D. C. Skokna March 25, 1991
ABEKDKEV MDITffiJ PROGRESS IDOKT FEBRUARY, 1991
There was one first aid and one recordable (MT) injuries reported in February. The recordable injury involved a mechanic who picked up a hot bearing heater and suffered minor second degree burns on two fingers. As of February 28, 1991, the plant's employees have worked 4,256 days (5,687,388 manhours) since the last lost time inj ury.
PVC Production, MM Lbs. Reactor Stream Factor, % Resin Quality, % Prime VCM Efficiency, Lbs./Lb. Flexible Compound Production, MM Lbs. Flexible Compound Quality, % Prime Rigid Compound Production, MM Lbs. Rigid Compound Quality, % Prime Plasticizer Production, MM Lbs. Plasticizer Quality, % Prime Energy Use, (EUI, %) Fixed Cost Variance, $M Variable Cost Efficiency Variance, $M
Operations
Februarv
36.2 87.8 98.1 1.01995
3.9 96.5
4.0 99.9
1.5 80.7 < 13.8> 36.3 52.4
Y.T.D.
201.1 88.2 98.6
1.02338 22.4 96.7 23.0 99.6 8.0 85.8
96.0 34.8
A
rH
V
Resin production was reduced to lower product inventories. The second phase of VCSM training was completed with the dryers being switched over to the new system planned for March.
Both rigid and flexible compound production rates were reduced to lower product inventories.
Improved steam stripping procedures in the plasticizer unit im proved the residual alcohol Cpk from 0.04 to over 1.0.
Costs
Fixed costs were $36.3M favorable primarily because of payroll which was $54.4M favorable, offset some by benefits clearance that was $31.7M unfavorable. The other categories were near budget.
Variable costs (efficiency) were essentially at budget.
VAB.0001189781
T. H. ftiffim 03/25/91 Abcrdatn Monthly Progress Report Pago 2
- February t
1991
m All natural teams net during February.
m Vinyl "A" shift made their management presentation. Their efforts reduced nitrogen use 30%.
i On 2/21, AT&T visited the plant to present us with their "Certified Quality Vendor" award. Vista is one of fourteen suppliers (out of 800 active suppliers) to receive this award.
We met with the State to review the method used to set our new NPDES permit parameters. Also, we sent a letter stating that we felt the proposed 10 ppm BOD limit is too stringent. The State agreed to re evaluate the limit.
A test run using "superbugs" started this month. These bacteria are more efficient in assimilating the contaminants present in our wastewater.
The State approved the delay of the remedial investi gation as requested by DuPont. The report is now due April 26, 1991. A second geo-physical study success fully found the buried drums we could not locate during an earlier study.
We met with the State on renewal of the air operating permits in particular about which VCM unit risk factor is correct. Our contractor, Clement Inter national, presented their work to determine the correct factor. The State agreed with Clement that the factor they were using was incorrect. The State wants to verify Clement's work with EPA and wait until the VCSM project is complete before they will renew our permit.
D. C. Skokna Plant Superintendent
rah
VAB.0001189782
Hems ton
J. D. Burns
X
R. T. Ferrell
X
T. H. Huffman
C. J. Matson
D. F. Harman
H. R. Flammer
R. R. Smith
B. J. Bean
R. H. Gerlach
R. D. Gamblin
Austin
R. L. Poe
X
H. J. Hall
H. D. Garrison
LCVCM Plant
P. D. Carrico
LCCP Plant
J. Friend
LCIAB Plant
J. V. Ware
X
Baltimore Haaunond
L. R. Bauer J. Pavao
X X
C. R. Miller
Premiere
P. L. Foote
Aberdeen RVS/DCS (File Copy), TJA, JBA, JEB, JME, SCH, HRK, DAB , DAM, RBN, JEN, JDO, REP, BLT
X X X X X X X X
X X X X
X
X
A
wmhmnmnwpmmpwhmmmv
VAB.0001189783
ll^^i ii 1
SAFETY - B. L. Trego
First Aid OSHA Recordable
Total Injuries
Number of Restricted Workday Cases Number of Lost Workday Cases
1 1
2
0 0
Fiscal
Fiscal Y.T.D. 1990
32
00
Vinyl Operations Compound Operations Maintenance
H.
Laboratory Re c e iving/Warehouse Office
Totals
010
032 276
000 000
1
29
Cuts and Abrasions Eye Injuries Burns Bruises S trains/Sprains Stings Other
Totals
03
00
12 02
13
00
a _2
2 12
2
1
2
1 0 1
Lost Workday Cases Days Lost
Safety Rg^prd
Last lost time injury - 7/5/79
Days since -
4,256
Employee hours since - 5,687,388
On February 28, 1991, the employees of the Aberdeen plant completed 4256 days with no lost time injury.
Topic for the plant safety meetings during the month was "Health Training".
VAB.0001189784
SAfEii - Continued
Routine dosimetry results for the month were:
Chemical
<_________________________
Number
;> PEL
Number
Percent
VCM Lead Total Particulates
70
98.6
1
6
100.0
0
6
100.0
0
The single VCM overexposure was with benefit of a respirator.
