Document 853BJ7Kxp4dRJ838QQaOzNwBB

PLAINTIFF'S EXHIBIT CONTRACT NO. ENG-130 between STANDARD OH. COMPANY OF TEXAS and for a FLUID CAmmc CRACKING UNIT EL PASO REFINERT, EL PASO, TEXAS March 30, 1955 CHEV BB 0010142 518 RV.2) INDEX : CONTRACT No. ENa-130 13,500 spd rara OTAcma unit STANDARD OH. COMPANY 0? TEXAS EL PASO, TEXAS SUBJECT ': ' 1.0 PERFORMANCE OF THE WORK .' 1.1 Scope 1.2 Specifications and Standards 1.3 Procurement of Material 1.4 Construction 1.41 Tools 1.42 Field Labor 1.43 Supervision ' . 1.44 Petroleum Products 1.45 Independent Contractor 2.0 COMPENSATION 2.1 "Coat of the Work" , 2.11 Contractor'o Home Office Costs 2.12 Contractor's Field Costs 2.2 "Gusrantedd Maximum Cost" . 2.3 "Fixed Fee" . 2,31 Overhead and Profit 2.32 Field Construction Overhead 2.33 Construction Equipment and Tools 2.34 Permits and Taxes 2.35 Insurance 2.4 Adjustments . 2.41 Changes in Scope 2.42 Overtime . 2.43 Taxes , " 2.44 Other Adjustments 2.5 Terms of Payment 2.51 "Cost of the Work" . . 2.52 "Fixed Fee" . . 2.53 Final Payment 3.0 CONTRACT TIME . 3.1 Diligent Procedure 3.2 Fores Mojeure 3.3 Dosages Due to Delays 4.0 INSPECTION, CONDEMNATION, CANCELLATION 4.1 Inspection 4.2 Condemnation 4.3 Taking Over and Stopping Work PAPE NO. ' z 2 2 2 2 3 3 4 4 4 4. 4 5 7 8. 8 9 9 ' 10 10 .10 10 12 13 . 13 14 l4 15 15 , 15 15 15 16 16 16 16 )( S18HV-2I CHEV BB 0010143 .' ' .. SUBJECT 5.0 LiABiLimr -s- '. .. Damage) 5.2' liability for COMPANY Property 5*3. Liability for the Work Hereunder 5.4 Employer's Liability 5.5 Liens 5.6 Patent Rights 6.0 INSURANCE 6.1 Insurance Required 6.2 Evidence of Insurance 7.0 GENERAL PROVISIONS ,: 7.1 Assignment 7.2 Waiver 7.3 Entire Agreement 7.k Addresses . / . ' PACE MO. .it 17 18 18 18 18 . 15 19 19 19 19 i9 20 20 5 1 8 RV.2J CHEV BB 0010144 Contract No. UNO-130 Page 1 of 20 CONTRACT STANDARD OIL COMPANY OP TEXAS, COMPANY, and _' CONTRACTOR, hereby mutually agree on ' , that CQNT&ACloR shall perform for COMPANY the work of designing, furnishing material for, and orocting at COMPANY'S Plant Site at El Paso Texas, a 13,500 BPOD Fresh Feed Fluid Catalytic Cracking Unit in accordance with COMPANY'S Specifi cation No- E-l455i dated March 30, 1956, as detailed and amplified by CONTRACTOR'S Proposal Specification dated ': and CONTRACTOR'S Supplementary Proposal, daied , all of " the aforementioned being hereinafter referred to as the '`specification," all in accordance with the TERMS AND CONDITIONS hereof, Pages 2 to inclusive, which together with the Specifications and Exhibits above listed arc part of this contract. COMPANY shall pay CONTRACTOR, in accordance with the TERMS AND CONDITIONS hereof, a total compensation of the sum of the follovirg amounts: a. A "FIXED FEE" of: ____________________________ .($______ _______ ) b. Tie "COST OF THE WORK" but not to exceed a "GUARANTEED MAXIMUM COST" of ($) c. Twenty-five por cent (25$) of the amount, if any, by which the "GUARANTEED MAXIMUM COST" exceeds the "COST OF THE WORK," all as defined and adjusted in accordance with the "TERMS AND CONDITIONS," Pages 2 to inclusive, hereof. CONTRACTOR shall commence work immediately, complete the various portions thsreof in accordance with the "Schedule," Exhibit A hereof, and complete the entire plant.ready to start operation by or before ' . (Seal) STANDARD OIL COMPANY OF TEXAS By______________________________ And ___________________ . (Seal) By_ And fz-AH STS CHEV Contract Bo. ENQ-130 Page 2 of 20 TOMS AND CONDITIONS 1.0 PERFORMANCE Of THE WORK 1.1. CONTRACTOR shall supply or causa to he supplied, all materials, equipment, machinery, tools, apparatus and supplies, and perform, or cause to he performed all work pertaining to the mechanical design, preparation of working and record drawings and specifi cations, engineering and field construction in its entirety, of a 13,500 BPOD Fresh Feed Fluid Catalytic Cracking Unit, herein after called the Plant, at COMPANY'S site at El Paso, Texas. This work shall he performed aa prescribed in Specification No. E-ll+55, dated March 30, 1956, entitled "Catalytic Cracking ' Unit #2, Standard Oil Company of Texas, El Paso, Texas," which specification is a part of this agreement. 