WASHINGTON WORKS & EP RFI PLANNING MEETING JUNE 26, 1997
810ZOOHSV
K-^^sysj
ONTPERSONNE^ML^
*> Bill Majndni-DiiPont CRG-Program Manager ^ Walt Stewart-Site Sr. Environinental CoMtrol
Consultant
^ Dan Weber-Site Environmental Engineer
^ Mike Lukas-^iiPont CRG-Prindpal Engineer ^ Andrew Hartten-DuPont CRGr-Senior GeoJPM
6IOZOOHSV
^ 10:00-10:10 ^ 10:10-10:40 ^ 10:40-11:10 ^ 11:10-11:20 <> 11:20-12:20 < 12:20-1:00
IntroductioB
(Walt/B
Review 30 Day Response
(Dan)
Current Conditions Summary (Dam/An
Break
RPI W.P. Conceptual Approacli (Mike/A
Define Path Forward
(AM)
OZOZOOHSV
^ To review the required scope and
schedule for RFI activities
ROZOOHSV
CUSSION TOPICS
^ List ofSWMUs to be addressed in R
^ Current conditions and VI results
-> RFI workplan technical approach a
schedule
ZZOOOHSV
30-DAY RESPONSE
ceo&ooHsv
'^iT
CURRENT CONDITIONS SUMMARY
W)0%)HSV
GEOLOGY & HYDROGEOLOGY
seoeooHsv
^LOGY
-> Simple stratigraphy--Ohio River Ter
Deposits
^ Fine grained soils near surface and a riverbank
<* Sand and gravel primary site geologi unit and aquifer
*> Overlies Permian age bedrock (shale/
9ZOZOOHSV
ROGEOLOGY
':* Flow direction controlled by groundwater pumping centers
>:* Pumping induces recharge--flow int from river
>> East WeU Field 2000 gpm
^RanneyWeU 800-1000 gpm
{* Lubeck 500-700 gpm
LWiQQHSV
WASHINGTON WORKS VI RESULTS
KEY CONSTITUENTS DETECTED IN GROUNDWATER (by SWMU)
Concentration Range (ing/I)
RIVERBANK LANDFILL
Freonll3
C-8 Tetraehloroethylene Chlorofoirn Axsemc Mercury
.081-3.1 .052-7,1 .019-.22 .005-.006 .007-.38 .0005-.028
ANAEROBIC DIGESTION PONDS
Freonll3
Methytene Chloride
C-8 Barium Lead
.015-4.0 .26-.29 .025.38,0 2.9-3.8 .13-.36
BURNING GROUND
Carbon Tettachloride Tetrachloroethykne Triehloroethylene
Freonll3
.009-.036 .011 -.025 .027-.32 .027-.039
EID911366
RFI WORKPLAN TECHNIC
APPROACH
6ZOZOOHSV
''.'
TECHNICAL APPROA
-> Fully understand hydrogeologic system confirm gw capture)
^ Identify key data needs (hydro, & analyt
-> Meet applicable EPA standard RFI
requirements Refine Site Conceptual Model (SCM)
QWOOHSV
^ CONCEPTUAL MOD
^ Present hypothesis to confirm or ref current understanding
^-> Supports risk-based decision makin >> Aids in identifying potential remedia
alternatives
*> Focuses RFI activities
itonxuisv
'K-BASED DECISION KING
*:< Screen VI data against Region III
residential RBCs to identify applica analytical list :* Development of site-specific RBCs
OZOOHSV
WORKPLAN
VHNICAL APPROACH
^ STEP 1-Identify initial data needs (includ workplan)
-> STEP 2-Constriict grouiidwater flow mod fully define hydrogeologic system (identif
additional data needs)
> STEP 3-Refine site conceptual model to confirm or identify final data needs
^ STEP 4-Submit tech. memo to EPA with
RFI data collection points
^ STEP 5-Field implementation
ESOZOOHSV
vssy
WORKPLAN TABLE O INTENTS
:* Introduction <:* Current Conditions (SWMUs,
Geo/Hydro, SCM)
-> REI Technical Approach
<* Report Preparation
*:* References
KOZOOHSV
^KSS^^
^MT
WORKPLAN'
INDICES
^ Proj. Management Plan i> Sampling & Analysis Plan ^ QAPP -> Data Management Plan 4- HASP ^ Community Relations Plan
SEOZOOHSV
WORKPLANPATH
UPWARD
*:* Subniittal date September 26,1997
9SOZOOHSV