Inlurv Class MT
FA
Department Maintenance
Maintenance
Bum - index and middle fingers of right hand.
Strain - right wrist.
A
VAB.0001189785
*
- T. J. Arbeitar
All of the plant's natural teams met during the month of February. It was previously reported that two teams failed to meet during the month of January. In fact, only one team failed to meet. This was a three-member team scheduled to meet the last week of the month with two members absent the final week due to illness and funeral leave.
The Vinyl A-Shift Natural Team made a presentation to management on February 25. The team studied nitrogen use in the plant and identi fied the sources of leaks. Through engineering and operational changes, nitrogen use in the plant has been reduced by 30% since August, 1990. The team recommends converting to bulk nitrogen when capital is available. This will further reduce nitrogen losses and eliminate the safety hazards associated with handling nitrogen cylinders.
Other natural team highlights for the month included:
The Vinyl C-Shift Natural Team continued work on their project to reduce VCM levels in discarded VCM filter packs. Initial results seem to indicate that procedures will allow for the disposal of the filter packs as non-hazardous waste.
m The Vinyl Operations Supervisor's Natural Team is currently working on a project to update all of the vinyl operating procedures. This project is not only critical to dally operations, but will also allow for compliance with new OSHA regulations and ISO standards.
The Senior Process Engineer's Natural Team (Steve Hillman) developed experimental design examples to be included in the DOE handbook they are preparing.
The Senior Process Engineer's Natural Team (Mike Kane) began work on their latest project - the development of a statistical reference manual.
The Plant Manager's Natural Team finalized the selection of cash flow improvement projects totaling $1.25MM annually and began work on these projects.
The Safety Director's Natural Team finalized plans for the respirator fit testing project.
The Warehouse/Purchasing Supervisor's Natural Team continued work on their inventory reduction project. The team selected vendors to be contacted on the sale of excess materials.
iMUfflP
VAB.0001189786
+ Ht-
On February 21, AT&T came to Aberdeen to present the plant with their "Certified Quality Vendor" award. Vista Aberdeen is on# of only fourteen AT&T suppliers to have achieved this quality vendor status (AT&T has 800 active suppliers). Aberdeen personnel and AT&T worked together through several audits to improve the quality systems at the plant. Vista supplies AT&T with 34862 grey compound used to make cable jackets. AT&T will no longer inspect incoming Vista compound.
VAB.0001189787
HOST VABTAWC1M . D.
PVC Flexible Compound Rigid Compound Plasticizer
Total
$ 43.3 < 37.2>
98.2 < 0-3>
$104.0
$28.9 2.3
< 1.2> 22.4
$ 52.4
<$344.4> < 227.0> < 202.8> < 70.0> <$877.2>
Total
<$305.2> < 261.9> < 105.9> < 47.9> <$720.9>
these products was close to budget.
The overall efficiency variance for
VRP yields were better than budget mainly because material not accounted for last month was recovered in February.
Price
VCM Resin to Rigid Compound Resin to Flexible Compound Alfol* 610 Plasticizers Phthalic Anhydride Colors Natural Gas Other Price Variances
Total
<$387.7> < 189.7> < 116.2> < 40.6> < 45.4> < 37.2> < 17.6>
24.9 < 67.7> <$877.2>
Fixed Cost Variances
Variance - SM
m Payroll andBenefits MM&C i Miscellaneous TI&D m Clearances
Total
$ 22.7 8.2
< 0.5> 5.9
< 0> $ 36.3
Ik
VAB.0001189788
HOST VABTAMCKfi - Continued
Payroll and Benefits
Payroll costs were $54.4M favorable while benefits were $31.7M unfavorable.
MM&C
This was essentially at budget.
Removal of asbestos from two
plasticizer reactors (caused by a small fire under the insulation)
prevented us from having a larger favorable variance this month.
Moving, Home Assistance - <$19.6M> ynclassified - <$10.2M>
VAB.0001189789
*
VIHYL - J. D. Olson, D. E. Knlttlg
The Vinyl Department had no first aid case or OSHA recordable injuries during February.
The monthly safety meeting topic was "Health Training".
General
1. Inventory control was implemented to meet the production target of 37.0MM pounds.
2. The second phase of VCSM training for vinyl operators was completed. The dryer panel training included a review of the DCS dryer operation, operational programs, and "hands on" practice.
3. The resin raw materials in the 744 account were valued at $261.0 M.
Feb.
YTD
- Production, MM Lbs. - Daily Rate, M Lbs./C.D. - Capacity Utilization Factor, % - Total Reactor Charges - Charges/C.D. - Reactor Stream Factor, % - Rotary Dryer Stream Factor (#4-#8), - Fluid Bed Dryer Stream Factor, % - Resin Quality, % Prime
%
36.2 1293.5
101.4 849.0
30.3 87.8 93.1 99.6 98.1
201.1 1330.9
104.4 4673.0
31.0 88.2 93.3 97.0 98.6
Reactor Downtime
Hours
Operational downtime (recovery scheduling conflicts, charge/rinse water conflicts, Q.C. data delays, dump conflicts and inventory control).
