Document 82NGVdX7rZayppB31e33vjBva

PLAINTIFF'S EXHIBIT REV. NO. ,----- DATE 0 ( S' BY APPROVAL V \ REASONS FOR ISSUE/REMARKS PRELIMINARY ISSUE DRAVO APPROVAL CUSTOMER APPROVAL ISSUE FOR BID 1 I ZJS \zvrto.itf Z 03-00-li FtD W-5- t ISSUE FOR PURCHASE ORDFR. 1 S<o PolZ. (2a V^TTZUcy\o>J~ . DRAVO CORPORATION, DENVER OPERATIONS OFFICE One Park Central Denver, Colorado 80202 Sheet 1 of 6 CONTRACT M-7119 COST CODE - N/A ASARCO, INCORPORATED ANTIMONY PLANT El Paso, Texas 79999 -SPECIFICATION NQ.Sp-041^GENERAL HVAC SYSTEM __ 1.0 SCOPE ^ . ' 1.1 This specification establishes the design criteria, the HVAC system functional re quirements, and describes the type of HVAC hardware to be implemented in the system design. 1.2 The Contractor shall furnish all material, labor tools, equipment, and services . required to fabricate and erect in place a complete and workable HVAC system in accordance with this specification and as indicated on the applicable drawings and specific equipment specifications subject to the terms of the contract. 1.3 The word "Engineer" means the engineer at ASARCO-, INC. ASARCO ELP 0007254 Contract No. M-7119 Date: January 28, 1976 Sheet 2 of 6 SPECIFICATION NO. MSP-0411GENERAL HVAC SYSTEM 2.0 CODES, STANDARDS. AND REGULATIONS 2.1 All materials, design, fabrication and erection procedures shall be in accordance with the applicable section or sections of all local, provincial and national codes, standards, or regulations having jurisdiction over the work. 2.2 The regulating agencies having jurisdiction include but are not limited to the fol1owing: .1 American Society of Heating, Refrigeration and Air Conditioning Engineers' (ASHRAE). .2 American Society of Mechanical Engineers (ASME). .3 American Standards Association (ASA). .4 American Standard Safety Code for Building Construction. .5 Sheet Metal and Air Conditioning Contractors National Association (SMACNA). .6 Underwriters Laboratory (UL). .7 Air Conditioning and Refrigeration Institute .8 Air Diffusion Council (ADC). .9 Air Filter Institute (AFI). .10 Air Moving and Conditioning Association (AMC:''. .11 National Association of Fan Manufacturers (:" ,".). .12 Occupational Safety and Health Administratich, ..OSHA). .13 National Fire Protection Association (NFPA). .14 (Jn"j fnv'rr| {J3C) 2.3 Reference to any code, standard, or regulation shall mean the latest published edition including addenda, supplements, or revision thereto, in effect .when the contract was awarded. 2.4 Where conflicts exist between agencies having jurisdiction, the more severe shall govern. ASARCO ELP 0007255 Contract No. M-7119 Date: January 28, 1976 Sheet 3 of 6 SPECIFICATION MSP-0411_________________________________________________ GENERAL HVAC SYSTEM 3.0 MATERIALS 3.1 All materials used in the fabrication and installation of the HVAC system shall be in accordance with the materials specified in the individual equipment specifications and callouts on HVAC drawings. 3.2 Where a manufacturer's name is used in specifying the material, it shall be implied to mean "or approved equal." Deviation from the materials so listed shall not be made without the prior approval of the Engineer. ASARCO ELP 0007256 2 Contract No. M-7119 Date: January 28, 1976 Sheet 4 of 6 SPECIFICATION MSP-0411 4.0 DESIGN 4.1 Basic Design Criteria .1 Altitude of Facility .2 Climatic Design Conditions: Summer Outdoor Temperatures Winter Outdoor Temperature Wind Velocity Winter .3 Inside Design Conditions: Main Plant Rectifier Room Office Lunch Room Electrical Substation 4.2 SYSTEMS DESCRIPTION GENERAL HVAC SYSTEM 3914 Ft. 98FDB, 69FWB 25FDB 7 MPH SUMMER 105FDB 104FDB 75FDB, 45% RH 75FDB, 45% RH 110FDB