EPA REGION 5 Enforcement and Compliance Assurance Division INSPECTION REPORT
Inspection Entry Date/Time Inspection Exit Date/Time Weather Media Statute(s)/Program(s) Type of Inspection
04/18/2024 02:52 PM (CT)
Announced: No
04/18/2024 3:42 PM (CT)
Access: Granted
Intermittent rain and close to 60 degrees Fahrenheit
Water
Clean Water Act, NPDES, Stormwater - Industrial
Industrial Stormwater Inspection (ISI)
Permittee Name Facility or Site Name Facility/Site Physical Address City, State, Zip Code County Facility GPS Coordinates Mailing Address City, State, Zip Code
Northeast Asphalt, Inc. (Pearl Quarry) Northeast Asphalt, Inc. (Pearl Quarry) W1396 Pearl Street Oneida, Wisconsin 54165 Outagamie 44.519465, - 88.257141 N3 W23650 Badinger Road Waukesha, WI 53118
FRS ID Permit Number SIC and/or NEACS
WIR051IA0B 1422
Regulatory Representatives Participating in Inspection:
Title
Name
N/A
N/A
Organization N/A
Lead Inspector: Danny Nguyen
Supervisor Review: Mr. Brooke Furio
DANNY NGUYEN Date: 2024.06.14 07:30:54 -04'00' Digitally signed by DANNY NGUYEN
EPA REGION 5
nguyen.danny@epa.gov
(440) 250-1709
BROOKE FURIO Date: 2024.06.14 07:46:28 -04'00' Digitally signed by BROOKE FURIO
EPA REGION 5
furio.brooke@epa.gov
(440) 250-1705
1 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
SECTION I - INTRODUCTION
Site Entry and Inspection Objectives
EPA REGION 5 inspector, Danny Nguyen, arrived at Northeast Asphalt, Inc. Pearl Quarry (NEA - Pearl), located at W1396 Pearl Street, Oneida, Wisconsin 54165, at 02:52PM (CT) on 04/18/2024 for an unannounced inspection. Mr. Nguyen presented his credentials to Mr. Zach Leitner and informed him that this was an EPA REGION 5 inspection to investigate elements of the Clean Water Act (CWA) and applicable regulations. This report is based on information supplied by NEA - Pearl's representatives, direct observations made by the EPA REGION 5 inspectors, records and reports maintained by the permittee and other information including: photographs taken by EPA REGION 5 inspectors, physical evidence collected by the EPA REGION 5 inspectors, measurements taken by EPA REGION 5 inspectors, verbal or written statements made by information supplied by NEA - Pearl's representatives during or subsequent to the on-site inspection, and materials, processes, data, photographs, or documents shown, demonstrated, or submitted to the EPA REGION 5 inspectors by NEA - Pearl's representatives during or subsequent to the on-site inspection. In addition, information gathered prior to or subsequent to the inspection from a review of EPA, State, and/or public records may be included in this report.
Attendees Organization
EPA REGION 5 Walbec Group
Attendee Name
Danny Nguyen Zach Leitner
Facility/Site Description
Title
NPDES Inspector Environmental Coordinator
Present in Opening Conf. Yes
Yes
Present in Closing Conf. Yes
Yes
EPA REGION 5 inspector confirmed the following Facility information:
NEA - Pearl applied for and was issued a Multi Sector General Permit (MSGP) to Discharge Under the United States Environmental Protection Agency (EPA) National Pollution Discharge Elimination System NPDES ID WIR05IA0B. Northeast Asphalt, Inc. (NEA) is one of six companies that make up the Walbec Group who produces construction materials and services to their customers. NEA produces and provides asphalt pavement services and products throughout Northern Wisconsin. According to the site's Notice of Intent (NOI), Pearl Quarry is a nonmetallic sand and gravel pit/quarry, in which sand and stone are excavated/blasted, crushed, and sorted into specified gradation stockpiles. Mobile petroleum crushing plants are brought in for crushing and washing operations. Pearl Quarry is owned by the Oneida Tribal Nation and NEA-Pearl leases the quarry for operations.
Stormwater does not directly discharge from the quarry. Stormwater is collected at the southeast corner in the quarry in a sump hole. NEA - Pearl conducts dewatering operations on an as needed basis by pumping out the stormwater from the quarry sump hole and discharges through a hose to a stormwater ditch that flows south where it merges with a west-east flowing community stormwater ditch.
