Document 91xVokkqp12XDjBnOqXo0jNKq
PLANT MANAGER'S SAFETY BOARD MINUTES OF MEETING AUGUST 20, 1980
Present were:
G.W. C.M. G.A. G.W. J.E.
Bostick Cruse Danner Daues Fox for J.A.
Glass
J.E. Fox for D.E. Kaldenberg B.C. Lancaster C.M. McCullough G.L. McKee D.W. Metten
M.L. Owens G.T. Ryan J.G. Trafton G.L. Tromblee
REVIEW OF STATISTICS--J.E. Fox/J.A. Glass A. Texas City Plant Safety Performance Summary - July 1980
TOTAL INJURY CASES
1979
1980
1980
JUL YTD JUL YTD TARGETS
12 131 26 126
--
RECORDABLE CASES
(A) WITHOUT LOST WORKDAYS (medical treatment only)
(B) LOST WORKDAYS **Bi RESTRICTED ACTIVITY **B2 DAYS AWAY FROM WORK (C) FATALITIES
2
0 0 0 __ 0
11 0
20 10 10 0 __ 0
5
1 0 1 __ 0
15
7 -- -- --
*T0TAL RECORDABLE CASES
2 13 0 __ 6 22
*A+B+C = TOTAL RECORDABLE INJURIES **B!+B2 = (B) TOTAL LOST WORKDAY CASES
INJURY RATES PER 200,000 MANHOURS
1979
1980
1980
MTD YTD MTD YTD TARGETS
TOTAL INJURY - TIR TOTAL RECORDABLE - TRR TOTAL LOST WORKDAY - TLWR DAYS AWAY FROM WORK - DAWR
8.43 1.40 0.00 0.00
13.16 1.31 0.20 0.10
18.64 0.00 0.00 0.00
12.62 0.60 0.10 0.10
--
1.26 0.40
--
YTD 1980 MCIC TARGET YTD
--
1.94 0.58
--
--
1.55 0.38 --
003386
i^wioo**00
PMSB Minutes of Meeting of August 20, 1980
Page 2
B. Comments on Statistics
There were no Recordable Injuries during the month of July although a total of twenty-six (26) Industrial Injuries were recorded. This com pared with sixteen (16) Industrial Injuries for June of this year and twelve (12) for the month of July last year. Striking-Against and Lifting-Pushing-Pulling-Type accidents caused over forty (40Z) per cent of the Total Injuries.
C. Onits and Groups with Rising Trendlines
Rising trendlines for at least the last two months have been recorded in Power 2, Dept. 53, Dept. 51, Dept. 513, Truckers and Laborers, and Carpenters. Areas indicating a rising trendline outside of control for only one month were Dept. 48/56 and Dept. 33.
D. Contractor Safety--C.M. McCullough
The Recordable Injury Rate for July was the same as June where a reduction in rate had taken place. Injury rates are still lower than recorded over the previous few months.
E. CEP Project Safety--B.C. Lancaster
They reported on two Recordable Injuries: 1.) Where a Pipefitter collapsed on top of a Dept. 51 tank; and 2.) Where a Laborer received blisters on his feet from an unknown source.
JULY 1980
YTD as of 8/1/80
TOTAL INJURY CASES
11 34
RECORDABLE CASES
(A) WITHOUT LOST WORKDAYS (medical treatment only)
(B) LOST WORKDAYS **Bi RESTRICTED ACTIVITY **B2 DAYS AWAY FROM WORK (C) FATALITIES
1
0 0 0 _0_
1
2 0 2 0
*T0TAL RECORDABLE CASES
13
TOTAL MANHOURS WORKED (MHW)
19,127
82,029
SC 003387
LAM004401
PMSB Minutes of Meeting of August 20, 1980
Page 3
FREQUENCY RATES/200,000 MHW
TOTAL INJURY RATE TOTAL RECORDABLE RATE TOTAL LOST WORKDAY RATE TOTAL DAYS-AWAY-FROM-WORK RATE
115.0 10.5 0.0 0.0
82.9 7.3 4.9 4.9
REPORT OF THE SAFETY ADVISORY COMMITTEE (SAC)--G.L. McKee
Two studies are presently in progress but they have no recommendations to report at the present time.
III. REPORT OF THE SAFETY AND HOUSEKEEPING ACTION COMMITTEE (SHAC)--C.M. Cruse
SHAC is surveying the Ladder Inspection Program by talking to individuals throughout the plant to determine if the end results of the program are being effective. They are presently evaluating the results of their survey.
The major activity of the SHAC committee is to gear-up for the up-coming plant inspection. The inspection dates have been set as September 23, 24 and 25.
IV. STATUS OF ACCELERATED VESSEL INSPECTION (AVIP)(SHAC)--C.M. Cruse
The Accelerated Vessel Inspection Program is 93% on schedule. This is an improvement from the 91% reported for June. The number of vessels pastdue for inspection has dropped from 118 to 90. It should be noted that while we are 90 vessels behind schedule, a large number of vessels have also been inspected ahead of schedule.
V. STATUS OF THE S-T-A-R-T SAFETY PROGRAM--C.M. Cruse
SHAC has made a survey of the Expanded Staff personnel to determine the present status of the S-T-A-R-T Program. They received answers that varied from "Yes, they are on schedule", to "No, they have not started", to questions of "What is S-T-A-R-T?" Operations and Maintenance are about 50% complete through the Foreman level.
The PMSB suggested that the next "SET" be started in September.
VI. LOSS REPORTING--J.E. Fox/R.T. Hammann
DELINQUENT
Incident Date 12/20/79
Location 35F
Incident Line 1 Extruder Failure
SC 003388
LAM004402
P1-1SB Minutes of Meeting of August 20, 1980
Page 4
1/80
35F New Die Plate Failure - Line 1
4/7/80
Mtl. Hdl.
Napthalene in 75 psi Steam Lines
VII REVIEW OF INCIDENTS
Monsanto Incidents
Date
Incident No.
Description
7/15/80
80-34
Investigation of sulfuric acid spill; Dept. 51 (DeVore)
6/24/80
80-35
Lube oil console fire; Dept. 15 (M. Sweeney) '
6/9/80
80-36
Investigation of ACY spill; Dock 5 (Paganucci)
8/12/80
80-38
Laceration of hand; Dept. 33 (Baca)
8/2/80
80-39
Gasoline spilled while refueling equpiment; Dept. 51 (McCullough)
8/8/80
80-40
Days-Away-From-Work--Man was struck in
eye by end of a piece of wire while tying down loose scaffold boards in preparation of hurricane; Dept. 15/16 (J.A. Martin)
Contractor Incidents
Date
Incident No.
Description
7/21/80
C-31
Contamination of man's boots with AN while walking through water; Dept. 51 (Kane)
7/15/80
C-33
Tug Boat Carol Lee sunk at Monsanto dock (C. Berg)
VIII PLANT MANAGER'S COMMENTS
It should be obvious to everyone that the injury rate is going up fairly rapidly and that several of the injuries that have occurred have been of a more serious nature. There should not be a let down in safe practices or safety awareness. Maintenance activity is presently at a high rate and October will be another month of high maintenance activity.
7
JEF/br;8/21/80 Attachment
' John E. Fox
SC 003389
LAM004403
. . ;\S Total Injuries "Total Injury Rate
1
<
358
Cummulative In ju r ie s
dm m ulative Recordable In ju rie s
DEC.
JAN.
FEB.
MAR.
APR.
Recordable Injuries Recordable Injury Rate
MAY
JUN.
JUL.
AUG.
SEP.
OCT.
NOV.
DEC.
a3
sc 003390
LAM004404