WINTER Uncontrolled Uncontrolled 75FDB 75FDB Uncontrolled A A Main Plant - Summer ventilation is accomplished by natural ventilation thru continuous gravity roof ventilator running along the ridge of the L-shaped building with fresh outside air drawn from fixed louvers located along the outside walls. Summer ventilation is at the rate of 9 air changes per hour and winter ventilation half this much. To control winter ventilation, 100 percent of the area of the gravity ventilators are provided with chain operated dampers to close or open as maybe required to conserve process equipment heat gain thus providing a comfortable working environment in the wintertime even without the use of heating equipment* Rectifier Room - Due to very high internal equipment heat gain, this area shall be provided with a split-system air conditioning unit with the evaporator and fan unit suspended from the ceiling structure of the room and the air cooled condensing unit located outdoors on grade. . The fan shall run contin uously year round to pressurize the room at .10" W.G. ' .3 Office and Lunchrooms - These areas shall be air conditioned year round with all electric cooling and heating units. The office shall be provided with an-over ceiling mounted self-contained air conditioning unit-. The lunchroom shall be provided with a window type package air conditioning unit. .4 Electrical Substation - This room shall be ventilated and pressurized to .1" W.G. year round. Pressurizing outside air shall be introduced into the room by two roof mounted power ventilators with filter racks. Hot exhaust air shall be exhausted thru relief drapers located along the outside walls. ASARCO ELP 0007257 Rev. No. 2 Contract No. M-7119 Date: January 28, 1976 Sheet 5 of 6 SPECIFICATION MSP-0411 GENERAL HVAC SYSTEM 4.0 DESIGN (continued) 4.3 GENERAL AIR DISTRIBUTION SYSTEM .1 Description: All air distribution systems shall be low pressure systems consisting of galvanized sheet metal ductwork, insulation,registers, grilles, and diffu sers to convey ventilation, exhaust or conditioned air to or from the con ditioned space. 4.4 GENERAL TEMPERATURE CONTROL SYSTEM .1 The temperature control system shall be basically electric comprising a complete system. 4.5 EQUIPMENT Split-System Air Conditioner This unit shall be a complete package,shop assembled and wired, complete with, temperature controls, condensing section, evaporator, fan and filter section. The following unit shall be furnished: (See MSP-0487 and MSP- 0486). A One (1) unit for rectifier room, Trane Air Handler # 10, 4,500 CFM and Trane air cooled condensing unit RAUA 100, 10.5 tons nominal capacity. Ceiling Mounted Air-Conditioner A This unit shall be a complete package, shop assembled and wired, complete with temperature controls, evaporator, compressor, condenser, filter, fan, electric heating coil, and diffusers. The following unit shall be furnished (See MSP-0490). (This unit shall be mounted on the deck over the ceiling of the office.) One (1) unit for office'.Trane SAHA 30 1250 CFM, 25,320 BTUH 4.51 KVJ heating. Wall Mounted Air-Conditioner This unit shall be a complete package, shop assembled and wired, complete with evaporator, compressor, filter, integral thermostat and electric heating coil. The following unit shall be furnished: (See MSP-0489) A One (1) unit for lunchroom Chrysler R18-UEG, 12,820 BTUH cooling 11,!320BTUH heating. Power Roof Ventilator(with filters) unit shall be suitable for roof mounting and furnished complete with V-belt drive components, motor enclosure, rooftop disconnect switch, roof curb, channel type filter racks, bird screen, access doors, and adjustable vane