Document 99jgkdkL7VoqvnyJdLwJVQb5L

inter-o^ice memo, tenneco oil p&m To D. M. Hersh At Flemington DApril 4, 1984 Fpdu H. R. Horton at Flemington Coc i to R. A. Lojewski S'JB.ECT Flemington Quality Assurance Monthly Report - March, 1984 Safety First Aid Minor Restricted Duty Lost Time Total Recordables Month 0 0 0 0 0 YTD 0 0 0 0 0 Goal 1 1 0 0 1 Incidence Rate 0.0 0.0 0.0 0.0 0.0 Inciden Goal 1.33 1.33 0.00 0.00 1.33 Statistics A. Regular Production Prod. Type March, 1984 Graded I M Lbs. M Lbs. 314 655.28 473.72 318 2200.12 2020.12 390 1099.78 1099.78 391 -2.51 -- 400 1099.62 1099.62 Total 5052.29 4693.24 RFT % 72.29 91.82 100.00 -- 100.00 92.89 Year--To-Date Graded I M Lbs. M Lbs. 3033.14 5993.79 1094.48 -3.58 1816.04 1513.35 5430.27 1094.48 -- 1636.04 11933.87 9674.14 RFT % 49.89 90.60 100.00 -- 90.09 81.06 B. E Grade Production Prod. Type 314 318 E M Lbs. 181.56 180.00 Reason Volatiles (high) Volatiles (high) C. Off-Grade Production Prod. Type March, 1984 Grade III Graded M Lbs. Prod.% 314 0.00 318 0.00 390 0.00 391 0.00 400 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.00 0.00 Year--To-Date Grade III Graded M Lbs. Prod.% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 TEN 4374 Quality Assurance March, 194 Page 2 D. Special Production 1. Summary Prod. Type 318-5 LOP No. 1443 March, 1984 Prod. On Target M Lbs. M Lbs. % 2220.10 1860.10 83.78 Year-To-Date Prod. On Target M Lbs. M Lbs. % 6354.67 4863.53 76, E. Customer Relations One bulk truck shipment of COP 314 was rejected by Kentile, Brooklyn for poor flow (pencil test). The truck was aired, sent back in several days later and accepted by them. III. Major Projects/On-Going Program A visit was made by R.A. Lojewski and H.R. Horton to CBS, Terre Haute to investigate differences in brookfield viscosity results between Tenneco and CBS. A report has been issued summarizing results of the visit. Three compartments of one of the cars of Burlington 318-5 were rejected by CBS for high brookfields. Neither Burlington or Flemington Q.C. re sults on samples prior to shipment confirmed these high numbers. We are attempting to obtain the specific samples tested by CBS. The Flemington melt indexer was sent to CSI for temperature profile check this report period. No problems were indicated by CSI. HRH:ms H. R. Horton fEN 4375