Document 8RoV4qbvZpL023QVrKGGOYaYa

In re: A ll Asbestos Litigation Filed by Simmons Cooper, C ircuit Court, Third Judicial District, Madison Cty., IL ; 11/17/05. In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL ; 11/17/05. Eaton Axles & Brakes Eato^i Corporation Axlqt & Brake Division P.O. Bo/4008 Kalamazoo, Michigan 49003 (616) 342-3018 February 5, 1988 Mike Brooks Chief Engineer Oshkosh 2307 Oregon Street P.O. Box 2566 Oshkosh, WI 54903 Dear Mike: On December 2, 1987, you wrote me regarding l-EMTT coined and non-asbestos brakes. In order for you to propose this change to the U.S. Army, I offer the following. 1) New Eaton part nuirbers were assigned to correspond with new Oshkosh part numbers and are shown on attached chart. These new brakes include non-asbestos linings and coined shoes* 2) A new coining operation was Implemented to obtain a greater consistency in final component geometry and a subsequent reduction in variation in brake toroue output. The coining of the shoe assembly returns the shoe to the desired radius after distortion hy the weld process. To further assure optimum lining to drum contact for all possible conditions, both the shoe radius and the radius tolerance were reduced 0.010 inches (see Fig. 1). By controlling the self enerqizing forces generated by pressure distributions surrounding the initial contact point of the lining to the drum, a significant reduction in brake to brake variation is achieved while output torques remain within the ban of the original, non-coined, configuration (Figs. 2-4). Because vehicle stopping distances are controlled by the initial lock up of a single wheel, this new brake output consistency permits improved performance with reduced premature lockup. 3) The cost impact will add $6.42 per brake assembly. 4) We would like to introduce this.change effective June 1, 1988. At that time, our inventory of asbestos linings should be depleted. Telex 224305 Telecopier (616) 342-3019 Shipping Address: 13100 E. Michigan Avenue, Galesburg. Michigan 49053 EAB 067365 SCF-EC-3575 In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL ; 11/17/05. In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., I L ; 11/17/05. v * Page Two Oshkosh February 5, 1988 i 5) Drawings showing the coined shoe are enclosed for vour review. Eaton's request to change brakes on the LVS program to a 'coined shoe will be presented at a later date. ` Should you have any questions, do not hesitate to call. Regards, L. E. Sengewalt Account Manager LES/pt (2826s) c: A. Bau J. Clark R. VanWormer Enclosures EAB 067366 In re: All Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL; 11/17/05. ' hemtt brakes with non-asbestos linings and coined shoes EATON PART HUMBER DESCRIPTION OTC OLD PART NUMBER OTC EATON NEW PART NUMBER NEW PART # 804839 804380* 804693* 804952* 804953* 804955* 804954* Kit Brake Brake Shoe & Lining Assy Brake Shoe & Lining Assy Brake Assy Front LH Brake Assy Front RH Brake Assy Rear RH Brake Assy Rear LH 1307450 1329550 1314290 1336620 1336610 1336630 1336640 1654120 1654130 NONE 1654140 1654150 1654160 1654170 808933 ^05714 808934 808935 808937 808936 EAB 067367 A In re: All Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL; 11/17/05. In re: All Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL; 11/17/05. ADDITIONAL OPERATION ASSURES PROPER INITIAL CONTACT FIGURE 1 EAB 067368 In re: All Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL; 11/17/05. GEOMETRY EFFECTS SUMMATION OF FRICTION FORCE FIGURE 2 EAB 067369 In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL ; In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL ; GEOMETRY EFFECT ORIGINAL 5.A.P. DESIGN POTENTIAL INITIAL CONTACT RANGE FOR SAME TOLERANCING OF SHOE, SPIDER, DRUM, ETC. FIGURE 3 EAB 067370 In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL ; 11/17/05. In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL ; 11/17/05. 8, GEOMETRY EFFECT COINED SHOE BRAKE POTENTIAL INITIAL CONTACT RANGE FOR SAME TOLERANCING OF SHOE, SPIDER, DRUM, ETC. FIGURE 4 EAB 067371 In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL ; 5 In re: All Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL; 11/17/05. EATON BRAKE TORQUE COMPARISON ORIGINAL VS COINED DESIGN VARIANCE WITHIN A THREE TEST SEQUENCE BRAKE PRESSURE ORIGINAL TEST# 2005 COINED TEST# 2611 20 PSI 30 PSI 40 PSI 50 PSI 60 PSI 70 PSI 80 PSI 9.15 % 10.66 % 11.50 % 13.73 % 15.33 % 16.41 % 18.34 % 9.00 % 5.77 % 1.91 % 8.79 % 6.13 % 3.18 % 2.11 % FIGURE 5 In re: All Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL; 11/17/05. EAB 067373 In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL ; 11/1 M-E^TT $: Kj a m(n I ISsi ! J3 (A oU-Aa^T/r. 0 CD l Cx3 -///s/S2- C-^0 . \ C3 Or^ d-^AaJ^5______-r&^EJSL 2- 3 O ' A ^S_ . i o a -oil 3 "f"C^A -tn U5 aAA. oa'7 ..>..0.0 ^ Pf^CrrP 3 tt.VJ g 3,^2-% -U_ M Btf X$'1l uA Q-^\ a <3 Jg*-JlO i9om ^V-^g-'r.-- CX-fO ^ ~~ a a ^L^J?^Ty^E~0 - -0-0 M {Lt..QC>llll 0(^2. ^OQl) I.OK^ 4 rI31s.o?>i C- - o ^ K K &a / `r.k 2l 4- R> a J-..TAA cr -o-H <S <t_ p 3 If I 3 'O i C= CaO -JZ~&?1.S3Z& "2-fa ^ *7 a -Amg^3T @12^O-................. .... 3 / 7. 2 .^ 3 . oa -Q* 5 z . 3 c, to . >2_g . Q) E? fl 2. 3 y2 ^031 Coo -Q JL O M I S~ , OH 2- .? .1 L_?_ . 3"7V -3.,A.cUfA- 3.M1 5~.7 3v . tss- _6;M2-_____ aa /CxalA'J S3&S a 65 Form E30-1650 (10/84) Printed fn U S A, EAB 067374 In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL ; In re: A ll Asbestos Litigation Filed by Simmons Cooper, Circuit Court, Third Judicial District, Madison Cty., IL ; 5 EATON CORPORATION AXLE & BRAKE DIVISION ENGINEERING CHANGE AND/OR RELEASE NOTICE ENGREL: 6936 DEBT: MRKTG REQUESTOR: WRIGLEY SHEET 1 OF 1 PART # REV ITEM & DESCRIPTION OF CHANGE 808933 808934 808935 808934/35 808936 808937 808936/37 EPL: KIT - 16.5 X 5 BRAKE COMPONENTS CUSTOMER: OSHKOSH MILITARY P/N 1654120 EPL: 16.5 X 7 BRAKE ASSEMBLY - CCW CUSTOMER: OSHKOSH MILITARY P/N 1654140 EPL: 16.5 X 7 BRAKE ASSEMBLY - CW CUSTOMER: OSHKOSH MILITARY P/N 1654150 DWG: 16.5 X 7 BRAKE ASSEMBLY CCW (SHOWN) CW (OPPOSITE) 1.75 O/S, 11.560 C/L TO C/L, 55 DEG BRKT ANG CAM & DRUM (SAME) 0 DEG INDEX ANG MM-NAB10 LINING 5.5-6.0 LESS SLACK EPL: 16.5 X 7 BRAKE ASSEMBLY - CW CUSTOMER: OSHKOSH MILITARY P/N 1654170 EPL: 16.5 X 7 BRAKE ASSEMBLY - CCW CUSTOMER: OSHKOSH MILITARY P/N 1654160 DWG: 16.5 X 7 BRAKE ASSEMBLY CW (SHOWN) CCW (OPPOSITE) 1.75 O/S, 11.560 C/L TO C/L, 72 DEG BRKT ANG CAM & DRUM (OPPOSITE) 0 DEG INDEX ANG MM-NAB10 LINING 5.5-6.0 LESS SLACK REASON FOR ACTION: CUSTOMER REQUEST EFFECTIVE DATE: 22 DECEMBER 1987 EFFECT ON COMPLETED STOCK: N/A EFFECT ON IN ERDCESS STOCK: N/A EFFECT ON VENDOR STOCK: N/A EFFECT ON SERVICE: N/A EFFECT ON TOOLING & GUAGING: N/A AFFECTED CUSTOMER (S) : OSHKOSH MILITARY REMARKS: DATE APPROVED: / "3 -jjfj APPROVED BY zi KLG EAB 067375