Development and Testing of Equipment for Removal of PCBs From Porous Surfaces
Quadrw HP8, Inc. racravio, vwnnpDn
MONS 018335
REPORT SUMMARY
SUBJECT HasaidouaAomc eubataneao
TOPICS PCS wests management
Hazardous materials
Porous materials Cleaning
Solvents
AUOIENCE Environmental and RAO engineers and edandele
DuvulopmMit and lasting of Equipment for Removal of PC8o From Porous Surfacos
Cleanup of PCBs frorll materials such as conerate, brick, or as phalt typically involves removal of the contaminated area or man ual scrubbing and mopping. This study shows that PCS removal by mechanical equipment can be as effective as manual clean ing, depending on the age and condition of the surface;
BACKGROUND
Removal of potycWorlnalad Mphenyte (PCBs) ham porous materials Is a cosdy and often labor-intensive proceed with the comamlnaled aurtaee often requiring repeated manual acnibbinQ and mopping. TypleaSy. comami-
nawd wood and asphalt are replaced Instead of cladnad: brick and concrats surtacaa art often replaced aa wal. A mechanical anatom VM
OBJECTIVE lb evaluate aqutpmaol tor (sat and driddiva removal of PC8 Sent porous maisrisls such es concrete.
APPROACH
The raaaafchars fires eaarchad the open Herniate for kitonaaHcn on fMROMft of PC81 from ppfmt tuvtocoo. Thoy frton conWM ipfrfttdnMftoty 70 vandora of sprsy vecuum-desning equipment, onahiaiad adhMa pcoAioiOi ind Mtoctod two dnioo tfovteoo toe tooling. Ono dovict woo o combination spray and vacuum unit medMad tor concrete cleaning and Pm odrar wee a commercial ruQ cleaner. One eeriee ol leala Swotted mtrmrinp uncontamtnaled tranetormar oS Sam aged (3Mo to year old) oonciata A eaoond eat of taala compared the aftacllveridaa of both devlcoe St rstnmrirtg Asksral (a mixture cf PCS and SI- and waachlotcbanwwaa) Sam needy plaoad ftltraa week-old) concrete with the ratine achieved by vtgoeous scrubbing using a wire brush.
REBUTS Vbry IftHa published SriermaScn is ataSsble on datnup of PCBs on tephWt, brick, or wood. The ourvay showed, horranot that PCS penetration of
concrete than now concrete probobly because of the high molelute HONS 018336
oontsnt (up to 90% of saturation) of tha now concrata Ot too imo rrtochantcal dartcaa. a eonunarcial fUO ctaanar aaa Itia meet attac-
tha. This una was aa aflaelhm at ramculng PCSs as vigorous hand
brushing. A aurtacaaampNng toennlqua mdfcaiod dial too daaning ptocsduras sara probably conftnad to tha IM 00004 in. bom tha aurtaca but alae shonad that a largo bactton ottha PCS contamination was at or vary naar Ota surtacs. TWo combtnstlon ot charactsrtailca
maalmtzaa tha sllact at daantng.
EPfll PERSPECTIVE
This raport ohsrs now tschniquas lor ramming PCS eonlaminalion of porous concrols aurfacsa, but tt also highiighls tha problems bwohsd. If tha molalura contant of tha concrata la too high, tha sttoctlvanasa of
both manual and mschanical daaning is rsduead. If tha eoncmta is fraetursd, panobatlon of PC8a may ba so daop that rsptocamam of comaminalsd saebona Is nsestaary. Thsss toots show that undsr soma conditions mschanical daanup of PCS cantamlnalion can ba as sAsctha as manual daaning, but daaning aflocihianaao dspsnds on tha aquipmarit uaad. on tha condition of tha concrata. and on tha alapaad bins sines tha contamination. Thaos varlablaa sS naad to ba conoidsrad by a utNty planning a daanup opsration.
PROJECT
RP1203-2S EPRt Pro|act Managers: R. Y. Komal: M. E. McUarn Coal Combustion Syatams Division Contractor Quadras HPS. Inc.
For turthar Information on EPRI rassarch programs, cai EPRt Tbchntcai ItrtormaMon SpadalMs (418) 9884411.
HONS 018337
Development and Testing of Equipment tor Removal of PCBs From Porous Surfaces
CS-4925 Reeearch Project 1283-25 find Report. November 1986
Prepared by OUADREX BPS. INC.
451 HWt Street
Principal Inveabgalort H. R. Gardner 0. S Bdaman
Prepared tor
Electric Power Reeeercri Indrtute 3412 HSview Aranue
Palo Alta. Cdttomta 94304
EPRI Protect Manager R. Y. Komd
Heal Waatai and YMer Management Program Coal CombueOon Syelema Divieion
HONS 018338
OROERING INFORMATION RaquaaB lor copias ol this report mould Do diractad lo Raaaarch Raports Caresr (RRQ. 8o 50490. Pdo Atai CA 94301 (415) 985-4091. Thara * no cnarg* lor reports aquasred by EPRI mambar ut*M* and sFTilisAus. US. maty assocabonA US gorarnmart aganoas (tadarai. stare and local), madia and loraign orgaruaeons with winch EPRI naa an mkxmalion aacnanga agreamara On raquasl RRC will sand a catalog ol EPRI reports
s md lam are naaarea ww mwia a lacwc ren n--awm a
HONS 018339
ABSTRACT
Thi objective of this project was to Identify or develop equipment thet could be used with existing deenlng solutions to decreese the cost and labor Intensive nature of PCI Spill cleanup from a variety of porous surfaces. The approach In cluded a sequence of: acquisition of background and existing PC8 spill cleanup Information, preliminary testing on concrete surfaces using transformer oil as a surrogate for Askarel, and finally proof-of-prlnclple testing on Askarel (60S Aroclor 1260, 40* trichlorobenzene) coated concrete surfaces. A three-jet vacuum Itead and a coemerclal rug cleaning system were satisfactorily tested for use In PCI Spill cleanup. Using a nonsolvent cleaning material and machine and hand cleaning, the surface PCI concentration was reduced by factors of $3 to 170 for an Askarel application of 480 ml/m1. When the Askarel application was 160 ml/m1, the PCI concentration was only reduced by factors of 1.1 to l.B. The near saturation moisture content of the three-week old concrete used for the PCI removal testing was believed to have severely limited the ability of solvent type cleaning materials to remove PCBs from the concrete surface. The NIOSH wipe technique and a specially developed technique for Incremental concrete surface removal both produced samples that resulted In meaningful PCI concentration data.
HONS 018340
EPRI FOREWORD Cleanup of porous surfaces exposed to polychlorinated biphenyls (PCIs) has generally been approached In two ways: (1) repeated aanual scrubbing and mopping with a detergent or a solvent or (2) complete removal and disposal of the contam inated material, loth approaches are costly and labor-intensive. The need exists for a rapid, cost-effective cleanup method using readily available equipment such as the spray cleaner-vacuum used In coanerclal carpet-cleaning processes.
leceuse sufficient funds were not available to address this problem exhaustively, EMI Initiated a scoping study to examine this Identified need. The Initial results Indicate that mechanical removal of PCBs from porous surfaces by using coammrclal cleaning equipment Is approximately as effective as manual cleaning and probably requires substantially less operator time. However, neither quantifi cation of percent removal of PCBs nor reclamation of cleaning solvents containing PCIs was performed, loth of these Issues must be resolved before commercialItatlon of this technique can be accomplished. Although this RIO project was limited In scope, the Information contained In this report Is being made available for consideration and judicious use by utilities In PCI cleanups. It may also sorve as a seed for other Investigations Into methods for the cleanup of PCIs from porous surfaces.
HONS 018341 v
ACKNOWLEDGMENTS Th authors extend tholr appreciation to H. L. Butts for his highly valued conceptual designs, assistance In equipment fabrication and assembly, and con sultation on the establishment of cleaning system operating parameters all of which contributed greatly to progress on this project. In addition, the pur chasing, organizational, editorial, and typing skills of V. A. Scorup contributed to a high rate of progress on the project and expedited the completion of this report.
HONS 018342
CONTENTS
Section
1 INTRODUCTION
2 BACKSROUNO DEVELOPMENT PCS Cleanup from Concrete Surfeces Penetration of PC8s Into Concrete Results of Equlpeitnt Survey PCB Cleanup of Other Materials References
3 PRELIMINARY TESTING ANO DEVELOPMENT Approach Application of Transformer Oil (Texaco CT-JT) Equipment Development and Selection Three-Jet Vacuum System Commercial Rug Cleaning System Evaluation of Cleaning Solutions Classification Effectiveness Concentration Gradient Sampling References
* PREPARATION FOR TESTING ON ASKAREL COATED CONCRETE SURFACES Approach Procedure Pouring of Concrete Sections Coating with Askarel PCS Sampling Extraction and Analysis
5 TESTING OF CLEANING METHOOS ON ASKAREL COATEO CONCRETE SURFACES Approach Three-Jet Vacuum Mead
,x Jkun fcoirtasrM
Page
1-1
2-1 2-1 2-2 2-2 2-3 2-3
3-1 3-1 3-1 3-2 3-2 3-5 3-7 3-7 3-10 3-13 3-15
4-1
4-1 4-1 4-1 4-1 4-3 4-6
S-l
S-l S-l
HONS 018343
Section
Commercial Rug Cleaning Equipment Wipe Test Results Concrete Sampling Results
Hand Brushing Visual Effects of Cleaning
General Effect Concrete Comparison Effect of Power Cleaner 155 Soak Time Effect of Power Cleaner 155 Concentration Surface Replenishment Time Interval Before Cleaning Wipe Test Replication Air Sampla Results
5 CONCLUSIONS
APPENDIX A
Concrete Mix Oeslgn and Property Data
APPENOIX B
Procedure for Mlpe Sampling
Page
5-4 5-4 5-6 5-6
5-11
5-11 5-11 5-11 5-14 5-14 5-14 5-14 5-15
6-1
A-l
B-l
HONS 018344
ILLUSTRATIONS
flaurt
Put
3-1 Three-Jet vacuum h*ad with exhaust and handling wand attached
3-3
3-2 Thrtt-Jet vacuum head with Integral vacuum and pressurized fluid couplings
3-3
3-3 Underside of three-jet vacuum head with fan Jet nozzles and Interior peripheral gap to confine vacuum. 0.7SX
3-3
3-4 Components of commercial rug cleaning system
3-6
3-5 Portion (lower right) of transformer oil coated concrete surfact cleaned In 45 sec by one treatment with Freon-113 using three-jet vacuum head. 0.1X
3-10
3-6 Visual effect of Indicated cleaning approach. 0.1X
3-12
3-7 Diamond Impregnated bottoming tool. 1.3X
3-13
3-S Fixture and drill used to abrade concrete surface In an ^90* arc to obtain concrete particles for PCS analysis. 0.1X
3-14
3- S Area abraded with bottoming tool to remove particulate sample for PCS analysis. Mote spots of higher PCS concentration present at O.OSS In. depth of sampling. Concrete section no. 9. 0.5X
3-14
4- 1 Surface roughness of concrete used for PCS removal testing (top) compared to normally brushed and worn concrete bottom.