354.0
Maintenance downtime (VC charge line plugged in Old Module, power outage, transformer problems, maintenance on D744 gearbox, D600 rupture disc and relief valve replacement, removing Old Module chem wash lines, hydro blasting D745, hydroblasting and drilling D744 condenser, and BUS-80 maintenance).
466.0
\
VAB.0001189790
VINYL - Continued
Operational downtime (centrifuge plugs, dryer cleaning, flameouts).
Maintenance downtime (centrifuge maintenance, baghouse screwfeeder maintenance, preventive maintenance, and exhauster work).
Reactor limited production.
31.4 33.5 35.2
J. B. Autrey, S. A. Truitt
All old chem wash valves were pulled out of the Old Module. The valves will be used in upcoming projects and as spares.
m Since reactor 600 is not currently running low mole resin, the original relief valves and safety discs have been re installed.
Temporary repairs were made to #6 dryer exhauster. Excessive vibration is causing balance problems. The exhauster will be changed out in March.
The motor on #6 dryer had to be replaced because of bad windings and bearings.
Reactor 745 was brought down for hydroblasting and acid cleaning on the water side of the condenser. Problems with contamination had developed, but were brought under control.
Reactor 744 was also brought down for hydroblasting in an effort to control contamination.
I&E personnel completed training on the UPS feed systems for the new vinyl control room.
A
VAB.0001189791
CQMFOmg) - J.E. Bickerson, K.6. AHn
SUffttY
The Compound Department had no OSHA recordable injuries in February. The topic of the monthly safety meeting was "Health Training".
general
Control of costs and inventories continued to be a high priority during February. Combined flexible and rigid compound inventories fell another 1.47MM pounds during the month. Lines were operated only on an as-needed basis and operators from shutdown lines were utilized to cover vacations and other absences to reduce overtime costs.
Repairs to the Line I roll mill lubrication system and a Line III ribbon blender were responsible for some abnormal maintenance downtime.
The use of new steam stripping procedures in the plasticizer unit have improved our residual alcohol Cpk's. Before the new procedures were in stituted, the Cpk was 0.04. The current Cpk is 1.0 and more improvement is possible.
Operating
Line I
27.5
Line III
21.5
Line V
9.0
Total
% Prime
Capacity Utilization Factor
1651 1911
301 3863 96.5 46.2
60 89
140
Downt ime
Hours
Line I
- Product Changes - Hill Maintenance - Quality Problems &Control - Miscellaneous Maintenance
83 30 28 16
Line III
- Product Changes - Miscellaneous Maintenance - Quality Problems & Control - Blender Maintenance
57 32 18 11
8417 12762
1232 22411
96.7 55.7
*
VAB.0001189792
COMFOUHD - Continued
Line V
- Miscellaneous Maintenance - Product Changes - Startup/Shutdown - Quality Problems & Control
24 23 23 10
Operating
Month
Rigid Compound
23
% Prime
Capacity Utilization Factor
3975 99.9 67.2
173
Downt ime
Hours
- Quality Problems & Control - Product Changes - Miscellaneous Maintenance
51 45 37
Operating
JLJL.
23030 99.6 77.8
Plasticizer
28
% Prime
Capacity Utilization Factor
1450 80.7 77.0
52
Key Maintenance Work - J. B. Autrey, S. A. Truitt
7951 85.8 84.4
Line X "B" blender gearbox seal was leaking and was replaced.
The vacuum blower was pulled and cleaned. Pluggage was suspected when the system was not operating properly.
The Line V CPU board was replaced in the Orbitran panel.
VAB.0001189793
BKT1HBTWP. - R. R. Polk. 8. C. Hillman, M. R. KlM
GioncAT.
The Class "A" design was finalized. The project was submitted for approval as a part of the Third Fiscal Quarter 1991 Capital Budget. The project will replace the two existing Gump screeners with two sixty-two inch Kason screeners, resulting in significant improve ments in the ability to meet customer oversize particle specifica tions .
The test of "superbugs" is continuing. Initial analysis results show single digit BOD values (8 ppm) , down from 30 ppm prior to the test. The impact of the "superbugs" has been positive; the test will continue through the middle of March.
Current operation has centrate being sent to the sewer after having heat recovered and water stripper effluent going to the cooling tower. At present, the antis tat being used on the rotary dryers (wet calcium stearate) does not allow the centrate water to be re cycled to the cooling towers. The wet stearate fouls the towers and the equipment in the cooling water system. Until a suitable substi tute is Identified, the current operation mode will be used.
Two HA20PS were issued for review in February. One was for the Incinerator Replacement Project and the other was for the Dry Blend Screener Project.
