Document 8RVbw9Kae4Q4bMoeQ86ZDm5N5
PLAINTIFF'S EXHIBIT
Foster Wheeler Corporation
Engineers > Manufacturers Constructors 110 SOUTH ORANGE AVENUE. LIVINGSTON. N. J.
RANCHES IN F*INCPAL CITIES Of THE UNITED STATES AND CANADA AI.SO LONDON AND AAAIS
Novanbar lb. 1966
CABLE AOOBESS AEWOP TELEPHONE SSS-II 00 iAftt* CODE 2D>)
Mr. H. A. Brown, President Coastal States Petrochemical Coapany
0/0 Mr. 0. F. Adana, Consulting Unglna*r 219 South Madison Tula*, Oklahona
Rsi TV Costrset 5-l6-5b7
FV Filo 0-5-161803 Pilot Plant Isobaton* Pyrolysis Map*
Qentlesnani
Confining information telephoned to ME*. Adana on Jfovaabar b and Novanbar 7, va attach a dlgaat of tha raaulta obtained from tbs two runs parfornad par oontraot.
Cementing on thasa determinations, for a conversion on tha order
of 505
eondltiona 565} tha isobutene yield la sonawtaat higher than
wa expaotad, and llkawlaa tha propylene ylald. However, taking Into
aeeount the higher degree of eoavaralon tha propylene la right In line,
and tha isobutan* about 55 higher.
Tha aaeond run at lower eonvaraion level whom propylene over 115 above the expaotad yield, bat isobutene about 175 lower, both in tarn* of tha actual laobatane conversion of 365.
Wo Motioned on tha phone that sqm degree of linaarity was indi cated for the iaobuten* yield. This would permit a soMwhat higher laobotans conversion level, and aeoordalngly lower reayole ratio without substantially affecting laobatane yield.
The oonoluaiona which ean be drawn from thea* ruse arei
1. Operation at a preasura level In azeeas of 200 pslg la practicable.
2. A total yield in sxesss of 605 by weight of isobutan* plus pro pylene la attainable, baaed upon isobutan* diaapparanaa.
3. A lower laval of laobatane oonvaraion than 505 la not warranted.
b. Formation of aeatylaaaa and dlolaflns in tha 0^ end lighter rang* are nil, simplifying purification prebiaua.
CED0007023
FOSTER WHEELER CORPORATION. SHEET NO.
-I -
5. Oenvoraloao and iMiriirt operettas ooariitloao or* ooopatlblo vitti adoption* oif on&otlaf furnaoo ooaflfarirtloao and opwpoaoata.
loo okaervad that projection of plant faollltlo* to poralt oconontc foaoitnity ovaloattkap vaa the coat atop la eoaoldwroU on of ttda propoaod operation. l)C await poor doolpurtilna of a aaottwf to pwarooo thlo objective.
V* traat that thaao pilot plant rana aero oondaotod to pear aatlafaetiea.
Very traly ynro,
room wma ootpowno*
CSOiov ottaohaont
leaneth 9. fiaaoreot Oeaoral solo* filriaioa
CED0007024
LWO-5b-66oil9 Contract 5-16-5U7 File 0-5-161803 November lb, 1966
COMPOSITE TEST RESULTS
Test No. Run No. Sample No. 3tear Dilution
S'srt
N2 K2 CHI, QHl* C2H6 C3H6 U3H8 ISO Q*H8
CfiH8-2 ISC CjjHlO N -'bHlC Undetermined in Crs TOTAL TN GAS C5 Plus Liquid Recovered Tors TOTAL
223 1
207 1.55
WI.%
0.62 0.62 8.12 1.38
o.?h
13.67 2.23
19.1*8
.ho
.07 1*5.73
1.57 3.21 WM'
.50 1.66
105755
Transfer Temp., F.
Residence above 120oF, sec,
1330 1.2
Transfer ^essure, psig
1 21*0.0
Overall Reaction Vel. Constant, sec. 0.633
Dehydrogenation Squib. Approach,
5.5
Uemethan.vtion
"
""
neg
Wt.% ISO C^Hio Conversion
53.0
22k 2
211 1.55
</
-. 0.22 1*.6U 0.83
0.32
8.68 1.LO
. *13. 71 21 .08 60.16
h.i*? Jg
95.76
b.2b 1OT.W
1276 1.25 2U5.0 0.1*07 1.76
neg.
36.0
Feedstock
'art
C3H8 ISO CbHio N-ChHlO
i.ity
Mol i
0.25 97.25
2.50
IWTCB
flGas yield structure reflects inclusion of solution gas from recovered liquid.
VY.%
0.2 97.3
2.5
CED0007025
CED0007026