CHAPTER 70
1962 Guide And Data Book
before rising to the condenser. This minimizes the possibility that refrigerant, condensed in the line on off cycles, will drain back to fixe head of the compressor. Any oil traveling up the pipe wall also will not drain back to the head of the com pressor.
The loop in the hot gas line, shown in Fig. 11, will serve as a reservoir and trap liquid resulting from condensation in the line during shutdown.
Hot gas lines discharging straight across to a condenser
CONDENSER TO RECEIVER PIPING
liquid receivers are usually lnwH in systems having evan. orative or air-cooled condensers, and also with water-coo}^
condensers where additional liquid storage capacity Is needed to pump the system down. In many water-cooled condenser systems, however, the condenser also serves as the receiver if the total refrigerant charge in the system does not exceed \u storage capacity.
When receivers are used it is necessary that liquid pipiofrom the condenser to the receiver be designed to allow free drainage of liquid from the condenser at all times. For this to happen, the pressure in the receiver, in relation to the presu^ in the condenser, must not be allowed to rise to the point where a restriction in flow can occur.
liquid flow from the condenser to receiver can be restricted by any of tiie following:
1. Gas binding of the receiver. 2. Excessive friction drop in the condensate line. 3. Incorrect condensate line design. 4. Condenseroutlet to receiver inlet relationship.
immediately adjacent to the compressor will not require ttiia loop at the compressor.
Whenever the condenser and receiver are located where the ambient temperature can be higher th.n that of the com pressor, a check valve is sometimes installed in the hot gas line near the condenser. This valve prevents refrigerant from boiling off in the condenser or receiver and condensing in the cooler hot gas line or on the compressor heads during off cycles..
A purge valve should be installed at the high point in hot gas lines to facilitate the releasing of non-condensable gases. Purging at this point should be conducted only after the system has been shut down for a short time to allow the non-condensables to gather there.
Gas Binding at Receiver
liquid piping between the condenser and receiver be designed to prevent liquid hold-up in the condenser due to a gas-bound receiver.
Gas binding usually occurs when the receiver ambient temperature is above condensing temperature, and may hap pen as the result of any of several conditions:
1. On evaporative condensers: o. Where low prevailing wet-bulb temperatures resuit in low condensing temperatures. b. Where they are oversized for dry-coil operation. e. Where no provision is made to control the supply air automatically at partial load operation.
2. On water-cooled condensers: . Where the low.water supply temperature makes it eco nomical to design for low condensing temperatures. . Where no provision is made to control the now of water automatically, particularly at partial load operation.
3. On receivers where it is necessary to inwtAll them in ab normally warm locations.
In whichever, way it occurs, the existence of a condensing temperature lower than receiver ambient temperature mprw that the liquid inside the receiver is colder than the outside of
Hot Gas Mufflers
Mufflers may. be installed in hot gas lines to dampen the
discharge gas pulsations and thus reduce vibration in the piping system.
noise
The proper location of a muffler is in a horizontal or down
comer portion of the hot gas line, immediately after leaving
the compressor. It should never be installed in a riser.
Gas velocities through the muffler are substantially lower
than in the hot gas line itself and the muffler may form an
oil trap if installed in a riser or in a horizontal line in such a
manner that it does not drain oil at the outlet.
fig. 12 .... Shell-and-Tube Condenser to Receiver Piping (Through-Type Receiver)*
Refrigerant Piping Systems for Refrigerants 12, 22 and 500
745
static liquid build-up to.overcome the pressure drop through the valve will not build up in the condenser. When a shut off valve is located in a horizontal line, it should be positioned with the valve stem in a horizontal position so it will not form a liquid trap. Where an external equalizer (vent) line is de sired it should be run from the top of the receiver to the top
of the condenser, similar to fig. 13. fig. 13 shows piping at a shell-and-tube condenser and a
bottom inlet (surge type) receiver. An equalizing line is re quired in this arrangement to prevent a build-up of receiver pressure, beyond condensing pressure, by relieving any flash gas back to the top of the condenser. Table 1 lists equalizer
line sizes for various tonnage ranges. The liquid drain line from the condenser to a bottom inlet
type receiver, or a top inlet receiver that is equalised,back to the condenser, should never be sized so that the velocity of the liquid through it at full load exceeds 150 fpm. There should always be an elevation difference of at least 12 in. be tween the bottom of the condenser and the top of the receiver to allow height for enough static head of liquid to offset the friction pressure drop in the liquid tine between the two qhftlltt. When a vidve is located in this line the height may have to be increased as indicated in the table in fig. 13 unless the line is sized for a liquid velocity below 100 fpm.
receiver).
fig.13 .... Shell-and-Tube Condenser to Receiver Piping (Surge-Type Receiver)*
the receiver shell, thus causing heatleakage into the receiver. This, in turn, causes a portion of the liquid in the receiver to evaporate. If no provision is made to vent this gas back into tiie condenser, the receiver, becomes gas-bound.
The following piping recommendations are made to over come these difficulties.
SHELL-AND-TUBE CONDENSER TO RECEIVER PIPING
Single Condenser
Tig. 12 shows piping at a shell-and-tube condenser with a free draining liquid line to a top inlet high pressure receiver. With a free draining liquid line, having a liquid velocity at full load not exceeding 100 fpm, an external equalizer is not necessary. Any gas generated in the receiver can return back up the large condensate line to the condenser without re stricting the flow of condensate leaving the-condenser. Any horizontal run in this Imp, should be pitched in the direction of the receiver at a slope of at least K in* per ft. A shut-off valve located between the condenser and receiver should be located at least 8 in. below the condenser outlet so that any
Multiple Condensers
When two or more shell-and-tube type condensers are mounted in parallel in a single system they can be arranged' as shown in either fig. 14 or 15, depending upon the height available.
The liquid drain tinea between the condenser outlets and receiver inlet should be sized for a liquid.flow velocity not greater than 150 fpm, preferably 100 fpm. The elevation difference between the outlet of the condenser and inlet of the receiver in fig. 14 or top of liquid level in fig. 15 must be at least 12 in., and preferably greater (see table in fig. 13).
An equalizer line is shown from the top of the receiver to the top of the condensers, in each case, to prevent liquid hold up in one of the condensers..
A purge valve should always be located in the top of each wmHpngpr for removing noncondensables from the system.
EVAPORATIVE CONDENSER TO
RECEIVER PIPING
liquid receivers are used on all evaporative condenser sys tems to accommodate fluctuations in refrigerant charge at thtg point. Proper attention must be given to the condensate piping so that the receiver is always equalized back to some part of the condenser for the relieving-of any. gas pressure tending-to^develop in the receiver. Otherwise liquid hang-up can occur in the condenser due to restriction of free drainage, caused by this gas pressure building up in the receiver.
The receiver can be vented directly back through the con-
Toble 1 ..., Equalizer Line Sizes*
Equalizer Line Size (Nominal Pipe Size) fa.
M&x Tons--Refrigerant 12 Max Tons--Refrigerant 22
Vt
I
IK IW
2