PLANT MANAGER'S SAFETY BOARD MINUTES OF MEETING AUGUST 20, 1980 Present were: G.W. C.M. G.A. G.W. J.E. Bostick Cruse Danner Daues Fox for J.A. Glass J.E. Fox for D.E. Kaldenberg B.C. Lancaster C.M. McCullough G.L. McKee D.W. Metten M.L. Owens G.T. Ryan J.G. Trafton G.L. Tromblee REVIEW OF STATISTICS--J.E. Fox/J.A. Glass A. Texas City Plant Safety Performance Summary - July 1980 TOTAL INJURY CASES 1979 1980 1980 JUL YTD JUL YTD TARGETS 12 131 26 126 -- RECORDABLE CASES (A) WITHOUT LOST WORKDAYS (medical treatment only) (B) LOST WORKDAYS **Bi RESTRICTED ACTIVITY **B2 DAYS AWAY FROM WORK (C) FATALITIES 2 0 0 0 __ 0 11 0 20 10 10 0 __ 0 5 1 0 1 __ 0 15 7 -- -- -- *T0TAL RECORDABLE CASES 2 13 0 __ 6 22 *A+B+C = TOTAL RECORDABLE INJURIES **B!+B2 = (B) TOTAL LOST WORKDAY CASES INJURY RATES PER 200,000 MANHOURS 1979 1980 1980 MTD YTD MTD YTD TARGETS TOTAL INJURY - TIR TOTAL RECORDABLE - TRR TOTAL LOST WORKDAY - TLWR DAYS AWAY FROM WORK - DAWR 8.43 1.40 0.00 0.00 13.16 1.31 0.20 0.10 18.64 0.00 0.00 0.00 12.62 0.60 0.10 0.10 -- 1.26 0.40 -- YTD 1980 MCIC TARGET YTD -- 1.94 0.58 -- -- 1.55 0.38 -- 003386 i^wioo**00 PMSB Minutes of Meeting of August 20, 1980 Page 2 B. Comments on Statistics There were no Recordable Injuries during the month of July although a total of twenty-six (26) Industrial Injuries were recorded. This com pared with sixteen (16) Industrial Injuries for June of this year and twelve (12) for the month of July last year. Striking-Against and Lifting-Pushing-Pulling-Type accidents caused over forty (40Z) per cent of the Total Injuries. C. Onits and Groups with Rising Trendlines Rising trendlines for at least the last two months have been recorded in Power 2, Dept. 53, Dept. 51, Dept. 513, Truckers and Laborers, and Carpenters. Areas indicating a rising trendline outside of control for only one month were Dept. 48/56 and Dept. 33. D. Contractor Safety--C.M. McCullough The Recordable Injury Rate for July was the same as June where a reduction in rate had taken place. Injury rates are still lower than recorded over the previous few months. E. CEP Project Safety--B.C. Lancaster They reported on two Recordable Injuries: 1.) Where a Pipefitter collapsed on top of a Dept. 51 tank; and 2.) Where a Laborer received blisters on his feet from an unknown source. JULY 1980 YTD as of 8/1/80 TOTAL INJURY CASES 11 34 RECORDABLE CASES (A) WITHOUT LOST WORKDAYS (medical treatment only) (B) LOST WORKDAYS **Bi RESTRICTED ACTIVITY **B2 DAYS AWAY FROM WORK (C) FATALITIES 1 0 0 0 _0_ 1 2 0 2 0 *T0TAL RECORDABLE CASES 13 TOTAL MANHOURS WORKED (MHW) 19,127 82,029 SC 003387 LAM004401 PMSB Minutes of Meeting of August 20, 1980 Page 3 FREQUENCY RATES/200,000 MHW TOTAL INJURY RATE TOTAL RECORDABLE RATE TOTAL LOST WORKDAY RATE TOTAL DAYS-AWAY-FROM-WORK RATE 115.0 10.5 0.0 0.0 82.9 7.3 4.9 4.9 REPORT OF THE SAFETY ADVISORY COMMITTEE (SAC)--G.L. McKee Two studies are presently in progress but they have no recommendations to report at the present time. III. REPORT OF THE SAFETY AND HOUSEKEEPING ACTION COMMITTEE (SHAC)--C.M. Cruse SHAC is surveying the Ladder Inspection Program by talking to individuals throughout the plant to determine if the end results of the program are being effective. They are presently evaluating the results of their survey. The major activity of the SHAC committee is to gear-up for the up-coming plant inspection. The inspection dates have been set as September 23, 24 and 25. IV. STATUS OF ACCELERATED VESSEL INSPECTION (AVIP)(SHAC)--C.M. Cruse The Accelerated Vessel Inspection Program is 93% on schedule. This is an improvement from the 91% reported for June. The number of vessels pastdue for inspection has dropped from 118 to 90. It should be noted that while we are 90 vessels behind schedule, a large number of vessels have also been inspected ahead of schedule. V. STATUS OF THE S-T-A-R-T SAFETY PROGRAM--C.M. Cruse SHAC has made a survey of the Expanded Staff personnel to determine the present status of the S-T-A-R-T Program. They received answers that varied from "Yes, they are on schedule", to "No, they have not started", to questions of "What is S-T-A-R-T?" Operations and Maintenance are about 50% complete through the Foreman level. The PMSB suggested that the next "SET" be started in September. VI. LOSS REPORTING--J.E. Fox/R.T. Hammann DELINQUENT Incident Date 12/20/79 Location 35F Incident Line 1 Extruder Failure SC 003388 LAM004402 P1-1SB Minutes of Meeting of August 20, 1980 Page 4 1/80 35F New Die Plate Failure - Line 1 4/7/80 Mtl. Hdl. Napthalene in 75 psi Steam Lines VII REVIEW OF INCIDENTS Monsanto Incidents Date Incident No. Description 7/15/80 80-34 Investigation of sulfuric acid spill; Dept. 51 (DeVore) 6/24/80 80-35 Lube oil console fire; Dept. 15 (M. Sweeney) ' 6/9/80 80-36 Investigation of ACY spill; Dock 5 (Paganucci) 8/12/80 80-38 Laceration of hand; Dept. 33 (Baca) 8/2/80 80-39 Gasoline spilled while refueling equpiment; Dept. 51 (McCullough) 8/8/80 80-40 Days-Away-From-Work--Man was struck in eye by end of a piece of wire while tying down loose scaffold boards in preparation of hurricane; Dept. 15/16 (J.A. Martin) Contractor Incidents Date Incident No. Description 7/21/80 C-31 Contamination of man's boots with AN while walking through water; Dept. 51 (Kane) 7/15/80 C-33 Tug Boat Carol Lee sunk at Monsanto dock (C. Berg) VIII PLANT MANAGER'S COMMENTS It should be obvious to everyone that the injury rate is going up fairly rapidly and that several of the injuries that have occurred have been of a more serious nature. There should not be a let down in safe practices or safety awareness. Maintenance activity is presently at a high rate and October will be another month of high maintenance activity. 7 JEF/br;8/21/80 Attachment ' John E. Fox SC 003389 LAM004403 . . ;\S Total Injuries "Total Injury Rate 1 < 358 Cummulative In ju r ie s dm m ulative Recordable In ju rie s DEC. JAN. FEB. MAR. APR. Recordable Injuries Recordable Injury Rate MAY JUN. JUL. AUG. SEP. OCT. NOV. DEC. a3 sc 003390 LAM004404