Direction of broomed finish Is vertical. 1.3X
4-2
4-2 Lower row. 4S0 ml/in.* Askars1 application on left and ISO ml/m* application on right. Note appearance of uncoated concrete In upper row
4-4
4-3 460 ml/ln.1 Askarel application on left. 160 ml/ln.2 Askarel application on right. 0.125X
4-4
4-4 Askarel around places of aggregate (arrow) at depth of 0.055 In. from concrete surface coated with 160 ml/m2 Askarel. Concrete section no. 11 before cleaning. 1.3X
4-5
4- 5 Mtpe sampling using mask to define area. Note gauze fibers retelned on rough concrete surface that had to be picked up with a tweezer. 0.15X
4-5
5- 1 Dark appearance of new concrete fracture surface (right) Indleating high moisture content. Old concrete on left. 0.5X
5-3
HONS 018365 >1
Floure
5-2 Macrostrueture of aid concrete (left) compered to new concrete (right). 1.4X
5-3 Steel wire brush used for HAND BRUSH approach. 0.3X
S-4 Steel wire brushing Power Cleaner 155 on concrete surface
5-5 Head attachment for vacuuming Power Cleaner 1S5 from concrete surface. 0.5X
5-8 Appearance of Power Cleaner 155 after brushing for three minutes. Hota that foam on left edge of section has been vacuumed up
5-7 Cleaning results with Power Cleaner 1S5
5-8 Presence of higher PCS concentration spots to depth of 0.0470.050 In. on concrete section number 7 after third MACHINE BRUSH cleaning. 0.3X
5-9 Network of cracking delineated by a higher concentration of transformer oil after cleaning attempt. 0.3X
Paoe S-4 5-8 5-8 5-9 5-9
5-12 5-13
5-13
HONS 018346 all
SUMMARY
The cleanup of polychlorinated biphenyls (PCBs) In spill or other contamination situations Is costly and labor Intensive. Particularly difficult Is the removal of PCBs from porous surfaces such as concrete, asphalt, brick, and wood. In the Interest of reducing labor and other costs associated with spill cleanup, a project was Initiated with the objective of developing equipment that could be used with existing cleaning solutions to reduce PC8 concentrations on porous surfaces to acceptable levels.
The approach Involved the following sequence: acquisition of background Infor mation on PCB spill cleanup practices and results, preliminary evaluation of equipment and cleaning solutions using uncontaminated transformer oil applied to concrete surfaces, and finally proof-of-prlnclple testing on Askarel coated concrete surfaces.
Two types of cleaning equipment were evaluated for removal of uncontaminated transformer oil from concrete surfaces. One used a vacuum head that contained three spray Jets. With the spray and vacuum activated, and the head positioned In contact with the surface, the head could be moved In a systematic pattern to obtain complete coverage at a rate of Id In./min. Confining the vacuum to a rectangular annulus around the Interior of the head was essential for control and pick up of the volume of fluid sprayed from the Jets. Based on test results. It appeared that this head would be most effective on concrete when used with solvent type cleaning solutions where the agitation provided by the Jets was adequate for cleaning purposes. In the preliminary testing of the three-jet vacuum head with Freon-113 to remove transformer oil from concrete surfaces, the removal effec tiveness was very good based on visual comparison of the cleaned surface to an uncoated surface. The testing also Indicated that the head could be used with equally good results on floors and walls. Although not demonstrated. It is believed that this head could be used to clean nonporous surfaces with solvent or nonsolvent cleaning solutions.
S-1 '
HONS 018347
The second type Of equipment evaluated was a commercial rug cleaner (JJ that had spray (rive Jets), vacuum, and rotating brush capability in the cleaning head. Cleaning fluid for the head was pumped from a portable module containing a supply, and a used solution recovery tank each with 14 gal capacity. In use, the cleaning head Is pulled along the surface to be cleaned at a rate of 8 in./min. The cleaning solution sprayed from the Jets is agitated against the contaminated surface with the rotating brush. The used cleaning solution is picked up by the vacuum slit on the trailing edge of the cleaning head. In preliminary testing on trans former oil coated surfaces it was found that of the nonsolvent cteaning solutions tested. Power Cleaner 155 (2) appeared to perform the best on a visual comparison basis.
Proof-of-princlple testing was conducted with Askarel (60X Aroclor 1260, 40* trlchlorobentene) coated concrete surfaces. The concrete used for testing, however, was poured three weeks prior to testing and as a result was within POX of satur ation with moisture. This high moisture content; 6.IX compared to 2.4X for completely cured concrete 30 years old, was believed to have caused a decrease in the effectiveness of the cleaning methods tested. In the extreme case it was found that the presence of moisture at, or near saturation (4-7X) in concrete (new or oTd) severely limited the ability of Freon-113, Freon-113 plus 35X ethanol, or perchloroethylene used in the three-jet vacuum head to remove PCBs from concrete surfaces.
While using Power Cleaner 1SS in the commercial rug cleaning system and nand brushing tests, it was determined for Askarel applications of 480 ml/m1 that factors of reduction in PCS concentration of S3 to 170 could be obtained. The 'two modes of machine cleaning tested appeared to be as effective as the hand brushing approach. However, when the Askarel application was reduced to 160 nl/m2, a reduction in PCI concentration of only 1.1 to 1.8 could be obtained. The data appear to indicate that there Is a limit to the degree of PCS removal that can be achieved. Other than implicating the high moisture content of the new concrete that was used for testing, no reason can be given for this greatly diminished effectiveness at reduced Initial concentrations of PCS.
The effectiveness of the Power Cleaner 155 for removing PCBs appeared to decrease when the Power Cleaner concentration was increased from 1:32 to 1:1.
The PCI concentration results obtained from use of the wipe technique were in general very reproducible and permitted the compilation of an acceptable body of
S-2.
HOMS 018348
date. Considering the roughness of th< concrete surfece being sampled by wiping this wes e surprising result.
A Surface sampling technique that permits the removal of Incremental layers of concrete was successfully demonstrated. The results obtained Indicate that the action of a cleaning method Is probably confined to the first 0.004 In. of the surface. The results also Indicate that before cleaning a large fraction of the PCI concentration Is at or near the surface. Thus, a large proportion of the PCS contamination Is accessible to the action of a cleaning method.
Airborne PCBs were detected during the concrete surface sampling activity (a fine powder was generated), and also In the exhaust hose during vacuuming operations Involving the removal of Power Cleaner 155, and Freon-113 from concrete surfaces. The presence of airborne PCS requires that appropriate masks be worn by exposed cleaning personnel, and that vacuum exhaust hose be vented through an activated charcoal drum or other means to remove the PCS before release to the atmosphere.
For the purposes of the Initial development of equipment and preliminary salectlon of cleaning approach and materials, transformer oil was considered to be an acceptable surrogate for Askarel. Rate of progress on these activities was accelerated by using visual appearance to evaluate the relative effectiveness of cleaning techniques and materials for oil removal. It Is Important to recognise, however, that based on the results of tha testing on Askarel coated concrete surfaces, although substantial reductions In PCB concentration were associated with the visual Indication of the removal of Askarel, the remaining measured PCB concentration was considerably higher than expected.
REFERENCES 1. Power Stractor It and Extrator (14 gal). National Super Service, Naiawe, OH. 2. Power Cleaner 155, a product of Penetone Corporation, 74 Hudson Avenue,
Tenefly, IU.
HONS 018349
S-3
Section 1 INTRODUCTION Because of the labor In Cent tv* ntur* and high cost of polychlorinated biphenyl (PCB) spill cleanup In elactrlcal utilities, there Is e need for equlpeient that cen be used to decrease the cost and time for a cleanup operation. Particularly difficult Is the resioval of PCBs from such porous surfaces as concrete, asphalt, brick, and wood. In many cases, removal of PCBs from these materials Is not even attempted, rather the contaminated material Itself Is either completely removed or removed to a depth where the PCB content Is not considered hazardous. Thus, there Is a need for techniques or methods that result In cleanup to levels that will not require physical removal of the surface In question. This report de scribes the results of preliminary work directed toward the development of equip ment and support systems for us* In PCB spill cleanup from porous surfaces. Since concrete Is the surface coanonly contaminated with PCBs. It was selected for use In the testing program. The general approach for the project was to review the nature of PCB spills and existing spill cleanup practices, and then Identify or develop equipment for testing and evaluation with existing cleaning solutions using first transformer oil and then In a proof-of-principle demonstration, Askarel coated concrete surfaces.
HONS 018350
1-1
Section 2
BACKGROUND DEVELOPMENT
The objective of the work reported In this section wes to obteln beckground Information that would both focus and expedite the development of equipment for remove! of PCls from porous surfaces. Information was sought from a variety of sources Including the United States Environmental Protection Agency (USEPA) and Its regional offices. National Institute for Occupational Safety and Health (HIOSH), Independent consultants, electrical utilities, publications, and vendors. Although the search for Information was not considered exhaustive, the compilation of observations and data provided a good starting point for the work. Oesplte the fact that Information was sought on porous surfaces In general (concrete, asphalt, brick, and wood). It was found that a preponderance of work had been done on the cleaning of concrete. Accordingly, most of the following discussion concerns the cleaning of concrete.
PCB CLEANUP FROM CONCRETE SURFACES
A major consideration when developing an approach to PCB removal from porous surfaces concerns the depth of penetration of PCBs. If the depth Is such that surface cleaning Is not expected to reduce the PCB level to a releasable or acceptable value, the contaminated surface matertal has to either be completely removed, or the PCB removed sufficiently from the surface that It Is not available to human contact. This can be achieved because of little or no leach back after cleaning or through the use of a sealant coated on the surface. Removal of the surface material was not part of this project. Only general cleaning approaches will be discussed that represent a consensus of the Information reviewed.
