Document 99bd6MgNx7D9EZ04qdJjY2qN6
npi --inruTj j\|
LAKE CHARLES COMPLEX INDUSTRIAL HYGIENE PROGRAM
STANDARDS COMPLIANCE MONITORING PLAN
This document addresses the minimum industrial hygiene sampling which Lake Charles is jre-quired to- conduct under various OSHA Comprehensive Health Standards. It will be revised whenever either a new applicable standard is issued, or when an existing standard's revision affects the monitoring requirement.
I. OSHA 1910.1001 - Asbestos
A. OPERATIONS
1) Electrolyzers
(a) Personnel Monitoring * - Cell Builder (May also be Renewal Man or Renewal Helper) TWA samples - 2 men, every 6 months Ceiling samples - 2 men--3 samples each during 1 day, every 6 months.
(b) Area Monitoring - Processing Room between the glove boxes TWA sample, every 6 months Ceiling sample, during processing operations, every 6 months
- Processing Room at Asbestos Paper Cutting Station Ceiling sample, during cutting, every 6 months
- Processing Room at Dust Collection Return Air Plenum TWA sample, every 3 months
2) Area C Chlorine
(a) Personnel Monitoring * - Glanor Renewal Man (may also be Renewal Helper) same as l.a, above
- Area Monitoring same as l.b, above
* Note: If any result exceeds the action level, a second follow-up sample shall be taken. If the result of the second test is also above the action level, the frequency shall be increased to monitoring every 3 months. If any result exceeds the IPEL and is similarly verified, the frequency shall be increased to monthly. Two successive samples below the IPEL~or action level shall cause the monitoring frequency to be decreased to the next lower frequency. Further reduction may be done until the minimum of every 6 months is reached.
SI* 043355}
2
B. MAINTENANCE
1) Personnel Monitoring - Insulators or other job titles during Asbestos insulation demolition TWA sample, at least 1 man each time an identified asbestos job occurs.
2) Area Monitoring
|
- Asbestos insulation demolition sites
TWA sample in immediate vicinity, each time an Identified
asbestos job occurs.
II. OSHA 1910.1017 Vinyl Chloride (Personnel Monitoring Only)
A. OPERATIONS *
1) Tri-Ethane II
(a) TE II Auxiliary Operator TWA, every 3 months
(b) TE II Furnace Operator TWA, every 6 months
2) VCM II
(a) Auxiliary Operator TWA, every 3 months STEL, every 3 months
(b) Furnace Operator TWA, every 6 months
(c) Process Operator TWA, every 3 months STEL, every 6 months
(d) Storage Operator TWA, every 6 months
B. MAINTENANCE (TE-II, VCM)
1) TE-II - Two job titles assigned to work in Tri-Ethane II Area TWA, every 2 months
2) VCM II - Two job titles assigned to work in Vinyl Process Area TWA, every 2 months
* Note: See Note, Page 1, concerning frequency of monitoring adjustments SL 043356
C. SHIPPING * 1) Tank Car Loading (VCM)
-3-
CO
(a) Tankerman
TWA, every 6 months
STEL, while connecting/disconnecting cars - 2 samples/day
every 3 months
-
(b) Tankerman's Helper
TWA, every 6 months STEL, while connecting/disconnecting cars - 2 samples/day every 3 months
2) Docks Area (VCM)
(a) Tankerman STEL, while loading barges, etc. - every 3 months
(b) Tankerman's Helper STEL, while loading barges, etc. - every 3 months
* NOTE: See Note, Page 1, concerning frequency of monitoring adjustments indust hyg/evll