Document 8RoV4qbvZpL023QVrKGGOYaYa
In re: A ll Asbestos Litigation Filed by Simmons Cooper, C ircuit Court, Third Judicial District, Madison Cty., IL ; 11/17/05. In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL ; 11/17/05.
Eaton
Axles & Brakes
Eato^i Corporation Axlqt & Brake Division P.O. Bo/4008 Kalamazoo, Michigan 49003 (616) 342-3018
February 5, 1988
Mike Brooks Chief Engineer Oshkosh 2307 Oregon Street P.O. Box 2566 Oshkosh, WI 54903
Dear Mike:
On December 2, 1987, you wrote me regarding l-EMTT coined and non-asbestos brakes. In order for you to propose this change to the U.S. Army, I offer the following.
1) New Eaton part nuirbers were assigned to correspond with new Oshkosh part numbers and are shown on attached chart. These new brakes include non-asbestos linings and coined shoes*
2) A new coining operation was Implemented to obtain a greater consistency in final component geometry and a subsequent reduction in variation in brake toroue output. The coining of the shoe assembly returns the shoe to the desired radius after distortion hy the weld process. To further assure optimum lining to drum contact for all possible conditions, both the shoe radius and the radius tolerance were reduced 0.010 inches (see Fig. 1).
By controlling the self enerqizing forces generated by pressure distributions surrounding the initial contact point of the lining to the drum, a significant reduction in brake to brake variation is achieved while output torques remain within the ban of the original, non-coined, configuration (Figs. 2-4). Because vehicle stopping distances are controlled by the initial lock up of a single wheel, this new brake output consistency permits improved performance with reduced premature lockup.
3) The cost impact will add $6.42 per brake assembly.
4) We would like to introduce this.change effective June 1, 1988. At that time, our inventory of asbestos linings should be depleted.
Telex 224305 Telecopier (616) 342-3019 Shipping Address: 13100 E. Michigan Avenue, Galesburg. Michigan 49053
EAB 067365
SCF-EC-3575
In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL ; 11/17/05. In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., I L ; 11/17/05.
v
*
Page Two Oshkosh February 5, 1988
i
5) Drawings showing the coined shoe are enclosed for vour review.
Eaton's request to change brakes on the LVS program to a 'coined
shoe will be presented at a later date.
`
Should you have any questions, do not hesitate to call.
Regards,
L. E. Sengewalt Account Manager
LES/pt (2826s)
c: A. Bau J. Clark R. VanWormer
Enclosures
EAB 067366
In re: All Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL; 11/17/05.
'
hemtt brakes with non-asbestos linings and coined shoes
EATON PART HUMBER
DESCRIPTION
OTC OLD PART NUMBER
OTC
EATON
NEW PART NUMBER NEW PART #
804839 804380* 804693* 804952* 804953* 804955* 804954*
Kit Brake Brake Shoe & Lining Assy Brake Shoe & Lining Assy Brake Assy Front LH Brake Assy Front RH Brake Assy Rear RH Brake Assy Rear LH
1307450 1329550 1314290 1336620 1336610 1336630 1336640
1654120 1654130 NONE 1654140 1654150 1654160 1654170
808933 ^05714
808934 808935 808937 808936
EAB 067367
A
In re: All Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL; 11/17/05.
In re: All Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL; 11/17/05.
ADDITIONAL OPERATION ASSURES PROPER INITIAL CONTACT
FIGURE 1
EAB 067368
In re: All Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL; 11/17/05.
GEOMETRY EFFECTS
SUMMATION OF FRICTION FORCE
FIGURE 2 EAB 067369
In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL ; In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL ;
GEOMETRY EFFECT
ORIGINAL 5.A.P. DESIGN
POTENTIAL INITIAL CONTACT RANGE FOR SAME TOLERANCING OF SHOE, SPIDER, DRUM, ETC.
FIGURE 3 EAB 067370
In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL ; 11/17/05. In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL ; 11/17/05.
8,
GEOMETRY EFFECT
COINED SHOE BRAKE
POTENTIAL INITIAL CONTACT RANGE FOR SAME TOLERANCING OF SHOE, SPIDER, DRUM, ETC.
FIGURE 4 EAB 067371
In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL ;
5
In re: All Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL; 11/17/05.