The cleaning method generally used consist of: 1) pouring a cleaning solution on the contaminated area; 2) soaking for approximately 10 min followed by scrubbing with a brush; 3) adding an absorbent to the PCS-solutlon mixture; 4) shoveling/ sweeping the mixture Into a drum for disposal; and S) mopping the floor with a general detergent, e.g., trisodium phosphate. If necessary, the cleaning method is repeated three times or more depending on whether the cleaning Is successful or the decrease In PCS level per cleaning Is rapidly approaching an acceptable value. Cleaning solutions that have been used for PCB cleanups Include: kerosene.
2-1 HONS 018351
dtesel fuel. Triton X-10O, Triton X-114. Power Cleaner 155, hexane, petroleum ether, toluene, Hooctane, perchloroethylene, and trichloroethylene. Use of many of these solutions causes concern over fire and health hazards. Some sources also point out that the use of solvents tends to drive the PCBs further Into the concrete. In eddltlon to the above procedure, the use of hot water or steem hes been suggested as a potential cleaning method.
In a separate project from the work being performed on this project, Quadrex KPS, Inc. hes tested the use of Quadcote-100, a paint-on, self-peeling netertal for cleanup of PCS. Quidcote-100 Is applied with a brush or roller to a surface requiring decontamination. A film Is formed which during drying spontaneously flakes or spalls from the surface. The debris can be vacuumed or swept up for disposal. Although the spontaneous spalling action Is exhibited from metallic and other smooth surfaces. Its performance on concrete surfaces Is variable. After application to a concrete surface, some of the Quadcote-100 flakes off and the rest forms a hard surfaced material that had to be scraped or abraded off. It has not been determined what causes this behavior. At the present time the use of Quadcote-100 Is not recommended for use in decontamination of concrete surfaces.
With respect to the Influence of time between a spill and a cleanup attempt, one source stated that cleanup should only be attempted ff the time between spill and cleanup Is less than 24-40 hours. Seyond this time the concrete should be removed. Other sources Identified possible alternatives to surface material removal such as use of sealants or epoxy coatings, and re-covering the contaminated surface with fresh concrete or asphalt.
PENETRATION OF PCSS INTO CONCRETE
The degree of PCS penetration Into concrete Is a function of amount and type of PCI supply, duration of leak, and physical characteristics of the concrete, l.e., porosity. In cases where the supply of PCI has been more or less continuous such as under a leaky transformer, as much as SO ppm PCI has bean found at depths up to I in. In another Instance 200-300 ppm PCI was found at a depth of 4 In. These determinations were mode through the use of core samples and/or chipping with a Jack hammer.
RESULTS OF EQUIPNENT SURVEY
Contact with approximately 70 vendors resulted In Information on a number of types of sproy-vecuim equipment:
2-2 MOMS 018352
Integral tpray and vacuum - With rotating brush - Without rotating brush Separate spray and vacuum e Complete spray and vacuum supply systems - With mobile head Complete mobile system
Based upon the previously discussed general approach to cleaning It was apparent that a mechanical device for cleaning should have spray and brush capability, particularly with nonsolvent cleaning materials. It was believed that vacuum capability was also essential to remove cleaners. Several systems having these capabilities were Identified. One was found that could be used at no cost to the project (1). For application of solvent type cleaning materials and hot water, a three-jet vacuum head developed by Quadrex HRS, Inc. was fabricated for testing.
Information was also obtained on coaamrclal wallpaper steamers for use In RCB removal from porous surfaces. Evaluation of the Information Indicated that although the steam application approach could be useful, the device would require Incorporation of vacuiae capability to contain the removed contaminants. Depending on the success of removing PCBs from concrete floors with hot water or steam, adding vacuum capability to a wall steamer for testing nay be worth consideration.
PCS CLEANUP OF OTHER MATERIALS Little Information could be obtained on PCB removal from materials such as asphalt, brick and wood. Independent sources stated that PCB contaminated asphalt and wood should be removed. This approach for wood, however, may be tempered depending on whether the wood was painted and the type of paint, e.g., epoxy, water base. etc. Another source pointed out that asphalt nay have residual PCB from Its Initial manufacture. TMs could mask the magnitude of a spill and complicate evaluation of the progress of a cleanup.
REFERENCES 1. Power Stractor It and Extractor (14 gal), National Super Service, Maumee, OH.
HONS 0L83S3
2-3
Section 3 PRELIMINARY TESTING AND DEVELOPMENT
APPROACH
The general epprotch for preliminary testing end development of PCS cleenup equip ment was to perform the work on evaluation and selection of cleanlnq materials In parallel with the work on development and/or selection of equipment for cleaning material application and removal.
To reduce costs In this phase of the project, the following measures were taken:
e .
Texaco CT-JT uninhibited transformer oil (uncontaminated with PCI)
was substituted for Askarel. This was based on the following considerations: a) PCS contaminated transformer oil Is Involved In some spills; b) visual estimation of oil removal from a concrete surface could be used for preliminary evaluation rather than expen sive and time consuming chemical analysis of wipes or core sample debris; and c) the viscosity of transformer oil Is nominally compar able to the more common Askarels. The visual estimation of oil removal as the result of a cleaning treatment was based upon compar ison of the appearance of the cleaned surface (after evaporation of surface moisture, generally about 2 hours) to the appearance of oiled and unoiled surfaces.
a Emphasis was placed on the use of concrete for preliminary evaluation of cleaning solutions and equipment. This was done because It Is probably the most common material contaminated with Askarel. A local source of concrete test sections approximately 4 ft x 5 ft x S In. thick and having a broomed surface finish was found. Ten to twelve sections were obtained for test purposes. These sections were estimated to be 30-40 years old.
APPLICATION OF TRANSFORMER OIL (Texaco CT-JT)
In preliminary work It was found that the surface of the 4 ft x 5 ft concrete sections could be completely and uniformly covered with transformer oil by appli cation at an areal density of 160 ml/m2. After 12-18 hours, however, enough of the oil had soaked In that Its appearance was the same as the uncontaminated sections. To provide a concrete surface that would stay uniform In appearance (In the uncleaned condition) for a one to two week period It was necessary to apply oil three times, each at an areal density of 160 ml/m2 for a total of 480 ml/n2. After this level of oiling the concrete surface was a dark brown color. The
MONS 018354 3-1
effect of a cleaning attempt (If oil removal took place) was to restore the sur face appearance to the light sandy color of dry concrete. The degree of approach to the dry concrete color was used to estlaiate the effectiveness of a cleaning attempt.
The rate of oil penetration along a crack and through the thickness of a concrete section was very high. For a 4 In. thick concrete section, oil was otserved to travel along a crack completely through the section in 5 min. This indicates that It is probably not possible to clean badly cracked or damaged concrete.
EQUIPMENT DEVELOPMENT AND SELECTION
As discussed in Section 2. two types of eoulpment were selected for testing and evaluation. One was a combination spray end vacuum head that contained three 80* fen Jets and had static vacuum capability to 100 In. water provided by a standard shop vacuum. It was patterned after a previous Quadrex HPS Inc. design. The other type was a commercial rug cleaning system that contained five 110* fan jets, a nylon bristle rotating brush, and a vacuum slit. Information on the development, application, and testing of both systems Is provided below.
Three-Jet Vacuum System
The three-jet vacuus system Is composed of a spray-vacuum head and exhaust and handling wand. Figure 3-1, with connections to a standard shop vacuum and a pump and reservoir for supply of the cleaning fluid. The configuration of the vacuum head is illustrated In Figures 3-2 and 3-3. Note the approximately 1/4 In. wide slit or gap adjacent to and around the Interior of the head. Figure 3-3. This confines the vacuus exhaust to this annulus region and was found to be essential to keeping the flow of cleaning fluid within the boundary of the head during cleaning. An earlier version without the gap did not effectively vacuus the cleaning fluid from the concrete surface. The three nozzles used In the head are Identical and have an 80* spray pattern. Depending on flow requirements or re strictions, nozzles with different size orifices can be used.
The head with Jets and vacua activated Is moved on a contaminated area at a traverse rate of about 14 In./min. This traverse rate was established by evalu ation of visual cleaning results during stationary testing for S, 10, IS, and 30 sec dwell times; and also by testing at traverse rates from 10 to ISO In./min. In tests with Freon-113 (referred to as Freon In the remainder of the report) It was determined that the head performed equally well on floor and wall areas.
3-2 ,
HONS 018355
Figure 3-1. Three-jet vacuum head with exhaust and handling wand attached.
Figure 3-3. Underside of three-jet vacuum head with fan jet notales and Interior peripheral gap to confine vacuum. 0.75X! Figure 3-2. Three-Jet vacuus head with Integral vacuum and pressur ized fluid couplings.
Fleece now Kiel me muenden(e) on thin page nee been (educed 10H m pdndng. 3-3 HONS 018356
In Initial tests with this system, the Freon was pressurized to 700-1000 psi with a flow of 0.5 gpm. It was found that the impact of the Freon on the oil coated concrete surface drove the oil Into the surface and as the head was moved the oil came up to the surface again (leach back). Lowering the pressure to 20-30 psi with a flow of 0.3-0.4 gpm resulted in very effective visual cleaning with little or no leach back. For pressures in this range it was found that an inexpensive pump (]_) mounted on a standard 1/4 in. drill would provide the desired pressure and flow.
A comparison of the effect of flow rate in the three-jet head was made for a pressure of 16 psi. For a traverse rate of 11-14 in./min it was determined that for the combined three-jets, a flow rate of 0.36 gpm (0.036 in. orifice) produced 50X better cleaning than a flow rate of 0.18 gpm (0.026 in. orifice).
Using the three-jet head, tests were then made to compare two methods of application of fresh Freon at 30 psi and a traverse rate of 12 in./min. One method consisted of spraying the Freon on an oil coated concrete surface at a distance of 4 in. for 10 sec followed by vacuuming up the Freon and oil mixture. The other method was the one in common use which maintains contact of the three-jet head with the concrete surface during the spraying and vacuuming operation. After a total of 10 tests of each method on adjacent sections of concrete surface. It was concluded that the contact method In common use was 50% more effective in the removal of oil as indicated by appearance.
Vacuum to the three-Jet head is provided by a standard wet or dry shop vacuum with 100 in. water static vacuum pressure (2). Because of concern over Freon leakage from this unit during use, a halide leak detector kit using a standard propane fuel bottle wet used to detect any Freon leakage. Through the use of this detector it was possible to teal up the leaks in the shop vacuum thus confining Freon discharge to the exhaust hose whose effluent can be vented In a controlled manner, a.g., through an activated charcoal drum.
