Company: DOW CHEMICAL CO. - -ocess: HDPE - POLY B
Worksheet
HAZOP-PC l.oo
Hod : 20 Pag : l
I Node: 20 DR-2007 MECHANICAL SEAL
Parameter: Flow
Intention: 10 GPH H20
|GUIDEWORD DEVIATION POSSIBLE CAUSES
CONSEQUENCES
No No Flow INSTRUMENT DAMAGE SEAL
FAILURE
ENVIRONMENTAL
MISOPERATION
RELEASE
LOSS OF PUMPS
02 INTO VENT
PLUGGED LINE
SYSTEM
REGULATOR FAILURE SHUT DOWN TRAIN
RECOMMENDATIONS
EVALUATE WATER FLOW INDICATION
BY | *
EVALUATE WATER STRAINER
GH
EVALUATE AUTO START OF SPARE CONDENSATE PUMP
RF
GAS DETECTOR AT SEAL
*
EVALUATE CONTINUOUS N2 PURGE TO SEAL CAVITY
GH
-
EVALUATE WATER
GH
FLOW IN BOTTOM/
OUT TOP
EVALUATE SOURCE GH/
OF WATER
RF
+--------------- +--------------- +-----------------------------+------------------------------ +-----------------------------+-----+
DO a
Company: DOW CHEMICAL co. TV-ocess; HDPE - POLY B
Worksheet
HAZOP-PC 1.00
Node: 20 Page: 2
Node: 20 DR-2007 MECHANICAL SEAL
Parameter: Temperature
Intention: 5-<100 DEG C WATER
|GUIDEWORD|DEVIATION| POSSIBLE CAUSES | +--------------------
CONSEQUENCES
| RECOMMENDATIONS |BY |
More
Higher
SEE NO FLOW
SEE NO FLOW
CHECK TIE IN
GH
Temp
WATER FLASHING IN
WRONG TIE IN
SEAL
EVALUATE SEAL
GH
POINT
SPECIFICATIONS/
TEMPERATURE
LIMITS
Less
Lower Temp
LOW AMBIENT TEMPERATURE
SEE NO FLOW
ESTABLISH FREEZE DS POLICY
+-------------------
FOLLOW FREEZE POLICY
GH
DO A 120983 CONFIDENTIAL
Worksheet.
HAZOP-PC 1.00
Company: DOW CHEMICAL CO. --ocess: HDPE - POLY B
Node: 20 Page: 3
+------------------------------------------------------------------------------------------------------------------ -------------------------------------------------------------+
Node: 20 DR-2007 MECHANICAL SEAL
Parameter: Pressure
Intention: 10 PSI ABOVE DRYER
+-------------+--------------+-------------------------- +--------------------------- +-------------- -------------+--- +
|GUIDEWORD|DEVIATION| POSSIBLE CAUSES I CONSEQUENCES | RECOMMENDATIONS | BY | +----------------- +-------------------+------------------------------------ +-------------------------------------- +------------------------------------ +------ +
More
Higher
BACKPRESS WATER DESTROY SEAL
Pressure REGULATOR FAILURE SEE NO FLOW
CHECK REGULATOR SETTING
GH
MISOPERATION FREEZING WEATHER
INCREASE SEAL WEAR CHECK SEAL DESIGN GH
PRESSURE
TRAINING
RF
Less
Lower
REGULATOR FAILURE EXCESS SEAL
CHECK SEAL
GH
Pressure LOSS OF WATER
LEAKAGE
SPRING TENSION
PUMP
CHECK MINIMUM
GH
WATER PRESS REQ'D
+------------- +--------------+-------------------------- +---------------------------- +-------------------------- +---- +
120984 DO A CONF1 denti*l
Company: DOW CHEMICAL CO ocess: HDPE - POLY B
Worksheet
HAZOP-PC 1.00
Node: 20 Page: 4
----------------------------------------+
Node: 20 DR-2007 MECHANICAL SEAL
Parameter: Service Failure
Intention: MAXIMIZE SEAL LIFE
H --~--
t""-----------------f--------------------------------------------------------------+------+
|GUIDEWORD|DEVIATION| POSSIBLE CAUSES j CONSEQUENCES | RECOMMENDATIONS |BY | +----------------- +----------------- +--------------------------------- +------------- '--------------------- +--------------------------------- +----- +
More
More Service Failure
HIGH VIBRATION BEARING FAILURE SHAFT FAILURE WAX BUILDUP
HIGH MAIN BUDGET EVALUATE VIBR
PLANT SHUTDOWN
MONITORING
HYDROCARBON
RELEASE (WILL ALSO EVALUATE AMP
GD/ DS
*
BROKEN BLADE .
LOSE PACKING)
MONITORING
MISALIGNMENT
DRIVE SYSTEM FAILURE LACK OF
EVALUATE CAIN JULY 90 FAILURE
GH
LUBRICATION
EVALUATE SEAL N2 KW
TRIP BASED ON
MECH FAILURE/
PROBLEM SIGNAL/
SEAL GAS RELEASE
EVALUATE SHUTDOWN RF LOGIC
+---------------+------------- +---------------------------------- +-------------------------------------+---------------------------------- +----- +
DO A 120985 CONFIDENTIAL