Document 91bKj2Zg2ZqMYw8QxRJpyoM9L
F.E.S. Sheet Rev*
74 11 of 14 11/1/77
Step 3 . Second _Burnish Speed - 40 MPH Deceleration - 10 ft/sec.^ Temperature - from 450F to 550F.
(control from lining thermo
couple) at the start of each application. No. of stops - 200 Adjustment - reset thermocouple depth to .040"
Step 4.___Brake Retardation Speed - 50 MPH Stops - 10 psi increments starting at 20 psi through 80 psi. DO NOT EXCEED 25 ft/sec.2 Temperature - 125 to 200 between stops (control from lining thermocouple). Adjustment - Reset thermocouple depth to .040".
Step 5._ Brake Power Speed - 50 MPH to 15 MPH Pressure - required to maintain a 9 f.p.s.p.'s. not to exceed 100 psi. Cycle - 72 seconds (i.e., from the beginning of one stop to the beginning of the next stop). Temperature - 125 to 200F. No. of stops - 10
Step 6. Hot Stop Speed - 20 MPH Deceleration - 14 ft/sec.2
Cycle - 1 minute after the end of the 10th brake power stop (Step 5). Stop - One
Immediately following this step, continue on to the recovery step.
Step 7. Recovery - Brake Power Speed - 30 MPH Pressure - not to exceed a minimum of 20 psi or a maximum of 85 psi. Cooling - Cool for 2 minutes from the end of hot stop before starting the recovery stop (Step 6). Cycle - One minute (i.e., from the beginning of one stop to the beginning of the next stop). No. of stops - 20
OBR 05074