INTEROFFICE CORRESPONDENCE
GAF Corporation
PLAINTIFF'S EXHIBIT GF-1026
TO LOCATION
FROM LOCATION
SUBJECT
j
Mr. P. E. Teague St. Louis
R. C. Hylan Corporate Environmental Engineering Linden
ST. LOUIS ASBESTOS SURVEY NO. 10
date December 18, 1972
Mr. P. S. Bettoli Mr. C. F. Bien Mr. J. J. Butler Mr. T. A. Dent Mr. L. J. Faneuf Mr. W. Fassuliotis Mr. J. B. H. Fitzwilliam Mr. W. E. Greig Mr. E, C. Gutzwiller Mr. J. G. Hall Mr. H. J. Holloway Mr. D. W. Honza Mr. D. L. Johnson Mr. H. B. Johnson Mr. H. R. Kuhlken Mr. B. Latuchie Mr. W. H. Page Mr. A. M. Sobkowicz Mr. S. J. Stempien----Mr. P. I. Weiner EED Files
Three all day asbestos samples were taken by St. Louis personnel and submitted to EED for counting. The results are summarized below:
Sample Identification
Fibers/cc
SL-63A-63B Operator Reliefman - No. 7 Line
0.17
SL-64A-64B Machine Tender - No. 7 Line
0.26
SL-65A-65B Machine Tender - No. 1 Line
0.23.
In order to reconcile the results of the all day samples with those obtained from the one hour samples on the same operation it will be necessary to have some idea of the operator's movements during the eight hour sampling period. Therefore, on future all day samples, please indicate the move ments of the employee with particular emphasis on the time spent on the operation being sampled.
If you have any questions about the above results, please let us know.
rg
Attach.
R. C. Hylan