Document 99X0dkxGD8mLgZ8QBjqXXGar6
UNITED STATES
AGENCY
ENVIRONMRENETAGLP
IROONTE C1T
ION
BOSTON, MA 02109
Date:Dated as shown on electronic signature(s)
Subj:Inspection Report - Clean Water Act (" CWA ")
National Pollutant Discharge Elimination System (" NPDES ")
From:Andrew Spejewski, EPA Inspector
ANDREWDigitally signed by ANDREW
SPEJEWSKI
SPEJEWSKIDate: 2025.02.05 09:30:31 -05'00 '
Thru:Margarita Chatterton, EPA Inspector
To:File
I. Facility Information
A. Facility Name:Angel Court Construction
B. Facility Location:32 Casey Drive
Milford, MA 01757
C. Facility Contacts:Dominic Afonso
D & F Afonso Builders Inc
32 Casey Drive
Milford, MA 01757
D. ID No (s).:None known
Click or tap here to enter text.
II. Background Information
A. Date(s) of inspection: 12/10/2024
B. Weather Conditions:overcast but dry, rain previous day
ED_019088A_00020027-00001
C. US EPA Representative(s): Andrew Spejewski
Margarita Chatterton
D. State / Local Representative(s): None
E. Federally Enforceable Requirements Covered During the Inspection: EPA's General
Permit for Construction Stormwater
F. Previous Enforcement Actions: None known
III. Type and Purpose of Inspection
Evaluation of compliance with EPA's General Permit for Construction Stormwater
IV. Facility Description
The site is a construction site, planned for eventual single - family residential construction. It is
currently only being cleared and rock removal underway. It includes a smaller mostly flat area
southeast of Casey Drive, consisting mostly of stockpiles, with a large infiltration basin farther
southeast. The main site is northwest of Casey Drive, and slopes up steeply away to the
northwest, sloping down again at the far northwest end of the site.
At the time of the inspection, the northwest section had been cleared and extensively graded;
the southeast area was stockpiles of gravel and dirt, and the retention basin was in place.
V. Inspection
The EPA inspectors arrived unannounced on the site about 9:30 AM. An excavator was moving
rock on the site. The inspectors approached the equipment operator to ask for the
superintendent. The operator identified himself as Kyle Crowley of G. Lopes Construction; he
said he was just a subcontractor tasked with removing rock from the site. He identified the site
owner as Dominic Afonso. Mr. Crowley contacted his supervisor at G. Lopes after Mr. Spejewski
provided his phone number, and the supervisor then called Mr. Spejewski. The supervisor,
identified as " Dan ", confirmed Mt. Crowley's account and contacted Afonso Construction.
Within a few minutes, Brendon Ferreira called Mr. Spejewski. Mr. Ferreira identified himself as
working for Afonso Construction and agreed to meet the inspectors on site. Mr. Ferreira gave
permission for the EPA inspectors to walk the site unaccompanied while they waited for him.
Mr. Spejewski and Ms. Chatterton then toured the northwestern portion of the site [details
below].
Within a half hour Mr. Ferreira arrived, as the inspectors returned to the site entrance, and
quickly thereafter Dominic Afonso arrived. Mr. Ferreira and Mr. Afonso stated they were
representatives of D & F Afonso Builders, Inc.
[Mr. Afonso introduced himself as " Dominic " and provided a business card which identified him
as " Domingo Afonso "]
2
ED_019088A_00020027-00002
A. Opening Conference
Mr. Spejewski explained the purpose of the inspection, showed his credentials to Mr. Afonso
and Mr. Ferreira, and gave them a copy of the Small Business Information Sheet.
Mr. Afonso said that he ran the construction company, and that Brendan, his grandson, was also
an employee. Mr. Afonso said he had built the roads and homes in most of the surrounding
area over many years, and confirmed the active construction site nearby on Casey Drive was
also a D & F Afonso project [See inspection report for Black Bear Condos, from the same date].
Mr. Afonso said that this site was planned for residential development, but they were still
removing rock to get the grade down, Mr. Afonso indicated that overburden and rock removal
had been going on for years.
Mr. Afonso was unsure whether there was a NPDES permit for the site; he said his engineers
would have taken care of that.
Mr. Afonso and Mr. Ferreira said they look at erosion controls regularly, but do not document it
anywhere.
B. Facility Tour
The inspectors toured the northwest portion of the site unaccompanied. The site sloped steeply
up to the northwest from Casey Drive; it was at or below the terrain along the southwest edge,
to the north, and along the northeast edge, while the northwest corner ended in a steep slope
down to the northwest.
The northwest edge of the site sloped down steeply at least 30 feet to bordering undisturbed
woodlands (which sloped down away to the northwest). The slope was constructed of bare dirt
and rocks with no stabilization on the slope or perimeter controls at the base.
The entire site was cleared and stripped of topsoil.
Several stockpiles of dirt were located at various locations, including a pile along the southwest
edge that was covered in weed growth (it appeared to be multiple years'growth) and farther
northwest a pile with no stabilization or perimeter protection.
The pile's uphill edge formed a temporary pond / basin that captured stormwater from a portion
of the site; standing water was present forming a small pond during the inspection.
There were no erosion controls on the dirt / gravel road leading up the site from the main
entrance.
The site entrance (from Casey Drive to the site's main unpaved road) had gravel, but was
partially covered with mud. There was a small amount of dirt washed onto Casey Drive.
At this point, the inspectors having returned to the site entrance at Casey Drive, they met Mr.
