Document 9J8eozYGzmJk8QG96kwjvLarp
DETAILS
1.
I. METHODOLOGY
At present we have no analytical method capable of measuring PCB's in plant effluent streams at a level of 0.01 ppb. Chromatographic interference present when analyzing any plant streams will limit our detection of PCB's to about 1 ppb. We report "no detectable PCB's" when none are detected at the 1 ppb level. Our method is accurate to about + 30%.
The Instrument itBelf is capable of measuring PCB's at the 0.01 ppb level but this would only be true if the sample were comparable to distilled water and the sample prepared at some point removed from the WGK environment. Background levels of PCB's in the WGK laboratory can distort results by as high as
5 ppb.
II. CURRENT LEVELS
Average or ranges of PCB levels in various streams are tabulated
below.
.
A. Department 246 zone Effluent stream
B. Waste Treatment Plant Influent. (Reflects plant losses and input from Monsanto Village and neighbor industries)
Discontinued sampling at this point pending installation of facilities to permit more reliable and representative sampling of stream. Past data ranged from 70 to>5000 ppb. Equivalent to 0.2 to 15 # PCB/day.
Monthly daily average value during past four months was 191 ppb with a range of 27 to 543 ppb. Equiva lent to 24 #/day average.
C. Waste Treatment Plant Effluent (Plow to river after removing scum and settleable solids.)
Monthly dally average value during past four months was 86 ppb with a range of 12 to 282 ppb. (Equiva
lent to 9 #/day average.)
D. Miscellaneous streams analyzed during past year.
1. River Raney Well Water
4 - 33 ppb
2. Ground Water adjacent to
Dept. 246
83 - 290 ppb
HONS 039184
2.
II. CURRENT LEVELS (continued)
0. Streams from
6-56 ppb
neighboring indus
tries (Midwest Rubber.
American Zinc. Cerro,
Mobil, Cooper.)
4. Tank Car Wash Water from Rip Track
6,000 - 150,000 ppb
5. Plant Cooling Tower Water
No detectable PCB's
6. Plant City Water
No detectable PCB's
XII, CURRENT TECHNOLOGY - Removal from aqueous streams
A. Filtration - Can remove about 80-9096 of the PCB that
are initially present. Have been about 3 ppb
after filtration of material at 40 ppb level
initially.
,
B. Carbon Treatment - Anniston data Indicate PCB reduction to 20 ppb by carbon adsorption of PCB and reduction
to 5 ppb when filtration follows carbon treatment.
Muriatic acid after carbon treatment has residual PCB content about 3-5 ppb.
Carbon treatment and filtration have permitted reduction in PCB content of tank car washes from about 50,000 ppb to 7 ppb.
C. Waste Treatment Pilot Plant
Pilot data Indicate reduction as follows. Average of two runs.
Influent Lime treated Sand filtered Carbon treated
77 ppb PCB's
27 ppb 22 ppb
7 ppb
At this time there is no research in progress to permit removal
of PCB from aqueous streams to values below the carbon removal capability of 5 ppb. Carbon treatment of all streams are not contemplated at this time.
MONS 039185
IV. CURRENT PROGRAM
a-
During the past four months PCB monthly average dally losses
as measured at the Waste Treatment Plant in #/PCB/day are as follows:
Waste Treatment Waste Treatment
Influent
Effluent
December, 1971
12 lbs/day
5 lbs/day
January, 1972
13
11
February March
47 9
24 8
It is believed the Waste Treatment Influent represents losses from the plant. In turn it is believed the major source of plant losses is the Aroclor department. Calculations and '
recent plant field data would indicate the major source of PCB to the sewer from the Aroclor department to be organics present in the HC1 off-gas. This premise is the basis for the control program that has been developed by the PCB Task Force Committee
that will permit control of PCB losses from the department, the
incinerator and the Rip Track at an average dally loss of about
1 #/day in the fourth quarter of 1972.
The program for PCB loss control that has been developed by the PCB Task Force and is currently being Implemented can be summarized as follows:
A. Department operational control - containment - and recovery of PCB's to-ln-from department effluent streams. Currently in effect and consists primarily of:
1. Off-gas temperature control and Brink's mist eliminator
operational control.
'
2. Settling basin operational control
3. Depts. 246-217 production coordination
4. Drip pan-bucket control of minor leaks
5. Dry clean-up procedure in place of profuse water cleaning of area.
B. HC1 off-gas and air blow scrubbing projects. Calculations and field sampling would Indicate losses of 14 to 31 #
PCB's/day can be present in the off-gas leaving the department.
MQNS 039186
IV, CURRENT PROGRAM
4.
B. (continued)
It la believed we can reduce this quantity by 953f by. additional scrubbing of the off-gas. Laboratory work is in progress to verify, and then a project will be
prepared. Estimated costs of $30,000 - $50,000.
.
C. Modifications to existing tank car wash procedures at
Repair Track to permit limiting PCB in wash water to about
400 ppb. This is equivalent to about 0.02 #/pcB/day when _
tank cars are washed.
`
D. Complete current project work
1. settling basin modification to permit improved separa tion of PCB from department Effluent discharge.
2. Major repair to main sewer from department to eliminate
cross flow of ground water and permit improved sampling and flow measurements of department Effluent discharge. A $50,000 project.
The current program should permit us to reduce PCB loss to the sewer to about 1 #/day from those areas where PCB contamination is a possibility. Namely the Aroclor production department,
the Incinerator and the Repair Track. 1 #/day would be equiva lent to 13 ppb from TjfGK plant assuming 6400 0PM total effluent
flow from plant. Any reduction in water flow from the plant to reduce costs of Secondary Waste Treatment would result in Increase in PCB content above 13 ppb.
It is also conceivable and highly probable that residual PCB in WOK soils will continue to be leached for months to come. It is ' estimated this amount could approach the equivalent of 5 #/day average (65 ppb at 6400 gpm flow). This amount would chow up in WOK Effluent streams.
V. COSTS
A COST
A. Department and off-gas system could be contributing about
. 30 # PCB/day.
B. Program to get to about 1 #/day sw 13 ppb from plant exclusive of
- residue pCB's in the total WOK ground system.
$100,000 major projects $100,000 minor projects,
analysis, research and additional technical . effort. Possibly $20,000/year operating cost;
HONS 039147
COSTS (cont'd)
C. Program to get to 5 ppb =><0.01 #/day by carbon treating Dept. 246 Effluent of 200 OPM.
D. Program to get to 5 ppb rssO.4 #/day by carbon treating total plant Effluent.
E. No process known to get below 5 ppb PCB In Effluent streams.
COSTS
1-
Costs not known at this time
Costs not known at this time
Costs not known at this time
Edward E. Stewart Technical Services Department
I
HONS 039188