Initial conversion of process equipment to the DCS was completed successfully. Dryer number 1 started up with no major complica tions. Conversion of the remaining rotary dryers will continue in March and should be completed by early April. Operator training and qualification testing is about fifty percent complete. Also, the DCS operating system software has been upgraded to version 10.0 which Is the latest version available. The project continues to progress as scheduled.
A
VAB.0001189794
h.
ENSINEERIH6 - R.E, POU, 3.C. HILLHAN, R.R. KAK
AIERKEM CHERICAL PLANT APPROVE) CAPITAL PROJECTS
A
AFE HMKR
PROJECT OESCIIPTIW
STATIS
A8M
*mn im nkuk
CLOSE) TS FIELJ CHAtBCS.
AS19 run tuciucK mp
THE PROJECT MIL K ClttCI II FIEII CRAMES ill NK.
AA49 nn. cwm.sma mkmbitiw
tk ni mmm is m site, mmm if m mm is planki fii rmci am anil.
A909 inn antHNncuiM IS11 rai utm MiinuTiM
TW PROJECT HU K CUK II FIEII CIMMIS 1NMRCN.
mm is samo n kin in mi.
M29 rWMMMMMMI IBfMfll.fHmB I1fBtlMlMWIffItI CII9ltTIUfl
INSTALLATION II CONFUTE EICEPT FN POWKIST ITEAS. FIELI CL8S8IE IS PLANKI FN MtCI.
0749 LEM RANHMI AM IIPMMI IflHfTIM
imtalutim is a mmn im mmm planki fii macs.
1149 cmw life i mi-pi ummmuk ciTMcn is i mmm m planki fm cnputim in inch.
)8S9 CMMM
MU
imiauaum is impute assn fm unmust item.
1)899 RAILCM CLMNNO MM
mm is nmms. project cmpletion is planki fm nay.
F699 LOO ROLECNLM IEIMT KSIH EXPANSIOH
the project sill k assEi rs fieu csmses in mki.
F779 MYERS NMAS COWMfNATION IEIUCT1IN ASIITIML PMHUSI ITEM ME UMtt COMIKIATION.
6159
Uffll
rmM
Uftft
umiMiMKM i
1M M1IIMMMM IF MM II C0MU1C AM IK PROJECT MILL IE CLOSE* TO Fiai CNAMES IN APRIL.
5819 VCR SINT MAM KPtACEKMT
CLOSE) TO FIEU CSMKS.
6039 PLAMT RATER HMOl
TK PROJECT IIU K CLOSE) TO FIELI CHAISES IN AMIL.
1570 hi mu rnmnnsni tain
KSIIN IS MMIEIEb IMTALUTIM IS PUMO FM 7/91.
1510 KtHBI M> Mr MUM KUEF
KSIIN IS CflMUItfr IMTALLATION IS PUNK! FM 7/fl.
0180 PLASTICIZER L0A0IM AM MUAIIM KVISIOHS KSIIN IS IN PM0KI1 HITS CNPIET1QN PLANK) FN RAT.
/ FASO un win* in knctim
comtmchm IS MflMKSS llfl CMPLETIIN PLANE) fm APRIL.
FAAO KCALCIF1D M1KL
MMTMOTM H IN PMMISSIITR CWPUTION PilMK) FM AWE.
OSAO TC SPIU CDNTAIHNEHT
INSTAUAT1M IS CIMIETE EXCEPT FN PUNCHLIST ITERS.
SAID TC CORFUANCf PROJECT
INSTALLATIN IS CMPLETI EXCEPT FOR PRNCKIST ITERS.
6A30 REACTM SLUM! STRIPPIM OPTIRIZATIOH IMTALLATIM IS CMPliTE AM TK STSTIS OPERATIONAL. FIEL) CLOSURE IS PLANK) FM APRIL.
H500 PLANT jj-RA-Ti M STITEH HS10 KST 1KIKMTM IfFUCPENT
EMINKIIM IS IN PMMISS. PROJECT CARPIETION IS PIANNM FM LATE-1991, KUHRT IF TK INQNEIATM IS PLANK) F9R 3/91. PROJECT CMPtETION IS PLANK) FM 5/91.
HA20 EAST IKWIW KILACEKHT
KLIKST OF TK HKMMIIM IS PLANK FIR S/ft. PROJECT C0RPLET10N IS PLANK) FOR 7/91.
H501 iiisceumm (trim mnrs < tin EMINBIIM II IN FNNCSS ON IS PROJECTS.
H521
REPLACE**! IIKKK VISC0I1TT ANALYZER i
THE EIOJPNENJ Nil ION RECEIVE) AN) TIE PROJECT SILL BE CLOSE) TO FIEL) CHAISES IM MARCH.
HS31 BOILER FIENATE! TAM KPIAKKNT
mm IS SCKMLE) TO KOIN IH RARCH.
VAB. OOO1189795
J*
F. 6. Jeanion
Water
All wastewater discharge parameters were met for the month of February.
We met with the State Water Quality Department to review the modeling procedure used to determine our permit limits. They agreed to run some additional ca**s of mur outfall'varying dissolved oxygen anil flow in James Creek. In addition, we talked about verifying the model with actual data that we would gather in the summer and what was involved in obtaining a winter 7Q10.