Ferraira and Mr. Afonso. Mr. Afonso said there was an underground drainage adjacent to Casey
Drive, extending on either side of the site entrance; according to him the drainage was a
3
ED_019088A_00020027-00003
perforated pipe that discharged (along with catchbasins) to the stormwater basin to the
southeast, on the other side of Casey Drive.
Mr. Afonso and Mr. Spejewski walked to the stormwater basin.
Immediately adjacent to Casey Drive were multiple large stockpiles. There was no stabilization
or perimeter protection. Some appeared fairly fresh; others had significant weed growth. The
southeast border of this area was a slope down about ten feet of unstabilized dirt and rocks,
ending at undisturbed woods.
Set farther southeast in the woods was a stormwater retention basin. It was difficult to
approach the basin, as it required going down the slope and through woods; there was no path
or other obvious access to reach the basin (Mr. Afonso was not familiar with exactly where the
basin was).
A forebay on one side had muddy water flowing into it from a hidden outfall apparently buried
in dirt. The forebay had muddy water in it, but not enough to flow over the berm between the
forebay and main basin. An outfall was present in one corner of the main basin; Mr. Afonso said
it was for high - flow, while low - flow went to the forebay. [later, at his office, Mr. Afonso was
able to produce plans for the basin].
The basin walls and floor were covered in weed and small tree growth.
C. Records Review
After touring this site (Angel Court), the group went to the Black Bear Condos site [See separate
inspection report for Black Bear Condos Construction]. The group then went to Afonso Builders
offices in Milford. Mr. Afonso was able to produce an engineering plan for the stormwater
basin. He was unable to locate a Stormwater Pollution Prevention Plan for either site, or any
information about a NPDES permit for either site.
Mr. Afonso put Mr. Spejewski on the phone with a man who identified himself as an engineer
working for Afonso Construction, and said that he would look for a SWPPP or any NPDES
application information. [The engineer subsequently emailed Mr. Spejewski stating they do not
typically file NPDES permits for clients].
Mr. Spejewski noted concerns to Mr. Afonso, including slope stabilization, the difficulty of
inspecting the stormwater basin at Angel Court, the downed silt fences at Black Bear, and the
potential lack of NPDES permits for both sites. Mr. Spejewski then thanked Mr. Afonso and
others for their time, and left the offices, concluding the inspection.
D. Closing Conference
Mr. Spejewski told Mr. Afonso there were some issues, including lack of stabilization of
stockpiles, some sediment washed into Casey Drive from Angel Court, difficulty of access to the
basin at Angel Court to support inspections and downed silt fence around Black Bear, but also
apparently a lack of permit coverage; Mr. Spejewski said that Afonso Construction should get
any evidence of permit coverage to him as soon as possible.
4
ED_019088A_00020027-00004
Mr. Spejewski and Ms. Chatterton then thanked Mr. Afonso for his time and left his office at
about 12:15 PM.
E. Inspection Photos
Picture List:
IMG_0141.JPGMain entrance immediately northwest of Casey Drive
IMG_0142.JPGFacing northeast along Casey Drive, at main entrance
IMG_0143.JPGFacing west from main entrance
IMG_0144.JPGSouthwest edge of site
IMG_0145.JPGFacing southwest to edge of site
IMG 0146.JPGDetail, berm along southwest edge
IMG_0147.JPG[operator error] terrain along southwest edge
IMG_0148.JPGFacing onto site from above center of southwest edge
IMG_0149.JPGFacing northwest from center of southwest edge
IMG_0150.JPGnorth - center of site from center of southwest edge
IMG_0151.JPGsouth - center of site
IMG_0152.JPG[operator error] sky, along southwest edge
IMG_0153.JPGtemporary pond, north center of site
IMG_0154.JPGFacing northeast from near northwest corner
IMG_0155.JPGFacing north over northwest corner
IMG_0156.JPGSlope down at northwest corner
IMG_0157.JPGFacing off site at northwest corner
IMG_0158.JPGNorthwest corner of site, facing northwest
IMG_0159.JPGCenter of site, showing temporary pond
IMG_0160.JPGNortheast edge of site
IMG_0161.JPGFacing Casey drive along northeast edge of site
IMG_0162.JPGNortheast edge of site, facing Casey Drive
IMG_0163.JPGnorthwest of Casey Drive, in infiltration area
IMG_0164.JPGMain site entrance and edge of site
IMG_0165.JPGStockpile southeast of Casey Drive
IMG_0166.JPGForebay of basin to southeast
IMG_0167.JPGDischarge to forebay
IMG_0168.JPGForebay, southeast basin
IMG_0169.JPGEdge of forebay
IMG_0170.JPGMain bay, southeast basin
IMG_0171.JPGWall of main bay
IMG_0172.JPGInlet to main bay
IMG_0173.JPGStockpile, southeast edge of site (southeast of Casey)
IMG_0174.JPGDetail, stockpile in southeast area
IMG_0175.JPGFacing northwest along northeast edge of site, from Casey Drive
IMG_0176.JPGFacing southwest along Casey Drive
IMG_0177.JPGMain site entrance
IMG_0196.JPGPlan of stormwater basin
** END **
5
ED_019088A_00020027-00005
Unless otherwise noted, this report describes conditions at the facility / property as observed by
EPA inspector(s), and / or through records provided to and / or information reported to EPA
inspector(s) by facility representatives and as understood by the inspector(s). This report may
not capture all operations or activities ongoing at the time of the inspection. This report does
not make final determinations on potential areas of concern. Nothing in this report affects EPA's
authorities under federal statutes and regulations to pursue further investigation or action.
6 10
ED_019088A_00020027-00006