Document 91j5amV2k4rGb4gJeGZa87e67
Anniston
J. T. Bell J. L. Corder A. G. Hill G. L. Jessee L. C. Lahman J. C. Landwehr H. E. Schulte W. F. Taffee
General Offices
H. C. Carder D. Danna (5) M. W. Farrar P. B. Hodges F. J. Holzapfel D. B. Hosmer R. E. Howard W. K. Johnson C. F. Luecke W. R. Richard W. R. Robirds C. W. Roos J. R. Savage J. E. Smith J. A. Stephens
South Second St.
P. 0. DeGarmo
Other Locations
A. H. Forsten Alvin, Texas
D. w. Jackson W.G.K.
COMPANY CONFIDENTIAL
Anniston Plant
TECHNICAL SERVICES DEPARTMENT
MONTHLY REPORT
Summary
AUGUST 1970
Month
COST IMPROVEMENT RESULTS
Est. Act. ______Target% of Target
$40,355
$53,015
76%
YTD
$558,347
$497,605
112%
Organic Division
The Aroclor Process Sump was put into service on 8/12/70 bettering the revised startup date of 9/1/70 by almost three weeks and the original date (10/15/70) by two months.
The initial phase of the Aroclor waste effluent carbon treatment studies is complete. In the 13 day pilot run, initial concentrations of 1000 - 8000 ppb Aroclor in waste water were reduced to a range of 0-15 ppb upon passing through the series of 1" diameter packed carbon beds at an average flow rate of 25 cc/min. Over 99% of Aroclor removal occurred in the 6" deep carbon prefilter. This unusual re duction is believed to be due to the filtration of solids on which Aroclor was adsorbed. The study is presently being divided into two phases: (1) feasibility studies for con tinuous solids (with Aroclor) removal from limestone pit effluent, and (2) carbon adsorption from the clear stream at the Aroclor sump.
Redesigning of Aroclor chlorinator spargers will give better chlorine distribution, resulting in reduction of free chlorine in the off gas. This is a potential cost improvement of $31,000 in chlorine usage and is an integral part of AroclorHC1 pollution abatement.
DSW 551459
n - 306
.............................................CONFIDENTIAL INFORMATION
"This document contains confidential information which is the property of Monsanto Company. Only those portions of the document relevant to a duly authorized individual's need to know may be excerpted for him. The report must not be sent outside the Company without written approval and the authorized recipient is accountable for its safe keeping, excerpting or otherwise disclosing of its contents and for its proper disposal. The docu ment remains the property of Monsanto Company and shall be returned within two months to its author, except upon special authorization to hold
STLCOPCB4089876
)
Organic Division - continued
2.
The joint Research-PR&D study on Montar 9 is progressing on.schedule. Twelve gallons of M-9, distilled by Organic Research, were used to prepare samples of high quaterphenyl (up to 50%) material hydrogenated 30%, to 100%. These samples will be used for market evaluation. EDO is 9-25-70.
The low color 5460 plant test is scheduled for the week of 9/7/70. This test is aimed at reducing the color to 1.25 NPA.
The delayed-promoter injection phase of the Polyphenyl Pilot Studies has been delayed by a burned-out reactor heater and then a coked reactor. The new reactor has now been installed and was started up on 8/31.
Construction for the expansion of HB-40 (CEA 1482) is approximately two weeks ahead of schedule with startup tentatively scheduled the week of November 16.
Revised design and estimate for Bulk Plasticizer Terminal was reviewed with J. E. Smith.
The following HC1 recovery improvement work has been completed or is in progress. 1. Pressure by-pass loop installed by CED on CEA 2080 was relocated, calibrated and is presently working well, eliminating sewering of acid through this line. 2. Drain taps were installed on carbon towers to allow batch pretreating of fresh charges to eliminate iron. Previously total production was sewered during pre treatment.
An HC1 fume collection/scrubbing system for docks and storage tanks has been pro posed. The project will significantly reduce water load to sewer and subsequent treatment for PCB removal.
PNP had a very good production month (1,862,860#) with excellent on-stream time (93.7%).
Agricultural Division
Tests of Process Amendments "Chlorination in the Presence of Acetone" and "Hydrocarbon Dilution of Still Residue" was restarted on 8/10/70. The residue hold tank temperature was maintained at 60-70C., compared to 50-60C. normally. Revised operating conditions were not successful in preventing residue from precipitating from the diesel fuel. Higher temperatures apparently caused the formation of some very large balls in the hold tank and the test was stopped.