1.2 Specification and Standards CONTRACTOR shall design the Plant in accordance with (a) Specification E-ll55 and such additional drawings, standards, and explanations as COMPANY shall furnish to CONTRACTOR to : detail and illustrate the work to he done, and (b) the standards prescribed by law or by any body having the right to prescribe the minimum standards. 1.3 Procurement of Material . CONTRACTOR shall purchase and furnish all new materials and new equipment to be supplied by CONTRACTOR for the Plant. In general, all purchases Bhull be based upon competitive bids. l.k Construction l.kl Construction Tools CONTRACTOR shall furnish or cause to be furniBhed all construction tools and equipment to be used in the con struction of the Plant. CONTRACTOR shall be free to determine the quantity, type, and size of such tools and equipment which, CONTRACTOR feels are necessary to properly prosecute the work hereunder and whether to furnish his own tools for the work or to rent tools from others. All construction tools and equipment owned and furnished by CONTRACTOR shall remain CONTRACTOR'S property and all tools and equipment, including rented tools and equipment, shall be removed by CONTRACTOR upon completion of. the work. CHEV Contract No. EN0-130 Pago 3 of 20 . 1.42 Field Labor 1.421 . To tho extent that It Is practicable and con sistent with the timely ond efficient performance of this contract, all labor employed by CONTRACTOR at the site of construction shall be obtained from that available in tho vicinity of the work to tJ done and shall be paid the standard wage rates provailing in that locality for the reopoctive classes of labor involved. 1.422 CONTRACTOR reserves the right of hiring and dis charging; of designating the classification of work for each employee; of shop or field fabricating pipe or other material in accordance with his beat judgment. 1.423 COMPANY reserves the right to participate in the determination of size and composition of the field labor and field supervisory forces for timely and efficient prosecution of tho work. 1.424- In the work, or uny part or ports of it, CONTRACTOR may at its discretion cause any of CONTRACTOR'S employees, subcontractors, or subcontractor's employees to work such occasional overtime as the CONTRACTOR deems practicable for the proper execution of the work, it being that Buch overtime work shall not increase the "Guaranteed Maximum Coot" of the work. Any continued variation of the normal work week that involves premium, time will not be made without previous discussion with ond approval by COMPANY. 1.425 CONTRACTOR shall take all reasonable precaution to oosuro that labor employed by it and its sub contractors on the premises of COMPANY shall comply with COMPANY'S personnel and safety regulations. CONTRACTOR shall use all reasonable efforts to prevent lobor disputes that would interfere in any way with the business of COMPANY. 1.43 Supervision and Inspection CONTRACTOR shall provide competent personnel to supervise tho construction work hereunder, including creft inspection and the performance of all tests required hereunder. 518 RV.2} CHEV BB 0010147 Contract Ho. EN0-13.0 Page 4 of 20 l.* Petroleum Products '' CONTRACTOR shall use only such petroleum products as are manufactured or marketed hy COMPANY or Its designated corporate afilllatos in performing the field work and in the operation of vehicles and other equipment operated hy CONTRACTOR or his subcontractors in connection with the field work. ' . 1,1*5 Independent Contractor CONTRACTOR shall he an independent contractor maintaining complete control over CONTRACTOR'S men and operations. . , Neither CONTRACTOR, nor his subcontractors, nor the employees of either, shall he deemed to he the servants, employees, or agents of COMPANY. 2.0 COMPENSATION . COMPANY shall pay CONTRACTOR (a) the actual "Cost of the Work" as defined in Section 2.1 helow hut not to exceed the "Guaranteed Maximum Cost" aa defined in Section 2.2 helow, plus (h) Twenty-five (25%) per cent of any amount hy which the "Guaranteed Maximum COBt" exceeds the "Cost of the Work" plus, (c) a "Fixed Fee" as defined in Section 2.3 helow. 2.1 Cost of the Work "Cost of the Work" shall comprise the sura of the following items: 2.11 CONTRACTOR'S Home Office Costs .. 