Document 9J0oN26wnZY0beZNJ9BNenq3V
FILE NAME: American Cyanamid (AMCY) DATE: 1968 Oct 23 DOC#: AMCY018 DOCUMENT DESCRIPTION: Unpublished Internal Inspection Report
(
i
William R. Bradley and Associates
UVIIPNHINTAI HKAITH CONSULTANTS ttRCEN S T R t H NLWAKk, N. j. 07lui
1 U l 611 4146 October 23, I960
Mr. S. H. Thomas Director of Environmental control Owens Corning Fiberglas Corporation F. 0. Box 901 Toledo, Ohio 43601
Re: Environmental Health Investigetion Owens corning Piberrlaa Corporation Berlin. N. J. Plant
Studies on employee work environment were conducted at the Berlin, New Jersey Plant of Owens Corning Flberc.las Corporation September 23 throuv/h September 27, 1968. This punt processes initallation for flat surfaces and for pipes in various sizes and thicknesses, using asbestos, silica, diatomite and cement as main ingredients. The operation is known 33 the Kaylo process. Samples of work room air were collected to determine the concentration of asbestos dust3 and measurements were made of noise intensity at various octave band frequencies.
EXHIBIT
A dust exposure / U U for employees unloacinc, 00 cars of diatomite shipped in paper bays. The supplier should be urged to use a multi-wall paper bac of heavier strength and one with a dust proof seal. More care should be taken In the loading of box cars to prevent broken bags.
There is potential dust exposure at the second floor batch mix area during bag dumping. It is recommended that the hopper where bags are dumped be enclosed on three sides and mechanically exhausted to the bag collectors. Hie handling of empty bags is a source of dust. It is suggested that empty bags be placed in a mocnanicaily exhausted bin.
Oust counts in the area of the flatware line where the product is boxed or stacked on pallets are higher than ujsjrable. It is suggested that cartons to be loaded, travel on a roller conveyor that passes through a mechanically exhausted booth enclosure.
The design of dust collection hoods on the integrated line sawing stations should be improved in order to provide more complete enclosure. Oust counts are excessive at these stations, and it is recommended that employees wear
2 -
1
j I
^ | ^
!
' |
ii'*piratory protection until environnental control has been installed.
Dust control at the two band sawing stations for pipe needs improvement. Operators are exposed to high dust concentrations. The two band saw stations should have a separate dust collecting system rather than being "tied in" to one of the existing systems. Hood design for dust con trol should be improved.
work environment around the entrance to the Sid cylinder is bound to be quite warm and to have high humidity due to escaping steam, ngineerinc studies should be made to en close an exhaust steam to the outdoors.
.
,*n sir sample In the uowtherm boiler room shows that tiure is no exposure to Dowtherm.
Measurements for noise throughout tne plant show a nuisance level of noise being created by the release of conpressed air without the benefit of muffles, a high noise level exists in front of tns Sid cylinder due to escaping steam. This noise source adds to the background
-3 -
'
noise level of nearby areas of the plant. Noise on the
flatrare sanding linte is borderline and employees here should be monitored periodically with audiometrie testing*
Undesirable noise levels e<ist on the integrated line sawing equipment, enclosure of the sound source with accoustical paneling is desirable.
The Rotoblast equipment in the Mold Shop is noisy# but the main shop sound pressures e::ist in the lower octave band'frequencies. The problem is mainly one of nuisance sound intensity.
frr n r ( Z y a ,-:' . i.
villiam R. Bradley
-- V
I
-4
Sample No l
4*2
4 3
Location
MPielrliCounbsicofFooFtartoifcll eici
Breathing zone level of workmen in box car while unloading paper bags of diatomite (Eagle Pitcher "Celatom").
Batch mix floor while charging asbestos 7B, K3, S33, scrap, 11ms, iron chromite into west asbestos tank.
Batch mix floor while charging into south hydropulper. charging lime and diatomite by hand, cement and silica being charged by screw conveyor.
16.0
6.0 tS 5.0 i s
4 5
No. 2 line stripping area. No. 2 line pouring end.
3.1 \S
2.2 is
6 * 7
* 8
9 10
** H
No. 1 line pouring end.
No. 1 line stripping end.
Discharge area of pre-hardener during fork lift truck unloading.
In front of No. 9 Sic Condenser.
Operator's desk at rear of No* 8 Sid Condenser.
Flatware sanding at feed operator's station. (K-17)
2.3 s
3.5 U
IS ,
3.6
2.6 ts 1.9 yr
4.2
v * 12
Flatware line at top sander station. (K-17)
5.2 l*""
UJS r :i.*MPl>JS ( c o n t in u e d )
sample Mo
Location
J
Millions of Particles Per Cubic Foot of fir
**13
Boxing flatware and packing on skids. (K-17)
6.0 u '
*14 Feeder's station on billet line.
3.3 l
]
J 1$ Packer's station on billet line.
3.1 ^
**16
Integrated line sawing station on pipe halves. * **W
12.9
** 17
Flatware finishing line, packing
7.7
station. K-10 product sizes
2 x 6 x 36 and 2 x 12 x 36.
** 18
Flatware finishing line, packing station. K-10 product size 3 x 6 x 36.
6.8 * -
19
Shipping area at end of flatware
line. K-10 product size 3 x 6 x 36.
Carton closing and cluing.
1.4 O
** 20
integrated line, 3awinci k -10 product size 12 x 3 x 36 and 10 x 1.5 x 36.
13.8 .
* ?1
Integrated line wrapping and packing
3.9
station.
22
Integrated line carton sealing area.
2.2
23
Special assembly laminating jigs.
2.3
Pipe area.
24
Band sawing, pipe area 3/8 x 2 1 / 2 .
