Document 8RG89jXG54pveN60yr0qxZo5o
6/ic
AT&T long lines
Medical Director - Headquarters Medical Directors - Regions'
Some of you have becc~e involved ir. environmental testing for asbestos. Enclosed are sots guidelines for sprayed on asbestos in cor.par.ycvr.ed and leased buildings to which you may wish to refer.
L
/
.-use. C'32
LLA 000114
Sutotaet:
Occupational Safety and Health Sprayed-on Asbestos in Company-owned and leased 3uLidings
S'- SR 87--76-51!
pro* nn: <:
dnsibuQon iito. d
*tl no. rf*M Utnn;
Strong Recommendation June 3, 1980 STF 108, HRD 020, KHD 057, 37r 172 SR 80-06-010
@ATsJ
irefca'' '? ec~: mm ~eegraor 2c--cam 222 M! A.'. aCdC 3as.xq a c;e
?r ir :
o: from
AVP - Support Services Copies to Medical Directors, Safety, and Snvironmental Coordinators.
AVP - Support Services
description
Provides guidelines required for CSHA coc.c . u-ce in company-c-one d a leased buildings vich sprayed-on asbestos.
o
\ .1
Section 29 CFR 1910.1001 of standards issued by the Occupational Kealrn and Safety Administration (0SHA) requires all employers to establisn am maintain an effective program for protecting their employees against asbestos exposures which are above acceptable levels. The major areas :: concern for the Bell System in this matter are in automotive operations (brakes and clutches) and in buildings isprayeJ-on fire protection am insulation) .
The attached document considers sprayed-on asbestos in company-owned leased buildings, and is one of a. series of Bell Syscem guidelines intended to satisfy Che requirements of the standards. Previous documents include:
am
SR 79-05-398
"Occupational Safety and Health - Exposure Co Airborne Asbestos Fibers - Request for Survey" - surveys all System-owned and leased buildings to determine if sprayed-on asbestos was used.
RL 79-07-25--
"Asbescos Hazards in. Leased 3ui!dings" - recommends that facilities under consideration for lease, containing sprayed-on asbescos, oe reviewed betcre ti-o. decision.
CL 73-08-05
"Motor Vehicle Mamtena-ce - Protection Against Exo"* to Asbestos Fioers" - promres general procedures : c protecting employees against asbestos exoosure garages .
"Motor Va- . : 1 e "a i n t e" a-: e - Brakes and
cm.
provides specific - e : o mm J - : a t i o r. s for protecting
employees against asbestos exposure while pert::
maintenance o o e r a C i p - s m crakes and : u t ; h e m
LLA 000115
In addition, an SR will oe issued shortly entitled "Occupational Satety and Health - Exposure to Airborne Asbestos Fibers" which will provide basic information to establish an overall asbestos control program.
The results of the survey of approximately 29,000 owned and leased Sell System buildings (SR 79-05-398) indicates tr.at there are less chan 13 or 216 (108 owned and 108 leased) buildings which are suspecced to have sprayed-on asbestos. However, bulk sample tests necessary Co determine if a substance i3 asbestos were not performed in all cases during the survey.
Concurrent with the building survey, Sell laboratories was requested to perform cests to determine the possible levels of exposure where asbestos was presenc. The results of these cests may be summarized as follows:
. If sprayed-on asbestos is ur.disCurbed, airborne levels of asbestos are well below OSHA standards (typical office or work space environment'1.
. During typical work operations which do not require the removal or displacement of c.ne sprayed-:n material, exposure levels are below OSHA standard s.
During any work operations -here cnere is significant disruption o: the sprayed-on material, there may be exposures above the OSHA standard (for example, work in crawl spaces or ceilings or removing ceiling panels).
. During renovations, ripouts and remodeling activities, airborne asbestos levels are generally above OSHA standards.
As a result of tne above it is recommended that:
1. Bulk sample tests be performed to confirm the presence or absence ot asbestos in each of tne 216 ouildings identified in the survey, and any other building which may have asbestos.
2. Warning signs, labels, or other means of control must be provided for employees who must perform work m an area where sprayed-on material may be disturbed.
3. Methods must be developed to minimize or eliminate the possibility or excessive exposure curing renovations or removal activities in the affected buildings. The Environmental Protection Agency (EPA) has specific requirements on these activities.
r*. A disposal procedure must he establisned for any collected asoest-scontaminated materials. The EPA also has requirements on this activity.
