Messrs.
E. J. Wipfler
- General Offices
R. J. Stratmeyer - General Offices
H. C. Carder
- General Offices
R. D. McCoy
- General Offices
N. L. Sample - General Offices C. E. Anagnostopoulos - S. 2nd R. E. Howard - General Offices J. R. McClain
August 1, 1967 MONSANTO COMPANY ORGANIC CHEMICALS DIVISION
To: The Director of Manufacturing Organic Chemicals Division
Estimate No. 5334 Dept. 246 - Aroclor W. G. Krummrich Plant, Sauget, Illinois
PROVIDE FOR AROCLOR STILLS PREHEATER
Capital Addition
-
Dismantling Expense -
$6,320 ______ 120
Appropriation Requested - $6,440
New Earnings -
$135,000/yr. B.T.
DESCRIPTION OF PROJECT
This project provides for an aroclor still preheater and pump to increase department capacity.
APPROVALS Plant Manager
ORIGINAL SIGNED BY. ----A.--MORGAN-------
Date //<//C 7
Technical Production Manager
Date
Director of Manufacturing
Date
DSW 256213
STLCOPCB4061205
2- -
Estimate No. 5334 Dept. 246 - Aroclor
BACKGROUND INFORMATION
Aroclor is in a sold out position despite the fact that Dept. 246 is opera
ting at or above its capacity of 30.0 M #/yr. A major aroclor expansion is
being planned, but increased production is necessary to meet sales through
1968.
NEED FOR PROJECT
The increased production of aroclors will result in new earnings of $135vOQO-B.T. on 1.85 M lbs. of product during 1968.
Use of a still preheater will increase capacity from 2.5 M #/Mo. to 2.65 M #/mo.
PRESENT SITUATION
The aroclor s_ales forecast (H. J. Day - 7/13/67) and proposed increased capacity in M lbs:
1967
1968
1969
1970
1971
Sales Forecast -
--
33-3
37.2
40.4
44.0
Production Capacity - 30.0
33*3
-- Major Expansion -
In a memo from R. M. McCutchan to H. C. Carder (6/I/67) it was stated that a still preheater, increased chlorine feed rate, and a FeClo filtering system were needed to get an increase of 5-7 M #/yr. The selection of a filter is in progress and confirmation of need will be made by IO/I/67. This decision depends upon further PR&D and TSD work in determining the optimum chlorinator catalyst level. At the present catalyst level the increased capacity of 1.85 M lbs./yr. can be attained without the filter.
Increased chlorine feed rate will be possible when projects 3824 (EDC 10/15/67^ and 4864 (EDC 11/1/67) are completed. As a result, capacity will be further increased by 1.45 M lbs./yr. to a total of 33*3 M lbs./yr.
SAVINGS AND/OR BENEFITS
Aroclor is sold at $0.075/lb. above manufacturing and SARE cost. earnings will be:
1.85 M lbs. x $.075/lb. = $135,000/yr. (B.T.)
New
SAFETY
No safety hazards will be created as a result of this project.
STREAM AND AIR POLLUTION
None
DSW 256214
STLCOPCB4061206
Estimate No. 533^Dept. 246 - Aroclor
3
STATUS OF PROJECT
Design package will be submitted to P&S within one month after approval. Installation should be about two months after transmittal.
ALTERNATE COURSE
There is no other economical course of action to increase the capacity of the present aroclor department.
RECOMMENDATION
Approval of this project is recommended.
Prepared by: R. M. McCutchan
ghw
cc: Messrs. J. A. Morgan G. L. Bratsch W. J. Wilson A. M. McGrath J. W. Molloy R. McCutchan John McCarthy H. F. Ray
P. E. Hei""1 --