MONTHLY REPORT
Anniston
Summary
A. G. Hill , G. L. Jessee L. C. Lahman J. C. Landwehr G. W. Miller H. E. Schulte W F. Taffee H. L. Williams
Month
January 1970
Cost Improvement Results
Est. Act. $42,191
Target $46,350
% of Target 91%
General Offices
YTD
$42,191
$46,350
91%
H. S. Bergen H. C. Carder D. Danna (5) F. B. Elliott P. B. Hodges F. J. Holzapfel D. B. Hosmer (2) W. A. Kuhn C. F. Luecke J. A. Morgan J. E. Smith J. A. Stephens
OTHER LOCATIONS
A. H. Forsten Alvin, Texas
D. W. Jackson WGK
T. M. Patrick So. 2nd St.
Organic Division
The project to install an improved entrainment separator on the No. 2 Liquid Aroclor still will he canceled as the in creased surge capacity justification is no longer valid.
The Biphenyl-Santowax MIP shows an anticipated savings of one million dollars in the next ten years primarily based on PR&D work in 1970-72.
Muriatic Acid MIP was issued.
A proposal for an incremental capacity increase to enable the PNP department to supply the total Parathion requirement was prepared. A detailed Project Description was transmitted to CED.
Ag Division
Parathion Recovery Filter-Coalescer Pilot Test began January 5, and continued throughout the month.
0S\N 551533
' ,1/,/'968
COMPANY CONFIDENTIAL INFORMATION
"This document contains confidential information which is the property of Monsanto Company. Only those portions of the document relevant
to a duly authorized individual's need to know may be exerpted for him. The report must not be sent outside the Company without written
STLCOPCB4089950
Company Confidential 2.
Plant Improvement Preliminary estimates have been received and initial design completed on a project to enclose the neutralization pit effluent ditch for a distance of approximately 450 feet after it leaves the plant.
Design & Drafting The H2S monitor, intended for use in the Niran department as a safety device, has successfully completed a two-month test run. No problems in either operation or maintenance of the unit were encountered.
Quality Control The Plant Quality Score was 80.7, up 0.5 from December. Product quality surveillance revealed continuing deviation of Liquid Aroclor composition from normal. Cause of Free Cl,, in Muriatic Acid; High free chlorine for the last eight months has required tank and tank-car blowing in order to meet specifica tion. Sales have been lost and costs increased. A sampling testing study is underway to isolate the source and to define the cause of high chlorine. A report is targeted for 2/15/70.
Pollution Control Final report from Kem-Tech Labs Inc. received during January. Report is being circulated. 1970 Pollution Control Objectives have been prepared and will be published first week in February.
J. C. Landwehr :kd
DSW 551534
STLCOPCB4089951
ORGANIC. DIVISION 1970 TSD COST IMPROVEMENT
LIQUID AROCLORS
TAR EST ACT
Disposal of Liquid Montar
TAR EST ACT
#3 Aroclor
TAR
Still New
EST
Burners
ACT
#2 Still Entrainment
TAR EST
Separator
ACT
1242 Distilla TAR
tion -
EST
Productivity
ACT
Flaking &
TAR
Drumming Faci- EST
lity-Headcounl : ACT
Aroclor Ware TAR
house -Reducec l EST
Headcount
ACT
TAR
EST
ACT
SOLID AROCLORS
TAR EST ACT
Solid Aroclor TAR
Instrumentatic ,n EST ACT
Sandvik Belt
TAR EST
ACT
Add Tray
TAR
Stripping Sec EST
tions to Santc - ACT
WaX
; TAR
CI2 Bulk Hand EST
ling Facility S ACT
Solid Aroclor TAR
Expansion
EST ACT
Chlorinator
TAR
Back Pressure EST
ACT
TAR
EST
ACT
TAR
EST
ACT
TAR
EST
ACT '
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
108C 1080 1080 1080 1080 1080 1080 108C 1080 1080
1500
1500
1 3000
300C
150C 1500 1500 1500 1500 1500 1500 150C 1500 1500
300C 3000 200C 1000 1000 300C
100C 1000 100C 100C
3750 3750 3750 3750 3750 3750 375C 3750 3750
2250 2250 2250 2250 2250 2250
4580 4580 4580 4580 /icon 4580 458C 4580 4580
2000
350C
200C 2000 2000
30000 50000
30000 -
360 360
360
360
' n5W 551333
|
STLCOPCB4089952
* .