The "Hydrocarbon Dilution" amendment was then tested independently. Results to date indicate increased yields and that the diesel fuel is a good residue pump-out aid. No problems have been experienced in the hold tank or in burning the residue as yet.
Experimental operation of #1 Parathion intermediate still verified predictions from process analysis of higher yields from controlling the profile of steam input with time. An average improvement of 200# per batch was achieved, worth $35,000 on methyl parathion at 1971 rates.
DSW 551460
STLCOPCB4089877
>
3. Quality Control The Plant Quality Score was 87.9, up 1.9 from July, with a YTD score of 86.0 against a target of 95.0. Improved Aroclor 1242 uniformity and PNP quality were proved. Pollution Control Monsanto has been dropped as a defendant in the class action suit by Bass Anglers Sportsman.Society against over 200 industries in the State of Alabama. Aroclor in plant effluent showed a sharp increase in August, concurrent with high solids out of the limestone pit. Work has begun on an interim HC1 neutralization facility so that the existing pit can be decontaminated and improved without interruption in waste water treatment.
DSW 551461
STLCOPCB4089878
)
4.
PLANT LABORATORIES ANALYTICAL AND QUALITY CONTROL - S. O. Kemp
Complaint Report
Quality Number ATL-18-P NY-51-P
Material Muriatic Acid Santowax R
__________Customer______ F. H. Ross Raybestos-Manhattan
Reason Assay Lumps
YTD Quality Complaints/100 Shipments 0.32 Target 0.20
DSW 551462
STLCOPCB4089879
)
5. COMMUNITY RELATIONS, PERSONNEL, RECRUITING AND DEVELOPMENT Community Relations 1* J. C. Landwehr attended the Air & Water Resources Sub Committee meeting in Birmingham, Alabama on August 14. 2. Dr. Lowell Taylor and Group from Auburn University visited to discuss recruiting and Co-Op program with Auburn University on August 19. Personnel Development 1. S. O. Kemp spent August 27 and 28 in St. Louis on special training for PCB analysis on Aroclor 5460 with E. M. Emery at Organic Research. 2. J. T. Bell and J. L. Brown attended Coaching and Appraisal course at Holiday Inn - Oxford on August 13 and 14. 3. T. W. Lawrence transferred from Technical Services to position of Plant Safety Engineer on August 31, 1970.
Visitors 1. J. E. Smith, St. Louis, visited concerning Bulk Plasticizers
Terminal - August 4 and 5. 2. J. R. Savage, St. Louis, visited to review Cost Standards -
August 17.
DSW 551463
STLCOPCB4089880
>
1970 DISTRIBUTION OF TIME BY TECHNICAL SERVICE
EXISTING PRODUCT TECHNOLOGY IMPROVEMENT
NEW PRODUCT EVALUATIONS
MAJOR PROJECT SUPPORT
PROCESS CONTROL IMPROVEMENT . '
70 60 50 40
PROJECT DESIGN
PROCESS MAINTENANCE
TECHNOLOGY AND TECHNICAL SUPPORT
TECHNICAL MANPOWER
PLANT IMPROVEMENT PROGRAM
REAL ESTATE MANAGEMENT
STLCOPCB4089881
ORGANIC DIVISION 1970 TSD COST IMPROVEMENT
FUNCTIONAL FLUIDS
-
TAR . EST
ACT
JAN FEB MAR . APR MAY JUN JUL AUG SEP OCT NOV DEC
Disposal of Liquid Montar
#3 Aroclor Still New Burners
#2 Still Entrainment Separator
TAR EST ACT TAR EST ACT TAR EST ACT
15.00 600 600
1080 0 C
1080
,0 o
1500
1080 0
0
1080
0 0
1080 1080 1080 U 0~
0
500
500
3000
~` 0 0
1080 1080 3000
1080
1242 Distillatio -l Productivity
tar
EST ACT
