Document 99v7zwdKgYLm6w9E0dvEryaQ5
PROGRESS REPORT .
TECHNICAL SERVICES OERT. -
B. KRUMURICH PLANT
W.O. KRUMMRICM PLANT
0G.L. Bratsch 0 *0D.W. Jackson . 0
OD.J. O'Toole
IS B.W. Corlew ` to
0 R.M. McCutcha si *0 C.F. Buckley to
E L.W. Sprandel to
*EJ to
G3 .
<a
Q *0
* TO RECEIVE DETAIL SECTION
to
to
0 to to
to
to
to 1 to
<b
| JOE NO. | 9^570? 4119
REPORT NO.
(*)
(DATE
| 12,15,70
GENERAL OFPICE
OTHERS
M.I. Lux
Anniston
D P. Danna (4) to J.C. Landwehr
* D.B. Hosmer/
NJLtro
F.J. Holzapfel 0 W.R. Kellogg
R.E. Howard
S. 2nd St.
*0J.R . Savage
P. 0. DeGarmo
*W. Papageorge T)T.M. Patrick
to *Q J.F. Quinn
E * R. L. Wiese
#0
*s
WATER POLLUTION - AROCLOR CONTROL
personnel: W. A. Krull (W* C. Engman) B. L. Bigge (T. M. Morrow)
PROBLEM: SUMMARY
Reduce Aroclor water pollution at Department 246.
As a continuation to the Aroclor pollution reduction program, the losses from Dept. 246 were measured at the beginning of 1970 to be in excess of 300 pounds/day with intermittent large spills of 2 - 4000 pounds. These losses occurred at the scrubber and through leaks and spills to the trench sewers.
To reduce the loss at these points, six projects were installed at an estimated cost of $49*400 of which $30,000 was new capital. These projects reduced the Aroclor losses to about one pound per day from the two points.
One additional $40,000 ($37*500 capital) project is approved to install concrete pads and curbing around the tank farm and loading docks. A settling basin will intercept the sewers from these areas. This will reduce losses from water run-off and spills.
Monitoring will continue on the effluent streams from the depart ment .
/br
W/ A. Krull Technical Services Dept.
DS\N 258031
COMPANY CONPIDENTIAL INFORMATION
Thta document the property of Koauite Company tad the recipient to responsible for its ssfekeeping sad disposition. It contains confiden
tial information of Monsanto Company which must not be reproduced, revealed to unauthorised persona or sent outside the company without
proper authorisation. Either retain in secure Ales or destroy.
'
'
form wok too REV-2/66
STLCOPCB4061743
91370;4119(4)
-2-
December 15, 1970
BACKGROUND
.
This report deals primarily with steps taken within Dept. 246 to reduce Aroclor losses to the sewer. At present, two sewer streams leave Dept. 246. These are the combined trench sewers and the scrubber sewer line.
Trench Sewer Measurement and Modifications
At first, losses here could not be accurately measured but Aroclor was
visible in the bottom of the trenches. Two projects were installed
which have reduced the loss at this point to 0.5#/day and improved
accuracy of measurement.
Approximate
Capital
Expense
'Installed- .
Project Title
Estimate
Estimate
Date
Benefits
Sewer Basin
1795 (Bigge)
$7000
$7000
7/1/70
Intercepts Aroclor from large spills and leaks which flow into the trench sewers. Reduced loss to about 0.5 #/day.
Absorber Relief Recycle
1512 (Krull)
$4500
$1500
7/1/70
Recycled relief lines from four absorbers,, Prevented large losses to sewer basin from absorbers.
Scrubber Sewer Measurement and Modification
Losses from the scrubber were estimated at about 300 #/day. This breaks down into about 250 #/day liquid and 50 #/day mist which flowed to the scrubber on a routine basis. Non-routine losses occurred due to level controller malfunctions on the continuous blow tank, and lack of piping to enable demisting of off-gas before sewering in Dept. 246. Four projects were installed which reduced the loss at this point to
about 0.5 #/day.
Project Name "
Blow Tank Repiping
1493 (Bigge)
Capital Cost
Expense Cost
$5400
Date Completed
4/1/70
DSW 258032
Benefits
Used intermediate starage tank to intercept blow tank overflow. Malfunctions of level controller no longer causes loss to sewer. Prevented 2 large spills from going to sewer.
STLCOPCB4061744
91370s 4119(4)
-3-
December 15* 1970
Scrubber Sewer Measurement and Modification (continued)
Project Name
Capital Cost
Expense Cost
Date Completed
Benefits
Liquid Trap Minor (Production)
2/1/70
Trapped liquid going to scrubber. Reduced loss by 250 #/day.
Off=Gas Piping 1948
(Krull)
$1500
5/14/70
Piping Installed to allow off-gas to be demisted before sewering in Dept. 246.
Blow Tank Demister
2031 (Krull)
$17*000
$5500
10/19/70
Installed Brink Mist Eliminator to intercept blow tank gas flowing to scrubber. Reduced loss to 0.5#/day,, The reduced air flow Increase scrubber capacity to drown HC1. By reworking condensate, about $2,000 per year yield savings will be realized.
Department Losses Summary
Department losses to the sewer through the scrubber and trench sewers have been reduced from more than 300 #/day to about 1 #/day. Provisions to Intercept 800 gal. spills have been installed.
Future Work
The losses from the department will be monitored to insure the levels remain at existing low levels. An additional project (#2422) by 3. Bigge is approved to install concrete paving and curbing around the tank farm and loading areas. The sewers from these areas will have an Intercepting basin (3500 gal.) to catch Aroclor run off from spills and leaks. (EDC design 1/1/71).
/br
DSW 258033
STLCOPCB4061745