type diffusers. Housing shall be made of galvanized steel. The following unit shall be provided (See MSP-0495). ASARCO ELP 0007258 ]Zei/ tJo _1_ Contract No. M-7119 Date: January 28, 1976 Sheet 6 of 6 SPECIFICATION MSP-0411 GENERAL HVAC SYSTEM 4.0 DESIGN (continued) 4.5 EQUIPMENT (continued) .4 Two (2) units for electrical substation:' Buffalo Style "H" filtered sky-vent size 24", 5057 CFM 0 1/4" W.G., 3/4 H.P. .5 Ceiling Exhaust Fan Unit shall be complete assembly with centrifugal wheel, inlet grille, motor terminal box with card, plug and receptacle inside the housing. The following unit shall be furnished (See MSP-0488). Two (2) units, one (1) for each toilet .6 Gravity Ventilators Unit shall be welded structure for roof mounting and continuous throughout the length of the roof. The following units shall be furnished (See MSP0491) 24" throat x!30 ft. long for electrowinning bldg., 24" throat by 110 ft. long for matte furnace building. Units shall be Burt Monovent Continuous Gravity Ventilator or approved equal. .7 Counter-Balanced Louver The louvers shall be factory assembled in a common frame. The following units shall be furnished. (See MSP-0493) Three (3) - 2'x2` for Rectifier Room Two (2) - 3'x4' for Substation Building *.8 Stationary Louver The louvers shall be factory assembled in a common frame except as limited by shipping. The following units shall be provided. (See MSP-0492) Seven (7) 8'x6`, three (3) 8'x4', four (4) 6'x4', and one (1) 4,-8"x2'-6" for the L-shaped main plant. ASARCO ELP 0007259 *ReV. No. _- "I - 0 Date' By- Approval I----^r Ui Reason for Issue/Remarks DPv'rqeIlinmmiinnaavryi/ ITscseunec Dravo Approval Customer Approval 1 u-3e>o IS Issue for Construction .- ,, - DRAVO CORPORATION CONTRACT M7119 COST CODE - 7100 DENV ER OPERATIONS OFFICE One Park Central Denver, Colorado 80202 ASARCO, INC. ANTIMONY PLANT El Paso, Texas 79999 .Sheet 1 of 7 SPECIFICATION N0.(rcSP-042r)GENERAL PAINTING & COLOR CODING 1.0 SCOPE OF EQUIPMENT AND SERVICES TO BE FURNISHED BY VENDOR 1.1 Refer to the following documents of latest issue which form a part-of this specification: .1 Piping Specification PSP-0414. .2 Piping Flow Sheets 100-P08-138, 100-P08-139, 100-P08-140, 100-P08-141 and 100-P08-142. .3 Steel Structures Painting Council SSPC Publications .1 Volume I - Good Painting Practices .2 Volume II - Systems and Specifications .4 US Federal Register - Occupational Safety and Health Standard (OSHA) 1.2 Materials, services and accessories that are required for the safe and satisfactory surface preparation (if specified), painting and the application of piping identi fication markers. These shall include, but not be limited to: .1 Paint .2 Thinners .3 Solvents .4 Paint Applicators .5 Hand and Power Tools .6 Surface Preparation Equipment .7 Piping Identification Markers .8 Safe Storage of Supplies and Equipment. ASARCO ELP 0007260 Rev. No. Contract No. M7119 Da Sheet 2 of 7 SPECIFICATION MSP-0421GENERAL PAINTING & COLOR CODING 2.0 EQUIPMENT FURNISHED BY OTHERS 2.1 Completely installed piping system. 2.2 Completely installed and insulated dust and fume collection system. 2.3 Installed miscellaneous steel, steel supports and conveyor inlet and discharge chutes. ASARCO ELP 0007261 Rev. No. Contract No. M7119 Da : Sheet 3 of 7 SPECIFICATION MSP-0421GENERAL PAINTING & COLOR CODING 3.0 FUNCTIONAL REQUIREMENTS 3.1 All piping shall be painted with the exception of the following: .1 Underground Piping .2 Cast Iron Piping .3 Galvanized Piping .4 Plastic Piping .5 Insulated Piping .6 Instrumentation Tubing 3.2 All pipe hangers and supports shall be painted. 3.3 All uninsulated ductwork, except plastic and stainless steel shall'be.painted. 