EATON BRAKE TORQUE COMPARISON ORIGINAL VS COINED DESIGN
VARIANCE WITHIN A THREE TEST SEQUENCE
BRAKE PRESSURE
ORIGINAL TEST# 2005
COINED TEST# 2611
20 PSI 30 PSI 40 PSI 50 PSI 60 PSI 70 PSI 80 PSI
9.15 % 10.66 % 11.50 % 13.73 % 15.33 % 16.41 % 18.34 %
9.00 % 5.77 % 1.91 % 8.79 % 6.13 % 3.18 % 2.11 %
FIGURE 5
In re: All Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL; 11/17/05.
EAB 067373
In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL ; 11/1
M-E^TT
$:
Kj
a m(n I ISsi ! J3
(A oU-Aa^T/r. 0
CD l
Cx3
-///s/S2-
C-^0 . \ C3
Or^ d-^AaJ^5______-r&^EJSL
2- 3 O
' A ^S_ . i o
a -oil
3 "f"C^A -tn U5 aAA.
oa'7 ..>..0.0 ^
Pf^CrrP
3 tt.VJ
g 3,^2-%
-U_ M
Btf X$'1l
uA Q-^\
a
<3 Jg*-JlO i9om
^V-^g-'r.-- CX-fO ^ ~~ a a ^L^J?^Ty^E~0
- -0-0 M {Lt..QC>llll
0(^2. ^OQl)
I.OK^
4 rI31s.o?>i C- - o ^ K K
&a / `r.k
2l 4- R>
a J-..TAA cr -o-H <S <t_ p
3 If I 3
'O i C=
CaO
-JZ~&?1.S3Z&
"2-fa ^ *7
a
-Amg^3T @12^O-.................
.... 3 / 7.
2 .^ 3 . oa
-Q*
5
z . 3 c, to . >2_g
. Q) E?
fl 2. 3
y2
^031
Coo -Q JL O
M I S~ , OH 2-
.? .1 L_?_
. 3"7V -3.,A.cUfA-
3.M1
5~.7 3v . tss-
_6;M2-_____
aa /CxalA'J
S3&S
a 65
Form E30-1650 (10/84)
Printed fn U S A,
EAB 067374
In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL ; In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL ;
5
EATON CORPORATION AXLE & BRAKE DIVISION
ENGINEERING CHANGE AND/OR RELEASE NOTICE
ENGREL: 6936 DEBT: MRKTG REQUESTOR: WRIGLEY SHEET 1 OF 1
PART #
REV
ITEM & DESCRIPTION OF CHANGE
808933 808934 808935 808934/35
808936 808937 808936/37
EPL: KIT - 16.5 X 5 BRAKE COMPONENTS CUSTOMER: OSHKOSH MILITARY P/N 1654120
EPL: 16.5 X 7 BRAKE ASSEMBLY - CCW CUSTOMER: OSHKOSH MILITARY P/N 1654140
EPL: 16.5 X 7 BRAKE ASSEMBLY - CW CUSTOMER: OSHKOSH MILITARY P/N 1654150
DWG: 16.5 X 7 BRAKE ASSEMBLY
CCW (SHOWN) CW (OPPOSITE)
1.75 O/S, 11.560 C/L TO C/L, 55 DEG BRKT ANG
CAM & DRUM (SAME)
0 DEG INDEX ANG
MM-NAB10 LINING
5.5-6.0 LESS SLACK
EPL: 16.5 X 7 BRAKE ASSEMBLY - CW CUSTOMER: OSHKOSH MILITARY P/N 1654170
EPL: 16.5 X 7 BRAKE ASSEMBLY - CCW CUSTOMER: OSHKOSH MILITARY P/N 1654160
DWG: 16.5 X 7 BRAKE ASSEMBLY
CW (SHOWN) CCW (OPPOSITE)
1.75 O/S, 11.560 C/L TO C/L, 72 DEG BRKT ANG
CAM & DRUM (OPPOSITE)
0 DEG INDEX ANG
MM-NAB10 LINING
5.5-6.0 LESS SLACK
REASON FOR ACTION: CUSTOMER REQUEST EFFECTIVE DATE: 22 DECEMBER 1987 EFFECT ON COMPLETED STOCK: N/A EFFECT ON IN ERDCESS STOCK: N/A EFFECT ON VENDOR STOCK: N/A EFFECT ON SERVICE: N/A EFFECT ON TOOLING & GUAGING: N/A AFFECTED CUSTOMER (S) : OSHKOSH MILITARY REMARKS:
DATE APPROVED: / "3 -jjfj
APPROVED BY zi
KLG EAB 067375