A letter was sent to the State informing them that we feel the new 10 BOD permit limits in the revised draft NFD3SS permit are too stringent. The State responded verbally to our letter and said they war# re-evaluating the permit limits.
The State was in the plant this month for their semi-annual inspection of our wastewater and stormwater samples. They collected samples from all four of our outfalls.
A letter was sent this month notifying the State of two changes made to our boiler and cooling tower chemicals.
A test run of superbugs" was started this month in our wastewater treat ment system. Some BOD reduction has occurred since we started.
iii
Superfund
The State approved the delay of the remedial investigation final report as requested by DuPont Environmental DERS. A meeting was held with Conoco and DERS to discuss the test results from samples taken of and around the superfund sites. The final report for the remedial investigation Will be complete at the end of March. This report is due to the State on April 26, 1991.
A second geo-physical study was completed to find the buried drums. This time it was successful. The drums were found fifteen feet below ground level. A drum removal clan is being out together bv DERS.
An audit of Sun Polymers by Conoco and Vista was completed this month. Conoco is interested in evaluating the option of drying pond #2 resin here in Aberdeen. A meeting will be held next month to discuss all options.
Waste
Waste shipments during the month included:
One bulk shipment of floor sweepings to CWM in Lake Charles, LA.
m One bulk shipment of separator oil to M&M Chemicals in Gadsden, AL.
VAB.0001189796
HUMP
F. G. Jeanson - Continued
A meeting was held with the State to discuss our operating permit renewal. The meeting was centered around the unit risk factor controversy. Our contractor, Clement Int. , presented the work he had done to determine the proper unit risk factor. After some discussion, the State agreed to the lower risk factor. The State wanted to verify Clement's work with EPA in Washington and wait until the Vinyl Control System Project was complete before they renewed our permit. They said our permit would stay in effect until that time.
The annual Vinyl Institute environmental survey was completed. Once again we had 100% compliance.
An environmental presentation was made to the 20th Century Club.
I attended the annual legislative reception held for our Representatives and Senators.
The resin claim dryer has been sold. p ayment.
Sun Polymers made a 10% down
The every four years TSCA report was completed and sent to EPA. This report summarizes the amount of certain types of plasticizer we manu factured in 1989.
- J. &. Ganc
A. Unadj ueted EUI
<14.8%>
B. Adjusted EUI
<13.8%>
C. BTU/Lb. Product
2883.7
D. Total Energy Consumption MMM BTU 131.2
< 7.9%> < 7.1%>
2740.0
689.2
Boiler
No. 1 No. 2 No. 3
83.4% 83.3% 82.9%
83.1% 83.3% 82.8%
All three boilers operated all twenty-eight days of the month.
VAB.0001189798
A
None
J. E. Beall
Melvin Tallie, Development Technician, Laboratory Reduction in staffing - employee exercised seniority into Lead Technician position.
Dave Gathings, Jr., Compound Operator, Compound Department - Promoted to Compound Shift Supervisor.
Douglas Knittig, Process Engineer, Process Engineering Department - Promoted to Operations Engineer (replacing James Vinoski).
None
None None
VPVMP
wm
j
VAB.0001189799
15 12 40 23 37 33
5
165 75
90 50 80 62 21 1 10 1 20
61 4 6 18
60% 42% 20% 26% 57% 30% 40%
37% 8%
0 0 0 8.3% 2.7% 3.0% 0
0 0 0 0 1 0 0
2.4% 24%
0 0 0 0 1 0 0
iMJJiW*1
U*M*WT
9800
%
A
DEPARTMENT HOURS ANALYSIS REPORT
/DISTRIBUTION LIST RNS, JFC, JVU, DEPARTMENT HEADS, FILE
2 4/91 THRU 3/ 3/91
cncoco <c
fmm
4
Ul 8ui
VAB. OOO1189801
O) s
Cu SiXI
&
CJ oc
WtS
5% <E:3<n>rn uw w
to
LU <cUoiMCnO
/
tiii
iCn\*
SP
to (O CO
s
5
NPW
T\
VAB.0001189802
- D. A. Barclay
There "were no reportable safety Instances this month.
All natural teams met in February. Statistic*
Processed Invoices Working Fund Checks Written Cost Savings Through Bid Process
Packaged
944
12
$5277
62 $17497
(Decrease )
Compound "A" Grade
PLENEX
*
Compound Off* Grade (BC)
CompoundOff-Grade (H)
MillscrapC*)
Dry Blepd "A" Grade
Dry Blexp Offgrade
Resin Type I
Resin Type *iC"
Vacuum Qftst
Total packaged Warehouse
3,960,418 80,945
889,372 57,750
116,100 449,495
50,074 367,470
36,950
6,310,588
* Include PLENEX millscrap and cleanout.
