Document 932978LdoZYwxYoOyZB6EVBb6
Monsanto
.
teT.o, E. E. Stewart, Krummrlch
1 March 3, 1972
UtJtCT <
STATUS - PCB POLLUTION CONTROL PROGRAM
TO :
Mr. J. R. Savage General Offices
B-2-N
COA1PAPJY
COUFIDENTIM
" Messrs
G. L. :
C. F. ] w. c. :Engmafl p. e. : g. a. :
A. e. :
B. ]
w. r. :
This Is the March 1, 1972 status of the PCS pollution control program.
I. PCB LEVEL IN SEWERS
Aroclor sewer loss control data are attached. February losses from the plant were about 3-1/2 tlme6 greater than last month, but losses from the Treatment Ple.nt to the river were slightly lower than last month.
A. Aroclor Department - Higher than normal losses from the department are attributed primarily to two causes, Aroclor 1105 was produced until 2/7 and during this period all the off-gas is sewered, and the oTf-gas temperatures are at 80*C from both the continuous and the batch chlorinators (normally 40*C). Also, during the period 2/7 to 2/19 excess off-gas was sewered at the Dept. 246 area. Calculations and grab samples taken at the HC1 scrubbing Jet would indicate 1-2 PCS/ hr are sewered when the off-gas Is sewered. Since 2/19, there has been very little sewering of off-gas at the department. 98# of the Aroclor off-gas is being used for C/S acid production. The C/S scrubber Is being analyzed to determine disposition of PCB at the c/S department.
Preliminary work has been started to prepare a project for the installation of another HC1 off-gas scrubber at the Aroclor department. $2500-5000 WGK Research costs and $30,000 project costs may be required.
B. Total Plant - Losses are measured at the Waste Treatment Plant Influent. February losses of 47 #/day compare with 13 ff/day in January. Continuing to compare results from drum sampler with flip-flop isokinetic sampler. Data erratic because of freeze-ups with isokinetic sampler. More data required before changing from existing drum sampler.
MONS 099064
Mr. J. R. Savage STATUS-PCB POLLUTION
CONTROL PROGRAM
Page 8 3/5/72 WGK
I. PCB LEVEL IN SEWERS (cont'd) r
C. Treatment Plant Effluent - February losses of 10 #/day slightly better than 11 #/day last month. Best has been 5 #/day and goal Is < 1 #/day. Do not expect to make further significant reductions until additional clean-up Is made to the sewered
HC1 off-gas from the department.
II. PROJECT STATUS
Estimate No.
J102
"Enlarge Aroclor Settling Basin" Project completed during month.
3500
"Repair Sewer and Paving in Second Street" Design complete. Submitted for bids to outside. Expect completion 5/1/72.
3694
"Ex/tend Pad at Truck Loading Docks". To Vbaeftftaesr* conata4 inn 1lnoescsoeos aaft frt>hv!iss aay*rea. In progress.
III. PROGRAM STATUS
A program hasibeen developed by the PCB Task Force Committee that should permit us to reduce PCB losses from the department to about 1 #/day. The specific program Is attached.
Edward E. Stewart Technical Services Department
/tm
MONS 099065
OFF-GAS SCRUBBER
production
Pally check and record of demister operation and off-gas
temperature control.
(In progress)
Coordinate 16 production with 217 and sewer
excess gas from 236 at 236.
(March start)
Maintenance
Technical Services
Verify off-gas calculated losses Scrubbing process defined & demonstrate In Lab.
Prepare project (Estimate) to scrub off-gas.
Coordinate design of WGK scrubber abtivity with CEP activity related to 1109 design.
(3/5)
(March & April) (March ic April)
MONS 099067
AIR-BLOW REDUCTIONS
Production Step-down air blowing and minimize production of ^ 1248 In batch chlorlnators.
Maintenance
Technical Services
Prepare project to scrub air-blow.
' (April)
(will hold pending reduction noted in off-gas
project)
,
\
HONS 099068
SETTLING & SEWER MUST FUNCTION PER DESIGN r
Production Pally Inspection of basins (In progress)
Maintenance
Project S^SS - Install PCB level alarm In North
Settling Basin
'
(March)
Technical Services Get PCB level probes v/orklng In North Settling Basin
and in off-gas storage tanks.
Develop technique to reduce PCB content In tank car
washes to si 400 ppb.
.
i
Modify basin to effect more efficient skimming.
Modify South basin to lower the level.
(March)
(March) (March-April) (March-April)
MONS 099069
rr
i Production
CONTAIN PHYSICAL LOSSES r
Maintenance Complete Project 3500 "Repair Sewer at 2nd Street". Project 369** "Extend pad at truck loading dock."
(5/15) (3A0)
Technical Services
Premise for containment at loading docks.
Premise for automatic cut-off during loading of tank cars.
(April-May) (April-May)
MONS 099070
EXTRAS
f
Production Drip pan - bucket- drum color procedural emphasis
Water off in-line power factor analyzer
Altering procedure of clean-up (less water, more physical pick-up).
(March-April) (February)
(In progress)
Maintenance
Replace city water break tank
Pump' Shop project
Maintenance man Inspects all pumps on monthly balss.
Monitor project y\wy$*^
.
(3/J) (3/15) (In progress) ("/!)
Technical Services Verify accuracy of laboratory method Define specific sampling procedure Select pump and define future sampling program
(February) (March) (March)