Ouring use of the three-jet head with Freon, some operational problems were noted that may Influence the development of a commercial system. Any moisture vectnmed into the head freezes on its interior surfaces and on the interior of the metal handling wand. Under prolonged use there is a possibility of sufficient ice build up to block the exhaust passage, at least in the head. This cooling of the wend reguires the use of gloves during use. Another problem involves the build up of ice and water in the cannister containing the used Freon. Provision for accon-
3-4 ,
HONS 018357
modation of these problems should be included in the design end/or operating procedure of i commercial system based on this technology.
At this point It was decided that the state of development of the three-jet head had progressed far enough that proof-of-principle tests could be conducted on Askarel coated surfaces.
Commercial Rug Cleaning System The components of this system are illustrated In figure 3-4. The cleaning head contains five 110* fan jets each with a 0.026 in. orifice that together spray cleaning solution at 16-196 psi and 0.3-1.1 gpm. It also contains a rotating brush with nylon bristles and a vacuum slit. The portable supply-recovery tank system contains a 14 gal cleaning solution supply tank, a 14 gal solution recovery tank and associated pump and instrumentation.
While cleaning a surface the head is pulled along at a rate of 0 In./min. The Jets spray cleaning solution from the supply tank. The solution is agitated against the surface by the rotating brush. The used cleaning solution is picked up by the vacuum slit on the trailing edge of the cleaning head and vacuumed Into the recovery tank. With a flow rate of 0.8 gpm and 14 gal supply tank capacity the system can be operated for approximately 18 min. The value for traverse rate was determined by testing at rates ranging from 8 to 24 In./min and visual evalu ation of cleaned surfaces. Tests of the effect of traverse rates on Askarel coated surfaces should be conducted to determine if a faster traverse rate can be
Inary tests Indicated that cleaning by moving the cleaning head parallel to the direction of the broomed finish on the concrete surface may be more effective than cleaning perpendicular to the direction of brooming.
Tests were net on oiled concrete surfaces with and without the rotating brush using Freon to determine If the rotating brush would Improve oil removal. The traverse rate was 20*24 In./min with a spray pressure of 16 psi. It was found that 60S better oil removal could be obtained without the use of the rotating brush. It Is believed that use of the brush decreases the surface contact time of the Freon which reduces the degree of oil removal.
To Improve cleaning fluid management of the supply-recovery tank system, two modifications were made. A 2000 watt heater was Installed through the wall of the
3-5 HONS 018358
Extraction haad and control handle. 9.03X!
Supply recovery tank with added heater (arrow) and recirculation piping with filter. o.u;
Underside of extractor head with noules (S). rotatable brush and vacuum silt (bottom of assembly), o.zsx: Figure 3-4. Components of coeaerclal rug cleaning systeir
3-6 HONS 016359
supply tank to permit heating of the cleaning solution to 50-60"C prior to use. The second modification Included a pump and piping to permit recirculation of the cleaning solution from the recovery tank to the supply tank In the event this mode of operation was determined to be feasible.
The proof-of-prlnctple testing on Askarel coated surfaces (Section 5) was con ducted with the system modified as described above.
EVALUATION OF CLEANING SOLUTIONS Classification Tno general types of cleaning solutions were selected for testing: solvents and nonsolvents. To classify the cleaning material as to type, one ml of transformer oil was mixed with four ml of cleaning solution In a 10 ml graduate and the mixture vigorously agitated by shaking. Based on this test the cleaning solutions selected for testing were classified as follows:
Solvent Behavior (oil and cleaning solution completely miscible) Freon-113 (1) Kerosene Triton X-114 (4)
SI lx (i)
Nonsolvent Behavior (oil segregated from cleaning solution) Power Cleaner 1S5 (6)
Hot Naur (90*C)
A summary of the properties of these solutions Is presented in Tables 3-1 and 3-2. The nonsolvent solutions all foamed to various degrees whan agitated with the transformer oil and then segregated from the transfonaer oil as the foam collapsed. Unlike the other nonsolvents, Cltrlkleen partially dissolved in the transfonaer oil. The time for collapse of the foam varied from 2-3 hours for the Power Cleaner 1SS to several days for soma of the other solutions.
As discussed In the following paragraph the degree of foaming and time for foam collapse are of concern from several aspects. Ourlng use In the commercial rug cleaning machine the combination of spraying and brush agitation promote foaming.
3-7 HONS 018360
Table 3-1 CHARACTERISTICS OF SOLVENT* TYPE CLEANING SOLUTIONS
Property
Type Degreaser
Solubility in Water Specified pH Measured pHb Specific Gravity Flash Point CO Bolling Point (*C) Foaming Tendency6
Rlnsablllty (with water) Threshold Limit Value (ppa) Hazards:
Eyes Inheletlon Skin
Volatile Voluaw (X) Blodegradablllty Ionic Nature Recommended Concentration
Freon-113
Solvent
Insoluble c 6.0 1.565 None 47.6 Low Leaves no residue 1000
kerosene
Solvent
Insoluble c 6.0 0.81 46 c Low Leaves residue Not established
Yes YCS Mild effect
99.6
Evaporates
c
Full strength
Yes Yes Yes
99.9 Incinerate c Full strength
Triton *-114
Solvent
Excellent 6.0-8.0 6.0 1.05-1.06 (75*C) >150 c Low to moderate c
Not established
Yes Yes Yes
0 90S Nontontc 5-10X In water
S11 x
Oetergent emulsifier Complete 11.5 12.0 1.048 None 100 Moderate Leaves no residua None
Yes No No
62.0 Complete c 1:20-1:100 In water
*lased on bohovlor with uncontamlnated transformer oil *As supplied concentrete 'hot evellible
HONS 018361 3-8
Table 3-2 ' CHARACTERISTICS OF NONSOLVENT* TYPE CLEANING SOLUTIONS
Property
Power Cleaner 155 Citrikleen Cco-Clean tzz Clean Nokoais-3 Maqnusol 728 Blazer
Type 0e9re*Mr
Alkaline
Solubility ia Hour Coaplete
Specified pH
12.0
Nusurcd pH&
12.S
Specific Gravity
1.170 (20*C)
Flash Point CC)
None
loilioo Point (*C) 100
Foaaing Tendency** Noderate
Rinsability (uith water)
Leaves no residue
Threshold liait Value (ppa)
None
Hazards: Eyes limitation Skin
Yes NO HiId effect
Volatile Voluae (X) biodefradabillty Ionic Nature
0 Coaplete c
Recoanendtd Aaount in Hater
1:6
Solvent enwlsifier
Coaplete 10.4 11.0 0.9SS 74 100 High Leaves no residue Not established
Alkaline
Alkaline
Colloid dispersant
Blend: Solvent penetrant, eaulsifier
Coaplete c.
Coaplete 9.5-10.0
Coaplete c
Moderate 11.5
13.0
13.0
11.0
12.0
1.02 None
>1.0 340
c None
0.965-0.985 57
99
104 100
100
Moderate
Leaves no residue
Moderate
Leaves no residue
High c
Very high c
(tone
None
None
Not established
Alkaline solvent
Coaplete 13.1 c 1.056 >93 100 Very high Leaves no residue 50
Yes Hi Id effect Yes
Yes No Yes
0 Coaplete c
c Coaplete Nonionic
Concentrted 11-1:4 or 1:3
Yes No Nild effect 0 Coaplete c
1:5-1:64
res No No
80 991 Nonionic, anionic 1:1-1 :S
Yes No Yes
60 c c
1:4
Yes Yes Yes
85 Coaplete c
-1:15
HONS 0 1 8 3 6 2
*8ased on belli vi or w ttli uncontammated transformer 011i
b As Supplied concentrate
CNol aval table
A cleaning solution with t high foaming tendency would be more difficult to work with because the volume of foam formed could exceed the volume in the solution recovery tank before the volume of solution in the supply tank could be used. In addition, the formation of large amounts of foam could cause problems for reuse of the solution. Foam formation and the time for foam collapse are important from a waste management standpoint. Solutions with shorter foam collapse times may be more amenable to recovery, waste reduction, and reuse. If the time for foam collapse and segregation of the oil Is a matter of days rather than hours, volume reduction of the used solution by natural oil segregation may not be practical.
Effectiveness Solvent Type Cleaning Solutions. The three-jet vacuum head was used to test kerosene and Freon for removal of transformer oil from concrete surfaces. Only a single test was made with kerosene because It left a coating similar In appearance to.transformer oil on the concrete surface. The presence of this coating made It Impossible to estimate the degree of transformer oil removal. Use of Freon resulted In an estimated 90S removal of the transformer oil. Figure 3-5. Since the relative solvent power of Freon and kerosene are essentially Identical (Kauri Butanol Nos. for Freon and kerosene are 31 and 29, respectively), Freon was selected for future testing on Askarel coated surfaces because of Its capability to effect a high degree of removal of transformer oil from concrete surfaces as Indicated by visual appearance.
Figure 3-5. Portion (lower right) of transformer oil coated concrete surface cleaned In 45 sec by one treatment with . Freon-113 using three-jet vacuum head. 0.1X.* ' Pieman now umi me auaraeon<s) on Me page has been reduced 10H m printing.
3-10 HONS 0183>3
Small places of aspnalt wara Immersed In Freon, kerosene, end concentrated Power Cleaner 1SS to determine the limits of application of these solutions as cleaning materials for asphalt. Dissolution of the asphalt started upon immersion in kerosene and continued extensively with time. The dissolution in Freon and Power Cleaner 1SS was considerably less with Power Cleaner 1SS being the least active. For cleaning tests It is believed that either Freon or Power Cleaner 1S5 could be used on asphalt.
A test was made with the three-jet head on asphalt using 30 psi Freon and a traverse rate of 8 in./min. Although the effect of the cleaning could not be visually estimated, the Freon did not appear to damage the surface of the asphalt. In another test, 0.4 ml of Freon was poured on a 1 in. diameter area on the asphalt and allowed to soak In and/or evaporate. In this case, there nay have been some softening of the surface of the asphalt which could result in permanent damage.
Freon that had been used to remove transformer oil from concrete surfaces was tested to determine its potential for reuse. Within the limits of visual evalu ation, the used Freon appeared to clean as well as new Freon. The capability for reuse before purification should be determined with PCB contaminated surfaces.
