Monsanto CONFIDENTIAL r-- ...... LOC...Q- E. E> stewart, W. G. Krummrlch Plant MMWMI TO October 31 1972 STATUS - PCB POLLUTION CONTROL PROGRAM Mr. J. R. Savage General Offices B2SL G. L. Bratsch C. F, Buckley W. C. Engman P. E. Helsler 0. A. Hlppe P. B. Hodges - G.O. (E1SF) A. E. Leisy/R. M. MeCu-char W. R. Richard - G.O. (T3A) This is the November 1, 1972 status of PCB pollution control program. . I, PCB LEVEL IN SEWERS "Knowing PCB losses" from the operating department and the incinerator area in October at 1.9 #/day were more than double last monthls losses, waste Treatment Plant Effluent and Influent losses of 3 #/day and 8 #/day respectively were the same as last month. "Knowing losses" and Waste Treatment Plant Effluent losses are within the expected EPA guideline if the eventual standard will be based on concentration of PCB in the receiving water at 0.01 ppb. Aroclor sewer loss control data are attached. A. Aroclor Department - "Knowing PCB losses from the department increased from 0.55 to 1.76 #/day during the month. This Increase is due to the intermittent sewering of off-gas at the Aroclor department when excess gas is available. It has not been possible to completely coordinate production between the Aroclor and Chlorosulfonic Acid departments when Aroclor is the sole supplier of gas at low chloro sulfonic acid production rates. This condition will be reviewed to determine methods of correction. Also continued air blowing during the month, and a premise for long range correction must be developed. Did not do in October. B. Incinerator - Measured losses decreased to 0.11 #/day. , The incinerator was in operation all month. Losses during month are significantly lower than previous months. Ultimate goal from this area is 0.05 #/day. HONS 029757 Mr. J. R. Savage STATUS - PCB POLLU TION CONTROL PROGRAM Page 2 10/51/72 WGK I. PCB LEVEL IN SEWERS (Cont'd) C, Total Plant - Influent of 8 #/day is the game as last month. Would expect possible reduction of an additional 1-2 #/day and the rest attributable to background. Back ground losses up to 5 #/day will probably decrease slowly with time. D. Treatment Plant Effluent - October losses at 3 #/day are the same as last month. This loss Is equivalent to about 0.003 ppb in the Mississippi River. II. PROJECT STATUS Project 39T2 - "Reroute North Basin Sewer" - To reroute effluent from department North Settling Basin such that all sewer flow from the department will flow from one point. EDC - 12/13/72 Project 3956 - "Alterations to HC1 Distribution System" to eliminate possibility of sewering Dept. 246 HC1 gas. EDC 12/15/72. (This project to be reviewed based on latest mode ' of operation where 246 is sole supplier of gas to 217). III. PROGRAM STATUS Re Engman/Bratsch 4/24/72 1. HC1 Off-Gas A. Aroclor - Attempting to coordinate production with operations in the C/S department, but there have been Instances of automatic sewering of off-gas. Because of reduced C/S requirements, the Aroclor department has become the sole supplier of gas, and It has not been possible to completely coordinate production so as not to sewer any gas. This condition Is being reviewed to determine methods of correction. B. Awaiting approval of estimate "install PCB Off-Gas Scrubber" ?73000 capital, $4000 expense. 2. Blow Tank Off-Gas Resumed air blowing 8/14. Premise for longer range correc tion not completed in October. To be done In November. MONS 029758 Mr. J. R. Savage STATUS - PCB POLLU TION CONTROL PROGRAM Page 3 10/31/72 VGK III. PROORAM STATUS...(Cont1d) 3. Aroclor Department Catch Basin Project 397? EDC at 12/15/72 (See write-up under "Project Status") Project to he prepared In 4th quarter to permit either filtration or carbon treatment of overflow from south basin to permit reduction of losses to essentially zero. 4. Incinerator Scrubber No work planned. 5. Incinerator Catch Basin Project to be prepared In 4th quarter to permit either filtration or carbon treatment of overflow to permit reduction of losses to essentially zero. 6. Rip Track Hashes Future work required (filtration, carbon treatment, etc.) to get PCB content in wash water down to desired 0.01 #/waah. WOK STRATEGY An "in hand" status report was prepared for the Federal Authorities in the event we are asked what we have done, are doing and will do at WOK to control PCB's from the environment. Plant strategy review meeting held 10/20/72. Minutes published on 10/^6/72. No plan to contact EPA until PCB is declared a toxic sub stance and standards are to be prepared with regard to water quality. /tm att. Edward E. Stewart Technical Services Department MONS 029759