Document 93g1veR3jMxYyn5QG76by4Dbe
C. Still Operator
.
.
Aroclor Expansion (CEA-l800) Training Program.
Content .
.
.1 General Indoctrination
2* Dept. Organization
3. Introduction to Personnel 4. Dept. Tour
5. Security of Information
6 Safety and Housekeeping
7. Introduction to Training
.8 Classroom Training
9. Field Training
.10 Materials Handling .11 Quality
12. Sampling
.
.
13* Instrumentation
14. Trouble Shooting
15. Recording Data
16. Plant Disaster Plan
_
17. Discussion
-Tff*
PCB-ARCH-EXT0374414
C. Still Operator
1st Week
General Indoctrination
Dept. Organization
Introduction to Personnel
Dept. Tour
Security of Information
Safety and Housekeeping
Introduction to Training
Train on Existing Equipment
2nd Week Monday
Tuesday Wednesday Thursday
Friday
Review Training of Previous Week
.
Materials Handling
Quality
Sampling
Classroom Training on function of equipment
Field training for location of equipment, lines and process flow.
Field training for location of instruments Classroom training for function of instruments
Field training on complete operation of continuous
blow tank. .
"
"
"
"
still operations
"
"
"
"
therminol system
Field training on receivers 3 and 4, surge tanks 3&4, All 4 porocel absorbers both Power Factor Analyzers and finish product tanks 3 and 4.
3rd Week Monday
Tuesday Wednesday Thursday
Friday
Review and discussion of previous training.
Safety, plant disaster plans.
Field train on rework and transfer lines.
.
Field train on therminol system.
Field training on complete process flow on all 4 still systems.
Review instrumentation and panel board. Trouble shooting and discussion on equipment failure.
Review record sheets, how to fill out, where to get
readings and samples.
~
Run #1 and #2 stills.
Open discussion of all equipment and training. Final check-out in field of any problem or question
able areas.
PCB-ARCH-EXT0374415
C. Still Operator
1st Week
1. General Indoctrination Introduction to Arcelor, areas of responsibil ities, plant and dept, procedures *
2. Department organization
Salaried
Hourly
H. Ray - Dept. Supv.
Premium Operator
T. Molloy - Prod. Supt.
Still Operator
V. Brawley - Foreman
Second Operator
J. Cagle -
"
Standard Operator
T. Athmer -
'
Repairman
G. Craine -
Porter
V. Cook -
"
G. Schwartztrauber- Cost Analyst
3. Introduction to personnel
-4. Dept, tour
Existing Equipment
New Equipment
.. .
5. Security of information Reason for security
6. Safety and Housekeeping Discuss dept, safety record, eye protection, safe working habits. Location and use of emergency equipment & how to turn in fire alarm. Discuss housekeeping expected.
7. Introduction to training Discuss briefly how training will be done, subjects to be covered and probable timing.
8. Train on existing equipment Actual training with Premium Operator on existing blow tanks, preheater, stills 1 and 2, jets, receivers, blend and finish product tanks, city water tank and pumps.
2nd Week Monday
1. Review training of previous week. Discussion of Stills 1 and 2
2. Materials Handling
.
Discuss all chemicals used on immediate job in
respect to toxicity, consistency, special
precautions.
3. Quality Review spec sheets and discuss how the opera tion will affect the material specifications.
PCB-ARCH-EXT0374416
C. Still Operator
2nd Week Monday (cont'd)
4. Sampling .
Discuss sampling. Importance of good samples
and how to sample.
-5.
Classroom training on function of equipment. Chalk.talk on function of new equipment and safe limits of each.
Tuesday
1. Field training for location of equipment, lines and process flow. Identify new equipment, trace out all connecting lines and follow process flow.
Wednesday
1. Field training for location of instruments
.
Locate instrumentation in the field and
identify its function.
2. Classroom training for function of instruments. Chalk talk on function and operation of instruments.
Thursday .
1. Field training on complete operation of con tinuous blow tank. Dry-run complete operation of the continuous blow tank.
2. Field training on complete operation of #3 & #4 still operations. Dry-run complete operation of Stills 3 & 4.
3. Field training on complete Therminol system. Dry-run complete operation of therminol system.
Friday
1. Field train on receivers 3 & 4, surge tanks 3 & 4, all 4 porocel absorbers, both power factor analyzers and finish product tanks 3 & 4.
Dry-run complete operation of the above equipment.
3rd Week Monday
.
1. Review and discussion of previous training. Review and discussion of all equipment.
2. Safety and Plant Disaster Plan. Discussion of all safety devices including therminol unit. Review of the Plant Disaster Plan.
3. Field train on rework and transfer lines. Trace all connecting process lines so necessary transfers can be made.. Also locate all valves in lines.
PCB-ARCH-EXT0374417
C. Still Operator
3rd Week
.
Monday- (cont'd)
4. Field train on Therminol system. Final check-out on Therminol system.
Tuesday
1. Field train on complete process flow on all 4 still systems.
Dry-run complete operations of all 4 still systems.
Wednesday
1. Review instrumentation and panel board. Discussion of panel alarms and how to correct problems. Also demonstrate how to change charts.
2. Trouble shooting and discussion on equipment failure. Discuss how to correct problems indicated on instruments on panel board and in field. Discuss in detail, equipment failure and power failure.