1* 1 kA iip Mp ifiEX
w
4,035,813 64,682
734,449 73,172
132,457 312,968
44,605 636,800
37,600 327.141 6,399,687
75,395 < 16,263> <154,923>
15,422 16,357 <136,527> < 5,469> 269,330
650
89,099
i
(Decrease)
Compound "A" Grade Compound Offgrade Dry Blend *A* Grade Dry Blend Offgrade Resin "A" Grade Resin Offgrade
Total
2,272,254 552,350
2,118,423 879,940
10,983,350
___ lSd,100
16,962,417
1,774,593 368,450
1,550,810 1,057,260 5,926,210
___ SSjhlSQ
11,257,573
< 497,661> < 183,900> < 567,613>
177,320 <5,057,140> ____424.150 <5,704,844>
VAB.0001189803
1000
gWUHMLMk m
91
osno
03/90 06/90 10/90 12/90
03/90
07/90 01/90 11/90 01/91
PKGTD PRODUCTS INVENTORY
VAB.0001189804
3
g gs
tn to
s
Sf
S
IO CM
tn
i ii
ll
8E
to cn
ss
t
"i
s
CM CM
M K>
CM CM CM CM
m
PT
lO
to
IS
to to to o
.^
m cn
ui
cn cn to
Ui UU UI
ddd
iiiii
CL dL ^ dL a.
CM SSSRIf-s
HISSSI32S ss
?f I? ?N W M
c ^ 4 r
5553SS
S S & op s s
opo^oo
^ ^ O' CO O' f
ir g ^in i g 5 R s I
oStSSSoSSc*
K-- cu CD
to
I to
cc
s
a as il
cn to =3
t-1 DC
m m mM3 CM CO
m cd -- CM O
CM CM *M CM CM CM
uo no
? CM I Ol NO
g ch m q
o- CO
irk op m
cn i
i NO co
mH 5 25
9o o
NO NO NO NO
-4 m o NO rn
NO NO NO NO NO NO NO NO NO NO
CM 4T NO N*- NO NO NO NO
a$s CM CM NO CM
3 O t*o HO
O HO
--4 NO
CD CD
HO CM
CM NO
CM NO
CN* HO
NO NO
NO NO
NO CM NO
cn cn c0n0 cn
ss
St
CM CM
CM CM HO HO
-M NO
CM a
M g g gj g "ui tn
S3S8S
m
>tn a cn
s
cn
CD
HO
MO
NO CM CM HO NO CM -- *--
3 Si 8
HO HO HO HO c*
NO NO CD NO ZD
HO CO CM UO
81
NO NO
uO HO
i7
S3!
"38
iti
CM CM CM M* Ml Ml
CD
5 3) Mg CM CM CM
CD UO CD
HO O V
-4 Ml CN C tt *o HO NO CM
CM
tI
NO NO
S NO
II CCNMM OCCMM*
I ts
o o
?
O Q
?
O
O
r*
11 1 11i
N* NO NO NO NO NO NO
9^ CN CM CM CM CM CM CM
II CM
I
cn cn
ss
cn cn in cn
U CJ
HO UO
MMWMPMHMV
8
cn cn
3
F4._ i CM CM
Biisiliiii
cn cn cn cn
cn
I a
S8
IX
cn
5:
- *i
CM CM CM CM CM CM CM CM CM CM
at
83
tn
Ui
CnCM CM CM CM
mrnmm
tn
CM
Su
mm C t.a
BOXES
A
CO
3SS to to c a
tJ CU CL
uu
2 tt tfc
fsS
MO CM --* CM CM
a aCM
CM ~
&
CO
I NO
II I ccmo <en po
S S8 5
SCM CM
N2N
** ^9
NO NO NO NO NO
3
HO CM NO NO
!-
Q CM
S3X08
3 tn
^CJ CM NO CN* CM X CM o
auu
M
8
II R HO
8
8
z> tn
s
II NO
I I-*- nk I HO i i CM CO
NO
HO
O
l
O O* II
CD CD NO NO
CO O g>
tn cu
tn
UU
tn u cn w
cn u cu CD
i cn
CJI
tJ tUni tUni
Ou Ct
UO HO UO VAB.0001189805
CM CM CM CM
mm
ABERDEEN CHEMICAL PLANT SNIPPING ANALYSIS FEBRUARY 1991
-SNEPMEMTS BY PRODUCTS-
PUBLIC
RESIN-BULK RESIN-PACKAGED
18,790,220 201,638
FLEXIBLE COMPOUND-BULK
843,530
FLEXIBLE COMPOUND-PACKAGED 2,743,789
NEW BUSINESS
500
RIGID COMPOUND-BULK RIGID COMPOUND-PACKAGED
3,803,040 391,923
TOLLING - BULK TOLLING - PACKAGED
0 0
PLASTICIZER
43,720
TOTAL
26,818,360
*SHIPMENTS BY NODE BULK:
FEBRUARY* RESIN FLEXIBLE COMPOUND RIGID COMPOUND PLASTICIZER
RAILCAR
162 8
24 3
TOTAL FEBRUARY
197
YTD* RESIN FLEXIBLE CONPOUNO RIGID COMPOUND PLASTICIZER
834 53
114 11
TOTAL YTD
1,012
PACKAGED:
FEBRUARY* RESIN FLEXIBLE CONPOUNO RIGID COMPOUND PLASTICIZER
CUSTOMER PICKUP
5 28
1 0
TOTAL FEBRUARY
34
YTD* RESIN FLEXIBLE COMPOUND RIGID COMPOUND PLASTICIZER
20 108
6 0
TOTAL YTD
134
MONTH
IPT/ITC EXCH/TOLL
14,972,710 296,300
167,600 0
888,800 81,846
0 0
00
531,800 9,000
0 0
00 00
89,400 554,450
16,869,856 722,050
PUBLIC
97,738,994 974,183
3,640,990 13,219,148
33,353
16,818,700 1,764,234
0 0
648,670
134,838,272
CUSTOMER PICKUP
56 0
12 0
68
CARRIER
37 3 3 3
46
224 181 0 15
16 61 29 20
269 277
CARRIER
14 55 10
0
79
TOFC AIRAIPS
00 00 00 00
00
AIRAJPS
6 9 1 0
16
60 0 0 334 0 0
63 0 0 1 00
458 0 0
28 56
3 0
87
YTD
IPT/ITC
69,161,470 1,134,600
5,930,200 711,002
0
