Document 82qyB72dbQo52pdLgvKE0rkpd
tf .
Monsanto
c.FROM (NAME * location,
^
Engman, W. G. Krummrich Plant
DATE SUBJECT REFERENCE
TO
= February 8, 1972
CC: A. E. Leisy
A. Hippe
; WGK WASTE TREATMENT - GROUP D
R. M. Blowers
IN-PIANT REDUCTION PLAN
G. C. Vincent
R. L. Slifer
D. K. lynch
: W. M. Dowden
R. R. London T. W. Cummins
R. M. McCutchan
M. A. Terpstra - S. 2nd St.
M. D. Dealy
J. A. Stephens - T-476
L. P. Russe
R. W. Radue
- s. 2nd St.
J. K. Grant
J. E. White
- s. 2nd St.
D. E. Kircher
W. G. Kramper - F4 -W0O9
R. G. LePere ^
R. W. Peterson - F4-W705
w. M. Hatley
T. A. Garabedian
V. Brawleif^
C. Kleist
T. N. Carrico
K. E. Boucher
A. H. Ashcroft
A. L. Rasmussen
L. C. Hippard
J. W. Boehm
R. L. Maclin
G. R. Davis
- G.O.
(F4-W704)
To meet stream pollution criteria set by the Illinois Pollution Control Board, the plant has proposed and gained acceptance at the Director level to -install secondary treatment facilities which include neutralization and solids removal. These facilities will probably be Installed to serve all Sauget Village industries.. In conjunction with this, the plant will institute an in-plant reduction program to meet organic and phenolic criteria. Also the plant will Institute an in-plant flow reduction program to affect capital costs df the secondary treatment facilities.
Attached is a copy of the intent and schedule for developing the in-plant reduction programs. As you can see timing is tight. These dates must be met as the first variance review with the State is scheduled for 4/15/72 and we are committed to the State to let the engineering contract for the secondary treatment plant by 4/50/72. We must be ready to make firm commitments as to flow, organics, and phenolics reduction by 5/1/72.
Accordingly, I have set up the attached schedule to meet on each Of the products/product groups in Production Group D. Please give this first order priority. Due to the tight timing it will be nearly impossible to reschedule these meetings. Please make every effort to attend. Also please come prepared to discuss your ideas for reductions.
/tm att.
W. C. Engman Technical Services Department
0S>N 7,^
STLCOPCB4084037
"" * .
.
IMPLEMENT DEFINITIVE IN-PLANT REDUCTION PLAN
. ' '
'.
' ''
.
_
. . '.BASIC INTENTS: .' . , ..
,s... .
... . ' . . .
' ELIMINATE ALL CONTROLLABLE IN-PROCESS LOSSES.
\ ` ' REDUCE COST OF TREATMENT FACILITY.
-
. :
'
DEMONSTRATE THAT MICC IS CONTINUALLY IMPROVING
QUALITY OF MISSISSIPPI RIVER.
-
" 1. ESTABLISH RIGOROUS LOSS CONTROL PROGRAM.
' ' v
NO SEWER PHILOSOPHY. ^`
.' BRATSCH - COMPLETE
'
2. SCOPE DEFINED FLOW REDUCTIONS'.
. ..
'` -
TSD/CED - _ BY 4/1
3. ' DEFINE ADDITIONAL FLOW REDUCTIONS. ~ 1
TSD/MAINTENANCE/PROD. - BY 3/1
' 4. DEFINE METHODS PHENOLS/ORGANIC LOADING REDUCTIONS.
\ \
INITIAL SCREENING/ORDER OF ATTACK TSD/PROD. /TECHNOLOGY - BY 3/1
t
-'
METHOD DEFINITIONS/SCOPES - * TSD "/TECHNOLOGY/CED - THROUGHOUT YEAR
. 5,,
'>. -.Vz 'J ;
`
TIME-TAB LF/TAR GETS
.
; '
.'
ALL - B Y 3 /15
* .
DSW 345362 STLCOPCB4084038
k
DEPARTMENT PNA (New Plant)
Phos Esters Little Phos Aroclors Incinerator ONA
ONP (New Plant)
PERSONNEL
Dowden, London, Kleist, Grant, LePere, Kramper, Terpstra, Boucher, Garabedian
Dealy, Ashcroft, Grant, Boehm, Davis, Boucher, Radue, White
Dealy, Hippard, Grant, Davis, Boucher
McCutchan, Brawley, Carrico, Grant, Krull, Stewart
Russe, Maclin, Kircher, Rasmussen
London, Boucher, Grant, Hatley, LePere, Terpstra, Garabedian
Cummins, Rasmussen, Grant, Peterson, Stephens, Boucher
WHEN - WHERE
Feb. 9, 1972 2:30 P.M. Training Room
Feb. 17, 1972 9:00 A.M. Training Room 3
Peb. 17, 1972 10:30 A.M. Training Room 3
Feb. 17, 1972 1:00 P.M. Training Room 3
Feb. 17, 1972 2:00 P.M. Training Room 3
Feb. 17, 1972 3:00 P.M. Training Room 3
Feb. 18, 1972 9:00 A.M. Training Room 3
DSW 345363 STLCOPCB4084039