Document 91mMo46VJRN33naOqoq3DXzXR
UNITED STATESUNITED STATES ENVIRONMENTAL PROTECTION AGENCY
* *REGION 1
ENVIRONMENTAL
AGENCY5 POST OFFICEB OSSTQOUN,A RMAE ,0 21S0U9-I3T9E12
100
PROTECTION
Drafted Date:10 August 2021
Finalized Date:27 August 2021
Subj:Inspection Report
Clean Water Act - National Pollutant Discharge Elimination
System (" NPDES ")
The Timbers
From:Andrew Spejewski, Enforcement Officer
Thru:Neil Handler, Senior Enforcement Coordinator
To:File
I. Facility Information
A. Facility Name:The Timbers
B. Facility Location:1124 South Mammoth Road
Manchester, NH 03103
C. Facility Contacts: William Socha
Socha Companies, LLC
145 Cilley Road, Suite 101
Manchester, NH 03103
603-496-3684
williamsocha@comcast.net
D. NPDES ID No (s).: NHR1000PB
II. Background Information
A. Date(s) of inspection: August 5, 2021
B. Weather Conditions: overcast to drizzle
C. US EPA Representative(s): Andrew Spejewski
D. State / Local Representative(s): none
ED_019088A_00019748-00001
E. Federally Enforceable Requirements Covered During the Inspection: NPDES
General Permit for Discharges from Construction Activities (2017 Construction
General Permit)
F. Previous Enforcement Actions: None known
III. Type and Purpose of Inspection
Unannounced evaluation of compliance with the 2017 Construction General Permit
IV. Facility Description
The Timbers is an apartment complex, lying east of S. Mammoth Road in Manchester,
NH. The complex is mostly complete and occupied, but at the time of the inspection, the
southwestern section of the property was still under construction. The active construction
area was around a paved loop of road forming the southwestern part of the site.
Construction along the west and south parts of the loop has been completed and the
buildings are mostly occupied. The north part of the loop had a large dirt stockpile
located north of the loop road. The east part of the loop had two buildings under
construction in the south end of this area, and bare dirt surrounding it to the north. Two
stormwater basins were in place to the south of the loop. Additionally, a large, cleared
area between the loop and S. Mammoth road was being used for staging and construction
activities.
The site is fairly flat; the loop area is somewhat above a wetland to the south (and slightly
above the terrain to the east); the staging area is lower and only slightly above the
wetland elevation.
V. Inspection
A. Opening Conference
Mr. Spejewski arrived unannounced at the site at about 1:15 PM. After asking a site
worker for a supervisor, he was directed to Patrick Richelieu. Mr. Spejewski introduced
himself, explained the purpose of the inspection, presented his credentials and provided a
copy of the Small Business Resources Information Sheet. Mr. Richelieu said that he was
the framing supervisor for Socha Companies. Mr. Richelieu said he did not have the
SWPPP [stormwater pollution prevention plan] or other information and the owner was
on vacation and unreachable. Mr. Richelieu confirmed the owner was Mr. William
Socha. Mr. Richelieu gave Mr. Spejewski permission to walk the site unaccompanied.
Mr. Spejewski said that if he needed to view the SWPPP he would contact Mr. Socha and
noted that an EPA inspection report would be sent to him.
Mr. Spejewski then left to tour the site.
2
ED_019088A_00019748-00002
B. Facility Tour
The south edge of the active construction area had two large stormwater retention basins.
Both had well - established grass on the inner and outer walls. The eastern basin had an
outfall directed to the wetlands to the south; there was no sign of sediment deposits at the
outfall. The western basin had no obvious discharge point.
Two buildings were under construction east of the road, with bare lots to the north on
both sides of the road. East of the buildings a short slope led down to undisturbed woods.
Silt fence was in place along the foot of the slope. In places there was moderate silt
eroded and piled against the fence, but no signs of sediment escaping past the fence. In
one spot gravel was piled against the fence, and in one spot a large rock had rolled
against the fence, straining it and nearly pushing it over.