2,869,350 521,706
0 0
630,070
80,958,398
EXCH/TOLL
1,413,500 0
0 0
0
0 0
1,401,960 33,600
2,722,110
5,571,170
TOTAL
255 11 39 6
311
1,239 68
191 60
1.558
TOTAL
25 92
12
0
129
108 498
72
1
679
VAB.0001189806
TABOBATOBT - J. M. Edwards, Jr.
A
There were no safety incidents in the Laboratory during February The monthly safety meeting topic was "Annual Health Training".
B Customer Contacts
Representatives from A&T visited the Aberdeen Plant on 2/21/91. Ms. Cheryl Cincetti with AT&T made a presentation to an assembly in the Plant and awarded us the "Certified Quality Vendor" award.
02/04
Customer complained of contamination in 38552 NAT compound, lot 10B10. During the production of this material, there was an Incident of contamination in the product, Several boxes were downgraded and the problem material was assumed to be isolated. A procedural change was made to downgrade product boxes on either side of the discovered out-of-spec material.
02/04
Customer complained of contamination in com partment CB of 5305 railcar #46436. The compartment was transferred to their B-Grade silo. All samples, including the samples sent from Klockner of the contaminated compartment showed to be within specification. No further action is planned.
02/06
Customer complained of significant drop in Cpk values for 5415 shipments in the 4CQ90 for IV, contamination and percent moisture. A letter of explanation was written by Process Engineering.
02/08
Customer complained of difficulty unloading two recent 5385 railcars. The Aberdeen Yard Department assisted (via phone) to solve the problems.
mm&mi - Continued
Continued
Customer complained of difficulty breaking down 384FR compound. Nothing definite was discovered to explain the difference. The Technical Service Group will followup on this problem.
02/22 AT&T.
Customer complained of receiving underloaded railcars. AT&T has asked that our cars be filled at least 180,000 pounds. More dis cussion is planned to resolve this issue.
02/22
Customer complained of various types of con tamination plugging 5305 silo outlet sifters. Some of the contamination origi nated at the CSX terminal. The same type of contamination was found in Oxy resin which uses the same terminal. Samples of the con tamination have been sent to Austin R&D and CSX for further study. Another trip has been scheduled to talk with Mirrex and the CSX terminal.
Customer complained of bad smelling pallets in a shipment of 452-106A NAT, 89A compound. Investigation is underway.
Customer complained of contamination in six
railcars of 5305. A majority of the contam
ination was line scale that resembled "onion
skin" Four of the cars were Vista's. One
of the cars was from Pac West and one of the
cars was a competitor s. All of the samples
looked the
ie. Samples have been for
warded to Austin R&D for chemical analysis.
A meeting has been scheduled at Klockner the
week of March 25. A letter has been sent to
Klockner explaining what we have found thus
/
VAB.0001189808
tjutoattwy - Continued
Cmstumer Dayton Essex Group H&W Stylecrest
Product RP-151 WHT 145
5415 5385 RP-27 WHT 113
Reason Color Particle Size Static Flow 40 Mesh
Ho. 1 R/C 1 H/T 1 H/T 2 R/C
The following is a summary of residual VCM results on in> process samples. None of the reactor dally averages exceeded 400 ppm RVCM during the month of February, 1991.
Reactor
530
Number of Samples Average RVCM, ppm
30 0.186
49 0.186
The following is a summary of the residual VCM analysis of shipment samples for the month of February, 1991.
