.
COHFISMATIOE PKQHSD TO MR. J. A. WILKXESON OF CORHART REFRACTORIES CO. 5-24-66.
486-90786
1-0508 9000 - Cost
3 -- copies L. E. Clark* 7 - copies J. B. Hays.
L E Clark -- HGMc/RJNtL FAIRFIELD STEEL OPEN HEARTH - REPLACE BOTTOM No. 2 O.H.
May 31, 1966
CORHART REFRACTORIES CO.
Fairfield Steel Fairfield, Alabama #1 Storehouse
T. H. Walker
3000
Lbs. C-104 Corhart Mortar.
To be shipped with Corhart Roof, reference order 486-90786.
CONFIRMATION PHONED TO J. A. WILKXRSON OF CORHART REFRACTORIES CO. PER CONCURRENCE OF C. B. BROOKS - 5-31-66.
July 1, 1966
1--0508 -- 9000 -- Cost
36-90796
INSPECTION - 2 OPEN HEARTH SUBHEAilTH BRICK
An inspection of Peratex Brick from General Refractories korrisville, Pennsylvania, plant vra.3 conducted May 23-25, 1966. Ninety-five per cent of the brick order was inspected. The plant has operated intermittently the past few years and only very recently began manufacturing basic brick. This was the plant' 3 first attempt at manufacturing Peratex Brick.
The per cent rejects during manufacture were very high due primarily to sticking
together of the bricks. Bulk density (164 lbs./cu.ft.), cold modulus of rupture
(2636-3305 psi), available from their quality control data, and the general appear
ance of the bricks were all good. Statistical sampling applied to one-third of the
order was used to obtain variation in dimensions. Length and width were good and
\ coincided with their quality control figures.1 The variation on thickness was ex cessive and did not coincide with their measurements1; also some arching was observed
V
(thickness varied on same brick from side to side). As a result, statistical sampling was applied bo determine thickness variation on all the brick available for inspection
(95$).2 Excessive thickness variation was confirmed.
General Refractories agreed to regage the entire order so that 95$ of the br: ok would be within a l/fl" (.125") thickness range (2.90n-3.Q2u). \
Notes: 1. Table I, Attached 2. Table II, Attached
May 27, 1966
Chief Ceramic Engineer
TABLE
THICKNESS
3 il
-
II
nm\
mm
. iHfm-
ft\l ;l! iHfiiil
KSH'Sltf Isr
II HttiKHfWlll
M HH Rfr-fS-Bft IS HttM-fttmii* II' iKt HttffH- irtt'fiff-HS'
rKfiftf KK (iff flrj ffif iiif I [ ftri {fit ffit lift jKrSf jj|f |sf
.titt.v ,it.% ff.o .QjtftjA:ei.
Acceptable
TABLE I
LENGTH " 9" '
1 tttt UK fttt
iiim . wflttii
rnf HH-ttfh
III fitHttiftr
.?/.? 3S;.o .0xtf.oi WIDTH ~ H-&"
m
UiL
.7g.+0M,`ftM.W.Sc>
.?i.%axs*.% W .0 ,oi,of.