Facility/Site Information
Responsible official
Verify SIC Code Personnel conducting inspections/sampling
Zach Leitner 1422 Max Pace
2 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
Sampling locations Samples taken from end of pump hose discharging to the stormwater ditch
Copy of the SWPPP Yes
Number of employees 1 operator at site
Receiving Water
Unnamed tributary to Duck Creek
Number/location of Stormwater Inlets/ Outfalls/Drains including near docks or storage areas and where they initially drain (MS4, ditch detention basin)
Stormwater is discharged through dewatering operations from a sump hole in the quarry via hose and discharged to a stormwater ditch that flows south parallel to the site entrance road. No direct discharge outfalls at the site.
BMPs/Stormwater Treatment
Frequent visual inspections, good housekeeping, erosion control, spill prevention and response.
Industrial activities exposed to stormwater
Aggregate stockpiles, mobile crushing plants, and portable fuel storage tanks
Industrial Sector/Sub- J/J2 sector
Type of Operation Nonmetallic sand and stone excavation/blasting, crushing, and washing
Shifts/Hours/Days of During non-winter months 6:00 AM - 5:00 PM, winter months 7:00 AM - 3:00 PM Operations/Shutdowns Monday through Friday
Size of Facility
21 acres
Is the SWPPP team No present
Name of the person engaging with the inspector
Zach Leitner
Type of materials
Aggregate materials, mobile crushing plants, and portable fuel storage tanks
and/or vehicles stored
outdoors
Location(s) Location/Area/Sub-area Outdoor area
Description
The outdoor area consists of aggregate stockpiles within the quarry. Outside the quarry is grass and vegetated areas with a large dirt pile on the northeast side of the site outside the quarry.
3 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
SECTION II - OBSERVATIONS
Location: Opening Conference Observation #: DN1-OC-001
Date: 04/18/2024
Weather: Intermittent heavy rain and close to 60 degrees Fahrenheit
EPA observed the following, during the opening conference:
Mr. Leitner stated the entire Pearl Quarry property is currently being leased from the Oneida Tribal Nation. Oneida is the owner/lessor and NEA is the lessee for the entire property (reference document number 2020-0006 commercial lease dated March 2, 2020).
Pearl Quarry conducts similar operations as the Hobart Aggregate Site that is owned by NEA. Mr. Leitner stated there is no direct discharge of stormwater from the quarry into any receiving waters.
Stormwater collects in a sump hole on the southeast corner of the quarry and is pumped to the top of the quarry via a pump and hose where the stormwater is discharged into the site's stormwater ditch which ultimately merges with a west to east stormwater ditch that runs parallel with Pearl Street and ultimately discharges to Duck Creek approximately a mile away.
Location: Outdoor area Observation #: DN1-OB-001
Date: 04/18/2024
Weather: Intermittent heavy rain and close to 60 degrees Fahrenheit
EPA observed the following, during the walkthrough of the outdoor area:
On the north side of the site outside the quarry, Mr. Nguyen observed a retention depression filled with water. The depression is contained by a high berm around its perimeter. The depression is not listed in the NEA - Pearl's SWPPP.
Mr. Nguyen observed stormwater pooled in another depression on the north side close to the neighbor's property line per Mr. Leitner.
At the top of the quarry next to the stormwater ditch, Mr. Nguyen observed the dewatering of stormwater discharging from the sump hole to the ditch via the discharge hose. Mr. Leitner stated samples and quarterly assessments are taken from the end of the discharge hose into the ditch. He stated that routine inspections were not being conducted.
Mr. Nguyen observed the stormwater discharged from the hose flowing south parallel to the site entrance road. Mr. Leitner stated the ditch merges with a west to east flowing ditch that collects from other sites and facilities and ultimately to Duck Creek.
No permit coverage sign was observed during the walkthrough. Mr. Leitner stated the facility did not have a coverage sign displayed on the property.