Thursday
1. Review record data sheets, how to fill out, where to take readings and samples. Discuss record data sheets so each operator will know what data is needed and how data should be recorded. Also where readings are to be taken from and what they should mean to operations.
2. Run Stills #1 and #2. Run existing Stills 1 and 2 at direction of Premium Operator.
Friday
1. Open discussion of all equipment and training. Question, answer and discussion of any or all subjects.
2. Final check-out in field of any problem or questionable areas. Make final check-out in field, of previous known problem areas of equipment.
PCB-ARCH-EXT0374418
i____
C. Still Operator
3rd Week Monday .
.
*
(Alternate Plan)
-
4
,
.
.
Review and discussion of previous training
Water batch & simulate continuous blow tank operation.
Water batch & simulate #3 Still operation,
#3 Receiver, Surge tank, then
.
Finish Product Tank.
Tuesday
Water batch & simulate #4 still operation,
'
#4 Receiver, Surge tank, then
.
Finish Product tank.
Trouble shoot during simulation.
Wednesday
Water batch & simulate Therminol system operation Pack all Porocel absorbers.
Thursday
Review record sheets, how to fill out, where to get readings & samples. .Review instrumentation on panel board Field train on rework and transfer lines. Discuss equipment and power failure. Discuss polishing filters on absorber lines.
Friday
Open discussion of all equipment and training. Final check-out in field of any problem or question
able areas.
C. Still Operator
3rd Week Monday
(Alternate Plan) 1. Review and discuss previous training.
2. Water batch and simulate continuous blow tank operation. Fill continuous blow tank with 1242 Aroclor and simulate actual operation, pumping material
to #3 still pot.
3. Simulate actual operation of #3 still line.
Circulate material in #3 still pot, check-out
all possible instrumentation, then move material
.
to #3 receiver, surge tank, and finish product
tank.
Tuesday
1. Simulate actual operation of #4 still line.
Circulate material in #4 still pot, check out
all possible instrumentation, then move material
to #4 receiver, surge tank, and finish product
tank.
'
. .
2. Trouble shoot during simulation.
.
Trouble shoot in each possible area to learn
possible problems and corrective action needed.
PCB-ARCH-EXT0374419
C. Still Operator
3rd Week.
(Alternate Plan) - cont'd
Wednesday .
1. Water-batch and simulate Therminol system
operation.
.
Fill Therminol surge tank with 1242 Aroclor
and simulate actual operation, checking out .
instrumentation and trouble shoot to learn
possible problems and corrective action needed.
2. Pack Porocel absorbers. Fill absorbers with Porocel.
Thursday
1. Review record sheets, how to fill out, where to
get readings and samples.
Review record sheets, discussing what informa
tion is needed and what value the readings
. should be to the operator and why it is
necessary to record it. Also discuss sampling,
where to get samples and what is to be done with
.
them.
2. Review instrumentation on panel board. Final check-out on panel board.
3. Field train on rework and transfer lines.
4. Discuss equipment failure and power failure. Discuss what is expected to happen if any equipment should fail and necessary action to be taken.
Discuss what will happen to equipment if the power fails and what are the most critical operation to be performed after failure.
5. Discuss polishing filters on absorber lines. Discuss polishing filters, purpose, and actual change of cartridges and gasket.
Friday
1. Open discussion of all equipment and training.
2. Final check-out in field of any problem or questionable areas.
PCB-ARCH-EXT0374420
B. Premium Operator
Week Beginning Sept. 30, 1968
,
Subject
Water-batch Biphenyl/catalyst mix tank
Check-out instrumentation on Bi0/catalyst mix tank.
Water-batch'#6 through #9 chlorinators.
Check-out instrumentation on all chlorinators.
Check-out instrumentation on intermediate storage
tank.
Check-out panel alarms and instruments.
Trouble Shooting
.
Equipment Failure
Sampling
Data Sheets
1. Water-batch Biphenyl/catalyst mix tank.
Fill mix tank with 1242 Aroclor. Circulate
.............. to check-out line and pump.
.
2. Check-out instrumentation in Biphenyl/catalyst mix tank. Check-out all instrumentation in field and . on panel board, including timer.
3. Water-batch #6 chlorinator Fill #6 chlorinator with 1242 Aroclor. Circulate to check out line and pump.
4. Check-out instrumentation on #6 chlorinator. Check-out all instruments in field and on panel board.
" Oct. 1, 1968 Oct. 2, 1968
1. Water-batch #7, 8 and 9 chlorinators. Check-out all instruments in field and on panel board, giving special attention to the specific gravity controller.
1. Check-out instrumentation on intermediate storage tank. Check-out all instruments in field and on panel board.
2. Check-out panel alarms and instrument control points. Discuss each alarm on panel board stating problems and corrections. Discuss settings and control points on instruments.
PCB-ARCH-EXT0374421
B. Premium Operator
Week Beginning
Subject
Oct. 3, 1968 '
1. Equipment failure Discuss equipment failure and power failure.
2. Sampling Discuss sampling frequency, size bottles, reason for and necessary analysis.
3. Data Sheets Discuss record data sheets, what data is needed, how to record and what it should mean to operations.
4. Check-out HC1 line to condenser and drowning jet. Check-out valve line-up from each chlorinator to the HC1 condenser and to the new drowning jet.
5. Check-out chlorine lines Check-out lines and instrumentation for chlorine addition to each chlorinator.
Oct. 4, 1968
1. Review and discuss all equipment and training.