1500 1500 1500 1500 1500 1500 isod 1500 1500 0 100 1000 1520 2565 2000C 100 1000 1520 2565
1500
TAR
EST
ACT
TAR
PLASTICIZERS
EST ACT
Flaking & Drum ming Facilities Headcount
Solid Aroclor Instrumentation
TAR EST ACT TAR EST ACT TAR
3000 3000 3000
3000 3000 3000
2000
2000 2000
1000 1000 1000
3750 0
1000 TWO
1000
3750 0
0
3750 3750 3750 3750
0 nr
0
00
2250 2250 2250
3750 2250
3750 2250
3750 2250
Sandvik Belt
EST ACT
Add Tray Strip ping Sections to Santowax
TAR EST ACT
TAR
Cl2 Bulk Handling
Facilit
. les
EST
ACT
Solid Aroclor Expansion
TAR EST ACT
Chlorinator Back Pressure
TAR EST ACT
2000 3500 3500
00
0
4580 4580 4580 4580 4580 4580 4580
0 00 0 0.0
00 0
2000 -20JXL 2onn
3550 1950 3440
3550 3050 3440
30000 5000C
49500
5000C
10000 36000
24000
|l7900 20000
519.0C 5590C 1050C 38500 23500 24700
30000 360 360
4580 360
4580j
|
** 1 J
360
TAR
EST
ACT
TAR
EST ACT
TAR
EST
ACT
.. -- -
TAR -- -----
EST
' ACT
-
------ --
[ DSW 551465
1_____ 1-....... ______________
STLCOPCB4089882
) ' ORGANIC DIVISION 1970 TSD COST IMPROVEMENT
FUNCTIONAL . FLUIDS &
PLASTICIZERS
Aroclor Warehouse Reduced Headcount
Unproved Santowax Yield
TAR . EST
ACT TAR EST ACT TAR EST ACT
HB-40
Reduce Nickel Catalyst Usage
TAR EST ACT
Substitution of Santowax C for Santowax R
TAR EST ACT TAR
EST
ACT
GENERAL CHEMICALS
TAR EST ACT
Biphenyl Cool^-
TAR
ing Water
EST
Treatment
ACT
TAR
PftiP
' EST Modify Acidifies Dump valve Svste m act
Install Entrain-
TAR
ment Separator -
EST
Production
ACT
Optimize Reactoi Variables-PNP
TAR EST ACT
Re-use Well Water
TAR EST ACT
Untargeted PNCB Heel Credits
TAR EST ACT
HC1 HCl Catch Tank & Coalescer
150 M Gallon Storage Tank
TAR EST ACT TAR EST ACT
HCl Instrumentation
TAR EST ACT
TAR
EST
ACT
TAR
EST
ACT
JAN FEB' MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
(AFE ECTIN 3 BOT1 I BUS! NESS GROUP S)
innn 1000
1000 1000 1000 1000
1000
10Q0 1000
1160
4000 4000 4000 4000 5900 2800 5800 4000
4450 2800 5800 4000
700 700 700 1330 - 525 1230 1335 525 2080
700 425
565
4000 4000 4000 4000 400Q
97C 663C 97C
700 0 C
700 700 G
20Q0C
4Q0Q 2 QQQ(
-
600 670 670
3150 520 520
(BIP HENYL
600 680 680
600
580 580
3150 3150
1277 2164 3016 2164
PNP HCU
600 600 600
625 625
'600 67q 675
62625
600 440
440
600 290
29C
625 625
625
625 625
625 625
625
625
5500 5500 5500 5500 00
0
463f 463.0. -A5-1Q. -4600. .4630-
121 1604
0 1525 1780
12' ' 1605
0 1525
4630-.
500
625 625
5500 5500-
46.30 )
500
L*) 5Q0 \
l
5700 2500 2500 5100
4300 4300
2275 563 3078 1650 920
2275 563 3078 1650 920
5700 5700 5700 57Q0 7560 9000- 1030C 6545 7560 9000 1030C 6545 4300 4300 4300 4300 4300
410 410
550
4300 4300
4300 4300 4300 4300
1875
4000 1230C 4000 1230C
4300 4300
4300 4300
1875 '1875 1875 1875 1875 3440 6500 3940 8160 3440 6500 3940
-
1875
1875
1875
oS*6*
f
|
I
STLCOPCB4089883
. ORGANIC DIVISION 1970 TSD COST IMPROVEMENT
PLANT WIDE Improve Plant Power Factor Central Air Compressor
Chlorine Plant Shutdown' RTN Cooling ' Water to Tower Cooling Con veyor - P?S5
Total Organic Month - M $ Total Organic YTD - M $
JAN TAR
EST
ACT
TAR
EST
ACT
TAR 950
EST ACT
900 940
TAR
EST
ACT TAR 19900
EST 19900 ACT 19900
FEB MAR APR MAY JUN
950 900 914
950 9T6
840
950
790 790
950 S7KT
810
950 533
845
19900 19900 19900 19900 19900 19900
19900 19900 19900
9950 9950
9950
JUL
AUG " SEP
OCT
NOV
DEC
.