2.111 Engineering and Crafting , The salaries and wages of CONTRACTOR'S engineers, . ' designers, and draftsmen, material take-off and ' control men, and other technical engineering ' personnel directly engaged in the preparation of estimates, drawings, billc of material, hid summaries, specifications and descriptive reports, required for the work hereunder. . . - 2.112 Expediting and Inspecting Tho salaries, wages, and authorized' expenses of CON TRACTOR'S inspectors and physical expeditors, for the actual time devoted to inspecting materials and equipment in vendor's shops as required, and to expedite shipment of items purchased by CONTRACTOR for the work, and for necessary travel incidental thereto. fZ JAH 8TS CHEV BB 0010148 } . ;, Contract Ho. ENO-130 Pago 5 of 20 . 2.1X3 Plant Record Books . Ifca coat of preparation of Plant Record Books aa ' ` described In Specification Ho. E-1455, $ . 2.U4 Photorepro&uotion '' . She coBt of all direat prints, photostats, and other photoreproductions required for the execution of the engineering work. . 2.115 Cost of Bid Preparation ' . No engineering, drafting, photoreproduction, sales, or other expense of whatsoever nature incurred in preparation of CONTRACTOR'S hid proposal or general sales effort prior to date of award of contract is to he charged to "Cost of the Work." 2.12 COMPACTOR'S Field Costa 2.121 Materials and Equipment All materials, equipment, services and supplies (except for those items covered under Specification EG-1048, "Biot of Recoverable, Non-recoverable and Consumable Tools," and Specification EC-1049, "List of Supplies," hereof) required or entering ' into the,permanent construction work being performed hereunder, shall bo furnished by CONTRACTOR at cost, delivered to the Job site, less therefrom any end all discounts and ullowanccc which CONTRACTOR , receives, including those CONTRACTOR enjoys as a national fabrication and sales , agent, which savings shall inure to the benefit of the Job. . Surplus materials trad equipment remaining after completion of the work shall be the property of CONTRACTOR. The Cost of the Work chall be reduced by tho value of such materials and equipment as determined by cither of the following methods, at CONTRACTOR'S option: a) Not cost, delivered to the Job site, or b) The amount realized from the sale of such materials and equipment, provided that COMPANY be given tho option to buy any or all of the surplus to be sold for the Borne price at which . it would be sold to others. ' r'Licx/ Contract Ho. EHQ-I30 Pag# 6 of 20 2.122 Transportation of Material The coot of freight, express, hauling, and other transportation expense on all' material whoso coat is reimbursable hereunder as "Cost of the Work." The cost of loading and unloading at the Job site, of the above material, and also of all construction - equipment, tools and supplieu. (The costs.of load ing and unloading and other handling away from, th* Job olte, and all freight conte to end from the Job site, on items not chargeable to "Coet of the Work" hereunder but furnished under "Fixed Fee" shall not be chargeable to "Cost of the Work.") 2.123 Field Labor The cost of all field labor engaged in the con struction, erection and installation of the work hereunder, including but not limited to all common labor, skilled labor, labor foremen, subforemen, craft foreman, operators for construction equip ment; the cost of procuring both skilled and common labor; the actual cost of transportation, expenses and benefits CONTRACTOR 1b required to pay direct field labor in accordance with government regulations or union contracts. Rates and other benefits for hourly workers will be those based on negotiated contracts or those customarily in effect in the area at the time the work is per formed. 2.124 Supervision The actual salaries paid to CONTRACTOR'S superin tendent, assistant superintendents, general foreman, civil engineers and other supervisory personnel required by CONTRACTOR at the site of the con struction to supervise and direct the construction work; hut not.including any travel or subsistence . expenses paid by CONTRACTOR to such personnel, and not including any compensation or expenses of Field Office staff provided under Section 2.322 hereof. CHEV Contract Ho, ENG-130 Page 7 of 20 2.125 Insurance and Payroll Taxes ,- She cost of any and all Federal and State contribut-.