ORGANIC DIVISION 1970 TSD COST IMPROVEMENT
BIPHENYL
TAR EST
ACT
Improved Santowax TAR
C Yield
EST
ACT
Biphenyl Cooling TAR
' Water Treatment " EST
ACT
TAR
EST
ACT
TAR
HB-40
EST
ACT
Reduce Nickel
TAR
Catalyst Usage
EST
Substitution of
ACT TAR
Santowax C for Santowax R
EST ACT
TAR
EST
ACT
PNP
TAR EST
Modify Acidifier Dump Valve
ACT TAR EST
System
ACT
Install Entrainmen' STAR
Separator -
EST
Productivity
ACT
Optimize Reactor TAR
Variables - PNP
EST
ACT
Re-use Well Water TAR EST
ACT
TAR
EST
ACT
TAR
HC1
EST
ACT
150 M Gal. Storage TAR
Tank
EST
ACT
HC1 Catch Tank
TAR
and Coalescer
EST
ACT
HC1
TAR
Instrumentation
EST
ACT
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
4000 400C 4000 4000 4000 4000 4000 4000 4000 4000
600 670
600 600 60C 600 600 600
700 700 700 700 700 700 700
20000 20000
3150 520
3150
3150
4630
4630
4630
625 5500 4630
625 5500 4630
625 5500 4630
625 5500 4630
625 5500 4630
625
s
*
15500 ' i 4630 ^
S
snn snn snn
4300 4300 4300 4300 4300 4300 4300
5700 5700 5700 5700 5700 2500
1875 1875 1875 1875 1875 1875 1875 1875 1875 f DSW5 51536
STLCOPCB4089953
D ORGANIC division 1970 TSD COST IMPROVEMENT
MISCELLANEOUS
Improve Plant Power Factor Central Air Compressor
Chlorine Plant Shutdown RTN Cooling Water to Tower Cooling Con veyor - P?S5
Total Organic Month - M $
Total Organic YTD - M $
JAN TAR EST ACT TAR EST ACT TAR 950 EST 900 ACT TAR EST ACT TAR 19900 EST 19900 ACT
TAR EST ACT
TAR EST ACT TAR EST ACT TAR 40.6 EST ACT TAR 40.6 EST 36.29 ACT
FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
950 950 950 950 950
1000
1000
1000
19900 19900 19900 9950
25 25 25 25 25 25 "
72.1 96.88 58.07 44.62 27.97 34.12 30.52 30.88 64.68 51.68 51.68 112.7 209.6 267.6 312.3 340.2 374.3 404.9 435.7 500.4 552.1 603.8
f 0SW
STLCOPCB4089954
D
AG DIVISION 1970 TSD COST IMPROVEMENT
JAN FEB MAR APR
MAY JUN JUL &UG
SEP OCT . NOV
TAR
PARATHIONS
EST
ACT
Replace #3 Chlorinator
TAR EST
3500 3500 3500 3500
ACT
Improve Cl2~ Still Yields
TAR EST
3000 3000 ' 3000 3000 3000 3000
ACT
Increase Chlor- TAR
8500 8500 8500
inator Coolings EST
ACT
Acetone Recovery
TAR 2800 2800 2800 EST 1957
2800 2800 2800
2800 2800 2800
2800 2800
ACT
Chlorine Unloading
TAR 2250 2250 2250 EST 3634
3200
3200 3200 3200 3200
ACT
Optimize Methyl TAR
3000 3000 3000 1500
PNP/PCT
EST
Ratio
ACT
Optimize Ethyl TAR
PNP/PCT
EST
500
0
750
750
500
Ratio
ACT
Change Cooling TAR
200
200
200
H20 - Item 737 EST ACT
310
TAR
EST
ACT
TAR
EST
ACT
Total AG Month M $
TAR 5.75 EST 5.90
6.0
6.0
6.0 15.5 15.5 15.5 22.5 14.3 14.3 3.3
ACT
Total AG
TAR 5.75 11.75 17.75 23.75 39.25 54.75 70.25 92.75 107.1 121.4 124.7
YTD M $
EST 5.90
ACT
TAR
EST
ACT
Total Plant Month M $
TAR 46.35 EST 42.19 ACT
78.1 102.9 64.07
60.12 43.47
49.62 53.02 45.18
78.98 54.98
Total Plant YTD M $
TAR 46.34 124.5 227.3 291.4 EST 42.19 ACT
351.5 395.0 444.6
497.6 542.8 621.8
676.7
DEC
500
.5 125.2 52.18 728.9
DSW 551538
STLCOPCB4089955
Company Confidential 3.