8.7
-6 -
JIV
OUST SW PLES (co n tin u e d )
sample No.
Location
25
center of warehouse.
Million of Particles Per Cubic Foot of n y
1,3
*26
outdoors 20 feet west of Mo. 3 and
3.0
Mo. 4 bag collectors.
*27
Mold shop at discharge end of
Rotoblast.
3.S L-
28
Hold shop entrance to Rotoblast unit.
29
Mold shop repair area, disc sanding
and arc welding.
30
Maintenance Shop, center of area.
31
Dowtherm boiler room.
2.9
2.4 i s
1.6 0.9
32
Box car loading 2 x 6 x 36 pipe
2.3
covering.
* 33
Sitrance to Mo. 2-B drier. Fork lift
3.0
truck unloading in drier, flatware
and pipe.
34
outdoor sample collected in salary staff 1.1
parking lot.
-A- **>
I
r .. I
7
NOISE MiS^SURjH^NTS
Sample Overall A
NO.
Level Scale 31 63. 125 2SO 500 1000 2000 4000 8000
X
90
86 81 80 60 81 78 77 78 86 72
2
91
89 80 82 82 82 80 80 80 86 70
3
95
89 85 84 86 90 91 82 79 73 73
4
92
83 83 84 82 87 81 78 74 72 76
5
93
90v 85 81 83 81 89 77 75 74 76.
6
90
85 82 82 86 82 80 78 75 74 76
7
100
9 9 '. 82 82 82 84 84 90 88 88 97
8
96
$
101
10
93
11
97
12
95
13
91
14
89
15
88
16
99
17 .. 91
13
91
92 *' 84 84 100*' 83 82
91 J 80 80
94^ 80 81 93V on 86 86 81 80 87 80 86 85 78 81 95* 86 86 89 80 82 89 80 82
84 82 81 82 86 85 92 83 83 82 86 92 98 96 79 77 78 80 84 84 89 80 93 84 84 88 88 87,* 82 86 85 85 91 87 92 77 87 77 78 80 76 78 79 78 78 76 76 74 82 77 77 74 73 73 72 85 85 85 87 87 89 96 89 78 82 80 87 84 77 75 78 82 80 87 84 77 75
8
noI s s u r . - : n es (c o n tin u e d )
sample Overall A
No.
Level Scale 31 63. 125 250 500 1000 2000 4000 8000
19
93
92 * 81 83 80 82 82 85 90 82 82
20
86
94 k 81 84 84 87 86 87 87 89 93
21
84
75 76 76 74 81 78 84 72 70 70
22
82
78 74 73 70 79 74 70 70 68 68
23
82
76 73 71 69 68 66 76 68 66 68
24
90
88 75 74 70 68 71 82 76 74 87
25
98
90 * 84 95 89 86 90 86 66 87 79
26
98
51 79 94 52 90 88 87 88 84 80
27
95
85 79 92 84 83 83 80 76 76 70
28
84
75 72 81 76 70 72 70 66 68 70
29
94
89 86 90 84 86 83 81 81 81 2
30
92
84 88 80 82 83 74 74 74 75 77
9
LOCATION OF NOISE Mi^SUKaMENTS
Sample No. 1
2
3 4 5 6 7 a 9 10 u 12 13
Location
Batch mix floor while charging asbestos 7B, K3, S33# scrap# Urns, iron chromite into west asbestos tank.
Batch mix floor while charging into south hydropulper. Charging lime and diatomite by hand, cement and silica being charged by screw conveyor
No. 2 line stripping ares.
No. 2 line pouring end.
,
No. 1 line pouring end.
No. 1 line stripping end.
No. 1 line stripping end# use of compressed air.
Discharge area of pre-hardener during
fork lift truck unloading.
.
in front of No. 9 Sid Condenser.
Operator's desk at rear of N0. 9 Sid Condenser.
Flatware sanding at feed operator's station. (K-17)
Flatware line at top sender station. (K-17)
Boxing flatware and packing on skids. (K-17)
10
l#C.rTION OF* HOIS el Kti'SUKJMgN't'S (continued)
Sample NO. 14 15 16 17
18
19
20 21 2? 23 24 25 26
Location
Feeder's station on billet line.
Packer's station on billet line.
Inte^ated line saving station on pipe halves.
Flatware finishing line, packing station. K-10 product sixes 2 x 6 x 36 and 2 x 12 x 36.
Flatware finishing line, packing station. K-10 product sixe 3 x 6 x 36.
Shipping area at end of flatware line. K-10 product size 3 > 6 x 36. Carton closing and gluing.
Integrated line, sawing K-10 product sixe 12 x 3 x 3(, and 10 x 1.5 x 36.
Integrated line wrapping and packing, station.
Integrated line carton sealing area.
Special assembly laminating jigs. Pipe area.
Band sawing, pipe area 3/8 x 2 1/2.
Mold shop at discharge end of Rotoblast.
Mold shop entrance to Rotoblast unit.
11
loc.*tio:: of NoiSi: ms*"UH.Smbkts (continued)
Sample No 27
28 29 30
Location
Mold shop repair area disc sanding and arc welding.
Maintenance Shop, center of area.
Dovttherm boiler room.
Box car loading 2 x 6 x 36 pipe covering.
J
( -1 2 -
4
MAIII BATCHES A3 ASbdSTQS
K-10 Batch
K-3 or W-3 S-33 7-D
6%
63%._2%_
15%
K-10 Batch
X-3 or K-3 S-33 7-D
9% 3% JBL.
15%
Core Batch
S-33 4-T
9.1% 3.9%
13%
K-20 Batch
V-3 S-33 4-T
2% 10%
B.3%
20%
Silica minus 325 mesh - 99% SO2
Olatomaceous arth Nevada minus 325 mesh 85% Si02
14