Document 93Oj0xRzd56oM64DJEY0KqQgL
THIRD QUARTER REVIEW ORGANIC PRODUCTION AND MATERIAL
HANDLING DEPARTMENTS 1965 OBJECTIVES
November 9, 1965
I. SAFETY
1. Have no lost time or near-miss accidents and attain a serious injury index of 12,
None - Serious injury index 12
2. Conduct a Safety Audit on all expanded production facilities within four months of start-up.
Severson to complete audit of Biphenyl Tube by 6/30/65.
3. Complete a minimum of 12 significant safety improvements during the year.
a. Aroclor electrical gear upgraded. b. Safety showers installed - HB-40, Santowax R. c. Old hydrogen compressors, and gas meter room dismantled. d. New Muriatic Acid loading dock and piping. e. Eye wash bottles - all control rooms. f. Benzene loading dock upgraded safety-wise by replacing ladder
with steps and handrail. g. Gas meters removed Santowax R control area. h. Hazardous Santowax melt pots dismantled. i. Enclosed Santowax R control area. j. New Muriatic Acid Department. k. Eliminated very hazardous Santowax C draw-off required in
manufacture of Aroclor 2565 by installation of steam jacketed loading line. Also eliminated handling problems to put material in chlorinators. l. Daily log of pressure condition on three deluge systems at tubular unit. m. Improved OM piping eliminated drum draw-off and reworking operation. n. Eliminated hazardous operation of operating two Biphenyl stills with one receiver in manufacture of Biphenyl F. Piped in Biphenyl F tank. o. Safety showers at HC1 and Aroclor installed. p. New HC1 facilities installed with improved piping and PVC coated grating throughout. q. Aroclor chlorinator sampling facilities improved. r. Reduced use of gas torches in Aroclor - new therminol system installed. s. Level instruments on Aroclor tanks - eliminates measuring sticks and tank openings as tripping hazards.
DSW 551659
STLCOPCB4090076
Third Quarter Review
-2-
November 9, 1965
t. Replaced North wall of Aroclor building. u. New Biphenyl transfer line eliminated hazards in transfer
for chlorinator charges. v. New HC1 transfer line replaced an old line which caused HC1
fume problems.
A. Safety and Housekeeping inspection to be conducted by Superintendent monthly with responsible foreman and/or supervisor. Housekeeping to improve to Plant Manager's satisfaction.
II. QUALITY OPERATIONS
1. Average quality score of 95 minimum to be achieved.
Aroclor Biphenyl Chlorine
88.A 103.7 101.1
2. Obtain no more than three justifiable quality complaints, and a complaint index of 2.0 per M pounds production.
Complaint Index 3.5 Number of complaints - 11 - 2 justified R.F.T. Index 98.8
3. Obtain no more than eight justifiable service complaints, and a complaint index of A.O per M pounds production.
6 complaints to date - A justified - Carrier error
Complaint Index - 3.6
A. Complete Quality Audit on Liquid and Solid Aroclors and develop plan for quality improvement for these products.
Nothing done - TSD to initiate Quality Control Board Program
5. Achieve a minimum of two significant product quality improvements.
a. Aluminum Aroclor storage tanks. b. Relocate HB-AO draw-off line - Reactor Grade HB-AO. c. Defined operating conditions to allow OM production
in normal reactor grade specification. d. Modified Biphenyl tubular unit stripping column operation
to allow 10th tray control which minimized production of terphenyls. e. Cleaned up HC1 feed gas to Muriatic Acid Department. Should result in acid improvement before end of 1965.
DSV"551660
STLCOPCB4090077
Third Quarter Review
-3- November 9, 1965
III. COST IMPROVEMENT
1. Achieve raw material savings of $130,000 from 1964 practice. The yield
on the following to be:
1965
Achieved
Target
Third
Dollar
lbs/cwt
Quarter
Savings
Benzene Muriatic Acid Cr. (Liq. Arodors) Muriatic Acid Cr. (Sol. Aroclors) Anhydrous HC1 Mercury (826.36) Mercury (827.50) KC1
98.5% Theory
43.0
64.0 116.0
0.021 0.03 141.00
99.7
38.12
64.79 117.65
0.014 0.021 142.79
$ 13,020
-9,448
6,452 0
26,213 43,180
1,380
$ 80,797
All raw materials 3rd Quarter savings $79,700 versus targeted $95,000.