LLA 000116
W'e recommend the primary responsibility for implementation of the required program as detailed in the attached instruction will reside with the 3uilding Engineering Group at BOC Headquarters. As such, a coordin ator in this organization must be identified. In addition, Building Engineering must work closely with appropriate Medical, Safety, Environ mental -nd Building Operations Force representatives. The Building Operations Force supervisor responsible for effecced buildings will ultimately be responsible for the day-to-day procedures that are re quired. It is strongly recommended that implementation of these guidelines be initiated immediately.
The resource impact of this letter on Che 3e11 System is escima ted as follows
Ca p i t a 1
Signage Air Sample Test Kit Respirators
To t a 1 Capital
Si 0,000 10,000 ($500 per kit) L0,000 (S 10 per cartridge type)
S30.000
Expense
. Bulk Sacple Analysis by (Xitside Laboratories
. Air Sample Analysis by Outside Laboratories Total Expense
$10,000 l $2 5 to $50 per sample)
50,000 ($300 to $500 per sample) $60,000
Revenue Change
No revenue impact
Force Changes
No additional manpower required, however, certain Building Engineering, Building Operations, Medical and Safety personnel must include this accivity with their ocher responsibilities.
In addition to Che above impacc, there may be situations where the sprayed-on asbestos must be removed, contained or encapsulated. It is anticipated thac this will occur only in areas which are to be renovatec or remodeled. The cost for Chese activities Abased on current prices! per square foot of floor area renovated is estimated as follows:
Remova1 Enc apsulation Cone a i-.merit
S6 per sq. ft. $L per s q . it. $3 per sq. it. '.for painting) $6 pe r s q . ft. 1 i:r structural enclosing
LLA 000117
The name of the BOC coordinator should be forwarded to N. J. DeCapua, AT&T, 222 Mount Airy Roid, Basking Ridge, NJ by Sept. 1, 1900. In addition, it is recommended chat the coordinator consult with Mr. DeCapua on (201) 221-4984 so that maximum benefit can be obtained from the experience gained by AT&T and BTL efforts to dace.
S. R. Colas Assistant Vice Presid Support Services
LLA 000113
Attachment
Guidelines for Soraved-Cn Asbes;os In Companv-owned and Leased Buildings
Genera l
The following guidelines are Co be used m conjunction wicu Cne general program outlined in an SR Co be issued shortly, "3dCupa c lon.a l Health and Safety - Exposure to Airborne Asbestos Fibers," m complying with CSHA standards pertaining to 3ell System-owned and leased Ouildings which have spraved-on asbestos used for fire protection an :.cr eat insulation.
OHSA Asbestos Standard 1910.1001 (July 1, l37o
The eight hour time weighted average (TVA) airborne concencracions of asbescos fibers Co which any employee nay be exposed shall not exceed t-c fibers, longer than 5 micrornecers , per cubic cent.meter of air. In addicion, no employee shall be exposed at a^v time to airoorne concentrations of asbestos fibers in excess :: .; risers. longer fa- 3 micrometers , oer cubic centimeter of air. Medici. jr.-.. . I lance is required if employees are exposed to .1 fiber, re- cob.: cent;meter i3 hc^ra TWA) or greater.
Confirmation of Asoestos
SR - 79-05 - 398 requested tnat Cne 30Cs perform a : cm;r c'insive survev to identify alL owned and leased buildings w.oicn aoparently contain sprayed-on asbestos. A summary of cne System results is shown as Appendix A. It was noc necessary to confirm, the asbestos with a bulk sample test as part of the survey, however, a n_-ter of companies nave performed Chis testing.
As part of the steps required for compliance with the asoestos standard,
it will be necessary (in each facility identified as apparently having
sprayed-on asbestos) to perform a bulk sample test for confirmation that
che material is or is not asbescos. If c.-.e test menaces asbescos, c.nen
an ambienc air test must also be performed. Suer, amoient air tests will
determine the level of airborne asbestos m the area on an S-hr TV A
basis. The ambient air tests should be made m areas wnere the asbestos
exiscs ana is in an undisturbed state, i . e . , no one is working on the
asoestos. If the material exists throughout the building, several
typical locations should be identified and an amoient air test made in
each location. It is extremely important that tne ambient samples as
well as the bulk be analyzed ay qualified 1 a bora:ories approved ov
S' 105 ri . see S ?. to be issued shortly, "Occupational - e a . t " and s a t e t y -
Exposure to Airborne Asoestos Fibers, " for a
o: b u 1 : sanp.-e
and amoient air sj-pie testing.
