Document 9G2Bgr3Eynk53XmqqEnVXknR
RG 002165
ASBESTOS ACTION NOTIFICATION INFORMATION
1. Date of Notification: January 2, 1991
2. Group: Health Care Group - National Medical Care, Inc.
3. Division: Dialysis Services Division
4. Facility Involved:
Old Pittsburgh Paint Store 3500 Little York Road North Houston, TX
5. Facility Manager: Charles Beverly - Area Project Manager
6. Primary Contact: Lawrence K. Park
7. Type of Material o Floor Tiles and Mastik o Ceiling Tile o Thermal System Insulation - Fittings
8. Location Within Facility: Front portion of one large room (Showcase Area)
9. Approximate Date of Installation: (If Known) Unknown
10. Approximate Quantity/Extent of Material: 7500 square feet
11. Present Condition; Description of Inspection/Testing To Date: -4 samples consisting of: o Floor Tile (5-10% chrysotile Asbestos) o Floor Mastik (10-15% chrysotile Asbestos) o Ceiling Tile (1-5% chrysotile Asbestos) o Thermal System Insulation (5-10% chrysotile Asbestos)
For the present condition of ACM, the consultant performed a risk/damage assessment summary of above materials which can be found in Appendix A.
12. Action for removal has not yet `'commenced" but is in planning stage
13. Description of scope and cost of action taken/planned to be taken.
Due to proposed mandatory relocation due to operational needs
003081
and required renovation of space, plans include the removal of said floor tile, mastik, and ceiling tile and thermal system insulation. Currently, the cost of planned action ranges from
$52,375 to $36,164 (4 bids were solicited).
14. Date(s) action taken/planned to be taken
As soon as possible-pending Grace approval.
15. Reason for action:
Floor tile is "dried out, cracking and coming up easily" - in essence, delaminating and is in bad condition. Renovation is required in said area.
16. Contractor(s) involved: Name, Address, Phone, Function of Each.
Bids were submitted from the following contractors for the removal of the ACM:
(a) Olshan Asbestos Removal 502 Live Oak Houston, TX 77003 713/225-2540 Bud Wilson
$44,625
(b) Hazard Assessment Leaders and AEMS Houston, TX
$36,164
(c) Young Environmental Services and AEMS $38,460 55 Lyerly, Suite 301 Houston, TX 77022 713/697-4126
(d) D.L. Whitton & AEMS 2476 Bolsover, Suite 233 Houston, TX 77005 713/664-5056 David Breson
$52,373
Asbestos Management/Project:
(a) Asbestos Engineering & Management Services (AEMS) 13101 Northwest Fuy, #316
Houston, TX 77040 713/460-2367
003082
Appendix A 003083
DEC j vro
L. RISK/DAMAGE ASSESSMENT SUMMARY
FDMS DALLAS
Summarized below are the findings of the asbestos-containing floor materials found In a "limited scope" Inspection at the Pittsburg Paint Store (3500 Little York):
Floor Tile Risk Assessment: Moderate
Recommended Response:
Because renovation activities are planned, floor tile may be covered over if done properly and not "disturbed" or rendered friable (crushable by hand pressure) in the process. Individual floor tiles are very brittle and "pop" up easily which would provide
a poor base for another floor tile layer. Carpet over floor tile and mastic is only practical alternative to removal.
Floor Mastic
Risk Assessment: Minimal
Recommended Response:
Remove floor mastic only if material will be "disturbed" during renovation or demolition activities. Material is enclosed by floor tile and presents a minimal hazard to human health unless exposed. New floor covering should be applied over
existing floor tile or mastic material needs to be addressed.
Celling Tile
Risk Assessment: Minimal
Recommended Response:
Some water and physical damage has occured. Recommend removal and replacement of damaged tiles. Do not allow any work (electrical, HVAC, etc.) to be performed on or above ceiling without first addressing asbestos situation.
Thermal System Insulation
Risk Assessment: Moderate to High
Recommended Response:
Fittings appear to be from connection to a hot water heater that has since been removed. Area around fittings appears contaminated from removal of heater and requires "minimization" procedures before occupancy. Recommend removal of fittings before installation of new hot water heater.
003084
003080
ASBESTOS ENGINEERING fc MANAGEMENT SERVICES, IN C . (ASMS)
''E s tim a te d Removal C o s t" in c lu d e s c o n t r a c t o r 's sum, e n g in e e r s fe e , and la b o ra to ry c o s t, b u t does c o t in c lu d e