Document 93q1KZjOkXQnOrggYDq4Jr1wR

DownloadRandom document
Part B Response Part B Response to incident reported on: 02/06/2023 Any more accurate information on the matters for notification under Part A See Part A Measures taken, or intended to be taken to prevent a recurrence of the incident Ensure cleaning of the pipework leading to the autosampler is undertaken every 2 weeks Measures taken, or intended to be taken, to rectify, limit or prevent any pollution of the environment which has been or may be caused by the emission See Part A. Ensure additional training is provided to ensure the required maintenance (cleaning) can progress every 2 weeks. The dates of any unauthorised emissions from the installation in the preceding 24 months 30/06/2022: Breach of suspended solids limit 16/12/2022 Breach of R22 & R125 - Weekly Average at the Low Boiler Stack (CAR: BU5453IY/0451901) 22/12/2022: Breach of R22 - Weekly Average at the Waste Acid Stack (CAR: BU5453IY/0451578) 06/01/2023: Breach of annual CO limit 22/02/2023: Missed 24-hour effluent sample on 17/02/2023 from W1 Discharge to River Wyre 01/04/2023: Process gas release from SP2 Name* Post Signature Date 02/06/2023 *authorised to sign on behalf of AGC Chemicals Europe