AROCLOR
E. E. Bowles, (V. R. Haupt
Entrainment Separator No. 2 Aroclor StillNFC $4500________________
TSD Job No. 868
Project No. 3093, to provide an entrainment separator for No. 2 Aroclor still will be canceled. Recent changes in the demand forecast for liquid Aroclors have eliminated justification for this expenditure. This means of increasing production will be placed in the planning backlog for use when justified.
Therminpl SystemPotential Lost Sales;B-8 (h)
TSD Objective
New Therminol system is installed and running. CED construction installed the system in conjunction with the Solid Aroclor Expansion.
BIPHENYL-SANTOWAX
W. G. Niemeyer, D. A. Self, (V. R. Haupt)
The MIP is 95% complete. There is a potential savings of $4 M/yr. based on ideal costs including the effects on the products using biphenyl and Santowax. It is estimated that during the next ten years one million dollars will be saved resulting from PR&D's work in 1970-72.
HCl K. G. Hale, (A. G. McCarty)
Carbon Treatment Studies+ Quality963
$5,000 Savings
TSD Job No.
Pilot carbon treatment studies are targeted to begin in late February. PRSD evaluations of Perkin Elmer - Scanning UV instrument indicate the in strument is adequate for proposed studies. The Lab will purchase the instru ment to replace the old inoperative UV instrument.
HCl MIP;PlanningC-l - la - lal
TSD Objective
Complete HCl MIP was issued on 1/16/70.
PNP K. G. Hale, (A. G. McCarty)
PNP Dust
Safety
FlammabilityS&PP Audit814
TSD Job No.
Progress report "PNP Dust Flammability" 370:983(1) was issued mid-January. An inert (N2) blanketing system will be included in the scope for PNP De bottlenecking (TSD Job No. 482).
DSW 551539
STLCOPCB4089956
r'
'
PNP - continued
Company Confidential 4.
PNP - Sulfuric Acid
Safety
Unloading Pump________ S&PP AuditTSD Job No. 979
Progress report "H2SO4 Unloading for PNP" 370:979(1) was issued mid-January. No future actions planned by TSD.
*35
PNP - DebottleneckCapacityTSD Job No. 482
A preliminary project description describing objectives and equipment changes to expand PNP to an average production of 1.85 M #/month was issued to CED on 1/31/70. A capacity increase increment of 330 M #/month is targeted based on 1969 average production of 1.52 M #/month.
Additional information concerning justifications, locations, and design re quirements will be collected for developing the final scope.
NIRAN
D. W. Dudley, T. W. Lawrence, (A. G. McCarty)
Demonstrate Parathion
Recovery
____
TSD Objective B-5(a)
Tests of filtration techniques and coalescer elements began January 5. Pre liminary filtration results indicate chelation does not extend filter life, and may decrease life. Test will continue through February.
Acetone
Savings $25,200
TSD Objective
Recovery;20% Reduced COD;B-5 (a) __________________________________________________________
Acetone yield again improved during January. Acetone usage for January was 5.61 lb./cwt. versus a targeted 5.18 lb./cwt. COD load to waste treatment has been reduced 12% based on COD value of Acetone. Progress report on re sults of project was forwarded to typing during January.
Improve Chlorinator Cooling System__________
Savings $50,000 per 0.5
TSD Objective
reduction in chlorination time ______B-5 (g)
The Tentative Process Amendment has been approved. The design package cover ing the plant trial on No. 1 chlorinator has been transmitted to Maintenance. Installation
Chlorinator Off-Gas System ModificationSafetyTAS Job No. 980
Removing the chlorinator steam jets will be a major step in eliminating the possibility of water mixing with organics which collect in the catchpots. This will require installation of a transfer pump to charge thio acid, a
r
DSW 551540 STLCOPCB4089957
NIRAN - continued
Company Confidential 5.
vacuum pump to dry chlorinators after inspection, and a method of chlorinator sampling.. The latter is made difficult by the corrosive nature of the chlorinated thio acid and its vapor. Possible approaches that will be con sidered are: a small circulating sample pump and vacuum pump sampling.
Replace Nitrogen with HCl for Chlorination Sparge
Savings $20,000TSD Job No. 603
A combination of the high cost of an in-plant test, plus the probability that HCl sparge would not be feasible without HCl recovery for sales from chlorinator off-gas, scheduled to begin in the third quarter, may justify the HCl sparge test cost.