Th e rbectiies or : - e o - . s am o 1 a- a r.r, .
: . - : - : - o'c
7: estan..s
Perm
i o e n 11 f i e d t e x i s
ii roar o : > .re .
LLA 000119
2. To confirm thac ambient levels are not above che GSHA standard. Numerous 3TL cescs have indicated chat chis will be Che normal case. If, however, a situation occurs where ambient levels in an undisturbed environment are above OSHA standards, and chis is corroborated with additional testing, Chen it is necessary Co impleraenc some type of engineering controls. These controls may be one of che following:
. Enclosure of Che material - this may be achieved wich a dropped ceiling.
Sealing of the material - this can be acmeved by spraying an additional materiaL over che sprayed-on asbestos. Presently, chere are a number of different cypes of sealants available for chis purpose including latex paints, vinyl or bucyl polymers, plaster emulsions, epoxy materials and inorganic silicates.
Removal of che material - this activity should be avoided, if at all possible, due to the disturbance of wor* activity as a resulc of che extremely nigh levels of airoorne asbescos that are generated in the removal, and the need to replace the material with ocher building proCucts to achieve the original objective of the asbescos. If it is not possible to avoid removal Chen the appropriate procedures outlined below muse be followed.
Before any of the above engineering controls are implemented, a case by case feasibility study must be made and individual situations discussed with the Real Estate Management Group at AT&T.
Follow-up Measurements
It is recommended that follow-up ambient air tests be performed every five years co assure chat asbestos deterioration has noc occurred co the point where levels are above OS .HA standards.
Labe 1ing/Ident11itat ion of Areas with Sprayed-on Asbestos
Compliance wich che OSHA standard also requires thac eicher Caution labels be employed to idencify the sprayed-on asbescos material or engineering controls be employed as described above under Objective 2. The label should be approximately 6" x 3" with red lettering and shall state
This
Caution Area Con tains Asbestos Materials
Avoid Creating Oust 3reatmng Asoestos May Cause
Serious oocilv Harm
Ac leas:
label shall be preen net: l y located m each area .-here
exposed sprayed -
asbestos exiscs so cha; anyone working in the srea
will be alerced to the potential hazard. ?Foor ur.sxposed areas, sum as
hung ceilings, Che label should be locaced m a central control point so
that the people who would have Che need to enter these areas would be
.cade aware of the asbescos and its location. This area may be Che
building maintenance office or a similar location. It may also be
desirable to provide a wall-mounted drawing m c'he building manager's
office illustrating asbestos covered areas m Che building.
Work Procedures
In all buildings identified as having sprayec-cn asbescos every effort should be made to avoid work procedures wmch resulc in disruption of the asbescos material and the resultant release o : fioers into the air. Pre liminary data has indicated that for routine worn operations which no no: require the removal or displacement of anv sprayed-on asbescos, exposure levels are well below those permitted bv tne current OSHA standard. 1 n chose cases where some handling of me materia1. is necessary the soraved-on asbestos should oe worked m a -,o i s t-mec state , .on s s 1: 1 e
if it is not possible to avoid work proceuures which result m a significant disruption of tne sprayed-on materia! then protective c lathing and respirators must be employed during the work procedures. See SR to be issued shortly "Occupac lonal health and Safety - Exposure to Airborne Asoestos Fibers" tor a discussion or protective clothing and tne CSriA requirements for respirator protect.on. Cf particular concern are exposures to employees who work within hung ceilings, doing such work operations as installing or removing telephone cables and electrical wiring, or working on building equipment.
The above work procedure modification must be achieved chrough meecir.gs witn employees m the Duildir.g and by posting such a policy in appropriate central won locations ir. the ouilding. Before engaging in any wor* procedures whicr. may disturb spra..ed-or asbescos, employees must contact the Building Operations Control Center ,30CO, if implemented m that Company, or Che individual in that build-.-? n is responsible tor implementing Chese guidelines.
In addition co employee activity, it is also important rhjc any contractor engaged m ucrx activities wr.ich m.ignt disrupc the asbescos material be mforaid that chey must comply witn these procedures.