Honsolvent Type Cleaning Solutions. All of the nonsolvcnt type cleaning solutions were tested using the commercial rug cleaning system described earlier. Although other dilution ratios were evaluated, most of the comparative testing was done with a dilution ratio of one part cleaning solution to 32 parts water (1:32). Comparative tests were conducted with many of the solutions at both ambient temper atures and 50-60*C. In all tests the Power Cleaner 1SS produced visibly better cleaning results than the other solutions with an estimated oil removal of 95-98*, Figure 3-6. In early testing the Cltrikleen was a close second. However, since it partially dissolved In the transformer oil. its amenability to waste refaction techniques was not considered to be as good as the Power Cleaner 155 and It was dropped from the test program.
Based on the results with the Power Cleaner 15S It was decided to use this solution in subsequent development work. A more intensive examination of the effect of dilution ratio was conducted. Power Cleaner 155 solutions ranging from concen trated to 1:1, 1:5, 1:10, 1:20, and 1:32 were tested with the commercial rug cleaning system. Since no visual benefit could be observed from any of the sort concentrated solutions, the 1:32 solution was selected for use In PCS removal studies. A comparison was also made of the effect of application at a tamparatur*
3-11 HONS 018364
Concrete surface after transformer oil application and before cleaning.
Concrete surface after four cleanings with commercial rug cleaning system and Power Cleaner 15S [1:32) at
-.55-C.
Figure ]-S. Visual effect of indicated cleaning approach.
o.Tx:
of 55*C In contrast to room temperature. Although no visual Improvement in effectiveness could be observed as the result of cleaning with the 55*C solution, this application temperature was selected for use tn PCS removal studies because of a belief that higher temperature application should be better.
The Power Cleaner 1SS solution was reused approximately 10 times on transformer oil coated surfaces with no apparent decrease in effectiveness. Reuse on Askarel contaminated surfaces may be possible until recontamination associated with the reuse becomes a problem. At this point a switch to fresh solution should be made.
The three-jet vacuum head was used to test Power Cleaner 155, Cltrlkleen, Hokomls-3, Triton X-114, and hot water (90*C) for removal of transformer oil from concrete surfaces. Estimated oil removal was 95, 85, 85, 89, and 93t for Power Cleaner 155, Cltrlkleen, Nokomls-3, Triton X-114, and hot water, respectively. Since these were all somewhat lower than what was obtained with the commercial rug cleaning system. It was believed that the action of the rotating brush contributed to the capability for oil removal.
' Piaaaa now that Ota Huatraiiontt) on VM page hat boon raducad 104k In priming.
3-12 .
HONS 018365
Based upon the preceding results, the commercial rug cleaning system with Power Cleaner 1SS at 50-60*C was selected for testing on Askarel coated concrete surfaces.
CONCENTRATION GRAOIENT SAMPLING
A diamond Impregnated bottoming tool, Figure 3-7, was specially fabricated for removing layers of concrete for analysis to determine PCS concentration gradients In concrete slabs. The flxturlng for abrading the concrete surface In a 90* arc Is Illustrated In Figure 3-8. Moving the rotating tool across the surface of a concrete section will abrade a 1-1/2 In. wide area. Figure 3-9, to produce concrete debris In the form of small particles that can be analyzed for PCB content. By relating the PCB content to the depth of material removed for a series of samples taken at successive depths, a concentration gradient can be established.
During the establishment of operating parameters for this sampling method. It was determined that approximately seven grams of concrete powder was obtained for a 0.0S0 In. depth of removal over an area of IS In.1.
Figure 3-7. Diamond Impregnated bottoming tool. 1.3X1
3-13
MOMS 018366
Figure 3*8. Fixture end drill used to ebrede con crete surfece In an 'vSO* arc to obtain concrete particles for PCI analysis. 0.1X"
Figure 3-9. Area abraded tilth bottoming tool to remove particulate sample for PCI analysis. Note spots of higher PCI concentration present at O.OSS In. depth of sampling. Concrete section no. 9. 0.5XT
' Pleaee note diet the auevaoon() on ihia page hie been induced 10H m prtnUng. 3-14 HONS 01836?
REFERENCES 1. Teel Drill Driven Pump, Model IP866, Oayton Electric Mfg. Co., Chicago, IL.
2. Met/Ory Pickup Vacuum, Model 4Z227, Oayton Electric Mfg. Co., Chicago, 1L.
3. Trademark. E.I. DuPont de Nemours S Co., Inc., Wilmington, DE.
4. Triton X-114, a product of Rohm and Haas Company, Independence Mall West, Philadelphia, PA.
5. Slln, a product of Penetone Corporation, 74 Hudson Avenue, Tenafly, NJ.
6. Power Cleaner 15S, a product of Penetone Corporation, 74 Hudson Avenue, Tenafly. NJ.
7. Cltrlkleen, a product of Penetone Corporation, 74 Hudson Avenue, Tenafly. NJ.
8. Eco-Clean, a product of Uniflo Resources, Inc., 9 Ounbar Road, Springfield, NJ.
9. Ext Clean, a product of MU Marketing, Inc., 1228 S. 5th, Pasco, WA.
>0. Nokomls-3, a product of Nokomls International, Inc., P.0. Box 481S, Hayward, CA.
11. Magnuso) 728, a product of Magnus Sales Center, Osborn Building, St. Paul, MN.
12. Blaxer, a product of Associated Chemists, Inc., 4401 S.E. Johnson Creek Blvd., Portland, OR.
3-15
HONS 018368
Section 4 PREPARATION FOR TESTING ON ASKAAEl COATED CONCRETE SURFACES
APPROACH The epproech used to detenalne the capeblllty of cleaning methods and solutions for removal of PCBs was to perform tests on Askarel coated concrete surfaces at the Quadrex HPS, Inc. Gainesville, FL facility. In preparation for the testing, concrete sections were poured and final surface finished by brooming. PCS removal effectiveness was evaluated by surface wipes and concrete surface sampling. Analysis of solvent extracted solutions from the wipe and concrete samples was performed by gas chromatography In the Quadrex HPS, Inc. laboratory.
PROCEDURE
Pouring of Concrete Sections Selection of the concrete mix design (proportions of cement, sand, aggregate, water, and additives) and broomed surface finish was based on the properties of sidewalk type concrete which was believed to be comparable to that found In trans former vaults and other likely spill locations. The concrete mix design and resultant property and test data are provided In Appendix A.
For the anticipated test program, a total of 36 concrete sections were poured on January 9, 1986. Twenty-four of the sections were 22-1/2 x 24 x 3-3/4 In. and twelve were 22-1/2 x 48 x 3-3/4 In. Other than the broomed surface being consi derably rougher than expected compared to the old concrete used In preliminary testing, Figure 4-1, the sections appeared to be suitable for test purposes.
Coating with Askarel Prior to coating with Askarel, a silicone rubber bead was placed around a concrete surface near Its edge to act as a containment for the cleaning solution when required. This prevented Askarel contaminated cleaning solution from leaking down the Interface between the concrete and Its form. The Askarel used was a mixture of Aroclor 1260 and trichlorobenzene In a 60:40 ratio. Two Askarel concentrations were used on the concrete: 160 ml/m2 and 480 ml/m2. The lower concentration was
HONS 018369 4-1
New concrete with 160 ml/in.1 Askarel application. Not* dark spots that pro higher In Askarel conctntrstlon than surrounding area.
." v.. .*X '
e Old uncoatdd concrata used In pral Ininary tasting.
Figure 4*1. Surface roughness of concrete used for PCS removal testing (top) compared to normally brushed and worn concrete bottom. Direction of broomed finish Is vertical. 1.3X.*
Please nen mm am nuetradowe) an me page nee been (educed ioh m prtneng.
-2 ,
MONS 010370
obtained In ont application by pouring on a measured amount and spreading it around the concrete surface with a previously Askarel conditioned paint brush. The higher concentration was obtained by three applications of the lower concen tration with a faw hours of soak time between each application. The lower appli cation was made on six 22-1/2 x 24 In. concrete sections on January 23, 1986. The higher application was started on January 23. 1986 and finished on January 25, 1986. The difference In appearance between the two levels of Askarel application and uncoated concrete Is Illustrated In Figures 4-2 and 4-3. Note the dark spots on the surface with the lower level of Askarel eppllcatlon. Figures 4-1 and 4-3. The spots are small areas of higher PCS concentration than the surrounding area. These spots are believed to be cracks or areas of higher porosity that allow the Askarel to readily concentrate end channel below the concrete surface. An cxaaiple Is Illustrated In Figure 4-4 where Askarel was observed to be associated with and around pieces of aggregate at a depth of 0.055 In. from the surface. The aggregate pieces were apparently at, or close enough to the surface to allow contact by the Askarel. It Is Important to note that nlcrocracks are comaonly present at the Interface between the cement and aggregate particles In concrete.
PCS Sanelino
Two sampling methods were used to evaluate the effect of cleenlng attempts on the Askarel contaminated surfaces. One method Is a surface wipe procedure recommended by the National Institute of Occupational Safety and Health (NIOSH), Appendix 8. The procedure used Is not exectly that defined by NIOSH. A mixture of 1:1 hexane: acetone was used as the solvent on the wipe rather than hexane alone. For the wipe templing, a mask was used. Figure 4-5, to restrict the sample to the area desired and provide the area reference for reporting of analyses. After the wipe sampling, It was found that the rough concrete surface tore gauze fibers from the pad and retained them on the concrete surfece. Figure 4-5. From a sampling standpoint, and to avoid Interference of these fibers with subsequent cleaning and sampling attempts, they were picked up with a stainless steel tweezer end put In the bottle contetnlng the wipe sample.
The second sampling method used the diamond Impregnated, rotating bottoming tool. Figure 3-7, to remove In powder form, an arc of concrete surface approximately 10 in. long, 1-1/2* wide and 0.043-0.044 In. deep. The test arrangement Is Illus trated In Figure 3-8. The erea of concrete removed Is Illustrated In Figure 3-9. The concrete powder generated was swept up on smooth textured weighing paper using disposable brushes and transferred to a glass sample bottle for soxhlet extraction. The reason for using this sampling technique was to obtain data on the depth of
4-3
018^71 HQ**
Figure 4-2. Lower row, 480 m1/1n.J Askerel appllcetlon on left end 160 ml/** eppllcetlon on right. Note eppearence of uncoated concrete In upper row.
Figure 4-3. 480 ml/ln.1 Atkarel application on left, 160 1/1n.> Atkarel application on right. 0.125X.
HONS 018372 Pleeee now that the *uewtton<) on Me page haa Baan reduced 10*
4-4
Figure 4-4. Ask*re 1 around pieces of aggregate (arrow) at depth of 0.055 in. from concrete surface coated with 160 ml/*1 Askarel. Concrete section no. 11 before cleaning. 1.3X1
Figure 4-5. wipe sampling using mask to define area. Note gauze fibers retained on rough concrete surface that had to be picked up with a tweezer. 0.15X. pieeae noa th* the ustraUon<e) on Hue page nee been reduced 1044 m pnneng.