PROCESS AND QUALITY ANALYSIS
J. L. Murphree, Dave Dixon, (W. B. Dunlap)
Process Surveillance
Raw material quality deterioration in acetone and improved biphenyl quality were reported. A general trend toward greater variability is developing in finished product quality.
PNP - Identification of
Potential Savings
Critical Variables'$60,000TSD Job No. 839
TSD Objective C-3
The improvement documented throughout December was lost in the second week of January with occurrence of coldest temperatures of the winter. Deviations in pressure and temperature calibrations have been observed. Scales were checkweighed and proved to be correct.
Niran Still ControlPotential Savings $79,000 TSD Job No. 964
Control instruments were installed ahead of schedule. Control variables were observed through the month and will be evaluated. The existing level instru ment has not been repaired.
Cause of Free Cl2 in Muriatic Acid____________________________________________________________ TSD Job No. 001-1004
High free chlorine for the last eight months has required tank and tank-car blowing in order to meet specification. Sales have been lost, and costs in creased. A sampling-testing study was designed to isolate the source and to define the cause of high chlorine. This study is being carried out with a report targeted for 2/15/70.
DSW 551541
STLCOPCB4089958
D
Company Confidential 6.
ENGINEERING DESIGN AND SERVICES
Mechanical/Electrical/Instrument Design s Drafting
J. C. Price, G. W. Richey, R. V. Carlisle, J. K. Rennie, (W. F. Taffee)
J. A. Veazey B. D. Morgan R. L. Brewer
All material has been received for Automatic Alcohol Feed to Thio Acid Reactors (AFE 3161 - $3.9 M). Approximately 80% of the material necessary for construction has been received for a project to Modify Agitator Inter locks (AFE 3118 - $9.7 M). Both projects are scheduled for start-up during the spring turnaround at Niran.
Initial design has begun on a project to Prevent Steam Sparging of the Con densation Reactors in.the Niran department. This work is being done as a part of Acetone Recovery (AFE 3340 - $60.7 M) and is undertaken in the in terest of safety.
Two premises issued in January, 1) Provide Ventilation and Eliminate Atmos pheric Contamination of the Aroclor Motor Control Center, (Estimate $4.7 M) is a direct result of recommendation #7 of Near-Miss Accident #5-69. 2) Re place Glass Rotameters in Hazardous Service at Niran, (AFE #3154 - $8.3M) complies with an S&PP recommendation.
The structural design of a truck ramp to the proposed Solids Incinerator at the plant dump (AFE 3094 - $20M) was completed.
Significant group effort was expended again in January to provide additional
information for inclusion in the Anniston "L" Manual. C. A. Buehler, Standards
Specialist spent two days at Anniston. First draft is expected within two
months.
..
A two-month test of an H?S Monitor, intended for use in the Niran department, was completed during the month. While not in the class of an accurate quanti tative analyzer, the unit has performed well in the detection of abnormal levels (0-50 ppm) of hydrogen sulfide gas.
Drafting
In progress;
Prevent Steam Sparging of Condensation Reactors (Niran) - portion of Acetone Recovery AFE 3340, $60.7M, Install Solids Incinerator (AFE 3094 - $20M).
-*&
DSW 551542
STLCOPCB4089959
Company Confidential 7.
Drafting - continued
Review drawings were forwarded for the following projects:
Eliminate Safety Hazards #1 Benzene Feed Tank (AFE 3373 - $8.1 M), Re place #3 Aroclor Jet (AFE 3384 - $3.2 M).
Construction drawings were completed for the following projects:
Install Barricades Around Aroclor Still Heaters (AFE 3363 - $3.2 M), Modify Niran Formulation Facilities (AFE 2754 - $22.8 M).
UTILITIES ENGINEERING
J. C. Price, G. C. Jeffrey, (W. F. Taffee)
i
Final draft of progress report on Utilities Cost Improvement Results for
1969 and Plans for 1970 75% complete and will be published in February. Completed preliminary survey of plant instrument air usage and 1969 repair costs and downtime losses and portable compressor rentals to be about $25,000
per year, average air usage about 800 SCFM and peak air usage about 1100 SCFM out of an installed capacity of 1160 SCFM. Average and peak usage is ex pected to increase after startup of the solid Aroclor Expansion early in
February. Evaluation report will be published in February.