To the north of the buildings under construction there was a large dirt stockpile. North of
the stockpile was a slope up to surrounding undisturbed terrain. The stockpile had heavy
vegetation growth, except on the south side adjacent to the road, which was clearly
active. There was some dirt tracked onto the paved loop road.
The west and south sides of the loop road had completed buildings. Most of the lawns
were well - established grass. One area to the southeast, extending from the front of the
building down to the eastern stormwater basin, was open dirt with very new grass
growth; some straw matting was also in place.
From the southeast side of the loop road, an unpaved drive led east downhill to an open
disturbed area. There was no gravel or other sediment track - out control in place (or, if
there had been a gravel entrance, it was now buried under accumulated mud).
A wood mulch berm and silt fence ran south, downhill along side of the unpaved drive.
A wide flat area was at the bottom, extending out to South Mammoth Road. Wetlands
were to the south of this area; silt fence or a berm appeared to be in place between the
area and the wetlands.
Concrete debris and concrete wash - out was spread out in one area with no apparent
containment. In another area, a sign read'concrete'near a pit filled with concrete wash-
out. An entrance between this staging area and South Mammoth Road had a gravel
entrance, with only a small amount of dirt accumulated.
C. Records Review
N / A
D. Closing Conference
Mr. Spejewski left the site at about 2:00 PM.
3
ED_019088A_00019748-00003
Due to battery failure, photos were taken with the inspector's personal cell phone. Due to
inspector error, some photos were originally saved as.HEIF format. These files were
converted to.JPEG files for ease of viewing (the original.HEIF files have also been
archived).
Picture List:
IMG_20210805_132948.jpgSoutheast basin, facing south
IMG 20210805_132951.jpgFacing west along south edge of site
IMG_20210805_133017.jpgWall of southeast basin
IMG_20210805_133037.jpgOutlet of southeast basin, facing south
IMG_20210805_133105.jpgWest edge of site, near southernmost foundation
IMG_20210805_133154.jpgFacing north along west edge of site
IMG 20210805_133233.jpgFacing west off site
IMG_20210805_133317.jpgSilt fence, west edge of site
IMG_20210805_133412.jpgSilt fence, west edge of site near northern end of
active area
IMG_20210805_133459.jpgEast end of stockpile, facing north
IMG_20210805_133502.jpgFacing west along south edge of stockpile
IMG_20210805_133524_HDR.jpgOperator error, ruined picture
IMG_20210805_133543.jpgRuined picture (operator error)
IMG 20210805_133610.jpgSouth edge of stockpile
IMG_20210805_133616.jpgOver south edge of stockpile
IMG 20210805_133622.jpgSouth edge of stockpile and paved loop road
IMG_20210805_133928_HDR.jpgFacing east to loop, from drive to staging area
IMG 20210805_133951_HDR.jpgDriveway to staging area, south edge
IMG_20210805_134056_HDR.jpgStaging area, concrete debris
IMG_20210805_134106_HDR.jpgFacing south over debris in staging area
IMG 20210805_134208_HDR.jpgFacing north from staging area
IMG 20210805_134212_HDR.jpegSilt fence, south edge of staging area
IMG 20210805_134258_HDR.jpegStaging area, formal concrete wash - out
IMG_20210805_134325_HDR.jpegBerm at staging area, facing west
IMG 20210805_134401_HDR.jpegSite entrance to staging area from S. Mammoth
Road
IMG 20210805_134619_HDR.jpegLawn with seed, southwest corner of loop
IMG 20210805_134704_HDR.jpegFacing south to southwest basin
IMG 20210805_134719_HDR.jpegFacing east, from southwest basin to southeast
basin
IMG_20210805_134744_HDR.jpegFacing east to southeast basin
**
Unless otherwise noted, this report describes conditions at the facility / property as
observed by EPA inspector(s), and / or through records provided to and / or information
reported to EPA inspector(s) by facility representatives and as understood by the
inspector(s). This report may not capture all operations or activities ongoing at the time
of the inspection. This report does not make final determinations on potential areas of
4
ED_019088A_00019748-00004
concern. Nothing in this report affects EPA's authorities under federal statutes and
regulations to pursue further investigation or action.
50