3.4 All unpainted steel conveyor chutes, support steel and miscellaneous steel shall be painted. 3.5 All aboveground piping, except instrument tubing shall be identified in accordance with the applicable provisions contained herein. 3.6 Pipe Painting Requirements .1 All surfaces to be painted shall be thoroughly cleaned to remove any material that will be conducive to premature failure of the paint coat. The method(s) of surface preparation shall be compatible with the paint used. Mill scale, if any, shall be removed by hand brushing, sanding, scraping, chipping or a combination of these methods. .2 Oils, greases, and cutting compounds shall be removed by solvent cleaning. Prior to solvent cleaning, soil, spatter, salts and foreign materials other than oils & greases shall be removed by brushing or scraping. .3 The color of the finish coat shall match as closely as possible EC-103 (Shale Gray) as defined by DuPont Maintenance Finishes. .4 The finish paint shall have an epoxy base similar to Rustoleum 9386. .5 The finish paint shall be capable of withstanding a temperature range of 40F to 135F. .6 The dry thickness of the finish paint coat shall be not less than 2.5 mils. .7 Paint shall be applied in strict accordance with the paint manufacturer's recommended procedures. .8 Items explicity exempt from being painted shall be gaskets, instrument gages and sight glasses, factory finishes, equipment installed in the piping runs, valve stems or threads and electric or instrument control devices. .9 Final inspection and acceptance shall be performed by ASARCO, Inc. ASARCO ELP 0007262 Rev. No. Contract No. M7119 D. Sheet 4 of 7 SPECIFICATION MSP-0421.GENERAL PAINTING & COLOR CODING 3.0 FUNCTIONAL REQUIREMENTS 3.7 Pipe Color Coding Requirements .1 All aboveground piping, painted or insulated, shall be provided with markers that identify the type of service, direction of flow and identity of. the pipe. The color of the marker shall be in accordance with OSHA standards. .2 The markers shall be similar to the all-temperature perma-code pipe markers manufactured by W.H. Brady Company of Milwaukee, Wisconsin. .3 Where a pipe is identified, it shall contain (a) a direction arrow; (b) service call-out; (c) line number'; and (d) four circling color bands designating the degree of hazard. The direction arrow, service call-out and line number shall be as shown in the specification and on the piping flow sheets identified inl;.lJ[ &-.1.1.2 respectively herein. Each identification shall have the following configuration: .4 The above identification marker shall be provided on all pipe lines at every terminal point, bend and valve, between floors on vertical runs at eye level and at a spacing not to exceed 50 ft. The style shall be determined by the size of the pipe and as indicated herein. Additional color code bands shall encircle the pipe at 10foot intervals between identification markers spaced at 50 feet. .5 Directional arrows shall be bn colored backgrounds and shall be Brady Style 6 for piping with a total OD (pipe plus insulation) of 3 inches or less and style 2-for piping and. insulation OD's greater than.3.inches. Arrows shall conform to Table MSP-0421-1, Pipe Identification.Schedule. .6 Service call-outs and line numbers shall be Brady custom printed or stock printed letters and numbers on colored backgrounds-, style 4,6.or 8 for piping (p insulation) OD 3 inches less than styles 1, 2 and 3 for larger size piping service call-outs and line number shall conform to Table MSP-0421-1. .7 Circling color bands shall be Brady perma-code pipe banding Tape No. B-550 2k inches wide. The colors shall