Document 8x1bzKNEpr3Kdzx7n2nX7LR5
CHEMICAL COMPANY, INC.
CERTIFIED MAIL RETURN RECEIPT REQUESTED
August 13, 1981 JJF-115-81
Mr. Bill Stewart, P.E. Executive Director Texas Air Control Board 6330 Highway 290 East Austin, Texas 78723
Dear Mr. Stewart:
The Celanese Chemical Company, Inc., plant at Bishop plans to reclaim about
650 linear feet of steel pipe ranging in size from 10" to 24" in diameter and
one vessel 5' O.D. by 13' H. This reclamation work will start August 28, 1981.
The pipe and vessel are insulated with friable asbestos insulation, so
te
insulation will, be removed as the first step, and landfilled in the designated
asbestos landfill located on the plant site. All precautions outlined in :
40 CFR 61.20-61.25 will be observed.
^
This letter will serve as a notification of this work, as required by 40 CFR 61.22 (d) (2). The attached data sheet lists all the pertinent data.
Please contact me if you have any questions or comments.
Very truly yours.
/ JsJ. Fritsch Plant Manager
JJF/rgs attachment
bcc: W.H. Meyer J.F. Harper T.L. Markham Joe Smith J.F. Smith J. Garza File: 202.1 Central Files H.W. Head, Jr., Corpus Christi
XMC.cs .'ucmi.-u ."oiipjmv .Nr .
004261 U1GI481
Qi^wnp TPv 7*343 TELEPHONE: 512-584.3511
Attachment
NOTIFICATION INFORMATION - RECLAMATION
I. OWNER: Celanese Chemical Company, Inc.
II. ADDRESS:
P. 0. Box 47320 1250 West Mockingbird Lane Dallas, Texas 75247
III.
DESCRIPTION: Remove friable asbestos insulation from 650 linear feet of steel pipe ranging in size from 10" to 24" in diameter and from a vessel 5' O.D. by 13' H.
IV. ADDRESS OF SITE: '
Chemcel Plant Celanese Chemical Company, Inc.
P. 0. Box 428 Bishop, Texas 78343
V. STARTING AND COMPLETION DATE: Start - August 28, 1981 End - November 25, 1981
VI. NATURE OF RECLAMATION: See III above.
VII. PROCEDURE: Wet insulation thoroughly, strip off insulation, pack in plastic bags and landfill in registered (on-site) landfill.
VIII. LANDFILL SITE:
Texas Department of Water Resources Registration #30084 EPA I.D. #TXD008113441
004262