Clean Water Act Section 404: Site Visit/Case Development
For inspections authorized pursuant to Clean Water Act sections 308 and 404 (33 U.S.C. 1318 and 1344)
This report includes only factual information gained by documentation, onsite observations, and/or onsite interviews.
Blaine Preston Inspector Name(s) Joel Strange
Chris Parker
Time In 09:00 EST Start Date April 23, 2024 Time Out 15:00 EST End Date April 23, 2024
Inspector's Organization Enforcement and Compliance Assurance Division/Waterways and Wetlands Enforcement Section
Organization Requesting Inspection (if different)
Inspection Type Case Development
Inspection Status Original
Site Name
Seapoint Industrial Marine Terminal Complex
Site Address* Seapoint BLVD
City* Savannah
County* Chatham
State* GA Zip Code* 31401
Mailing Address* Sulfco, LLC 118 East 35th Street Savannah, Georgia 31401
City* Savannah
County* Chatham
State* GA Zip Code* 31401
Latitude* 32.079924 N
Longitude* -81.030263 W
Estimated Size of Site (acres) NA
Is there a home on the site?
Yes
No
Signature Inspector JOEL STRANGE Date: 2024.06.17 12:04:34 -04'00' Digitally signed by JOEL STRANGE Date
Signature Supervisor AHMAD DROMGOOLE Date: 2024.06.24 14:26:42 -04'00' Digitally signed by AHMAD DROMGOOLE Date
Effective August 2020
Page 1 of 3
Clean Water Act Section 404: Site Visit/Case Development
For inspections authorized pursuant to Clean Water Act sections 308 and 404 (33 U.S.C. 1318 and 1344)
Site Name
Seapoint Industrial Marine Terminal Complex
Start Date April 23, 2024 End Date April 23, 2024
Inspection Purpose Initial site visit
Presentation of Inspector Credentials
Opening Conference
Name and Title (Use N/A if owner/operator not available to join the inspection)
Ed King, Seapoint Council
Opening Conference Name of person authorizing access if applicable
Ed King
Notes from Opening Conference All parties introduced themselves, then the EPA inspection team discussed the inspection's purpose and objective.
Access Issues if Any Describe N/A
Inspection Observations and Sample Collection Site Owner/Site Operator/Responsible Party (Name, title and contact information)
Ed King, Seapoint Council, eking@dulanyind.com
Additional Persons Present at Inspection
Rafe Peterson (Seapoint Council), Ken Passarella (Consultant), Tyler Sniff (EPA), Bill Rutlin (USACE)
General Site Characteristics (layout of property, etc.)
See Attachment A.
Purpose and Need for Discharge of Dredged and/or Fill Material The facility is an industrial complex along the Savannah River. The owner is in the process of constructing a marine terminal facility.
Site Overview (Past inspections, site description, permits, etc.)
The Site is approximately 718 acres in land area and is a former superfund site. Four areas were identified by the US Army Corps of Engineers as having potential unauthorized wetlands fill. These areas are identified in Attachment A. The Site is located just east of the city of Savannah, immediately adjacent to Old Fort Jackson State Park (see Attachment A), adjacent to the Savannah River.
Scope of Inspection (Areas inspected or not inspected)
See Attachment A.
Effective August 2020
Page 2 of 3
Clean Water Act Section 404: Site Visit/Case Development
For inspections authorized pursuant to Clean Water Act sections 308 and 404 (33 U.S.C. 1318 and 1344)
Site Name
Seapoint Industrial Marine Terminal Complex
Start Date April 23, 2024 End Date April 23, 2024
Environmental Conditions (e.g., wind, rain, smoke, dust, temperature, snow)
Weather Conditions During the Site Inspection: scattered clouds, upper 70s to low 80s, little to no wind. Antecedent precipitation was wetter than normal on the date of the inspection (see Attachment B).
Field Work Conducted
Observations were conducted at the four locations identified by the Corps of Engineers (Attachment A). Specifically areas that had potential discharges into wetlands that have a continuous surface connection to the Savannah and Wilmington Rivers. Photographs were taken using a GPS-enabled Nikon AW120 camera. Locations of observations are included in the attached site overview map and photographic log (see Attachments A and C).
Closing Conference
Documents Received and/or Requested During the Inspection
NA
Compliance Assistance Provided (If any)
NA
Observations Relayed to Site Owner/Operator The EPA informed the Respondent's representatives that we would discuss observations with EPA management. In addition, the group was informed that the EPA inspection report would be completed within 60 days of the closing conference.
Actions Taken by Owner/Operator During the Inspection (If any)
None.
Potential Issues of Concern Including Regulatory Citations Unauthorized discharges of dredged and/or fill material into water of the United States (Sections 301 and 404 of the CWA, 33 U.S.C. 1311 and 1344).
Attachments* Maps and Sketches Photographs (including location) and Photo Log Other (SSIP, Wetlands Delineation Forms, etc.)
Attachment A - Site Overview Map Attachment B - Antecedent Precipitation Data Attachment C - Photographic Log
Additional Notes
None.
Effective August 2020
Page 3 of 3
ATTACHMENT A
Rainfall (Inches)
Antecedent Precipitation vs Normal Range based on NOAA's Daily Global Historical Climatology Network
Daily Total
7 ATTACHMENT B
30-Day Rolling Total 30-Year Normal Range
6 2024-04-23
5
4
2024-03-24
3
2024-02-23
2
1
0 Oct Nov
2023
2023
Coordinates Observation Date
Elevation (ft) Drought Index (PDSI) WebWIMP H2O Balance
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
2023
2024
2024
2024
2024
2024
2024
2024
2024
2024
32.079924, -81.030263 2024-04-23 6.369 Mild wetness Wet Season
30 Days Ending 2024-04-23 2024-03-24 2024-02-23 Result
30th %ile (in) 1.575197 1.65748 1.776378
70th %ile (in) 4.178347 4.351181 3.38189
Observed (in) 6.059055 2.814961 2.484252
Wetness Condition Wet
Normal Normal
Condition Value 3 2 2
Month Weight 3 2 1
Product 9 4 2
Wetter than Normal - 15
Weather Station Name SAVANNAH INTL AP
Coordinates Elevation (ft) Distance (mi) Elevation Weighted Days Normal Days Antecedent
32.1314, -81.2022
28.871
10.673 22.502
5.043
11352
90
ATTACHMENT C
Seapoint Marine Terminal Complex Inspection Photographic Log Savannah, Georgia April 23, 2024
Overview Map
Attachment C
Page 1 of 8
File Name: DSCN0447.JPG
Title Comment Description
Photo 1 Taken by Joel Strange Photograph of wetland fill in Area 2.
Attachment C
Page 2 of 8
File Name: DSCN0448.JPG
Title Comment Description
Photo 2 Taken by Joel Strange Fill and existing wetlands in permitted portion of Area 2.
Attachment C
Page 3 of 8
File Name: DSCN0449.JPG
Title Comment Description
Photo 3 Taken by Joel Strange Existing road facing expanded road in Area 1.
Attachment C
Page 4 of 8
File Name: DSCN0450.JPG
Title Comment Description
Photo 4 Taken by Joel Strange Fill and silt fence placed into wetlands in Area 3.
Attachment C
Page 5 of 8
File Name: DSCN0451.JPG
Title Comment Description
Photo 5 Taken by Joel Strange Photograph facing southwest of expanded road in Area 1.
Attachment C
Page 6 of 8
File Name: DSCN0452.JPG
Title Comment Description
Photo 6 Taken by Joel Strange Fill in wetlands at Area 4.