conform to Table MSP-0421-1. .8 The material for all markers shall be compatible with 50% caustic soda such as Brady B-350 perma code. ASARCO ELP 0007263 Rev. No. Contract No. M7119 Dc : Sheet 5 of 7 SPECIFICATION MSP-0421GENERAL PAINTING & COLOR CODING 3.0 FUNCTIONAL REQUIREMENTS 3.7 Pipe Color Coding Requirements - (continued) .9 All markers shall be installed in strict accordance with the manfacturer's recommended procedures. All markers shall be readily visible from working areas, platforms and walkways. .10 The colors shown in Table MSP-0421-1 shall conform to the following federal standards Yellow F.S. 944 Ornge F.S. 956 Green F.S. 983 .11 Final inspection and acceptance shall be performed by ASARCO, Inc. ASARCO ELP 0007264 iRev. No. ___ Contract No. M7119 De : Sheet 6 of 7 SPECIFICATION MSP-0421 GENERAL PAINTING & COLOR CODING CD KhK i*Z s*z OKO O o o o CD O o O o o CD O o O o O o _ LU _J <c <c c c < c < c <c < cC < <c c < 3(- u -J --J u --J --J .-J --J -J U U u --J u u --J u o i-- o CQ CQ CQ CQ CQ CQ CQ CQ CQ CQ CQ CQ CQ CQ CQ CQ CQ Q Ul o' o . --I oc o QujO z: cq - z 3 o z z 3 O 3 O 33 oo 3 o 3 o 2: 3 o z D IU LU LU -J --J --J --J --J --J LU _J LU LU -J LU LU --J _J --J --J --J u LU -J LU LUZ3 OZ LU QZ DC LU LU LU LU LU LU DC LU QZ o o CD >- CD CD >- >- >- >- >- > CD >- o mujo: = 5= uj oz hh ^ UJjO CO C CQ oz -J LU -J LU LU QZ >- CD 3 oo --J _u -J -J LU LU >- >- O z ZD *3 3 *=; 3: 3 3 3 30a 2Z o Z Z o O O o o o Z o Z O K O LU _J LU LU u _J u --1 LU --J LU o; cs _j LU ___1 LU LU -J --J u --j --J --J LU -J LU q;^o oz LU oz QZ LU LU LU LU LU LU QC LU DC < O o CD >- cs CD >- >- >- >- >- >- CD >* CD CQ 3 oZ --i LU u LU LU QZ >- CD 33 oo u --J LU LU >- >- oz o Z O z Z 3 o 3 o LU rs CD o 3 o 3 o zz 3 o Z LU CD Z LU CD LU CD Ul O LU _i LU LU -J --J Z -j _j --J LU U LU LU Z Z C <cQ- LU LU LU __1 -J k .j u u LU -U LU c LU < acj--i CD QZ LU QZ QZ LU LU DC LU LU LU DC LU QZ QZ QC QZ o. z: CD >- CD CD >- >- O >- >- >- CD >- CD O CD O O a: CQ PIPE IDENTIFICATION SCHEDULE QZ Cl LU DC Z LU ZD e QZ 00 h* i--< DC o QZ QZ c QZ LU Hi LU LU H- 1-- 1-- O ZDLU f-- QZ QZ 1-- i- < LU zO 3 <co o LU LU >- QZ < Qi 3 _J 3 _J 00 u LU LU LU 3 VH O LU c5> --J J-- o < or _j CO H-1 3 LU < 3 *-- M DC h- z < OO OO LU CD o < DC CL 00 C ZD DC H LU 1-- oo LU __I >- CQ CL QZ t-- z c00 O CQ s o o CO 3 o -J O O o -J o o o --J LU ZD U. u LU ZD LL VMo LL rn t-- o DZ HOO M CD < Z) Z <c -J Cl o o DC CL CD LU l-- QZ o Q. CL Hi QZ f-- 00 QZ zo --i 00 LU o oz h-t >< QZ o LU z o 00 o CO 1--. o 1--1 3 CQ CO ZD o eC o CJ 2Z >DC -J 3 o_ Cl LU ZD DC 00 DC LU I-- <. a: LU c 3 CD CD ZZ M H-4 u -J oo oo oo DC LU i-- c 3 >- 00 --J LU <c <c M oz SCD O CL OO u u 1-- LU LU f- 3 3 i--i o LL u. u. oi I--4 QZ < QZ LU LU H- H- (- c QZ z < QZ 3 LU LU 3 M i-- s: < 00 c ZD 00 QZ LU I-- LU h* Z o z00 O C Q o c u QZ zc M CL CL LU i-- >- Z --J oo HH QZ f- 1-- =) QZ o u LU LU o H" U oo <c LU 3 1-- Q LU LU z< --J CL CD CL CD < Hi LU t- QZ QZ o 1-- Q. Q. OO >QZ QZ -J 00 LU oo HH O c> CQ t--QZ z LU >- a: o 00 o QZ 3 o oo 3 o CD LL o Lt. 3- oo LL 3Z 3 zc <c --4 3 "D c CL <c --J Q. oo CL 3 CL LU 00 LJ 00 CO CO ASARCO ELP 0007265 'Rev*. No. Contract No. M7119 Da Sheet 7 of 7 SPECIFICATION MSP-0421GENERAL PAINTING & COLOR CODING 3.0 FUNCTIONAL REQUIREMENTS 3.8 Ductwork, Conveyor Chutes and Miscellaneous Steel Painting Requirements .1 All surfaces to be painted shall first have their primer coat touched-up to_remove any nicks or scraDes incurred during shipping, storage and erection. Touch-up paint shall have an epoxy base and shall be the equivalent of RustoTe'um 9373. .2 Prior to applying the finish coat, any oil, grease or foreign organic matter adhering to the ductwork