- . Iona, assessments or taxes for Unemployment In surance, Workmen's Condensation, Old Age Penafits, or other taxes and contributions required by law, which arc measured by or based upon wages, salaries, or other remunerations, as It accrues from the field payroll Included in the "Cost of the Work" under Sections 2.123 and 2.124- above. 2.126 Taxes and Duties The cost of any sales taxes, excise taxes, use taxes, Import duties or other similar cjiarges occasioned by items reimbursable under "Coot of the Work" hereunder, and the cost of any fees, permits, licenses or deposit* necessitated by, . Federal, State, County, or City statutes required for the performance of the work hereunder. 2.127 The Cost of All Subcontracts approved by COMPANY hereunder. . 2.128 Other Approved Costs . All other direct field costs as approved by COMPANY, not specifically includea in CONTRACTOR'S "Fixed Fee" as defined hereinafter. 2.2 Guaranteed Maximum Cost 2.21 . The "GUARANTEED MAXIMUM COST" is defined as the sum of money so identified on the facing sheet of this Contract, adjusted as provided in Section 2.4 hereof. COMPANY shall in no event bo liable for reimbursement of "Cost of the Work" in excess of the "GUARANTEED MAXIMUM COST" so adjusted. . 2.22 In the event that th6 actual "Cost of the Work" an defined hereunder, as finally audited and agreed upon by COMPANY and CONTRACTOR, is exceeded by the "GUARANTEED MAXIMUM COST," adjusted as provided herein, CONTRACTOR shall he entitled, to 25$ of the amount of the difference. CONTRACTOR'S share of the above difference shall be payable when the withheld portion of the "Fixed Fee" is payable under Section 2.52 hereof, or as soon thereafter as the amount is determined and agreed upon. CHEV o Contract No. ENG-130 Pago 8 of 20 2.3 CONTRACTOR>3 Fixed Fee ! 1 COMPANX shall pay CONTRACTOR In tha Banner provided herein a "Fixed Fee" in the amount obovn on the face shaet, page 1, hereof. This "Fixed Fee," adjusted as provided in Section 2.4, shall constitute CONTRACTOR'S entire compensation for. all oer- ' vices performed hereunder for which reimbursement is not pro vided under "Coot of the Work." Thia "Fixed Fee" includes without being limited thoroto, all compensation for the following, no charge for any item of which shall he wade to "Coat of the Work." 2.31 CONTRACTOR'S Overhead and Profit 2.311 Salaries and expenses paid by CONTRACTOR to executive or supervisory personnel directing the personnel whoso compensation is reimbursable under Section 2.1 hereof, but who are not engaged exclusively full time on that work. 2.312 Salaries and .expenses paid by CONTRACTOR to officers, executives, and to all other Homo Office personnel other than those reimbursable under Section 2.1 hereof, including hut not limited to personnel engaged In purchasing, accounting, legal, medical, clerical, research, promotional, sales, and labor negotiation work. 2.313 All travel and living expenses paid by CONTRACTOR except those paid to expeditors or inspectors under Section 2.112.or to "field labor" as defined in Section 2.123. ' 2.314 All Workmen's Compensation and payroll taxes paid by CONTRACTOR, except those accruing from field payroll as provided in Section 2.125. 2.315 Ml other jaourance premiums, health insurance, unemployment insurunce, contributions, vacation, sick leave, and holiday pay, and other benefits paid to all personnel whether direct salary is reimbursable or not, and whether in office or in field except those paid in accordance with Section 2.123. 2.316 All telephone service, cotmunication expense, post age, supplies, and stationery costs. I 'l -AH 8 1 S CHEV Contraot No. ENO-130 Pago 9 of SO 2.317 Utility, maintenance! and ropalr expense at CONTRACTOR'S Homo Office; office apace and facili ties for all Home Office employees; coot of research . and maintaining established sales offices; nochanl- ' . col and process guarantees; contributions to . CONTRACTOR'S employees1 retirement truot funds; depreciation, corporate taxes and dividends & 1 profit. 2.318 Cost of services for COMPANY representatives as outlined in Specification E-1455, paragraph XH- . A-1.0 exclusive of telephone and telegraph oxpensos. 