Document 93k7Gb8NMG6jGRram4YZ0ojr3
W. W. HDRNER isb H. SHIFRIN toss
E. E. BLQSS V. C. LISDHER
ASSOCIATES E. R. BREIHAN . K. HASEQAWA R. E. PREU3SCR W. G. SHIFRIN V. A. SiLSER F. E. WISELY
HDRNER & SHIFRIN
CONSULTING ENGINEERS 1221LDCUSTSTREET ST.LOUIS,MO. 63103
CHESTNUT 1-15 70
AIRPORTS BCWERAOC& DRAINAQC PUMPINQ STATIONB MYDRDUOaY ruooo CONTROL. SEWACIE TREATMENT INDUSTRIAL WaBTE TREATMENT WATER SUPPLY A TREATMENT P AVI N Q STRUCTURES SOILS CNQINECRINO INDUSTRY CNOINCCRINO SERVICED
November 10, 1965
Mr. Joseph W. Goldenberg Joseph W Goldenberg & Associates Post Office Box 430 East St. Louis, Illinois
Dear Joe:
This is to confirm our previous telephone conversations with regard to the point of discharge for the new Dead Creek pumping station force main we are designing for the Village of Monsanto.
Paul Hodges of the Monsanto Company has indicated that Monsanto Company is very desirous that the force main discharge into the 36-inch overflow sewer south of the Alton & Southern Railroad tracks rather than north of the tracks as originally contemplated. Monsanto Company's in terests can readily be accommodated by constructing a junction structure at the south end of the 36-inch overflow line and discharging the force main into this junction structure. In order to allow an overflow from the 36-inch line into Dead Creek during periods of storm runoff and yet direct the dry weather flow from the pumping station into the 36-inch line with out overflowing Into Dead Creek will require a careful hydraulic design of the junction structure.
Paul stated that by doing some cleaning of the 24-inch sewer north of the Alton & Southern tracks, the hydraulic gradient in the 24-inch sewer can be kept below the invert elevation of the 36-inch overflow sewer to Dead Creek during dry weather. It is on this basis that we are designing the junction structure.
PAUL HODGES DEPOSITION
May 31 - June 1, 1994 EXHIBIT NO. 14
C00030
RENUM 004042
WATER PCB-SD0000005498
Page 2 Mr. Joseph W. Goldenberg
Horner & Shifrin November 10, 1965
It should be pointed out that on November 8th it was observed that the hydraulic gradient in the 24-inch sewer was approximately 2 feet above the invert of the 36-inch sewer. If the cleaning of the 24-inch sewer doeB not lower the hydraulic gradient as much as anticipated, it will be neces sary to change the hydraulic design of the junction structure. The struc ture will be designed so that this change can be readily accomplished by merely adding some bricks to an overflow weir. However, the change would affect the hydraulic grade at which the 24-inch could overflow to Dead Creek. This overflow gradient is very important to Monsanto Com pany, but must be controlled by the hydraulic gradient required to provide sewer capacity without overflow into Dead Creek during dry weather.
If you have any comments on the above design procedures, please advise us. A copy of this letter is being sent to Paul Hodges for his in formation and any comments he might have.
Very truly yours,
GMS:kt CC: Mr. Paul Hodges Monsanto Company Monsanto, Illinois
Geo. M. Sallwasser
RENUM 004043 WATER PCB-SD0000005499