Document 84nbzJweRRN48MON5v6dQ3ry

Clean Water Act Section 404: Site Visit/Case Development For inspections authorized pursuant to Clean Water Act sections 308 and 404 (33 U.S.C. 1318 and 1344) This report includes only factual information gained by documentation, onsite observations, and/or onsite interviews. Blaine Preston Inspector Name(s) Joel Strange Chris Parker Time In 09:00 EST Start Date April 23, 2024 Time Out 15:00 EST End Date April 23, 2024 Inspector's Organization Enforcement and Compliance Assurance Division/Waterways and Wetlands Enforcement Section Organization Requesting Inspection (if different) Inspection Type Case Development Inspection Status Original Site Name Seapoint Industrial Marine Terminal Complex Site Address* Seapoint BLVD City* Savannah County* Chatham State* GA Zip Code* 31401 Mailing Address* Sulfco, LLC 118 East 35th Street Savannah, Georgia 31401 City* Savannah County* Chatham State* GA Zip Code* 31401 Latitude* 32.079924 N Longitude* -81.030263 W Estimated Size of Site (acres) NA Is there a home on the site? Yes No Signature Inspector JOEL STRANGE Date: 2024.06.17 12:04:34 -04'00' Digitally signed by JOEL STRANGE Date Signature Supervisor AHMAD DROMGOOLE Date: 2024.06.24 14:26:42 -04'00' Digitally signed by AHMAD DROMGOOLE Date Effective August 2020 Page 1 of 3 Clean Water Act Section 404: Site Visit/Case Development For inspections authorized pursuant to Clean Water Act sections 308 and 404 (33 U.S.C. 1318 and 1344) Site Name Seapoint Industrial Marine Terminal Complex Start Date April 23, 2024 End Date April 23, 2024 Inspection Purpose Initial site visit Presentation of Inspector Credentials Opening Conference Name and Title (Use N/A if owner/operator not available to join the inspection) Ed King, Seapoint Council Opening Conference Name of person authorizing access if applicable Ed King Notes from Opening Conference All parties introduced themselves, then the EPA inspection team discussed the inspection's purpose and objective. Access Issues if Any Describe N/A Inspection Observations and Sample Collection Site Owner/Site Operator/Responsible Party (Name, title and contact information) Ed King, Seapoint Council, eking@dulanyind.com Additional Persons Present at Inspection Rafe Peterson (Seapoint Council), Ken Passarella (Consultant), Tyler Sniff (EPA), Bill Rutlin (USACE) General Site Characteristics (layout of property, etc.) See Attachment A. Purpose and Need for Discharge of Dredged and/or Fill Material The facility is an industrial complex along the Savannah River. The owner is in the process of constructing a marine terminal facility. Site Overview (Past inspections, site description, permits, etc.) The Site is approximately 718 acres in land area and is a former superfund site. Four areas were identified by the US Army Corps of Engineers as having potential unauthorized wetlands fill. These areas are identified in Attachment A. The Site is located just east of the city of Savannah, immediately adjacent to Old Fort Jackson State Park (see Attachment A), adjacent to the Savannah River. Scope of Inspection (Areas inspected or not inspected) See Attachment A. Effective August 2020 Page 2 of 3 Clean Water Act Section 404: Site Visit/Case Development For inspections authorized pursuant to Clean Water Act sections 308 and 404 (33 U.S.C. 1318 and 1344) Site Name Seapoint Industrial Marine Terminal Complex Start Date April 23, 2024 End Date April 23, 2024 Environmental Conditions (e.g., wind, rain, smoke, dust, temperature, snow) Weather Conditions During the Site Inspection: scattered clouds, upper 70s to low 80s, little to no wind. Antecedent precipitation was wetter than normal on the date of the inspection (see Attachment B). Field Work Conducted Observations were conducted at the four locations identified by the Corps of Engineers (Attachment A). Specifically areas that had potential discharges into wetlands that have a continuous surface connection to the Savannah and Wilmington Rivers. Photographs were taken using a GPS-enabled Nikon AW120 camera. Locations of observations are included in the attached site overview map and photographic log (see Attachments A and C). Closing Conference Documents Received and/or Requested During the Inspection NA Compliance Assistance Provided (If any) NA Observations Relayed to Site Owner/Operator The EPA informed the Respondent's representatives that we would discuss observations with EPA management. In addition, the group was informed that the EPA inspection report would be completed within 60 days of the closing conference. Actions Taken by Owner/Operator During the Inspection (If any) None. Potential Issues of Concern Including Regulatory Citations Unauthorized discharges of dredged and/or fill material into water of the United States (Sections 301 and 404 of the CWA, 33 U.S.C. 1311 and 1344). Attachments* Maps and Sketches Photographs (including location) and Photo Log Other (SSIP, Wetlands Delineation Forms, etc.) Attachment A - Site Overview Map Attachment B - Antecedent Precipitation Data Attachment C - Photographic Log Additional Notes None. Effective August 2020 Page 3 of 3 ATTACHMENT A Rainfall (Inches) Antecedent Precipitation vs Normal Range based on NOAA's Daily Global Historical Climatology Network Daily Total 7 ATTACHMENT B 30-Day Rolling Total 30-Year Normal Range 6 2024-04-23 5 4 2024-03-24 3 2024-02-23 2 1 0 Oct Nov 2023 2023 Coordinates Observation Date Elevation (ft) Drought Index (PDSI) WebWIMP H2O Balance Dec Jan Feb Mar Apr May Jun Jul Aug Sep 2023 2024 2024 2024 2024 2024 2024 2024 2024 2024 32.079924, -81.030263 2024-04-23 6.369 Mild wetness Wet Season 30 Days Ending 2024-04-23 2024-03-24 2024-02-23 Result 30th %ile (in) 1.575197 1.65748 1.776378 70th %ile (in) 4.178347 4.351181 3.38189 Observed (in) 6.059055 2.814961 2.484252 Wetness Condition Wet Normal Normal Condition Value 3 2 2 Month Weight 3 2 1 Product 9 4 2 Wetter than Normal - 15 Weather Station Name SAVANNAH INTL AP Coordinates Elevation (ft) Distance (mi) Elevation Weighted Days Normal Days Antecedent 32.1314, -81.2022 28.871 10.673 22.502 5.043 11352 90 ATTACHMENT C Seapoint Marine Terminal Complex Inspection Photographic Log Savannah, Georgia April 23, 2024 Overview Map Attachment C Page 1 of 8 File Name: DSCN0447.JPG Title Comment Description Photo 1 Taken by Joel Strange Photograph of wetland fill in Area 2. Attachment C Page 2 of 8 File Name: DSCN0448.JPG Title Comment Description Photo 2 Taken by Joel Strange Fill and existing wetlands in permitted portion of Area 2. Attachment C Page 3 of 8 File Name: DSCN0449.JPG Title Comment Description Photo 3 Taken by Joel Strange Existing road facing expanded road in Area 1. Attachment C Page 4 of 8 File Name: DSCN0450.JPG Title Comment Description Photo 4 Taken by Joel Strange Fill and silt fence placed into wetlands in Area 3. Attachment C Page 5 of 8 File Name: DSCN0451.JPG Title Comment Description Photo 5 Taken by Joel Strange Photograph facing southwest of expanded road in Area 1. Attachment C Page 6 of 8 File Name: DSCN0452.JPG Title Comment Description Photo 6 Taken by Joel Strange Fill in wetlands at Area 4. Attachment C Page 7 of 8 INTENTIONALLY BLANK Attachment C Page 8 of 8