Document 8VD4znY9z00YxKvzaL2MzqM3Z

fl Operations Report Dept. 246 - Aroclor PRODUCTION SUMMARY (Current Month) Scheduled - 2,240,000# Actual - 2,473,570# # of Schedule - 110# PRODUCTION SUMMARY (Year to Date) Aroclor . 1242 1248 1254 1260 1262 1254 - 10# Xylene Current Month 934,317# 627,849# 461,707# 414,717# 11,580# 23,400# Year to Date 1,783,507# 1,461,415# 1,058,364# 755,322# 11,580# 23,400# Total - 2,473,570# 5,073,588# Average Monthly Production - 2,536,794# Availabilities Repair - $3.90# Process - 97.17# Other - 99.00# YIELDS Standard Actual YTD # Theory on Biphenyl 95.50# 98.47# 99.8? SIGNIFICANT ITEMS THIS MONTH This month's production rate was second only to January's record rate. February's high production rate and yields verify last month's productlon and yield after allowing for the 70,000# inventory error in \ December, 1964. To consistently produce Aroclor 1242 with a thermal-chemical stability of 0.55 ppm or less, the distillate from still boil downs at the end of each Aroclor 1242 run was kept separate for use in non-electrical material. The two lots of 1242 produced in this manner had thermalchemical stabilities of 0.28 ppm and 0.44 ppm. The material with the 0.28 ppm was produced between the first and last 25# of the run. Also during the 1242 run the sensing point for vacuum control was changed from the receiver to the still on No. 1 still. Near the end of the month the vacuum control on No. 2 still was modified in the same way. These results are encouraging, but will not be conclusive until addi tional runs produce the same results. The cooler and Brinks mist eliminator in the HC1 off-gas line was put into operation on 2/5/65. The system is performing satisfactorily with no pluggage of the off gas line and no reports of Dept. 246 HC1 gas con taminating muriatic acid since its start up. DSW 296468 STLCOPCB4066412 1 Dept. 246 (cont.) 2 Information was received on the operation and standardization of the nuclear density gauge on No. 4 chlorinator. This unit will be put into routine operation and checked out next month. Hie drumming operation was increased from 2 shifts/day to 3 shifts/day. The fork lift to be used in the department for moving drums is scheduled to be delivered early next month. Stock Position Product Aroclor 1st of Mo. Last of Mo. Whse. Stock Dept. Stock - 1,480,885# 997,657# 2,478,542# 1,575,018# 842,191# 2,4i7,"269# D. E. Harris ghw DSVJ 296469 STLCOPCB4066413