Document 99bd6MgNx7D9EZ04qdJjY2qN6

npi --inruTj j\| LAKE CHARLES COMPLEX INDUSTRIAL HYGIENE PROGRAM STANDARDS COMPLIANCE MONITORING PLAN This document addresses the minimum industrial hygiene sampling which Lake Charles is jre-quired to- conduct under various OSHA Comprehensive Health Standards. It will be revised whenever either a new applicable standard is issued, or when an existing standard's revision affects the monitoring requirement. I. OSHA 1910.1001 - Asbestos A. OPERATIONS 1) Electrolyzers (a) Personnel Monitoring * - Cell Builder (May also be Renewal Man or Renewal Helper) TWA samples - 2 men, every 6 months Ceiling samples - 2 men--3 samples each during 1 day, every 6 months. (b) Area Monitoring - Processing Room between the glove boxes TWA sample, every 6 months Ceiling sample, during processing operations, every 6 months - Processing Room at Asbestos Paper Cutting Station Ceiling sample, during cutting, every 6 months - Processing Room at Dust Collection Return Air Plenum TWA sample, every 3 months 2) Area C Chlorine (a) Personnel Monitoring * - Glanor Renewal Man (may also be Renewal Helper) same as l.a, above - Area Monitoring same as l.b, above * Note: If any result exceeds the action level, a second follow-up sample shall be taken. If the result of the second test is also above the action level, the frequency shall be increased to monitoring every 3 months. If any result exceeds the IPEL and is similarly verified, the frequency shall be increased to monthly. Two successive samples below the IPEL~or action level shall cause the monitoring frequency to be decreased to the next lower frequency. Further reduction may be done until the minimum of every 6 months is reached. SI* 043355} 2 B. MAINTENANCE 1) Personnel Monitoring - Insulators or other job titles during Asbestos insulation demolition TWA sample, at least 1 man each time an identified asbestos job occurs. 2) Area Monitoring | - Asbestos insulation demolition sites TWA sample in immediate vicinity, each time an Identified asbestos job occurs. II. OSHA 1910.1017 Vinyl Chloride (Personnel Monitoring Only) A. OPERATIONS * 1) Tri-Ethane II (a) TE II Auxiliary Operator TWA, every 3 months (b) TE II Furnace Operator TWA, every 6 months 2) VCM II (a) Auxiliary Operator TWA, every 3 months STEL, every 3 months (b) Furnace Operator TWA, every 6 months (c) Process Operator TWA, every 3 months STEL, every 6 months (d) Storage Operator TWA, every 6 months B. MAINTENANCE (TE-II, VCM) 1) TE-II - Two job titles assigned to work in Tri-Ethane II Area TWA, every 2 months 2) VCM II - Two job titles assigned to work in Vinyl Process Area TWA, every 2 months * Note: See Note, Page 1, concerning frequency of monitoring adjustments SL 043356 C. SHIPPING * 1) Tank Car Loading (VCM) -3- CO (a) Tankerman TWA, every 6 months STEL, while connecting/disconnecting cars - 2 samples/day every 3 months - (b) Tankerman's Helper TWA, every 6 months STEL, while connecting/disconnecting cars - 2 samples/day every 3 months 2) Docks Area (VCM) (a) Tankerman STEL, while loading barges, etc. - every 3 months (b) Tankerman's Helper STEL, while loading barges, etc. - every 3 months * NOTE: See Note, Page 1, concerning frequency of monitoring adjustments indust hyg/evll