2.32 Field Construction Overhead 2.321 Field Office Expense The cost of establishing, operating and maintaining a Job office at the site, including the cost of office equipment and aupplioa; cost of labor and aateriala to build and furnish temporary construction building's, including construction office, warehouse, tool room, welding shed, change rooms smd any other temporary buildings which CONTRACTOR deema necessary for the proper and adequate protection of materials, equipment and construction personnel; cost of utili ties for use by construction forces and necessary for the construction work, coot of all telephone, telegraph and other communication expense of the Field Office; cost of Janitorial and similar Field Office oervices. The cost of dismantling and removing the above facilities from the site. . 2*322 Field Office Staff The salarias and wages and expenses of warehouseman, materiulsmen, tooloen, timekeepora, watchmen., accountants, secretaries, stenographers, typists, ' and clerks engaged in work at the site of con struction; it being understood and agreed that size and composition of CONTRACTOR'S field staff is the CONTRACTOR'S solo responsibility. 2.33 Construction Equipment, Tools and Supplios 2.331 ' . The cost of furnishing construction equipment, in cluding cost of moving such equipment to and away from the Job site, (excluding loading and unloading at the Job site), fuel, gasoline, oil, supplies, and repairs for same, it being understood and agreed that it is CONTRACTOR'S sole responsibility to determine the type and quantity of construction equipment necessary, in its opinioa, to prosecute the work efficiently. ' 5 1 B RV-21 CHEV BB 00101S3 ) Contract No. EHO-130 Page 10 of 20 . ' ' 2.332 She coot of snail tools and expendable construction materials and supplies aa sot forth In Specification '. ' EG-1048 and 0-1049, respectively/ . 2.333 The cost of form lumber and other Items of material not entering aa auch into the finished construction; the cost of scaffolding required by CONTRACTOR in performing work heroundor, it being understood and agreed that the cost of scaffolding required and ' supplied by the painting und/or inoulatlon sub- contractor is not included herein but os an item of reiinbursable coat under "Coat of tho Work." 2.34 Permits and Saxos The cost of any permits, fees, licensee, or deposits' necessitated hy Federal, State, County, or City statutes and required by CONTRACTOR for the prosecution of his business as contrasted to such permits, foes, licenses, or deposits required by statutes for the performance of the work hereunder. 2.35 Insurance The cost of insurance maintained by CONTRACTOR, other than premiums on Workmen's Compensation 11 iWSWiw.- insurance . that in determined by field, payroll reimbursable hereunder, it being understood and agreed that CONTRACTOR shall pro vide at CONTRACTOR'S own cost and expense all Insurance required under Section 6.12 hereof, and whatever other insurance CONTRACTOR considers necessary. 2.4 Adjustments ' ' ' The "Fixed Fee" and the "GUARANTEED MAXIMUM COST" shall.not be changed on account of any difference between the actual "Cost of the Work" and the "GUARANTEED MAXIMUM COST," or any estimate thereof, or on account of any change in wage rates, or in material prices, or in conditions affecting tho work, or on , account of any other difference between the anticipated and tho actual performance of this contract;, except as provided in this Section 2.4. 2.4l Changes in Scope . - COMPANY shall have the right at any time to order in writing changes in the work, including alterations and reduction therein and additions thereto, and COMPANY and CONTRACTOR shall commonly agree within 10 working dayo of the time of COMPANY authorisation as to whether s is g ftti CHEV rr nnini^ Contract No. EN0-130 Pago 11 of 20 such changes constitute a "Change in Scope." It Is the intent of this agreement that "Changes In Scope" shall ho construed as those changes vhieh may ho mode in the work. covered by the attached Specification which affect the sice and number of major units, buildings, plant thruputs, products to he made, and changes which affect like items. It is recognized by COMPANY and CONTRACTOR that dotciled changes of relatively minor nature will he made as the design work progresses and it is agreed