.
1000 1000 1000 -
TAR EST ACT
25 25 25 25 25 25 0
TAR
EST
ACT
TAR
EST
ACT
TAR EST ACT
40.6 72.1 96.88 58.07 44.62 27.97 34.12 30.52 30.88 64.68 51.68 51.68
36.29 94.54 103.6
~7T76T 53. 58" 30.33 37T63
36.33 99.86 109.1 70.89 77.98 42.22 35.03
TAR 40.6 EST 36.29. ACT 36.33
112.7 209.6 267.6 312.3 340.2 374.3 404.9 435.7 500.4 552.1 603.8 130.9 239.8 315.7 390.8 437.7 467.7 510.0 136.2 245.3 316.2 394.1 437.3 472.4
DSW 551467
STLCOPCB4089884
>
AG DIVISION 1970.TSD COST IMPROVEMENT
PARATHIONS
TAR EST ACT
JAN
FEB
MAR
.
APR
MAY JUN JUL AUG
SEP OCT
NOV
Replace #3 Chlorinator
TAR EST ACT
4860 4860
3500 2340
2340
3500 0
0
3500 0 0
3500 0
Improve C^Still Yields
TAR EST ACT
3000
0 0
3000 0
.0
3000 0 d
3000 0
3000
3000
Increase Chlor- TAR inator Coolings EST
ACT
8500 8500 ~cr
8500
Acetone Recovery
Chlorine Unloading
Optimize Methyl
TAR EST ACT TAR EST ACT TAR
2800 1957 1957
2250 3634 3634
2800 1069
1069
2250 4237 4237
2800 1225 1225
2250 3350 3350
2800 1935 - 1935
3200 1406 1406
2800
130 130 3200 3431
3431 3000
2800
715 715 3200 2430 2430 3000
2800
0 0 3200 1750 1750 3000
2800 0
3200 2710
1500
2800
2800 . 2800
PNP/PCT Ratio Optimize Ethyl PNP/PCT Ratio Change Cooling H.,0 - Item 737
4
EST ACT TAR EST ACT TAR EST ACT
500 0 d
200
310 310
750 2641 2641
200 230 230
750 0
0.
200 270 270
00 00
00 0
500
Untargeted: Plant Test -
TAR EST ACT
2430 2430
5270 5270
TAR
EST
ACT
Total AG Month M S
TAR EST ACT
5.75
5.90 5.90
6.0 8.17
8.17
6.0 4.85 4.85
6.0 10.63 10.62
15.5 XX 2.
11.2
15.5 3.15
3.15
15.5 1.75 1.75
22.5 277T
14.3
14.3
3.3
Total AG YTD M $
TAR EST ACT
5.75 11.75 17.75 23.75 5.90 14.08 18.92 29.55 5.90 14.08 18.92 29.55
39.25 54.75 40.73 43.87
40.73 43.87
70.25 92.75 107.1 121.4 45.62 43.33
45.62
124.7
TAR
EST
Total Plant Month M $
ACT TAR EST ACT
46.35
42.19 42.23
78.1 102.8
108.0
102.9 64.07 108.5 "81': 02 113.9 81.52
60.12 43.47 49.62 53.02 45.18 83775' 46.72 "37"."08 40.36
89.15 45.36 36.78
78.98 54.98
Total Plant YTD M $
TAR 46.35 124.5 227.3 291.4 EST 42.19 145.0 258.8 345.3 ACT 42.23 150.3 264.2 345.8
351.5 395.0 444.6 431.5 481.6 513.3
434.9 481.2 518.0
497.6 542.8 621.8 558.3
676.7
DEC
50(
C
125.: 52. U 728.S
DSW 551468
STLCOPCB4089885