Document 91JLEEzMVOoRgnwY5vRvo4vd6

Monsanto from iname locationi A# l. Rasmussen/WGK July 20, 1971 STATUS - CEA 2415 WASTE AROCLOR DISPOSAL TO A. E. Leisy J. R. Savage - GO F. J Holzapfel - GO R. M. Kountz - GO N. W. Wolk - F4-W709 G. L. Bratsch G, A. Hippe s' W. C. Engman R. M. McCutchan J. M. Petterson R. Maclin C. Presson Scrubber Repairs Zink and Heil are accepting liability for making the repairs. Cause of failure appears to be twofold: a) improper application (inadequate sandblast and too thick layers)} and b) erosion at tangential inlet. Repairs to be made in place. Tentative time table: July 27-28 Remove old lining. July 29-30 Repair steel shell. Aug. 2-r3 Sandblast and prime. Aug. 4-10 Apply new lining. Waste During the last run, some 150,000# of waste material was burned. Thus, a total of 162,000 pounds of-PCB containing liquids have been destroyed in the incinerator. Accounting Through June the incinerator account is $5,669 under budget. Major contributing items are: Drum Handling Utilities Labor & Wages Laboratory Supplies Maintenance Interim Storage Depreciation FIE Waste Credits - $ 4,100 + 7,100 + 9,500 - 1,800 + 1,600 - 2,700 - 2,400 + 3,200 + 3,500 - 10,000 July-August costs are expected to be $10-15,000 over budget, plus an additional $10,000 negative on waste credits. DSW 295420 "> STLCOPCB4065523 A. E. Leisy ' Status - CEEA 2415 - Waste Aroclor Disposal Page 2. 7/20/71 WGK Incinerator Brickwork Representatives from A. P. Green inspected the incinerator brick this date. They are concerned with the amount of spalling and surface attack. They took samples and will complete analysis by next week. Possible chemical attack could lower expected brick life to 1-2 years. Replacement costs are estimated at $30-50,000. Quench Pot Spark testing has revealed some 15 pinholes in the polyester lining. Subsequent inspection revealed disbonding similar to that in the scrubber column. Zink has been informed of this latest development. A. L. Rasmussen Mfg. Repr. my DSW 295421 STLCOPCB4065524