that such changes do not constitute a change in the scope of the work. If it is agreed, that the change item constitutes a "Change in Scope," CONTRACT shall within 15 working days deter mine in accordance with this Section 2.4l and furnish to COMPANY a written estimate of the cost of such change or, as the case may he, the saving in cost which will result from such change in the work. After approving the esti mate, COMPANY may require CONTRACTOR in writing to pro ceed with the change, whereupon the GUARANTEED MAXIMUM COST and the Fixed Fee shall he increased or decreased, as the case may he, in accordance with said estimate and this Agreement shall he amended so as to provide for such change. All work performed in accordance with such changes ahull he subject to all of the other provloions of thin Agreement. 2.411 GUARANTEED MAXIMUM COST: CONTRACTOR shall submit to COMFANY a proposul containing on estimate of the change in the GUARANTEED MAXIMUM COST, which esti mate shall he the sum of Paragraphs (a), (b), (e) and (d) hereof. (a) An estimate of the net change in cost of materials, equipment, servicea and supplies as defined in Paragraph 2.121, required or . entering into the permanent construction work; such estimate to inelude transportation-coots and soles and use taxes, por Par. 2.122. (h) An estimate of the net change in the' cost of field labor, as defined in Paragraph 2,123 as a result of such change in the work, including transportation, expenses and benefito. Rates and benefits will be those expected to be in effect in the area at the time the work is to be performed. (c) An estimate of the net change in the cost of . . salaries aad wages for technical personnel, as defined in Paragraph 2.111, and inspectors, and phyoieal expeditors, os defined in Par. 2.212; also expenses and necessary travel incidental to work by such inspectors and expeditors. . . CHEV BB 0010155 Contract Ho. EN0-130 Pago 12 of SO , . ' percent { $) of the estimated cos under paragraph \b) above, to cover such field costa os supervision; loading and un- . loading of materials, construction equipment, tools and supplies at the Job site; procuring skilled and common labor; Workmen's Compenea- , tion insurance, contributions, and taxes in connection with field labor under Paragraph (b) above. 2.412 CONTRACTOR'S Fixed Fee: The change in the Fixed Fee shall be determined as the sum of Paragraphs (a), (h)> (c), and (d) hereof. (a) A detailed estimate of the net change in the cost of equipment rentals. (b) _____ percent ( $) of the estimated cost under Paragraph 2.4ll (a), above. (c) percent ( %) of the estimated cost under Paragraph 2.411 (b), above. (d) ..........................Percent ( %) of the estimate's" net cHnnge in cost for technical personnel under Paragraph 2.411 (c), above to cover direct expenses, overhead and fee in connection uith salaries ond vages of said technical personnel. 2.413 It is the intent of the parties hereto that changes in the vork shall be evaluated in accordance with the foregoing Paragraphs 2.411 and 2.412 except in special cases wherein so doing will inpose a hardship either upon COMPANY or CONTRACTOR. In such cases, COMPANY or CONTRACTOR may request one to the other that the change be evaluated by negoti ation without reference to the foregoing Paragraphs 2.411 and 2.412 for the purpose of arriving at an equitable.settlement. 2.42 Overtime The normal work week will be considered 40 hours. In the event that at any time during the progress of the work, CCMPANY requests CONTRACTOR to work the office and/or field forces upon a regularly scheduled overtime basis, or upon a multiple shift basis, the premium portion of such overtime compensation, including payroll taxes and insurance thereon, paid to CONTRACTOR'S employees whose compensation is included in the "Coat of the Work" shall 518RV-21 Contract Ho. ENO-130 Page 13 of SO , be reimbursable and added to the "GUARANTEED MAXIMIM COST"; and tho premium portion of such overtime compensa tion, Including payroll taxes and lnauronco thereon, / paid to CONTRACTOR'S employees vhoae compensation Is included la the "Fixed Fee1 shell be reimbursable and added to the "Fixed Fee" it boing understood and agreed , that it is not the intention of the COMPANY, under this Paragraph, to request or approve overtime of modification of the vork week for CONTRACTOR'S convenience. Incidental , overtime in tho office or the field required for proper prosecution of the work is not within the scope of this Paragraph. . 