2. Labor utilization to be improved 77,, by increased productivity, and more effective production planning.
Product
1964 Usage
3rd Quarter T/D 1965 Usage
Hours Savings
Biphenyl Santowax R HB-40 Liq. Aroclors Sol. Aroclors HC1
Cl2 - NaOH KOH
.
0.078 0.096 0.143 0.073 0.212 0.032 0.045 0.062
0.067 0.090 0.152 0.062 0.206 0.036 0.046 0.062
3,300 410
- 390 2,625
290 - 420 - 175
0
5,640
5,640 = 5.3% equivalent to $20,300 savings 106,309
Organic Production 3rd Quarter 1965
148 M Lbs.
Organic Production 3rd Quarter 1964 =
125 M Lbs.
23 M Lbs. = 15.5%
Actual Manhours 3/4 1965 = 81,400
Actual Manhours 3/4 1964 = 80,734
DSW 551661
STLCOPCB4090078
Third Quarter Review -4- November 9, 1965
III.
3. Achieve overall plant on-stream time of 93.2%, process downtime maximum of 1.0%, and all other downtime less than 2.3%. Process downtime to be improved by better control of process, and other downtime by scheduling, and better utilization of surge capacity between products.
a. On-stream time b. Process downtime c. Other downtime d. Repair downtime
88.8 2.1 4.8 4.3
4. Assist in development and start-up of specific cost reduction items with savings of $330,000. To date $194,000.
5. Improve direct manufacturing costs other than labor at a rate at least proportional to the volume increases.
Product
3rd Qtr. 1965 D.C.
1964 D.C.
Savings Direct $/cwt.
$ Gain, or $ Loss*
Biphenyl Santowax HB-40 Liq. Aroclors Sol. Aroclors Muriatic Acid
Cl2 - NaOH K0H
0.998 0.525 0.399 0.543 2.135 0.577 0.648 1.890
1.305 0.737 1.355 0.646 2.136 0.452 0.571 1.686
0.307 0.212 0.956
0.103 0.001 0.125
0.077 0.204
$92,500 14,400 41,620 24,570 0 13,160* 13,600* 42,270*
Net Gain =
$103,560
Dollar Improvement -
$ 104 M _ o oy
Total Dollars Directs = $1,258 M - \
Volume Increase = 15.5%
6. Achieve 97% on-time shipments - 2.8%
DS\N 551662 STLCOPCB4090079
Third Quarter Review
-5- November 9, 1965
IV. METHOD AND FACILITIES IMPROVEMENT
1. Complete start-up of PNP Department, obtaining design rate within 60 days with start-up costs of less than 10% of the capital expenditure. OK
2. Complete start-up of Aroclor Expansion, and demonstrate design rate
with 60 days of construction completion. Start-up expenses not to
exceed 10% of capital expenditure.
OK
3. Complete start-up of Muriatic Acid facilities, and achieve 90% absorption
efficiency within 30 days of completion. Start-up expenses not to
' exceed 8% of capital expenditure.
OK
4. Assist in development of scope and provide liaison for Finished Goods
Packaging, and Warehousing Ptojeot..
OK
5. Implement and assist in development of HB-40 project. Project approval
to be obtained by 10/15/65.
Cannot be justified.
6. Assist and provide liaison for replacement project for Mechanical
Rectifiers. Project approval to be obtained by 9/1/65.
OK
7. Implement and assist in development of Biphenyl Still Project. Project
scope defined by 10/1/65.
OK
8. Audif of all reports and records for possible simplification or
elimination.
Minor improvements only.
9. Develop measurement and controls for "Work to Assist" costs and report
on a quarterly basis.
No formal program..
V. PERSONNEL IMPROVEMENT
1. Continue F.L.I.T. Operator Training Program for remaining and new operators. Training to be completed by 1/1/66.
Training in progress - 24 operators to be trained.
2. Process Function Outlines completed for three manufacturing facilities, and operator training utilizing these outlines to be completed by 1/1/66, Done
3. Develop realistic targets for each operating facility for operators. Performance report to be published monthly.
Decided not to publish for operator - supervision only.
4. Develop more objective Position Guides for all supervisory personnel.
Moody and Supervisors by 7/1/65.
Nothing done - will get 4th Quarter.
Conduct at least two supervisory training meetings during the year,
Subject to be:
a. I.F.O's and P.F.O's - use and training -
b. Cost Standards and Reports - Done
c. Production Planning
d. Start-Up Procedures - new facilities - Done
DSW 551663
STLCOPCB4090080