4-5 HOMS 018373
penetration of PCBs. Note in Figure 3-9 that the Askarel has penetrated in lo calized areas (dark spots) to a depth of 0.055 in. Extraction and Analysis For extraction of PCB from the wipe samples, each was placed In a soxhlet extrac tion tube and extracted for 5 hours with 1:1 hexane:acetone. The concrete powder was placed In a pure cellulose extraction thimble (25 x 80 mm) which In turn was placed tn a soxhlet extraction tube and extracted as above. Except for the extrac tlon time, the procedure for sample preparation prior to introduction to the gas chromatograph was taken from EPA Procedure 3540.
HONS 018374 4-6
Section S
TESTING OT CLEANING METHODS ON ASKAAEl COATED CONCRETE SURFACES
APPROACH
The testing of cleaning methods ms done on Askerel coated concrete surfaces during the period January 27 through February 7, 1986 at the Quadrex HPS. Inc., Gainesville, FL facility. Methods evaluated Included: 1) the three-jet vacuum system with Freon, Freon plus 3SX ethanol, and perchloroethylene; 2) the coamerclal rug cleaning systta In two nodes of operation using Power Cleaner 1S5; and 3) hand scrubbing with a wire brush also with Power Cleaner 1SS. Cleaning was done In a direction parallel to the surface grooves produced by the broom finishing operation. Details on the tests are provided below.
THREE-JET VACUUM HEAD
Freon, Freon plus 3SX ethanol, and perchloroethylene were applied to both Askerel and mineral oil contaailnated concrete surfaces in a stationary mode and a slow traverse rate both with the heed In contact with the concrete, and by spraying the fluids from 6 In. followed by vacuuming up. It was found that none of the tests resulted In the type of strikingly visual cleaning that had been observed for mineral oil on the old concrete at the Richland Engineering Office (REO). The cleaning attempts were so poor that no wipes or concrete samples were taken.
Upon speculation as to the reeson(s) for the difference In behavior, the differ ences that became suspect Included: 1) possible differences In response to cleaning between Askerel and mineral oil; 2) differences between the type of mineral oil used at Gainesville end that used at the REO; and 3) the age of the concrete end consequently the moisture content. In an attempt to establish the reeson(s) for the difference in behavior, some of the uncontaminated mineral oil used at Gainesville was tested with Freon on the old concrete at the REO. The same degree of visual oil removal that had been observed earlier for the Texaco mineral oil was observed for the Gainesville mineral oil. Since Freon ms not effective on either Askerel or the Gainesville mineral oil on the new concrete, and was effective for both types of mineral oil on the old concrete, the moisture content of the concrete appeared to be the major difference. To test this consl-
5-1 MOMS 018375
deration, a section of the old concrete was immersed in water for three days. After removal, it exhibited a uniformly dark brown appearance. Texaco mineral oil was applied to this concrete section and allowed to soak for one hour. At this point Freon was poured on the oil soaked concrete and vacuumed up within a few seconds. This is a treatment that normally provides striking visual evidence of cleaning. Little or no cleaning was observed indicating that the moisture was somehow tying up the oil so that it could not be extracted. This phenomena* then is believed to be the cause of the poor cleaning results obtained with the solvent type cleaning materials on the new concrete.
To obtain additional information on the differences between the new concrete and the old concrete, 2 in. cor* samples were taken from each type and subjected to moisture, absorption, porosity and density determinations according to A5TH Test C127 for specific gravity and absorption of coarse aggregate. The results are presented in Table 5-1. The new concrete contained 90S of the total moisture that could be absorbed in a 24 hour period compared to 53t for the old concrete. This
Table 5-1
SELECTED PROPERTIES OF CONCRETE USED FOR SURFACE CLEANING TESTS (Determined on 1.7 in. Diameter x 4 in. Long Core Samples)
Specimen Source
New concrete New concrete Old concrete 1-1 Old concrete 1-2 Old concrete 2-1 Old concrete 2-2 Old concrete 3 Old concrete 4-1 Old concrete 4-2 Old concrete S Old concrete 6 Old concrete 7 Old concrete 8-1 Old concrete SH
Oensity (.lb/ft*)
138.3 131.7 140.4 141.3 138.2 143.0 140.6 140.8 138.6 140.5 142.2 140.8 139.2 145. S
Initial Moisture
(t)
5.8 6.4 2.2 2.6 3.1 2.7 2.9 1.4 2.2 2.3 1.9 2.5 3.0 1.7
Absorption (t)
6.3 7.2 4.6 4.6 5.0 4.2 5.4 4.1 5.4 4.7 4.4 5.3 5.1 4.2
Porosity (J)
13.8 15.2 10.4 10.5 11.1
9.7 12.2
9.2 12.0 10.6 10.0 11.9 11.4
9.9
MQNS 018376 5-2
corresponded to 1S4X more moisture in the new concrete then in the old concrete during the testing of cleaning techniques. Besed on the high moisture content of the new concrete end the behevior of the old concrete when soeked with water. It Is believed that the presence of moisture, either at or close to saturation, inhibits the action of solvents for transformer oil or PCS removal on concrete surfaces. As an additional point of Interest a section of the new concrete was fractured and compared with a similar fractured section of the old concrete. The new concrete fracture was very dark indicating a higher moisture content. Figure $-1. After a few days of exposure to air the fracture surface lightened in appearance indicating a loss of moisture and became comparable in appearance to the old concrete. Although of unknown significance, the differences in the macro structure between the old and new concrete arc Illustrated in Figure 5-2.
Figure S-l. Dark appearance of new concrete fracture sur face (right) Indicating high moisture content. Old concrete on left. O.Sx:
' Pleeee no* mi Vie Mueinmonie) on this page has been raduced IOH m phndng. 5-3 HONS 018377
Figure 5-2. Haerostructure of old concrete (left) coeipered to new concrete (right). 1.4XT
COWCRCIAi. RUG CLEANING EQUIPMENT
Two epproechet were tested with the coienerclel equipment using Power Cleener 15$ et $5*C. In one, the extraction heed was moved across the contaminated concrete section at a traverse rate of 8 In./min using the complete spraying and brushing capability of the machine (MACHINE APPLY AND BRUSH approach with no solution soak time). In the other, 22 oz of Power Cleaner 155 was manually applied and the following operations performed (MACHINE 8RUSH approach):
a The Power Stractor was used to brush the surface at a traverse rete of 8 In./min;
e - The Power Cleaner was allowed to soak on the concrete surface for 10 min;
a Another brushing operation was performed;
e The Power Cleener was vacuumed up with the Power Stractor as Its brush was rotating.
wipe Test Results
Based on the wipe results presented In Table 5-2, both machine approaches produced
significant reductions In the PCS concentration of the sections treated with
480 nl/n1 of Askarel. (No reason can be given for the approximate factor of
three variation In starting PCS concentration at this level.) After the third
cleaning attempt the MACHINE BRUSH approach had reduced the PCB concentration from Please mm vm Urn nuaraesnM on Vila papa hat baan taduead m m pmum#.
5-4 ,
MONS 018378
Table 5-2
EFFECT OF CLEANING APPROACH ON CONCRETE OECONTAMINATION WITH POWER CLEANER 155 (Wipe Ttst Results, 10* ur/n2)
ction
8
10 7
11 3
4
9
2 12
Cleaning Aeoroach
Soak Tine in
Ask*re) l/n*
AsOiled
First
Second
Cleaning Atteaots
Third
Fourth
Fifth
Hand brush* Hand brush* Machine brush*
to
10 10
480 6.8 0.20 0.11
160 0.057 -
0.052
480 8.6 0.39 0.068
0.084 0.044
0.056 0.042
0.11
-
0.044 0.037
-
0.037 0.031
.
0.039(0.040)* 0.031(0.028)*
_
Machine brush* 10
160 0.050 -
0.045
0.056 -
->
Machine apply None 480 2.9 0.24 0.056 and brush*
0.064 -
---
Machine apply None 160 0.054 *
and brush*
0.047
--
---
Hand brush* Hind brushc Hind brush*
20 480 2.4 0.089 0.070
0.047 0.047(0.052)* -
-
10
480 2.9
-
0.12(0.08)*
0.088 0.097
0.088 -
10 160 0.048 0.068 0.059(0.057)6 0.041 0.048
0.035 -
-
HONS 0 1 8 3 7 9
*1:32, Water.-Pouer Cleener 155 solution bSecond wipe token 63 hours after wipe froa Indicated cleaning cl :.1, WateriPouer Cleaner 155 solution
8.6 to 0.11 x 10* ug/m2 while the MACHINE APPLY AND BRUSH approach had reduced the concentration from 2.9 to 0.064 x 10* ug/m2. The 10 min soak time In the MACHINE BRUSH approach may be the reason why this approach produced a greater reduction in PCB concentration after each cleaning attempt. From another perspective, the greater reduction with the MACHINE BRUSH approach may simply be the result of a higher starting PCB concentration on the surface used to test this approach.
Within the variability of the test results for both machine cleaning approaches, the first three cleanings of the sections treated with 160 ml/m2 of Askarel did not measurably decrease the PCB concentration on the surface. There was however, a visual effect Indicating that some cleaning had taken place.
Concrete Sampling Results
Comparing the results from the concrete powder samples. Table 5-3, the factors of reduction In PCB concentration on the sections treated with 480 ml/m2 were only l.S (0.43 * 0.28) for the MACHINE BRUSH approach and 5.2 (1.4 0.27) for the MACHINE APPLY AND BRUSH approach. Comparison of these factors to the much larger factors for the wipe tests indicates that the depth affected by cleaning is very saull, certainly less than the 0.045 - 0.050 in. deep sampling Increment taken after the third cleaning attempt. The data also indicate that the depth of pene tration of PCBs into the concrete exceeds the 0.04S - O.OSO in. sampling depth.
For the concrete sections treated with 160 ml/m1 of Askarel, three cleanings using the MACHINE BRUSH approach did not produce a significant reduction In PCB. Al though a factor of 2.8 reduction was achieved with the MACHINE APPLY ANO BRUSH approach, the PCB concentration after the third cleaning was essentially equal to that for the MACHINE BRUSH approach.