4 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
Photos 1. DSCN0700.JPG 2. DSCN0701.JPG 3. DSCN0702.JPG 4. DSCN0703.JPG 5. DSCN0704.JPG 6. DSCN0705.JPG 7. DSCN0706.JPG 8. DSCN0707.JPG 9. DSCN0708.JPG 10. DSCN0709.JPG 11. DSCN0710.JPG 12. DSCN0711.JPG 13. DSCN0712.JPG 14. DSCN0713.JPG 15. DSCN0714.JPG 16. DSCN0715.JPG 17. DSCN0716.JPG 18. DSCN0717.JPG 19. DSCN0718.JPG 20. DSCN0719.JPG 21. DSCN0720.JPG 22. DSCN0721.JPG
5 of 33
04/18/2024
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
SECTION III - RECORDS REVIEW
Records may not be in sequential order.
Record: SWPPP Ref #: DN1-RR-001
Reviewed By: Danny Nguyen
AOC: Yes Reviewed Date: 04/26/2024
The latest SWPPP (12/19/2022) was reviewed and the following observations were made:
The SWPPP still references Wisconsin state stormwater permit program. The Multi-Sector General Permit (MSGP) is a USEPA program for industrial facilities that fall within Tribal lands.
The SWPP did not include `Site Description' meeting all requirements in Section 6.2.2 of the MSGP. The SWPPP did not include inspection and corrective action procedures meeting requirements in Section
6.2.5.2 of the MSGP.
Record: Personnel Training
Ref #: DN1-RR-002
Reviewed By: Danny Nguyen
AOC: Yes Reviewed Date: 04/18/2024
Documentation of employee training as required under the permit was not provided.
Record: Inspection Reports
Ref #: DN1-RR-003
Reviewed By:
AOC: Yes Reviewed Date:
Documentation of inspections (routine or quarterly assessments) as required under the permit were not provided. Mr. Leitner stated that routine inspections were not being conducted and quarterly visual assessments were not being conducted since no stormwater is leaving the active operations in the quarry.
SECTION IV - SAMPLING ACTIVITIES AND ANALYTICAL RESULTS No sampling was conducted.
SECTION V - AREA OF CONCERN Areas of Concern may not be in sequential order. The presentation of Areas of Concern does not constitute a formal compliance determination or violation.
6 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
AOC Reference #: DN1-OC-001
Location: Opening Conference
Regulation and/or Permit Requirement
04/18/2024
Section 3.2.1 of the EPA Multi-Sector General Permit (MSGP) requires "The permittee once each quarter for the entire permit coverage, must collect a stormwater sample from each discharge point (except as noted in Part 3.2.4) and conduct a visual assessment of each of these samples" and Section 3.2.2.1 through 3.2.2.5 "must conduct the quarterly visual assessment procedures outlined in Sections 3.2.2.1 through 3.2.2.5 of the samples."
Additionally, Section 3.2.3 of the EPA MSGP requires "The permittee must document the results of the visual assessments with information outlined in Sections 3.2.3.1 through 3.2.3.8 in the MSGP and maintain onsite with the SWPPP."
AOC:
Quarterly visual assessments are not being conducted and documented as required in the MSGP.
AOC Reference #: DN1-OB-001
Location: Outdoor area
Regulation and/or Permit Requirement
Section 1.3.5 of the EPA MSGP requires "The permittee must post a sign or notice of your permit coverage at a safe, publicly accessible location in close proximity to the facility"
AOC: No sign or notice of permit coverage was observed during the facility walkthrough.
Regulation and/or Permit Requirement
AOC Reference #: DN1-RR-001
Record: SWPPP
Regulation and/or Permit Requirement
Section 6.2.2 of the EPA MSGP requires "The permittee must include in the SWPPP a site description as required in Sections 6.2.2.1 through 6.2.2.3."
AOC: The most current SWPPP reviewed did not include site description meeting requirements in Section 6.2.2.
7 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
AOC Reference #: DN1-RR-001
Record: SWPPP
Regulation and/or Permit Requirement
04/18/2024
Section 6.2.5.2 of the EPA MSGP requires "The permittee must document in the SWPPP your procedures for performing, as appropriate, the types of inspections specified by the permit" and Section 6.2.5.3 requires "The permittee must document in the SWPPP procedures for conducting the six types of analytical stormwater discharge monitoring specified by the permit."
AOC:
The SWPPP did not include inspection and corrective action procedures meeting requirements in Section 6.2.5.2.