Product
Average RVCM. ppm
5265 5305 5325 5385 5395 5415 5465 Dry Blend Debox Pond
40 53
3 74
1 40
3 17
8 6
0.093 0.107 0.096 0.282 0.008 0.045 0.091 0.070 0.707 0.255
A
VAB.0001189809
TABQATPBY - Continued
r
(based on dryer "regulars")
5265
5305
5385
5395
Bulk Density Inherent Viscosity
(vs. 0.715 - 0.744) L Color A Color B Color % on Pan
(vs. 2%, max.) % thru 140 Mesh Mets I.R.
(vs. 95% of control) Hard Particles, (% > 10) Average particle size.
microns
1.20 1.57
--
3.72 7.67 3.017 1.43
--
1.00
--
--
136
0.46 0.69 0.18 1.87 9.00 3.50 1.13
--
0.68
--
--
140
1.15 0.62
2.00
2.50 1.25
--
1.05
----
71.5
161
*_ --
---------- * --
-- -
-- --
5415
1.06 0.53
4.00
5.33 2.06 0.39 2.54 5.06 2.29 0
170
Hardness Specific Gravity Color Hard Particles Heat Stability Contamination Dicing Cross Contamination Mischarge
Total
H I^bs. XU
5.0 5.0 175.0
<0.12> <0.12> <4.34>
185.0 <4.59>
34.5 50.4
7.8 34.0 10.5
4.7 14.9 156.8
<0.86> <1.25> <0.19> <0.84> <0.26> <0.12> <0.37> <3.89>
There were no rejections for the month.
I. Miscellaneous
1. All six natural teams met during the month.
2. The new resin viscosity instrument was installed.
and
3. The Coulter particle size analyzer was put in Q.C. service on February 25 measuring all in-process samples. Con currently, shipment particle size analysis was switched from wire mesh screens to precision screens.
4. Dave Cox completed the IPA software program to run on PC's.
VAB.0001189810
SAMPLE SHIPMENTS FEBRUARY 1991
RESIN Ship Date 2/06/91 2/08/91
2/12/91 2/15/91
2/18/91
2/18/91
2/22/91
Product
5265
5265 5305
5415
Sifter Overflow "Coarse"
5385 5415
5385 5415
5265
2/25/91 2/27/91
2/28/91 2/28/91
5415 Control
5265 5305 5385
5415
.5385 5415
Aaount
300 lbs.
50 lbs. 50 lbs.
50 lbs.
5 lbs.
1 kg. 1 kg.
1 kg 1 kg. 50 lbs.
50 lbs.
50 lbs. 50 lbs. 50 lbs.
50 lbs.
100 lbs. 100 lbs.
Custoaer Nibco (KY) Kenrich Petrocheaical Inc
Ethyl Corporation
Shawnee Chemical FADALTEC (Colombia)
FACOMEC (Colombia)
INDUSTRIAL ENVAMEX S.A. (Mexico)
Vista - OKC IND. PLASTICAS
INTERNACIONALES
INDUSTIAS CONELEC ETERPLAST S.A.(Ecuador)
COMPOUND Ship Date 2/04/91
2/06/91 2/07/91
2/08/91
Product
Vistel 9102 WHT 449-78 WHT 110
18162 BLK (OG)
419-50-C NAT 02 419-79-C NAT 02
17462 WHT(OG) 38931 WHT(OG)
Amount
3200 lbs 2840 lbs
50 lbs.
50 lbs. 50 lbs.
50 lbs. 50 lbs
Custoaer U-Brand
H. Heller Coapany Akzo Engineering Plastics
Gentry Manageaent
VAB.0001189811
COMPOUND (Cont.)
Saaple Shipaenta/February 1991 Page 2
Ship Date 2/08/91
Product
462-34A BLK 462-34AX2 BLK 462-34B BLK
Amount
50 lbs. 50 lbs. 50 lbs.
Customer Vista - Austin
2/12/91
462-34AX1 BLK
50 lbs.
Vista - Austin
2/15/91 2/15/91
MSP-80 419-79-C NAT 02
100 lbs 50 lbs.
Vulcan Metals Vista - Austin
2/21/91
57462 NAT 57561 NAT 58561 NAT
300 lbs 300 lbs 300 lbs
Vytron Corp.
2/21/91
419-68 NAT
1400 lbs. Tines Fiber
2/21/91
17561 NAT(06) 17462 GRY 545(00) 18162 GRY 545(OG)
1 lb 1 lb 1 lb
Prototype Plastic Extrusion Co, Inc.
2/21/91
461-120A WAT CL(OG) 50 lbs.
Renee Products Corp.
'l
DRYBLEND Ship Date 2/07/91 2/12/91 2/13/91
Product
Amount
RP-151 WHT 145(OG) 1210 lbs.
RP-151 WHT 145(OG) 1500 lbs.
80172C WHT 110
100 lbs.
Customer Stylecrest Western Ag Sales Co., Inc. THE BRUNA CORP.
MISC. Ship Date 2/18/91
Product Vent Dust
Amount 5 lbs.
Customer
fr
Able Plastics
VAB.0001189812
A
TOTAL INJURES
OSHA RECORDABLE
VAB.0001189813
ABERDEEN ENERGY CONSUMPTION
f mrn i#ni
VAB.0001189814
*