PLANT IMPROVEMENT
G. C. Goodwin, (W. F. Taffee)
East Side Sewer (AFE 3408 - $14 M)
This project provides for the enclosure of the east side sewer at the point of its exit from the plant to a point approximately 450 feet NE of Highway 202.
Install Solids Incinerator at Plant Dump (AFE 3094 - $20 M)
Transmittal of design package has been delayed because of higher priority item (east side sewer). Transmittal now scheduled for late February.
Fire Water System Leak
A routine check of the plant's fire water meter by the Anniston City Water Department disclosed an abnormally high usage. A subsequent check of the system revealed leaks in three sections of the system amounting to approxi mately 75% of the total leak (17,000 gal./day). The three leaks are scheduled to be repaired by the Maintenance department before further testing of the system is attempted.
New Plant Waste Disposal
Montar 9 (quaterphenyls and above from the Santowax distillation) is being utilized to create a new solids waste disposal area close to the existing land fill operation. This new area will be large enough for at least 5 years at Pur present disposal rate. It is formed by damming a ravine with Montar (covered with 3 feet of earth). This double play solves an immediate problem of Montar 9 disposal at a savings of $5M over other proposals, and creates a new waste dis posal area at a time when the existing area has a predicted life of 1 to 2 vears.
[ DSW 551543
STLCOPCB4089960
F
POLLUTION CONTROL
E. G. Wright, (G. W. Miller)
Company Confidential 8.
Air and ^0 Pollution
Community and Governmental
ComplaintsRelationsPCE Objective B-3-a.
Two air pollution complaints were received during January. Both of these complaints were from the R.E.A. Express office. There were no water pollution complaints received during January.
Eimco Filter Unit at Waste Treatment Production AssistanceTSD Job No. 808 ___________________________
Problems were encountered with this unit during January due to the extremely cold weather. A pump was obtained which will allow precise regulation of the polyelectrolyte flow to the unit. Plant tests will continue during February to determine the capacity of the unit, also, some mechanical changes will be made.
Air Sampling Survey__________ Pollution Abatement TSD Objective C-2
The complete report from Kem-Tech Laboratories was received during early January. Copies of this report have been sent to the appropriate people.
HCl Neutralization PitPollution Abatement TSD Objective F-4
The HgPO^ neutralization pit is still not in operating condition, therefore, it is still impossible to evaluate the HCl pit at this time.
Waste Treatment
All wastes were effectively treated during January. There was one complaint from the city due to high solids in the treatment plant effluent. Average daily values for Monsanto's effluent are as follows:
PNP COD Parathion BOD
Average Daily (ppm) 1.0 127.5 .13 6.30
5 200 1.0 200
DSW 551544 STLCOPCB4089961
D
.
PLANT LABORATORIES
G. W. Miller
Company Confidential 9.
PROCESS RESEARCH AM) DEVELOPMENT
J. T. Bell
Of the 105 mandays available to PR&D for the month of January, 82 were expended on projects included in the 1970 PR&D Program. The remaining days were utilized in the conclusion of the Aroclor 5460 Acetone Insolubles project along with supervision, vacation and miscellaneous.
Blend Scavenger Refinement (Aroclor)
Improved Aroclor Electrical PropertiesJ. L. Brown
The special order' of type 4A Molecular Sieve has been received for a column evaluation of this material as a means to improve the electrical properties of Aroclor 1242-Phenyl Glycidyl Ether blends. This work will be initiated as progress in the construction of the biphenyl tube unit permits.
Biphenyl Tubular Pilot Studies
Obtain Desired Biphenyl/Terphenyl Ratio_________ J. L. Brown
Polyphenyl pilot studies are on schedule as per PR&D work plan of 1/2/70. Final inspection of the Polyphenyl Laboratory is scheduled for 2/2/70. Construction of the reactor section is 60% complete and is progressing to an EDC of 2/13/70. Installation of the control system will begin at that time.
Parathion Condensation Reaction Studies
Increased Yields
I. Ransaw______
The evaluation of different catalysts on reaction yields has been completed. The study of solvent effects is approximately 75% complete. This study ; will be resumed according to the 1970 PR&D Program.
Aroclor 5460 Acetone Insolubles
Quality _____________________ G. L. Arnett
The study to eliminate acetone insolubles in Aroclor 5460 caused by the presence of over-chlorinated terphenyls has been completed. Final PR&D report was issued 1/12/70.