Remodeling or Renov3C:o- Activites
Remodeling or renovation work ir. areas -itn sprayec-wn asbestos poses tne greatest asoescos hazard in Bell System buildings arc mav require .tne removal, sealing or enc.ti.re of the asoost-s. As s.c, it will be r.ecessarv do fully protect all emcloyees t . i sol a:.~. g tne work area ::r the rj,: of the facility, and mciv.tori-g to:'-, t-s.ee and outside Chr -or-:
LLA 000121
areas. Workers should wear appropriate protective clothing and respirators, and the area should be cleaned after the renovations with wet methods. Remeasurement of ambient levels should be performed co ascertain that they are below OSHA standards. In contracting remodeling and renovation work, specific guidelines must be established and included in the specification for bidding by outside contractors. It is extremely important to recognize that asbestos removal activities are complex and not routine to most building contractors. As such the BOCs must be assured chat any contractor who will perform this work has experience in asbescos removal. Section 61.22(d) "Demolition and Renovation" of the EPA's National Emission Standard for Asbestos details federal requirements for these accivic.es and is attached as Appendix B. Waste Disposal All asbescos scrap and debris must be collected and disposed of m accordance with EPA requirements. Section 61.22(j) of the EPA's National Emission Scandard for Asbescos details Che federal requirements for asbescos waste disposal and is attached as Appendix C. However, some states may have cheir own laws regarding disposal and Companies are advised Co check with the EPA Stace Waste Management Agencies for compliance with local disposal regulations.
LLA 000122
PNB Wisconsin NJ NY Southern Ohio NUB SNET Michigan Mountain Sout huestern New England C& P Pacific Illinois South Central* Cincinnati Bell of Pa. Indiana Long Lines BTL 195 Broadway BSCTE
TOTALS
RESULTS OF ASBESTOS SURVEY
Owned
Total W/Asbes cos
696 320 388 1001 1302 404 2469 200 483 1868 4458 812 839 1020 240 1284
70 6 74 298 4300
26 19
0
4 8 13 15 3 0 6 l 3 4 4 3
s 9 3 l 0 6 0 2 3 12 _0
23,199
108
Leased
To cal W/Asbes cos
254 72
n -i ^
357 622 231 303
54 317 438 568 347 363 649 195 561
19 325
64 too
2 41
2
1 0 6 26 5 4 0 4 0 5 1 3 8 9 0 0 0 3 0 7 1 19 _1_
6108
108
* Not including Louisiana
LLA 000123
ENVIRONMENTAL PROTECTION AGENCIES REQUIREMENTS NATIONAL EMISSION STANDARD -OR AS3ESTOS 61.22(d) - "Demo 11 Cion and Renavacion"
The requirements of this paragraph shall apply Co any owner or operacor of a demolition or renovacion operacion who incends Co demolish any insticucional, commercial, or industrial building (including aparCmenc buildings having more chan four dwelling unics), sCrucCure, facilicy, insCallaCion, or porcion chereof which conCains any pipe, ducc, boiler, tank, reacCor, turbine, furnace, or sCrucCural member thac is covered or coated with friable asbestos materials, except as provided in paragraph (d)(1) of this section; or who incends to renovate any institutional, consnercial, or industrial building, structure, facility, installation, or portion thereof where more than 80 meters (ca. 260 feet) of pipe covered or coated wich friable asbestos materials are stripped or removed, or more chan 15 square meters, (ca. 160 square feet) of friable asbestos materials used to cover or coac any ducc, boLler, tank, reactor, turbine, furnace, or structural member are stripped or removed.
(1) (i)
The owner or operator of a demolition operation is exenpced from Che requirements of this paragraph: Provided, (A) The amount of friable asbestos materials in the building or portion thereof to be demolished is less than 80 meters (ca. 260 feet) used on pipes, and less than 15 square meters (ca. 160 square feet) used on any duct, boiler, tank, reactor, turbine, furnace, or structural member, and 13/ cne notificadon requirements of paragraph (d)(LK li) are met.
(li)
Wriccen notification shall be postmarked or delivered Co che Administrator a: least 20 days prioc to commencement of demolition and shall include che information required by paragraphs (d)(2) of this seccion, with the exception of the information required by paragraphs (d)(2) Ini), !vi), (vii), (viii), and (ix) of this section, and shaLl scate che measured or estimated amount of friable asbestos materials which is present. Techniques of estimation shall be explained.
L3 PR 26372, June 19, 1973
(2) Wriccen notice of intention to demolish or renovate shall be provided to the Administrator by the owner or operacor ot the demolition or renovation operation. Such notice shall be postmarked or delivered to the Administrator at least 10 days prior to commencement of demolition, or as early as possible prior to commencement of emergency demolition subject to paragrapn i o 1 ( o: of t'n.s section, arid as early as possible prior co commencement ot renovation. Sum notice shall include t"u following it forma:.;-.
LLA 000124
(i) Same of owner or operator.