2.1*3 Taxes In the went that any additional taxes, including payroll' contributions, sales taxes or other similar charges ' arising directly out of the work being performed here under over and above thone in effect os of Juno 11, 1956, become applicable before completion of the work hereunder, the amount of such taxes shall be charged to the "Coot of the Work," and the "GUARANTEED MAXIMUM COST" shall be increased by that amount. The "Fixed Fee" shall not be changed. 2.1*1* Other Adjustments . , 2.l*l*l CONTRACTOR'S "Fixed Fee" and the "GUARANTEED MAXI MUM COST" shall be subject to adjustments in event CONTRACTOR proposes, to charge to "Cost of tho , Work" purchases or subcontracts whose coat includes services to be provided by CONTRACTOR for the "Fixed Fee" under Section 2.3 hereof. 2.1*1*2 CONTRACTOR shall bo entitled to compensation as agreed by COMPANY and CONTRACTOR on the basis of CONTRACTOR'S actual incremental costs including overhead oosts where applicable, in event of any of the following: (a) Any additional expenditures are made at the request of COMPANY for the purpose of main taining the scheduled completion data ,if need, for the extra expenditures arises from delays attributable to COMPANY'S purchasing require ments or if COMPANY action, or Inaction, is clearly responsible for the delay, or if the delay is caused by conditions beyond the con trol of both COMPANY and CONTRACTOR. In . order for CONTRACTOR'S claim to receive con sideration CONTRACTOR must notify COMPANY in. writing of his intent to claim compensation under the terms of this section within 1*0 hours after the occurrence used os the basis for the claim. 518BVr2] CHEV BB 0010157 Contract No. EN0-130 Pago It of 20 .' (b) Any additional expenditures are made necessary . by COMPANY'S desire to sword business to pre- ferred, suppliers when such suppliers are not : successful on a competitive bid basis, pro- ' viding lowost bidder's equipment or equipment' ` of supplier selected by CM?TRACTOR meats specifications. . 2.5 Terms of Payment . 2.51 "Cost of the Work" 2.511 Monthly Advances Upon execution of this agreement, and at the end of each calendar month thereafter, COMPANY shall advance CONTRACTOR an amount equal to CONTRACTOR'S estimated expenditures for the coming month. The . . amount so advanced shall be credited to COMPANY in CONTRACTOR'S monthly invoices os provided in Section 2.512 hereof, and the difference, plus or minus, shall be adjusted on the.COMPANY'S follow ing month's advance to CONTRACTOR. . 2.512 Invoices on "Coat of the Work" (a) As CONTRACTOR'S accounting operations permit, CONTRACTOR shall submit each month during the progress of the work hereunder, sc Invoice in quadruplicate, supported by one copy of pay rolls, receipted vendors invoices, and other appropriate vouchers shoving: 1) Expenditures for preceding month. 2) Advance on hand at start of month. 3) Remaining advance on hand at end of month. 4) Anticipated expenditures for coming month. ' , . 5) Net advance needed to cover estimated expenditures for coming month. (b) As CONTRACTOR'S accounting operations permit, CONTRACTOR shall submit, each week during.progross of the work hereunder, one copy of the field payroll detailing the field labor expended during the preceding week for oaeh separate Account Item set forth in Section IV of the Specification. This Field payroll shall clearly differentiate between labor expended und6r..the "Fixed Fee" and the "GUARANTEED MAXIMUM COST" portions of the work. 518 RV-2 CHEV Contract Mo. ENQ-130 Page 15 of 20 2.52 Fixed Fee 1 COMPANY shall pay CONTRACTOR'S "Fixed Fee" In ' (equal monthly in stallments during' the expected duration of the work, provided that COMPANY shall hold back ton per cent (10$) of each such monthly payment, sold holdback to ho paid to CONTRACTOR thirty-five (35) days after acceptance of the work by COMPANY provided there are no undischarged liens attachments, or claims attached thereto and subject to COMPANY'S audit provided in Section 2.53 hereof. If, during the progresa of the work, COMPANY and CONIB40TOR agree that the amount of the "Fixod Fee," or date of completion of Plant ready to commence operation, shall be changed, the monthly installments of "Fixed Foe" shall.be adjusted to distribute the remaining unpaid portion of the "Fixed Fee" over the remaining construction period. 