Muriatic Acid
Quality ______ _________
I. Ransaw
A Perkin-Elmer model 124 UV Spectrophotometer is being evaluated as a mSans to quantitate the organic impurities found in plant HC1. Completion of the evaluation is targeted for 2/6/70. A1 alternate to the UV method of analysis (Gas Chromatography) will be investigated should the UV method prove insufficient.
PNP Process Improvements
Increased Reaction Rate______ W. H. Howard
Rate studies with varying caustic molar ratios, % caustic, and initial sodium PNP content have been completed. The washing studies and color stability investigation will be completed 2/9/70 with PR&D report to follow.
DSW 551545
STLCOPCB4089962
p
PLANT LABORATORIES - continued
Company Confidential 10.
PROCESS RESEARCH AND DEVELOPMENT - continued
Continuous Alcohol
Determine
Distillation From Thio AcidFeasibility of ProcessJ. T. Bell
Investigation completed as scheduled on the project work plan with data on flow rate, temperature and vacuum obtained. A PR&D report has been prepared for issuance.
ANALYTICAL AND QUALITY CONTROL
S. 0. Kemp
Complaint Report
Quality
Number
Material
Customer
l-A-70 Aroclor 4465
Sidney Cook Chemical Co.
Reason Solubility
YTD Quality Complaints/100 Shipments 0.18
Target 0.20
DSW 551546
STLCOPCB4089963
.Company Confidential 11
COMMUNITY RELATIONS, PERSONNEL, RECRUITING, AND DEVELOPMENT
Personnel 1. C. W. Humphrey, Design and Drafting Co-Op from Alabama A&M, started
work on January 27 reporting to R. L. Brewer. 2. Effective February 2, W. G. Niemeyer transferred to CED's Process
Design - Project Management group responsible for Organic Division plants.
Recruiting 1. Thomas J. Ward, Process Engineer - Mississippi State, reported to
work February 1, for one month prior to induction in Armed Forces.
Development 1. G. W. Miller visited St. Louis January 22 and 23 to finalize analytical
methods transferred from Organic Research to Anniston plant.
Visitors 1. R. S. Yates visited for Solid Aroclor start-up. 2. Miss Judy Johnson, Anniston Star reporter, visited January 19 concern
ing feature article on industrial pollution in our area. 3. C. A. Buehler from W. G. Krummrich Plant visited on January 20-22 to
obtain material necessary for inclusion in the Anniston "L" manual. 4. J. F. Gaskill and R. F. Bennett of J. F. Gaskill Company of Birmingham
(Fisher Controls representative) presented a demonstration of the new Fisher ac2 instruments on January 21.
DSW 551547
STLCOPCB4089964
DISTRIBUTION OF TIME BY TECHNICAL SERVICE
PROCESS IMPROVEMENT-
NEW PRODUCTS
PLANT IMPROVEMENT
ASSIST OPERATIONS
SPECIAL ENGINEERING SERVICES
TECHNICAL .MANPOWER
MISCELLANEOUS ACTIVITIES
AND ABSENCES
Jan Feb Mar Apr Kay June July Aug Sept Oct Nov Dec
DSW 551548 STLCOPCB4089965
1
IN MAINTENANCE
FOR CONSTRUCTION
IN MAINTENANCE COMPLETED
NOT CLOSED
.
PROJECTS SUBMITTED
FOR APPROVAL
cn <<
oQ tu o ian $ g g 5,
APPROVED PROJECTS IN TSD
Company Confidential
TSD PROJECT SUMMARY
STLCOPCB4089966
1)
ANALYTICAL SAMPLES
LABORATORY ADMINISTRATION
% i
"ANALYTICAL MANPOWER
Manpower/sample
$/Manhours
% Total Plant Operating Cost
Overtime L
STLCOPCB4089967
. ANALYTICAL SAISLES
LABORATORY ADMINISTRATION
ANALYTICAL MANPOWER
Ma np ower/samp1e
0.6
0.4
0.2 _
$/Manhours
/
11.00 10.00
9.00 8.00 7.00
% Total Plant Operating Cost
2.0 1.5 1.0
0.5
! .. . . . !1 o
i
i
------- r i l l i
___ i8___
1-- ii* j
Overtime %
--
1 1
(
1
1968 1969 J' F M A W
I
j
j
j
1 .,1; . .
ji
j
1 l1 1
i
___1___ L
1 nSAN 551551
__ _l__ ____ 1 1 _1
>
xn
C
JJ
ft U
STLCOPCB4089968