Document 9104q6V11m2QzDJ2o3g8GLRy5

Section Number: Issue Number: Original Date: Revision Date: Title: References: Ethanolamines/Glycol Ethers Tier 3 Procedure 27 3.5 12-22-92 Author: Tim Dill 12-29-97 Isolating, Blowing, Dumping, And Charging Of D-51A Glossary Of Equipment Identification (Text #114) 1713 Use of Flexible Hoses 1703 Blowing Out Product Lines and Equipment with Nitrogen 2000 Quick Disconnects and Bleeds 27. Isolating, Blowing, Dumping, And Charging Of D-51A 1.0 Objective: 1.1 To blow out DB from the charcoal inside D-51A so that it can be dumped, and replaced with fresh charcoal. D-51A must be charged and in-service for all DB production to insure color stability and quality. This procedure also identifies when the charcoal is spent and must be changed. 2.0 Responsibility: 2.1 It is the responsibility of the operations personnel to ensure that this procedure is fully complied with. 2.2 It is the responsibility of the operations personnel to ensure that this procedure is executed in a safe and efficient manner. 3.0 Charcoal Spent/Inactive Identification: 3.1 If the delta color before and after the charcoal filter is 0.6 units or less, sample the filter again in one hour. If the delta is still 0.6 units or less, change the charcoal in the filter. Past experience has shown that the DB must pass through active charcoal to provide a stable color. Without the charcoal or if the charcoal is spent, the DB color will increase in the storage tank. 4.1 Method: 4.1 D-51 A is blown with Nitrogen into DV-132B. D-51 is then flushed with process water into a T/T trailer. After flushing the charcoal, it is then dumped into the charcoal bins. 5.0 Inventory: Date Printed: April 18, 1998 Page 1 Of 7 Paper Copies Of This Document Are Uncontrolled & Not Subject To Update. The Controlled Document Resides In File: T:\ORIGINAL\GLYETHER\ETHERS\DISTILL\D-5lCHG.DOC DO A 059967 CONFTDFNTIAL 5.1 Ensure that we have enough charcoal in inventory to complete this job. The charcoal to be used is Calgon PCB 12x30. 5.2 Ensure that two super sacks Calgon PCB 12x30 have been ordered for the next recharge/if the existing inventory is less than 4 super sacks. 5.3 Ensure that the office professional has been notified of the amount of charcoal used for this job. 6.0 Safety Notation: 6.1 Monogoggles, safety glasses, gloves and a dust mask are required to perform this task. 7.0 Special Notation: 7.1 We should not leave our charcoal beds full of product and not flowing. This can create a potential fire hazard. 7.2 Make sure that the D-51A tag on the G/E board reflects the status of the charcoal filter. 7.3 Do not isolate D-51 A without a vent or bleed open. This is to prevent D-51 A from over pressuring and blowing a rupture disc. 8.0 Procedures: 8.1 Blowing: 8.1.1 Tag and isolate D-51 A for charcoal replacement. 8.1.2 Connect N2 hose to the vent line on D-51 A. Be sure all lines are isolated to prevent contamination. 8.1.3 Connect a flex hose to the 1" bleed at the bottom of D-51 A to the EB bullet trailer, if DV-132B does not contain DB. Connect the flex hose to the P-132B suction block valve if DV-132B contains DB. 8.1.4 Start a flow through D-51 A (N2) to the EB bullet trailer or the P-132B suction block valve. 8.1.5 Blow until the D51-A is empty. 8.2 Flushing: 8.2.1 Flush D-51 A with process water by connection water hose to the vent line and flex hose from 1" bleed at bottom of D-51 A to T/T trailer. Flush D-51 A until TOD is less than 15,000ppm. Date Printed: April 18, 1998 Page 2 Of 7 Paper Copies Of This Document Are Uncontrolled & Not Subject To Update. The Controlled Document Resides In File: T:\ORIGINAL\GLYETHER\ETHERS\DISTILL\D-51CHG.DOC DO A 059968 CONFTDENTIAl 8.3 Dumping: 8.3.1 Connect flex hose to the dump valve. 8.3.2 Open the dump valve into charcoal bin. Open process water into D-51A to start dumping the charcoal into the charcoal bins. Do Not block in dump valve while process water is open to D-51 A. This will prevent the rupture disc from being blown. 8.3.3 Open process water into D-51 A to start dumping the charcoal into the charcoal bins. Do Not block in dump valve while process water is open to D-51 A. This will prevent the rupture disc from being blown. 8.3.4 After charcoal is removed form D-51 A, block in process water into D-51 A an let all water drain from D-51 A. After D-51 A is drained, block in dump valve and prepare D-51 A for charcoal re charge. 8.3.5 Catch a sample on T/T trailer of flush material, label sample and bring to environmental operations. Secure T/T trailer, label trailer, and have trailer moves to environmental operations. 8.4 Charging D-51 A with fresh charcoal: 8.4.1 Inspect D-51 A through manway to insure that a significant amount of charcoal is not left inside the vessel. 