Document 917eeLDVL8geZEyYGOrLgpZkR
CONOCO CHEMICALS 1984 CONSTRUCTION FORECAST
ABERDEEN CHEMICAL PLANT V ($M)
PRODUCT MIX/QUALITY IMPROVEMENTS A-l Bottle Compound Production A-2 Line III Metal Detector A-14 Miscellaneous TOTAL PRODUCT MIX/QUALITY IMPROVEMENTS
COST REDUCTION Energy A-3 Rotary Dryer Optimization
Other A-4 Reactor Jacket Expansion Joints A-5 Office Systems Computer Installation
A-14 Miscellaneous TOTAL COST REDUCTION
NECESSITIES Safety And Health A-6 Plasticizer Modernization - Phase III A-7 Reduction of VCM Exposure (Legal) A-8 Truck Loading Facilities For Silos A-9 Security Fence
Environmental A-10 VCM Standard Compliance Improvements (Air-Legal) A-ll Plant Sewer Revisions (Water-Legal) A-12 City Water Backflow Prevention (Legal)
A-1,4 Miscellaneous TOTAL NECESSITIES
REPLACEMENTS A-l3 Dryer Centrifuge Conveyor Assemblies A-14 Miscellaneous TOTAL REPLACEMENTS
TOTAL 1984 CONSTRUCTION FORECAST
A-14 Total Miscellaneous Projects Under $15,000
(1) No Transportation Capital Required.
7/18/83
Construction Capital (1) 840 29 , 47 916 916
160 160
40 71 111
28 299
85 115 120
50 370
160 180 130 470
190 1030
150 130 280 280
2,525
395
DTH 000099110
1984 CONSTRUCTION FORECAST-
CASH FLOW SUMMARY CALENDAR YEAR ABERDEEN CHEMICAL PLANT
($M)
m IT|
m
On
m1 i i
i in
ON
Os 1 i i
i ON
co cn
CM CM
/-s
pH
1* 1 CM
X-s m
! pH | N-/
/-v /-s /*s
ON CM ns d! 1 |
1
cn Nip'
1
cn w
|
On O w CM
Vp'
pH
m
cn CM
/*n n
/-/-s
/N /-N /-N /-N
sd-
CO CM CT\
IS. i--4
Vp ^ o
sd- on CM n sd- O ns CM CM
ON
ON
m 00 00 i
CM m
O CM
pH CM pH m st m cn ON CM
CM
On
ON H |
pH *d-
W W Sp/ Sp' W w s/ cn
pH
H sd-
in
NH m
H ph
pH
CO
'
00
vO
o
ON
o
ON m CM rs. CM H o
ON
m ON pH w
H n*
pH cn
*a-
pH pH
ns on
o
/N <-S /-N /-N /-s /-S /-s /-N /-s
cn
oo
CM
NO
CM
ON
m
00
ON
pH CM pH cn sd- CM cn 00 o W N*/ S/ Sp' w \ps cn NH
pH
ON cn dpH
CM VTl stf NO
pH 00
CM
*
ON cn r- lO pH ON
ON
NO 00 pH pH
H 00
H CM
cn
ph
l/N cn cn sd* m
H
<r>
ON CM m H
o 00
o> pH
pH 00 H H H
^4 cn CM
pH H
/S /-S no 00
O rH ww
/-v /*N no n
o *h
/-s/-s /-s /-N /-s /-N /-s /-s cn ns pH St O rs cn cn CM
pH CM pH m st <si m oo ON w w n-s s/ W Sp' Np' Np/ CM
Sp/ *'
/-s /-s /--s P-S /-s /-N /-s /H, /-N cm in pH CN 00 lO CM ON 00
^H CM pH cn cn cm cn ns ns w w Np' NH W Np/ Sp* *Sp/ CM
NH
NO
o NO cn pH
n*
o pH CM pH
/-N /-s /-s rs
o
H
ON
CM
o
00
NO ON
on
d
O
pH
SO
NO
O
cn
CM
CM
ON St n> pH ON f^.
o vO ns H
n
O NO
sd*
CM pH S--' s--/
cn ^H
cn o W pH
cn CM w cn
ns in
<r m
Os O-i fmt*
> pH OH
in
as
m
no
cn
m
n* st
St
O 00 pH CM ns ns cn lO 00 - .
CM
00
On On rs o
sd* ^H
CM n*
in on ^d- m st o CM CN pH
cn
ON CM 00
pH NO
pH pH pH pH cn pH
n*
00 ON
pH o
pH
00
cn ><r sO
pH 00
00 cn in NO sd* so
ON
ON 00 pH H
i--4 CM
Hm
n
Mt H
CM n
O
ON
pH
St
ON
ON
sd
O
pH
m on sd* cn Mf O CM cn m pH pH ^4 pH cn pH pH
ON
ON cn 00
ns
ns m m cn
NO
NO
00 f*M H m n* m m
ON
ON CO H pH
H CM
pH CM
sd*
ys
-4 \C ON o
cn n.