AOC Reference #: DN1-RR-002
Records: Training
Regulation and/or Permit Requirement
Section 2.1.2.8 (a) & (b) of the EPA MSGP requires "The permittee must train all employees who work in areas where industrial materials or activities are exposed to stormwater, or who are responsible for implementing activities necessary to comply with this permit (e.g., inspectors, maintenance personnel), including all members of your stormwater pollution prevention team" and Section 6.2.5.1(e) "The elements of your employee training plan shall include all, but not necessarily limited to, the requirements set forth in Part 2.1.2.8, and also the content of the training, the frequency/schedule of training for employees who work in areas where industrial materials or activities are exposed to stormwater, or who are responsible for implementing activities necessary to meet the conditions of this permit and a log of the dates on which specific employees received training."
Additionally, Part 8, Section 8.J.5.1 of the MSGP for sector specific requirements requires "The permittee must conduct employee training at least annually at active and temporarily inactive sites. (See also Part 2.1.2.8)."
AOC: Documentation of employee training as required under the permit was not provided.
8 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
AOC Reference #: DN1-RR-003
Records: Inspections
Regulation and/or Permit Requirement
04/18/2024
Section 3.1 and 3.1.6 of the EPA Multi-Sector General Permit (MSGP) requires "The permittee must perform routine facility inspections of areas as covered by requirements in the permit" and to "document the findings of the inspections and maintain the reports in the SWPPP."
AOC: No documentation on routine inspections was provided.
SECTION VI - CLOSING CONFERENCE AND FOLLOW UP
Closing Conference
The EPA REGION 5 Inspector held a closing conference with Mr. Leitner at 3:30 PM (CT) on 04/18/2024 for the inspection. During the closing conference, Mr. Nguyen discussed the observations and Area(s) of Concern identified during the inspection. Observations and Area(s) of Concern have not yet been evaluated for a formal compliance determination.
Mr. Leitner did not make a CBI claim. EPA communicated to Mr. Leitner that the inspection report will be emailed to him within 70 days of the day of the inspection.
SECTION VII - LIST OF APPENDICES 1. Facility Action Map (from NEA - Pearl's SWPPP) 2. Photo Log 3. Document Log
9 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
APPENDIX 1: Facility Action Map (from NEA's SWPPP)
04/18/2024
10 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
APPENDIX 2: PHOTO LOG
04/18/2024
Road Into Quarry 04/18/2024 03:04 PM Outdoor area facing west Overview of Pearl Quarry
No CBI
No PII
DSCN0700.JPG Photographer: Danny Nguyen 44.444175, - 88.179283
11 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
Inside of Quarry
04/18/2024 03:04 PM
No CBI
Outdoor area in quarry facing southwest
Southeast side in Quarry
No PII
DSCN0701.JPG Photographer: Danny Nguyen 44.518765, - 88.254745
12 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
Stormwater Sump Hole
DSCN0702.JPG
04/16/2024 03:05 PM
No CBI
No PII Photographer: Danny Nguyen
Outdoor area facing south
44.518618, - 88.254598
Stormwater collection area on southeast corner in quarry
13 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
Stormwater Sump Hole
DSCN0703.JPG
04/18/2024 03:05 PM No CBI
No PII Photographer: Danny Nguyen
Outdoor area facing south
44.518618, - 88.254598
Hose from stormwater sump hole in quarry to discharge area
14 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
Inside of Quarry
04/18/2024 03:08 PM No CBI
No PII
Outdoor area facing northwest
Overview inside of Quarry (northwest side)
DSCN0704.JPG Photographer: Danny Nguyen 44.518775, - 88.254752
15 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
Northside of Quarry
04/18/2024 03:10 PM
No CBI
Outdoor area facing northeast
Dirt pile on north side of quarry
No PII
DSCN0705.JPG Photographer: Danny Nguyen 44.521018, - 88.256548
16 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
Stormwater Drainage Ditch
DSCN0706.JPG
04/18/2024 03:12 PM
No CBI
No PII Photographer: Danny Nguyen
Outdoor Area facing north
44.521048, - 88.256728
Stormwater drainage ditch on north side outside of quarry
17 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
Stormwater Drainage Collection Area
DSCN0707.JPG
04/18/2024 03:14 PM
No CBI
No PII Photographer: Danny Nguyen
Outdoor Area facing north
44.521612, - 88.257335
Stormwater drainage ditch to collection area north side of quarry
18 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
Stormwater Depression
DSCN0708.JPG
04/18/2024 03:16 PM
No CBI
No PII Photographer: Danny Nguyen
Outdoor Area facing north
44.521395, - 88.256363
Stormwater collected in depression on north side of quarry (not described in the SWPPP).