(ii) Address of owner or operator.
(iii)
Description of Che building, structure, facility, or installation to be demolished or renovaced, including che lire, age, and prior use of Che atructure, and the approximate amount of friaole asbestos materials present.
A3 FR 26372, June 19, 1978
(iv) Address or location of the building, structure, facility, or installation .
(v) Scheduled scarcing and completion dates of demolition or renovat ion .
(vi) Nature of planned demolition or renovacion and method(s) to be emp loyed.
(vii ) Procedures Co be employed to meet Che requirements of this paragraph and paragraph (j) of this section.
(v n i ) The name and address or location of che waste disposal site where the friable asbestos waste will be deposited.
(i.x)
Name, title, and authority of the State or local governmental representative who has ordered a demolition which is subject to paragraph (d)(6) of this section.
(3) (i)
For purposes of determining whether a planned renovating operation constitutes a renovation within the meaning of paragraph, Che amount of friable asbestos material to be or stripped shall be.
this removed
(A) For planned renovating operations involving individually non-scheduled operations, che additive amount of friable asbestos material that can be predicted will be removed or stripped at a source over the maximum period of time for which a prediction can be made. The period shall be not less than 30 days and not longer than one year.
(B) For eac'' planned renovating operation noc covered by paragracn (d ) ( 3 ) ( i ) (A ) , the cotal amount of friable asbestos material chat can be predicted will be removed or stripped at a source.
(n>
For purposes of determining whether an emergency renovating operation constitutes a renovation within che meaning of this paragraph, the amount of friable asbestos material to be removed or stripped shall be the Cotal amount of friable asbestos macenal that will be removed or scripped as a result of the sudden, unexpected evenc that necessitated Che renovacion.
LLA 000125
(,.) The following procedures shall be used co prevent emissions of particulate asbestos material to outside air:
(i) Friable asbestos materials, used on any pipe, duct, boiler, tank, reactor, turbine, furnace, or structural member, shall be removed froei any building, structure, facility or installation subjecc to this paragraph. Such removal shall occur before wrecking or dismantling of any portion of such building, structure, facilicy, or installation that would break up the friable asbestos materials and before wrecking or dismantling of any other portion of such building, structure,' facility, or in stallation, that would preclude access to such materials for subsequent removal. Removal of friable asbestos materials useJ on any pipe, duct, or structural member which are encased in concrete or other similar structural material is not required pridr Co demolition, but such materials shall be adequately wecced whenever exposed during demolition.
(li)
Friable asbestos materials used on pipes, ducts, boilers, tanks, reacCors, turbines, furnaces, or structural members shall be adequately wetted during stripping except as provided in paragraphs (dHO(iv), (d)(c*)(vi), or (d)(vii) of this section.
(iii)
Pipes, ducts, boilers, tanks, reactors, turbines, furnaces, or structural members chat are covered or coated with friable asbestos materials may be taken out of any building, structure, facilicy, or installation subject Co this paragraph as unics or in sections provided the friable asbestos materials exposed during cutting or disjoining are adequately uected during the cutting or disjoining operation. Such unics shall noc be dropped or thrown to the ground, but shall be carefully lowered to ground level.
(iv)
The stripping of friable asbescos materials used on any pipe, duct, boiler, tank, reactor, turbine, furnace, or structural member chac has been removed as a unic or in sections as provided in paragraph (d)(4)(iii) of this section shall be performed in accordance with paragraph (d)(4)(ii) of this section. Rather Chan comply with the wetting requirement, a local exhaust ventilation and collection system may be used co prevenc emissions to the oucside air. Such local exhaust vencilation systems shalL be designed and operated to capture the asbescos particulate matter produced by the stripping of friable asbestos maceriaLs. There shall be no visibLe emissions co Che outside air from such local exhaust ventilation and collection systems except as provided in paragraph () of this sect ion.
9 3F3. 26372, June 19, 1973
(v) All friable asbestos materials chac have been removed or stripped shall be adequacelv vetted to ensure that such materials remain vet during all remaining stages of demolition or renovation and related handling operations. Such materials shall not be dropped or thrown co the ground or a lover floor. Such materials that have been removed or acripped more than 50 feet above ground level, except Chose materials removed as units or in sections, shall be transported Co Che ground via dust-tight chutes or containers.