NO
00
m oo sd- n*
cn o
ON
cm r-s pH pH
pH
pH . pH
V-/
*d*
NO
CM ns
NO NO
CM pH pH
sd- O CM m o vo m CM CM
m o sa-d- in pH CM m 00 ^H pH ^H pH pH m pH pH
cm ns in 00 pH n* stf* as m t a
00 o sd- pH so
cn cn o
^H CM pH pH pH m NO
pH
00
cn dm
CM
pH NO pH
/N /-Si /-N
<-l
p-s, /-s V-s /-S
/-N
m 00
o ns ON
d-
00
o
O s^ 00 o v> o m o ns
m
ON O -4 cn cn in NO
Ht m
00 NO NO o ^ O o m m
CM
m NO
o ^H
i--4 Np/
m
pH ON ip '-'g
00
sd- *-H >
n* CM O CM ns o pH cn
NH Np/ 3
C
O o pH Np'
odo-
loom
3
m 4->
CO 4)
-s 3
OOOOOOOO O 4-1
's 3
CO 4-1
as
4)
>V
O
CM
O
-l
ast\
. 0)
m
m
st co
Pd
o>
3 C
Ov
4>) CM
(S
CM O O o o o o h n m as oo co m
41
-040 Pd w01 MOM
4)
41 m pd
pH KH
o
4>
4) 3
4J
Od
3O 3 -H 4) 4J
<3 3
'.Oc
i 43s1 -h3o
s s4-1
>
01
Uo
ca
03
pd tu 4O-1 3H
4J H
J*
3 4) 4-1
ao >v wo
'-s Pd Pm
cd c8
se
u <u
m l
sr i
in
<5 <3 < <*
4J 41 X> 4J 3s CO M
CO
4-1
CJ
cml
iI>
r-l~
41 <J < <
oo as O '-4 CM CO HSt O+j P0)
4j
<j
4:
4j
i <
i <
L
<
3
CO
3
H
cd 41 4J 4J O3 HH
TMoH
n
O
V4
Pm Pm
i-s
DTH 000099111
fl ot
BUDGET ITEM
CATEGORY
1984 CONSTRUCTION FORECAST
COMMITMENT SCHEDULE
($M)
V
IRR, %
NROI, X
1984 BY QUARTERS 1st 2nd 3rd 4th
A-I A-2 A-3 A-4 A-5 A-6 A-7 A-8 A-9 A-10 A-ll A-12 A-13 A-14 A-14 A-14 A-14
Total
PMQI PMQI CR-E CR-0 CR-0 N-SH N-SH N-SH N-SH N-E N-E N-E R PMQI CR N R
53 -- 48 32 32
18(1)
-- -- -- --
--
-- -- -- -- --
47 -- 29 34 18
7 71
"(1)
-- -- -- -- -- -- -- -- --
--
115 120
180
150 26 14 95 65
865
840
160 40
85
50 160
130
21 14 95 65
-
540 1,120
____
O) Revenue Portion Of Project Only
TOTAL 1984
840 29
160 40 71 85
115 120
50 160 180 130 150
47 28 190 130
2,525
1985 CONSTRUCTION FORECAST
COMMITMENT SCHEDULE
($M)
BUDGET ITEM
CATEGORY
A-l
A-2 A-3 A-4 A-4 A-4 A-4 Undefined
N-SH N-E N-E PMQI CR N R --
IRR, %
' ---- -- -- -- -- -- -- --
Total
1985 BY QUARTERS
NROI, % 1st
2nd 3rd 4th
65
-- 175 --
25 16 99 67 -- 300
35 26 16 99 67
600 910
____
747 635 1 ,118
TOTAL 1985
65 175
35 51 32 198 134 1,810
2,500
7/18/83
DTH 000099112
BUDGET ITEM
CATEGORY
A-l A-2 A-2 A-2 A-2 Undefined
N-SH PMQI CR N R --
Total
1986 CONSTRUCTION FORECAST COMMITMENT SCHEDULE ($M)
IRR, Z
1986 BY QUARTERS
TOTAL
NROI, % 1st
2nd 3rd 4th 1986
35 35
-- -- 27
26 53
-- -- 18
18 36
---- -- 104
104 208
-- -- 69
69 138
--
-- 400 700 1?030
2,130
653 700 1,247
2,600
7/18/83
DTH 000099113
!*
It
V8ga|g
2as *
3$ JCDl Ohn l
saisssMs |o
SBSS^S 88
$
8 3 8 2 RS $ |3 382888
aaS2SN|S
8S2M
s 88
7/18/83
DTH 000099114
*
a is
7/18/83
8 & S
SS8 3
120 50
70 100 38 341 150 104 254
3
VO
in
m
8
CHM 8
8 8 8 g| R28P:|S as s|g
88
oo mlro ^2
38 ~38
8
3|$
H
3
*
8 3|E S
8 3|3
sis s
I iHQ 8*48 8H 8M 8H 8M
38 am k CM
7/18/83
DTH 000099116
II olo II
vOlvO
H
vOQ n
CONOCO CHEMICALS 1984 CONSTRUCTION FORECAST
ABERDEEN CHEMICAL PLANT
V
Overall Economic Bases