19 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
Westside of Quarry
04/18/2024 03:20 PM
No CBI
Outdoor Area facing west
Overview of northwest side of quarry
No PII
DSCN0709.JPG Photographer: Danny Nguyen 44.521205, - 88.25619
20 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
Westside of Quarry
04/16/2024 03:21 PM
No CBI
Outdoor Area facing west
Overview of southwest side of quarry
No PII
DSCN0710.JPG Photographer: Danny Nguyen 44.519075, - 88.257612
21 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
Stormwater Hose on Top of Quarry
DSCN0711.JPG
04/18/2024 02:23 PM
No CBI
No PII Photographer: Danny Nguyen
Outdoor Area facing northeast
44.51812, - 88.254393
Stormwater hose from collection area in quarry up to stormwater ditch
22 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
Stormwater Pump Power Station
04/18/2024 03:23 PM
No CBI
No PII
Outdoor Area facing west
Stormwater pump power station on top of quarry
DSCN0712.JPG Photographer: Danny Nguyen 44.518194, - 88.254218
23 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
Hose to Stormwater Ditch
DSCN0713.JPG
04/18/2024 03:23 PM
No CBI
No PII Photographer: Danny Nguyen
Outdoor Area facing south
44.518227, - 88.254253
Stormwater hose from collection area in quarry up to stormwater ditch
24 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
Stormwater Discharge to Ditch
DSCN0714.JPG
04/18/2024 03:23 PM
No CBI
No PII Photographer: Danny Nguyen
Outdoor Area facing northeast
44.518125, - 88.254277
Stormwater hose from collection area in quarry discharging to stormwater ditch
25 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
Stormwater Ditch Flowing South
DSCN0715.JPG
04/18/2024 03:24 PM
No CBI
No PII Photographer: Danny Nguyen
Outdoor Area facing south
44.518078, - 88.254292
Stormwater ditch flowing south parallel to site entrance road
26 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
Quarry Overview from Top
04/18/2024 03:25 PM
No CBI
Outdoor Area facing north
Overview of Pearl Quarry from top
No PII
DSCN0716.JPG Photographer: Danny Nguyen 44.518187, - 88.254228
27 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
Pearl Quarry Entrance
DSCN0717.JPG
04/18/2024 03:25 PM
No CBI
No PII Photographer: Danny Nguyen
Outdoor Area facing east
44.51812, - 88.254393
Entrance to Pearl Quarry next to stormwater discharge to ditch at top of quarry
28 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
Stormwater Ditch
DSCN0718.JPG
04/18/2024 03:30 PM
No CBI
No PII Photographer: Danny Nguyen
Outdoor Area facing north
44.51692, - 88.253818
Stormwater flow along ditch out of quarry entrance and parallel to road entrance (on leased property).
29 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
Stormwater Ditch
DSCN0719.JPG
04/18/2024 03:30 PM
No CBI
No PII Photographer: Danny Nguyen
Outdoor Area facing south
44.516743, - 88.253758
Stormwater flowing along ditch south towards merge with Pearl Street west-east stormwater ditch (on leased property up to Pearl Road and east west ditch)
30 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
Stormwater Ditch to Pearl Street Culver
DSCN0720.JPG
04/18/2024 03:31 PM
No CBI
No PII Photographer: Danny Nguyen
Outdoor Area facing northeast
44.516457, - 88.25386
Stormwater flow from Pearl Quarry merging with Pearl Street west-east stormwater ditch/culvert
31 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
04/18/2024
Pearl Street Stormwater Ditch
DSCN0721.JPG
04/18/2024 03:31 PM
No CBI
No PII Photographer: Danny Nguyen
Outdoor Area facing east
44.516467, - 88.253602
Stormwater flow under Pearl Quarry Entrance Road culvert flowing east merging with stormwater from other properties. Ultimately flows to Duck Creek approximately 1 mile away (not on leased property).
32 of 33
Northeast Asphalt, Inc. (Pearl Quarry) Inspection Date:
APPENDIX 2: DOCUMENT LOG Document Type Document Name Email Attachment Pearl Quarry SWPPP.pdf
04/18/2024
Contains Contains Sent/Uploaded By Date Received
CBI
PII
No
No
Zach Leitner
04/17/2024
33 of 33