NANO BRUSHING
To determine the effect of a more vigorous brushing approach, a steel wire hand brush. Figure 5-3, was used In the following sequence of operations (HAND BRUSH approach):
e Apply 22 02 of Power Cleaner 155 at 5S'C;
e Hand brush for 3 min, Figure 5-4;
e Allow Power Cleaner 155 to soak for 10 min;
e Hand brush for 3 min;
a Vacuus up Power Cleaner 155, Figure 5-5.
HONS 018380
Table 5-3
EFFECT OF CLEANING APPROACH ON CONCRETE DECONTAMINATION WITH POWER CLEANER 155 (Concrete Reaoval with Diaaond Bottoaing Tool, 10* ppa)
Concrete Section
Cleaning Approach
8 Hand brush*
Tine Aaount min nl/n'
10 480
10 Hand brush*
10 160
7
Machine brush* 10
480
11
Machine brush* 10
160
3
Machine apply Hone
480
and brush*
4
Machine apply None
160
and brush*
9 Hand brush* 20 480
2 Hand brush** 10 480
12 Hand brush& 10 160
AsOiled
Third
Cleaning Attenets
Fourth 2d
Fifth 1C 2
Seventh 1C 20
0.67 (0.043)
0.28 (0.046)
0.43 (0.047)
0.23 (0.06S)
1.4 (0.03S)
0.70 (0.0S1)
0.45 (0.055)
1.3 (0.041)
0.30 (0.050)
0.27 (0.047)
0.21 (0.057)
0.28 (0.060) 0.22 (0.058) 0.27 (0.045) 0.25 (0.056)
'
-
*
"
0.28 (0.062)
*
--
-
--
--
-
*-
0.29 (0.067)
*
*
-
0.30 (0.056)
0.23 (0.055)
-
0.32 (0.063) 0.27 (0.065)
0.27 (0.038) 0.22 (0.042)
*
*
-
"
-
-
-
0.28 (0.044)
0.21 (0.056)
* -
-
HONS 0 1 8 3 8 1
() Data in parenthesis is mxIimi depth of stapling (in.)
1:32, Water: Power Cleaner 155 solution ^1:1, Water: Power Cleaner 155 solution
Concrete reaoved froa first grinding ^Concrete reaoved froa second grinding in same area as first
Figure 5-3. Sttcl Mire brush used for HAND BRUSH ipprotch. o.3x:
y
( /"
Figure 5-4. Steel wire brushing Potter Cleaner 155 on con. Crete surface. ' Please note mat the liuetratlon<a) on this page has been induced ms In pnnmg.
5-8 HONS 018382
Figure 5-5. Head attachment for vacuuming Power Cleaner 155 from concrete surface. 0.5X?
During agitation with the brush on the concrete surface the Power Cleaner 155 foams to a moderate degree. The appearance of the foam Is illustrated In Figure 5-6.
Figure 5-6. Appearance of Power Cleaner 155 aftar brushing for three minutes. Note that foam on left edge of section has been vacuumed up.
As Illustrated In Table 5-2, the HAND BRUSH approach did not appear to produce any slgntflcantly greater reduction In PCS concentration than the machine approaches discussed above. A total of seven HAND BRUSH operations were performed on concrete sections 8 and 10 to determine the extent of PCB reduction achievable. Wipe tests for the 480 ml/m2 Askarel application Indicate that the PCB concentration was reduced from 6.8 x 10' to 40,000 ug/m2. For the lower Askarel applications, 160 ml/m2, the PCB concentration was reduced from 57,000 to 31,000 ug/m2. For
5-9 HONS 018383
both the 480 and 160 ml/n1 Askarel applications, no reduction In PCS concentrator occurred efter the sixth cleaning. In fact, for all practical purposes the re duction In PCS concentration after the fourth cleaning was Inconsequential. This result, the Inability to clean below a certain concentration. Indicates that for concrete surfaces either the Power Cleaner 155 solution Is unable to reaiove PCts below a particular concentration or there Is some Inhibiting factor present that affects the ability to clean. As was noted (n the work on cleaning attempts with solvents the high moisture content of the new concrete may also be a factor In fluencing the cleaning effectiveness of nonsolvent type solutions, In this case Power Cleaner 155.
After all cleaning attempts the concentration of PCS was lower for the 160 ml/in* Askarel application than for the 480 ml/m1 application. This suggests that In addition to only being able to clean to a minimum concentration, the minimum concentration Itself may be dependent on starting PC8 concentration, l.e., the higher the starting concentration the higher the minimum concentration that can be achieved.
The results from the concrete powder samples, Table 5-3, support the above obser vations. In addition, as Illustrated by the results after the seventh cleaning, the PCI concentration Is essentially constant over the depth sampled. In the case of concrete section 8 one sample was taken to a depth of 0.038 In. 1(mediately afterward a second sample In the same area was taken which extended the depth of the sample area from 0.038 to 0.044 In. Because of the small difference In PCB concentration between the two samples. It Is reasonable to suggest that the Incre ment of depth affected by the cleaning operation Is quite small. Coeparison of the results from samples taken In the same area In succeeding Increments at nearly the same point In time, l.e., from concrete sections 8, 10, 9, 2, and 12, reveals that In four of the five cases the sample taken at the deeper increment has more PCS. Assuming that the smaller amount of PCB In the upper Increment Is the result of cleaning and that the difference In PCB concentration between increments Indi cates the frectlonel thickness affected by cleaning. It Is possible to calculate the concrete surfece thickness affected by the cleaning. For example, teking concrete section 8:
Second sample Increment: 28,000 ppm PCB
First sample Increment: 27,000 ppm PCB
1,000 ppm PCB reduction because of cleaning
x 0.038 In. thickness of first Increment 0.0014 In.
5-10
HONS 01838*
Correspondingly, the estimated depth effected by the cleaning on concrete sections 9, 2, end 12 Is 0.0021, 0.0035 end 0.0096 In., respectively. Thus, It Is reason able to conclude that In general the depth affected by the perforsied cleaning operations Is certainly less than 0.010 In. with a probable depth of less than 0.004 In.
VISUM. EFFECTS OF CLEANING
General Effect
The effect of a single HAND BRUSH cleaning on a surface Initially coated with 480 ail/m2 Askarel Is Illustrated In Figure S-7. The surface appearance Is trans formed from a general dark appearance to a spotted appearance. The corresponding reduction In PCB level was from 2.4 to 0.069 a 10* ug/*.
Alto Illustrated Is the appearance of the same sample after the third and fourth HAND BRUSH cleanings of a section Initially coated with 160 ml/m1 Askarel. The spots are fading out and the general surface looks clean despite still having a PCB level of 42,000 ug/m1.
Concerning the spotted appearance of the cleaned areas, It was determined that the spots extend at least to a depth of 0.047-O.OSO In., the depth of the concrete samples on concrete section no. 7, Figure 5-8. As discussed previously these spots are areas of higher PCB concentration.
Concrete Comparison
The general spotted appearance of the new concrete treated with 480 ml/m1 Askarel after at least one cleaning was different than for similar treatment of the old concrete. The old concrete was probably 30 years old and reasonably stabilized with respect to drying shrinkage and associated cracking. The manifestation of this cracking can be observed In Figure 5-9, where after a cleaning attempt, a higher concentration of Texaco transformer oil remains in, and delineates, a network of cracks on the surface. Since the new concrete was still essentially wet, comparable cracking apparently had not yet occurred. The spots on the new concrete are believed to be the result of a concentration of PCB at aggregate pieces at or near the surface. Figure 4-4.
EFFECT OF POWER CLEANER 1S5 SOAK TINE
For the HAND BRUSH approach, although Increasing the soak tine from 10 to 20 min on concrete section 9 appeared to result In a greater reduction In PCB concen-
5-11
HONS 018385
Section no. 9, 480 al/m* as-coeted
Section no. 10. 160 nl/n1 HANO BRUSH, third cleaning
Section no. 9, 480 nl/n1
Section no. 10, 160 !/'
HANO BRUSH, first cleaning HANO BRUSH, fourth cleaning
Figure 5-7. Cleaning results with Power Cleaner 1SS.
5-12 ,
HONS 018386
h,,''"'r p" conc.ntr.t1on spots to depth of 0.047-0.0S0 In. on i tificrete section number 7 after third MACHINE BRUSH . l.-.i,,tng "m*
'-13
HONS 018387
tration ftr th first cleaning the effect on subsequent cleanings was Inconse quential, Table 5-2.
EFFECT OF POWER CLEANER 1S5 CONCENTRATION
Increasing the Power Cleaner 155 concentration from 1:32 (32 water) to 1:1 appeared to reduce the effectiveness of the HAND BRUSH approach for the 480 ml/m' Askarel application, Table 5-2. The effect on the 160 ail/m1 application was inconsistent.
Surface Replenishment
Long term date on the replenishment of PCBs on the concrete surface through migra tion from the interior (leach back) was not obtained because of funding restraints. On a Short term basis, the 2 to 15 hour time interval between cleaning and the taking of wipe samples did not, within the reproducibility of sampling and analysis, indicate that measurable leach back was occurring in these short time periods. It was observed, however, that the higher PCS concentration spots, Figure 5-8, did diminish in sharpness and become more diffuse between cleanings indicating that lateral PCI migration was occurring.
Time Interval Before Cleaning
To provide a frame of reference for other PCS removal work, the time interval between Askarel application and cleaning attempt is provided in Table 5-4. These data can be used with the data of Tables 5-2 and 5-3 to compare PCB removal eff*c tiveness for similar initial (precleaning) Askarel applications.
WIPE TEST REPLICATION
To obtain Information on the reproducibility of wipe testing, the following com-
perative tests were made:
a Tests on Adjacent Areas. One concrete section was divided into three areas and wipe tests were taken on each area at two different points in time. The as-oiled (160 ml/m1) PCI concentration taken one day after oiling was 62,000 uq/m*. The wipe tests on the three areas were taken seven days after oiling and were identical at 120,000 ug/n*. In a retest, the wipes on the three areas were taken three days after the first set of three. The results were 44,000, 41,000, and 41,000 ug/n*. Since these latter results were much closer to the as-oiled contamination level It is believed that the 120,000 ng/m* results were in error. Nevertheless, the reproduc ibility within each wipe test series was very good.
e Tests on Same Area. The wipe tests were repeated three times in the same area at essentially the sane point in tine on two concrete sections. On one section with an Initial Askarel concentration of 410 ml/m1 the wipe test result after the third cleaning was
5-14
HONS 018388
110,000 ug/n2. The three rtpllcitlons approximately 12 hours liter gave results of 100,000, 90,000, ind 64,000 ug/m2 In order of testing. On the other section with tn Askarel concentntlon of 160 ml/m1, the wipe test result efter the third cleaning wis 56,000 ug/n2. The three replications approximately 12 hours later gave results of 72,000. 58,000, and 8,600 ug/m1. It is apparent for each section that the polnt-ln-tlne replications on the same surface did not serve to demonstrate the reproducibility of the technique but Instead demonstrated the cleaning ability of the hexane:acetone solvent on the wipe.