8.4.2 Fill the bed with charcoal to about 80% (approximately 1600#) of capacity, (leave 2-3 feet of the bed top section empty to allow for charcoal expansion. Begin dumping charcoal through the top open man way. (Dust mask, gloves and monogoggles are required for this task) 8.4.3 Put the man way back on and bolt it up. 8.5 Ordering Charcoal 8.5.1 It is the responsibility of the operations personnel to replenish the supply of charcoal for the next recharge. 8.5.2 The operator must complete the Glycol Ethers Charcoal Request Form (attached to this procedure) and fax it to the Material Flow Specialist designated on the procedure. 8.5.3 The original Glycol Ethers Charcoal request form must be placed in the area engineer's mailbox after the faxing is complete. 8.5.4 The operator must complete the amines inventory depletion form (attached to this procedure) and place it in the office professional's mail box on her desk. 8.6 Placing D-51 A in service: Date Printed: April 18, 1998 Page 3 Of 7 Paper Copies Of This Document Are Uncontrolled & Not Subject To Update. The Controlled Document Resides In File: T:\ORIGINAL\GLYETHER\ETHERS\DISTILL\D-5lCHG.DOC D A 059969 confidfntiai 8.6.1 Connect a nitrogen hose to the bottom of the charcoal bed and purge the bed for 30 minutes through the top bleed. This will ensure that all oxygen is purged from the "system". 8.6.2 Fill the bed with DB using the top bleed to remove vapor space. 8.6.3 Empty a DV-132 check tank to be used for flushing the filter. 8.6.4 Backwash D-51A with overheads flow into the check tank until 3000 pounds has been put into the check tank. This step is completed to remove the fines from the charcoal. 8.6.5 Recirculate the check tank and pump it to rerun. 8.6.6 Start the DB overheads flow forward through D-51 A and using only one cotton filter, flow DB into check tank until the color is good or 4000 pounds has been put into the check tank (use whichever is highest, recirculate and pump the tank to rerun. 8.6.7 Swap the flow to the other cotton filter and go to the other check tank if necessary. 8.6.8 Change out the first used cotton filter so it will be ready for service. 8.6.9 Record the pressure drop across the cotton filter on the check sheet. 8.6.10 Check D-51 A rupture disc piping to insure that there are no drips or leaks. 9.0 Revisions: Revision #1 9/10/96 Revision #2 2/14/97 Revision #3 2/17/97 Revision #4 7/10/97 Added last sentence to 1.1 Added Section 3.0 Added last sentence to 8.3.2 or replaced last sentence of 8.3.2 to reflect piping modifications. Added Section 8.5.1 and renumbered. Added 7.3, 8.5.10, changed charcoal from Petrodarco to Calgon Revision #5 12/29/97 Added information to sections 4.1, 8.2-8.6 Date Printed: April 18, 1998 Page 4 Of 7 Paper Copies Of This Document Are Uncontrolled & Not Subject To Update. The Controlled Document Resides In File: T:\ORIGINAL\GLYETHER\ETHERS\DISTILL\D-5lCHG.DOC D0 A 059970 CONFIDENTIAL EA/GE MATERIAL REQUEST (Glycol Ethers Charcoal) FAX TO GERALD SANDERS AT 6914 DATE: CURRENT INVENTORY =Super sacks target inventory = 4 super sacks JOB DESCRIPTION: Order Charcoal for Glvcol Ethers REQUESTED BY: COST CENTER: 78 Source #: 172870 SUGGESTED VENDOR: Calaon CONTACT: Chris Dobbs PHONE #: 504-558-0047 ACTUAL NEED DATE: Within 3 weeks of the above date. QUANTITY CODE# 2 supersacks 2070302 FULL DESCRIPTION WITH PART NUMBER IF NOT CODED PCB 12x30 P.O.# SPECIAL INSTRUCTIONS: Date Printed: April 18, 1998 Page 5 Of 7 Paper Copies Of This Document Are Uncontrolled & Not Subject To Update. The Controlled Document Resides In File: T:\ORIGINAL\GLYETHER\ETHERS\DISTILL\D-51CHG.DOC DO A 059971 CONFIDENTIAL GLYCOL ETHERS CHARCOAL INVENTORY DEPLETION FORM Complete and Return to : Brenda Carbo Date: Number of bags of Charcoal used: ______ Type of Charcoal used: Calaon PCB 12 x 30 Special Notes: Operator: Date Printed: April 18, 1998 Paper Copies Of This Document Are Uncontrolled & Not Subject To Update. Page 6 Of 7 The Controlled Document Resides In File: T:\ORIGINAL\GLYETHER\ETHERS\DISTILL\D-51CHG.DOC DO A 05997? CONFIDENTIAL LAD MATERIAL REQUEST FAX TO INVENTORY MANAGEMENT AT 6021 DATE: JOB DESCRIPTION: Dak Packs and Wooden Pallets REQUESTED BY: Master No. Phone No. COST CENTER: 77 Source #: 172880 Priority: Routine ACTUAL NEED DATE: WITHIN TWO DAYS OF THE ABOVE DATE DELIVER TO: BLOCK 55 QUANTITY CODE# 40 ea. 10 ea. 1160302 2902650 FULL DESCRIPTION WITH PART NUMBER IF NOT CODED 25 Gallon Dak Packs 48" x 48" Wooden Pallets P.O.# Date Printed: April 18, 1998 Page 7 Of 7 Paper Copies Of This Document Are Uncontrolled & Not Subject To Update. The Controlled Document Resides In File: T:\ORIGINAL\GLYETHER\ETHERS\DISTILL\D-51CHG.DOC DO A 059973 CONFIDENTIAL