(vi) Excepc as specified below, Che vetting requirements of this paragraph are suspended vhen che temperature ac the point of vetting is belov 0C (32F). When fnable asbestos materials are noc vetted due to freezing cemperacures, such materials on pipes, ducts, boilers, tanks, reaccors, turbines, furnaces, or structural members shall, to che maximum excenc possible, be removed as units or in sections prior to vrecking. In no case shall Che requirements of paragraphs (d)(i)(iv) or (d)(i)(v) be suspended due Co freezing temperatures.
(vn)
For renovation operations, local exhaust ventilation ar.d collection systems may be used instead of wetting as specified in paragrapn IdKAHii), to prevent emissions of particulate asbestos material Co outside air vhen damage co equLpaenC resulting from che vetting 'would be unavoidable. Upon requesc and supply of adequace in formacion, Che Adnimscracor vill decermine vhecher daoage Co equipment resulting from wetting co comply with Che provisions of this paragraph would be unavoidable. Such local exhaust ventilation systems shall be designed and operated to capcure the asbestos particulate natter produced by che scripping and removal of friable asbescos material. There shall be no visible emissions Co Che outside air from such local exhaust ventilation and collection sysCems, excepc as provided in paragraph (f) of this seccion.
(5) Sources subject Co chis paragraph are exempt froa Che requirements of 61.05(a), 61.07, and 61.09.
(6) The demolition of a building, structure, facility, or installation, pursuant to an order of an authorized representative of a State or local governmental agency, issued because chac building is structurally unsound and in danger of imminent collapse is exempt from all but the following requirements of paragraph (d) of this section:
(i) The notification requirements specified by paragrapn 1 d ) (2 ) of chis seccion,
In)
The requirements on stripping of triaole asoestos materials fro
previously removed units or sections as specifier in paragraph
l l)i
i of this settlor.,
( i v i. >
The wetting, as specified by paragraph (dK4)(v) of this section, of friable asbestos materials that have been removed or stripped;
(iv)
The portion of the structure being demolished that contains friable asbestos materials shall be adequately wetced during the wrecking operation.
39 FR 15936, May 3, 1974; 40 FR 45292, Occober 14, 1975
LLA 000128
ENVIRONMENTAL PROTECTION AGENCY REQUIREMENTS NATIONAL EMISSIONS STANDARD FOR ASBESTOS 61.22( j ) WASTE DISPOSAL
Waste disposal for manufacturing, fabricating, demolition, renovation and spraying operations: The owner or operator of any source covered under the provisions of paragraphs (c), (d), (e), or (h) of this section shall cieet the following standards:
(1) There shall be no visible emissions to the outside air except as provided in paragraph (j)(3) of this section, during the collection; processing, including incineration; packaging; transporting; or deposition of any asbestos-containing wasce material which is generated by such source.
(2) All asbestos-containing wasce material shall be deposited at waste disposal sites which are operated :n accordance with the provisions of 61.25.
v3) Rather than meet the requirement of paragraph (j)(l) of this section, an owner or operator may elect to use either of the disposal methods specified under (j)(3)(i) and (ii) of chis section, or an alternative disposal method which has received prior approval by the Administrator:
(i) Treatment of abestos-containing waste material with water: (A) Control device asbestos waste shall be thoroughly mixed with water into a slurry and other asbestos-containing waste material shall be adequately wetted. There shall be no visiole emissions to the outside air from the collection, mixing and wetting operations, exceot as provided in paragraph (f) of this section. 13) After wetting, all ashes tos-cor, ta imng waste material shall be sealed into leak-tight containers while wet, and such containers shall be deposited at waste disposal sites which are operated in accordance with the provisions of 61.25.
LLA 000129
(C) the container* specified under paragraph (j)(3)(iM3) of this section shall be labeled with a warning label that states: Caution Contain* Asbestos Avoid Opening or Breaking Container Breathing Asbestos is Hazardous to Your Health Alternatively, warning label* specified by Occupational Safety and Health Standards of Che Departnent of Labor, Occupational Safety and Health Administration (OSHA) under 29 CFR 1910-93a(g)(2) (ii) may be used.
(ii) Processing of asbescos-containing waste material into non-friable forms: (A) All asbestos-concaining waste material shall be formed ;nto non-friable pellets or ocher shapes and deposited at waste disposal sices which are operated m accordance with the provisions of 61.25. (3) There shall be no visible emissions to the outside air from Che collection ana processing of asoes cos -containing wasce raacerial, except as specified in paragraph (f) of this section.
U) For the purpose of this paragraph Cj) , che term all asbestos-containing waste macerial as applied to demolition and renovation operations covered by paragraph (d) of this section includes only friable asbestos waste and control device asbestos waste.
LLA OC