Table 5-4
TIME INTERVAL BETWEEN ASKAREL APPLICATION AND CLEANING ATTEMPT (DAYS)
Concrete Action
Cleaning Approech
Amount ml/m2
-------------------------------Cleaning Attempts----------------------------------First Second Third Fourth Fifth Sixth Seventh
8 Hand brush*
480 3.0 3.5
4.0 5.0
5.5 6.0
6.5
10 Hand brush*
160 6.0 5.5
6.0 7.0
7.5 S.O
8.5
.7
Machine brush*
480
3.0 3.5
4.0 -
--
-
11
Machine brush*
160
S.O 5.5
6.0 -
--
-
3 Machine apply 480 3.0 3.5 4.0 and brush*
*-
-
4 Machine apply 160 5.0 5.5 6.0 and brush*
--
-
9 Hand brush* 2 Hand brush* 12 Hand brush*
480 5.0 5.5
6.0 6.5
--
480 6.0 6.5
9.0 10.0
10.5
-
160
8.0 8.5
11.0 12.0
12.S
.
-
*1:32. Water:Power Cleaner 15S solution ^1:1, Water:Power Cleaner 1SS solution
AIR SAMPLE RESULTS
To obtain Information on the potential for airborne KBs, air samples were taken using glass tubes containing Flortsll. Analysis was by gas chromatography after desorption by 1:1 acetone:hexane. The results are presented In Table 5-5. Con cerning the air In the work area, the activity of concrete sampling appeared to generate airborne KBs ebove the background levels Indicated by the overnight/ weekend sampling. During cleaning attempts, the exheust systems used to vacuum up the Power Cleaner 1SS end the Freon were sampled before discharging Into an actl-
5-15 ,
HONS 018389
vated charcoal drum. The exhaust during application of either cleaning approach contained PCS levels considerably above background, particularly for one cleaning sequence Involving Freon, It Is apparent that for a cleaning operation Involving an exhaust system, the exhaust system should be sealed to prevent PCS escape to the atmosphere, and should be vented through a carbon drum.
Table 5-5 ROOM AIR/EXHAUST SYSTEM RESULTS
Activity____________
Power Cleaner 155 Cleaning Power Cleaner 15$ Cleaning Power Cleaner 155 Cleaning Potter Cleaner 155 Cleaning Freon Cleaning Freon Cleaning Concrete Sampling Concrete Sampling Over Night Over Night Over Night Over Weekend
PC Concentration (ug/m*l
Room Air
Exhaust
-
-
-
19.0 3.0 2.3
1.2
3.4 1.3
28.0 39.0 77.0 87.5
283.0 58.0
sampling Time ihrsl
2.2 2.0 1.3
o.a
2.2 0.8 8.0 3.9 12.8 14.7 14.8 63.0
5-16
HONS 018390
Section 6 CONCLUSIONS
Because of the limited nature of this project the results obtstned should be regarded es a Marling point for t more comprehensive and definitive project that could establish boundary conditions or limits for the effectiveness of cleaning methods to be us,.,i ror pcB removal from a variety of porous surfaces.
Based on the iv>uHs obtained tho following concluslons/observatlons are made:
e Thu cum ii'te used In the PCB removal work was only three weeks old and li.ni a moisture content that was 90* of saturation. This high molstuiv content was suspected as being a factor In reducing the effectiveness of the cleaning methods applied.
a For hsk.n-i'i applications of 480 ml/m2, factors of reduction In PCB concent ration from 53 to 170 were obtained for machine and hend with Power Cleaner 155. When the Xskarel application was iso ml/rn- the reduction In PCB concentration ranged from 1.1 to 1.8. uther Hum Implicating the high moisture content of the concrete tested, uo reason can be given for this greatly diminished effec tiveness.
* Use til tin. commercial rug cleaning system appeared to be as effective >n ruthw ing PCB concentration as a vigorous hand brushing approach.
* Jhe cl lenteness of the Power Cleaner 155 for removing PCBs appeared
to duensise when the Power Cleaner 155 concentration was Increased from I:.;> t0 );1.
* '
tlt*r '"'"fporatlon of the vacuua confining rectangular annulus, the
three-Jet vacuum head performed very well for the spraying and vacuuming of Freon and other fluids from floor and wall areas. Although not demonstrated. It Is believed that this head could be U , ,:lean nonporous surfaces with solvent or nonsolvent cleaning
SOlutiwis.
* ?* hxiHU-.tisd high removal effectiveness of Such solvents as Freon,
rl!?? 1,1 ?'
ethanol, and perchloroethylene was not achieved,
lestimi Indicated that the high moisture content of the concrete
used severely Inhibited the action of the solvents.
* AJthoui|li 'substantial reductions In PCB concentration were associated ,tn ti"- rtmovel of Xskarel from concrete surfaces as Indicated by
visual .i|>|joarance, the remaining PCB concentration was considerably higher iiuin expected.
a A surfdie sampling technique that permits the removal of Incremental layers ul concrete was successfully demonstrated. The results
HONS 018391 (-1
obtained Indicate that the action of a cleaning method Is probably confined to the first 0.004 In. fro* the surface. The results also Indicate that before cleaning a laroe fraction of the PCS concentra tion is at or near the surface. This coaiblnatlon of characteristics tends to maximize the effect of a cleaning attempt. a The PCS concentration results obtained from use of the wipe technique were in general very reproducible and permitted the coeipllatlon of an acceptable body of data. Considering the roughness of the con crete surface being sampled by wiping this was a surprising result. a Airborne PC8$ were detected during the concrete surface sanding activity (a fine powder was generated), and also In the exhaust hose during vacuunlng operations Involving the removal of Power Cleaner 155. and Freon fron concrete surfaces. a For the purposes of the Initial development of equipment and prelim inary selection of cleaning approach and materials, transformer oil was considered to be an acceptable surrogate for Askarel. Rate of progress on these activities was accelerated by using visual appear ance to evaluate the relative effectiveness of cleaning techniques and materials for oil removal.
HONS 018392 6-Z
Appendix A CONCRETE MIX DESIGN AND PROPERTY DATA
MONS 018393
RMAMHNMflRtMK.
MATtMAif TCSTlMG lAtOSATOPT
m*+rniH UmtP0 (Mail ;nnin. nmn J73M
(90*1 M4IM
Otnnr Oi.lsion - Cl.....lit
cQHcnnt mix oesiGN
jcUUtOfCONCMIl:
4000 PS/
"'o l.
|
PROifCT: fioor rose Pnis
AMMlTICT/tNOIMIIP: Out art*____________________________
OATII/7/94 RETORT *0 /
Typo I
MATERIALS florid* Mining 4 **t*ti*li
I. POOOlANr
J. 7tM4 AOOACOATf: 4. COAMt AOOPIGATII: 1 C0A*M A40AC0AT1 M:
***** S*nd
florid* Poe* Jndustrits. inc.
037 Crushtd Houston* florid* Poc* Inovstrios, inc.
I. AIMNTIUIMIMO AOCNT: 7. CHCMICAl AOMMXTUM: I --
Opft* PffP **OP - 79
V. A. Cf#C 4 Cogny W. P, CfPCt 4 Comfi*ny
TUTS ON AGGMGATES
9m* *58 SSn
ARRRMATt
2.43 105.0
SSSm hRmwMMsT
mm mm
SIllliHlI Tn
JJgAttr tAr SUMictf___ ^ u
r
M-
'00
m-
R4MAVIRN m P4RMMRIM. MVII
4
M M MM MM
57 *> 54
J
MMTmniMMMWLMVM
1* Mr* %nr ir 4
M
_ 7.41 PM
M
1 2.45 90.0 551
100 57
75 39 U
J . . 7.04
N
MIX DCStGN POO 4000
PSICONCRETE AT 21 PAYS
Lter^tetg;.; .1.1 t/cw. rat If--p= fw^owiwff^Arpy Ax t. IPAt
_i*_
MATCMAtt
Cmn( SpnO #5/ 5ton*
(/
Oir m, V*6P - 79,
M. OX.
OUANTimi tttO SACItt
340 1300 1701 747
1.7 74.0
*
VOtUMt (CU PT.I
7.45 7.57 n. 77 4.70 0.11
u.tr
AVESAQE COMPRESSIVE STRENGTH, m. AT 3days_ REMARKS;
J500
3290
tobtrt *. H*ys - ttc^ic<y Strviets
HONS 016394 A-2
UNIVERSAL
IWOIHHIWWO TUTWW COWUMY \
0l III diM: tN
M Imn: tall Ihm:
4*303* 1-17-00 2-T-O*
tarn*
COMMCtttVf tmCMOTH Or Ht CONCWtl TMT Ml CMCN
QuadrM , Inc. 1940 NV 9?ih Olaco GalnaavUlo, Florida At ini C. Mellvolno
32600
1960 N> 09th Placo. GalnoavttU, Florida P.u. # ,, ;;y)R
HONS 018395 A-3
Appendix 8 PROCEDURE FOR WIPE SAMPLING*
1. Use 3" x 3* Johnson >nd Johnson Sttrl Pads.
2. Roll up pad and Insert In wide iiouth glass bottlt with screw cap. Inside of cap should be lined with teflon or alualnim foil.
3. Apply 6 el of hexane to pad and cap bottle.
4. lefore taking a wipe sanple, cover hands with nonlinear polyethylene gloves.
5. Open bottle and enpty rolled up gauze pad Into gloved hand. Any excess hexane In bottle should ba poured on pad.
6. Hold one side of pad (opposite folded edge) and using a series of adjacent left to right traverses conpletely wipe 0.2$ is2 (50 oa x 50 ca) area. Then turn pad over, still holding side opposite folded edge, and conpletely wipe
sane area In a series of adjacent top to bottoa traverses.
7. Open pad and fold over so the two contaalnated sides are Inside, and roll up.
8. Insert rolled pad Into bottle and cover.
-
9. Pad Is now ready for analysis.
10. Use new set of gloves for each saapla.
*To reduce effects of operator dlffarances, all wipe stapling on a given project should be perforaed by the saw operator.
MONS 018396
EPRI CS-492S
nwwwi ot RGBs Ham hmouc SurtaOM