SHAC Minutes from Meeting of June 15, 1983
R. Baca H. Conrad R. M. Fritz R. T. Hammann W. G. Howe
cc G. L. Tromblee G. Escamilla J. H. Cross
PLAINTIFF'S EXHIBIT
MON-1779
Harry Conrad discussed the PMSB meeting of June 15, 1983. It was announced that the previous record of days without a lost workday injury was broken yesterday. Safety Performance at the Texas City plant is excellent so far this year. A copy of the SHAC Agenda/Report is attached.
Bob Hammann presented the SHAC bulletin that was issued regarding nitrogen backflow preventers (copy attached).
Plans for the Quarterly Inspection were finalized, and the Group Categories were presented.
OLD BUSINESS
None.
NEW BUSINESS
Rufus Baca will handle the valve application responsibility assigned to SHAC in the AN incident (Investigation Report #83-05).
/ jP Attmts.
W. W. Latimer
SC 001170
LAM002370
STATUS OF SHAC ACTIVITIES PMSB Report, June 15, 1983
Hourly Safety Committee - One member absent at May meeting - George Danner discussed the SAC organization and its charter - Status report given on: Cooling tower fan hazard Vessel opening without blinding - complete Holeman responsibilities - New concerns Are manlifts periodically inspected? Protective clothing required when working around NSI New permit procedure. Why do Craft Leadmen have to sign?
Quarterly Safety and Housekeeping Inspection - Reminder, Scheduled for last two weeks in June - Service areas and laboratories eligible for awards - New laboratory check list developed by the Tech Center Safety Committee
Sample Bottle Disposal - Surveying units for methods of disposing of laboratory sample bottles
Drug and Alcohol Abuse Program - Bill Latimer and Gene Wofford met with Shell personnel. - Can develop an educational program with outside help but need a means to assist personnel in need after educational program is implemented
Hose Tape - Hopefully the problem of fading hose tape will be resolved with receipt of new tape, which is now in the plant.
Holeman Duties - Procedure written. Need PMSB approval.
SC 001171
LAM002371
Nitrogen Backflow Prevention - LP&S (Bob Hammann) reported that inspections were not being conducted according to P-Bulletin 0126. SHAC will issue an alert. Bulletin requires weekly inspection by owning depart ment and quarterly inspection by instrument department.
Unit Laboratory Inspection - TCSC will inspect any lab on request to insure compliance with lab standards.
/jP
SC 001172
LAM002372
RESPONSIBILITIES OF ATTENDANT (HOLEMAN) FOR PERSONNEL ENTERING CONFINED SPACE
One person shall be stationed outside of the confined space when internal work is being performed. The attendant (holeman) will:
Make certain proper permits have been issued.
0 Make certain specified safety equipment is available and used.
Maintain continual communication with the individual(s) in the enclosure. (In some cases, visual contact may not be possible. In such cases audio contact must be frequent.)
Maintain appropriate communication system to summon emergency assistance.
0 Know how to use rescue equipment specified for the job.
Be alert for changing conditions.
0 Take emergency actions short of entering the confined space until emergency assistance arrives. (Under no circumstances will the 'attendant enter the vessel until emergency assistance arrives.)
SC 001173
LAM002373
S H A C BULLETIN
V.P . C .M. R. A. D .D. H.M.
Osburn Cruse Hernandez Kos Lacy
AB-1 0-11 OA-3 0-11 0-6A
A. H . G. A. W.H. G.E. J.
Conrad Orum Triplett Sprock Kiser
NITROGEN BACKFLOW PREVENTERS
0-6A 2PD 51D 513D ID
Do your nitrogen backflow
preventers comply with the
plant standard, or does the
( installation look like this?
There have been installations found in the past few weeks where nitrogen backflow preventers do not comply with the plant standard (found in P-0126), a copy of which is attached. Please check your units, especially the peripheral areas (i.e., tank farms) to assure that your nitrogen backflow preventer stations comply with this plant standard. The owner is responsible for making a weekly inspection to ensure that the bypass valve is in the closed position with seals or locks intact. Also, the Instrument Department is responsible for making a quarterly inspection and operational test of each backflow preventer.
Attachment RTH/es
R. T. Hammann for SHAC
SC 001174
LAM002374
source
NUM.
LIST OF MATERIALS
QUAN.
__ DESCRIPTION
1 1 D/P Cell
2 3 1/4" Ball Valve H-M
#502-S6-T-S6
' v---
3
3 1/2" x 1/4" Swaqe (TBE)
v*-v.v-_
4
1/2" Sch. 80 Pipe
.XVHi-`
5 1/4" Sch. 80 Pipe
6 1/4" CU Tubincr
7 3/8" CU Tubing
a 2 Male Connector S.L. #600-1-4
9 1 Imperial Kwik-Connect Body
#298 PT - 1/4 - PT
f""''-"
'vt'iSv
-M*
10
1
Filter-Regulator-Foxboro
.
#B-110-XR W/Gace #P-103-WN
Hydrocarbons Divs . Eng. Stds. A-SD-3 5 2