2.53 Final Payment Upon completion of the entire work COMPANY may, at ita option, make on audit of "Coot of the Work." CONTRACTOR shall afford assistance to COMPANY'S auditors in making such audit. Upon completion of this audit and concurrence in the results thereof by CONTRACTOR, COMPANY chall pay . CONTRACTOR for any unreimburaod items of "Cost of the . Work" shown by the audit, but not in excess of ohe "GUARANTEED MAXIMUM COST" adjusted aa provided in Section 2.k hereof, plus twenty-five per cent (25$) of any amount by which the "GUARANTEED MAXIMUM COST," adjusted ns pro vided in Section 2.4- hereof, exceeds the "Cost of the . -Work" as shown by the audit, plus any remaining amounts then due CONTRACTOR hereunder. Any amount by which the total payments by COMPANY to CONTRACTOR exceeds the amount due CONTRACTOR as shown by the audit shall be returned to. the COMPANY. 3.0 CONTRACT TIME 3.1 Diligent Procedure; CONTRACTOR shall proceed with work in a prompt and diligent manner, using all reasonable efforts to complete the plant on or before the date shown on the facing sheet of this Contract. - 3.2 Force MoJeure*. Any delays ini or failure of performance by either party under this contract sbnll not constitute default hereunder or give rise to any claims for damages if and to the extent caused by occurrences beyond the control of the party affected, including, but not limited to the acts of God or the elements, or by other causes beyond CONTRACTOR'S reasonable control, including civil dioordero end labor disturbances. 5 1 8 RV-2~1 CHEV Contract No, ENG-130 : Paso 15 of 20 . 2.52 Fixed Fee COMPANY shall pay CONTRACTOR'S "Fixed Pea" In ' ( ) equal monthly in- BtaHIments during tho expected duration of the work, provided that COMPANY shall hold hack tan per cent (10$) of each such monthly payment, sold holdback to ho paid to CONTRACTOR thirty-five (35) days after acceptance of tbn work by COMPANY provided there are no undischarged Hons attachments, or claims attached thereto and subject to COMPANY'S audit provided in action 2.53 hereof. If, during the progress of the work, COMPANY and CONTRACTOR agree that tho amount of the "Fixed Fee," or date of completion of Plant ready to commence operation, shall be changed, the monthly installments of "Fixed Foe" shall be adjusted to distribute the remaining unpaid portion of the "Fixed Foe" over the remaining construction period. 2.53 Final Payment Upon completion of the entire work COMPANY may, at its option, make an audit of "Cost of the Work." CONTRACTOR shall afford assistance to COMPANY'S auditors in making such audit. Upon completion of this audit and concurrence in the results thereof by CONTRACTOR, COMPANY, shall pay CONTRACTOR for any unreimburoed items of "Cost of tho Work" shown by the audit, but not in excess of the "GUARANTEED MAXIMUM COST" adjusted as provided in Section 2.4 hereof, plus twenty-five per cent (25$) of any amount by which the "GUARANTEED MAXIMUM COST," adjusted as pro vided in Section 2.4 hereof, exceeds the "Cost of the , Work" as shown by tho audit, plus any remaining amounts then due CONTRACTOR hereunder. Any amount by which the total payments by COMPANY to CONTRACTOR exceeds the amount due CONTRACTOR os shown by the audit shall be returned to the COMPANY. 3.0 CONTRACT TOME 3.1 Diligent Procedure; CONTRACTOR shall proceed with work in a prompt end diligent manner, using all reasonable efforts to complete the plant on or before the date shown on the facing sheet of this Contract. ' 3.2 Force Majeure: Any delays in or failure of performance by either party under this contract shall not constitute default hereunder or give rise to any claims for damages if and to the extent caused by occurrences beyond the control of the party affected, . including, but net limited to the acts of God or the elements, or by other causes beyond CONTRACTOR'S reasonable control, including civil disorders and labor disturbances. CHEV cn