1. Rated Production Capacity as of January 1, 1984, based on 1984 budgeted product mix and current rate limitations associated with low molecular weight resin and RP-200 production is:
MM Lb./Yr,
2. Utility Costs
Resin Flexible Compound Dry Blend Plasticizer
425 55 50 25
Year
1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994
Electricity (/KWH
4.48 4.74 5.03 5.33 5.67 6.01 6.35 6.73 7.15 7.57 7.99
Natural Gas
$ MCF
Dryers
Boilers
4.74 5.12 5.43 5.76 6.10 6.47 6.86 7.27 7.71 8.17 8.66
4.45 4.81 5.10 5.41 5.73 6.07 6.43 6.82 7.23 7.66 8.12
Steam $/M Lb.
6.68 7.21 7.65 8.12 8.60 9.11 9.65 10.23 10.85 11.49 12.18
The electrical costs are based on the 1983 midyear cost escalated per information from TVA. The natural gas costs are based on the 1983 midyear cost escalated per information from North American Production.
3. Utility Requirements
Electricity, KWH/Lb. Natural Gas, CF/Lb. Steam, Lb./Lb.
Resin
0.14 0.90 0.74
Compound
0.20
--
0.09
Plasticizer
0.08 0.01 0.74
Dry Blend
0.09
-- --
7/18/83
DTH 000099119
CONOCO CHEMICALS
1984 CONSTRUCTION FORECAST ABERDEEN CHEMICAL PLANT
V
Overall Economic Bases (Continued)
4. Railcar Revenues
Railcar revenues are estimated to be $2,500 per year. No escalation is assumed for railcar revenues.
Load Size Lb.
Resin, Dryblend, or Compound
170,000
Turnaround Days
60
Miles per Trip
Revenue per Loaded Mile, $
700 0.59
Information provided by Supply and Transportation Department.
5. Gross Margins (selling price minus variable cost) as supplied by the Business Area are as follows:
*1984 1985
1986 1987 1988 1989 1990 1991 1992 1993 1994
Resin
5.9 7.3 7.7 6.0 6.5 7.3 7.7 8.1 8.5 8.9 9.4
Pipe
4.2 4.5 4.8 5.0 5.4 5.7 6.0 6.4 6.8 7.2 7.6
0/Lb. Dry Blend Fittings
7.4 7.8 8.3 8.8 9.4 9.9 10.5 11.1 11.8 12.5 13.2
RP-200
12.7 13.4 14.3 15.1 16.1 17.0 18.0 19.1 20.3 21.5 22.7
Compound
12.5 13.0 13.8 14.6 15.5 16.4 17.4 18.4 19.5 20.7 22.0
(1) Flexible or bottle compound
6. Budget preparation per D. J. Lorine's memo dated April 18, 1983.
7/18/83
DTH 00.0099120 .
CONOCO CHEMICALS
1984 CONSTRUCTION FORECAST V
ABERDEEN CHEMICAL PLANT
PROJECT CLASSIFICATION AMD PRIORITY
($M)
,tMUST DO" PROJECTS
A-2 Line III Metal Detector A-6 Plasticizer Modernization - Phase III A-7 Reduction of VCM Exposure A-8 Truck Loading Facilities For Silos A-10 VCM Standard Compliance Improvements A-ll Plant Sewer Revisions A-12 City Water Backflow Prevention A-13 Dryer Centrifuge Conveyor Assenftlies A-14 Miscellaneous Projects Under $15,000
Total
*
"OPTIONAL" PROJECTS
Priority
1 A-3 Rotary Dryer Optimization 2 A-5 Office Systems Computer Installation 3 A-4 Reactor Jacket Expansion Joints 4 A-9 Security Fence 5 A-l Bottle Compound Production
Total
CONSTRUCTION CAPITAL
29 85 115 120 160 180 130 150 395 1,364
160 71 40 50
840 1,161
7/18/83
DTH Q00099121
I
r
DTH .000099122