due to shipping, storage or erecting activities shall be removed by solvent cleaning. .3 The color of the finish coat shall match as-closely as possible EC-103 (Shale Gray) as defined by Dupont Maintenance Finishes. .4 The finish paint shall have an epoxy base similar to Rustoleum 9386. .5 The finish paint shall be capable of withstanding a temperature range of 40F to 135F. .6 The dry thickness of the finish coat shall be not less than 2.5 mils. .7 The paint shall be applied in strict accordance with the paint manu facturer's recommended procedures. .8 Items explicitly exempt from painting are plastic ductwork, gaskets, factory finished equipment, rubber boots, stainless steel, copper and aluminum. .9 Items explicitly to be painted include ductwork, ductwork supports and hangers, boiler stack, conveyor chutes and supports, miscellaneous steel and non-gray painted or unclad insulation on ductwork and the equipment connected by the ductwork. .10 Final inspection and acceptance shall be performed by ASARCO, Inc. ASARCO ELP 0007266 REV. NO. -- 0 DATE BY APPROVAL S t'V Ah '#&,rs.uv. ^y 1 <92-To-? us\ . 1 o 3 -76 REASONS FOR ISSUE/REMARKS PRELIMINARY ISSUE DRAVO APPROVAL CUSTOMER APPROVAL ISSUE FOR BID ISSUE FOR PURCHASE GRnFR ISSoS Fon CoozrTLUc.'nakT - DRAVO CORPORATION, CONTRACT M-7119 COST CODE - 3410 DENVER OPERATIONS OFFICE One Park Central Denver, Colorado 80202 ASARCO, INCORPORATED ANTIMONY PLANT El Paso, Texas 79999 SPECIFICATI0Nfij~P-0487^ AIR HANDLING UNIT 1.0 SCOPE OF EQUIPMENT AND SERVICES TO BE FURNISHED BY VENDOR 1.1 Refer to: .1 General Mechanical Specificaton MSP-0401 .2 General HVAC System Specification MSP-0411 .3 General Electrical Specification ESP-4001 Sheet 1 of 5 1.2 Vendor shall design, fabricate, furnish, and deliver all materials and accessories required for the safe and satisfactory operation of an Air Handling Unit. These shall include but not necessarily be limited to: .1 Casing, including mixing box with return and outside air dampers. .2 A .3 Fan and Motor Section, including magnetic starter. Direct Expansion Cooling Coil, Two Separate Refrigerant Circuits' .4 Insulated drain pan .5 Medium capacity filters. ^6 A.7 Rigging Brackets and vibration isolators. Mixed Air Temperature Control which includes Damper Operators and Mixed Air Temperature Controller. ASARCO ELP 0007267 Rev. No. Contract No. M-7119 Date: January 23, 1976 Sheet 2 of 5 SPECIFICATION MSP-0487__________________________________________________AIR HANDLING UNIT 2.0 EQUIPMENT AND SERVICES TO BE FURNISHED BY OTHERS 2.1 All external electrical wiring including disconnect switch, and relays. 2.2 All external refrigerant piping, valves, strainers, fittings and insulation. 2.3 All external ductwork, insulation, and grilles or diffusers. 2.4 Installation of unit and its accessories. 2.5 Structural supports ASARCO ELP 0007268 Rev. No. 1^ SPECIFICATION MSP-0487________ 3.0 FUNCTIONAL REQUIREMENTS 3.1 Quantity Required 3.2 Equipment Number 3.3 Service 3.4 Location . 3.5 Air Volume 3.6 /l\ 3.7 External Static Pressure Minimum Cooling Capacity (Sensible Heat) 3.8 DX Cooling Coil Entry Air Temp 3.9 DX Cooling Coil Leaving Air Temp 3.10 Cooling Coil Air Pressure Drop 3.11 3 . 1I c. Number of Refrigerant Circuit Mixing Box Required 3.13 Outside and Return Air Damper Required 3.14 Damper Operator Required 3.15 Mixed Air Temperature Controller Required 3.16 Mounting Position 3.17 Electrical Power Available Contract No. M-7119 Date: January 23, 1976 Sheet 3 of 5 AIR HANDLING UNIT___________ One (1) 58.3412 Continuous, 24 Hr. Da^ Indoors 4,530 ACFM 0.5 Inch WG 126.4 MBH 98F (DB) 74F (DB) 0.5 inch W.G. (Maximum) Two (2) Yes Yes Yes Yes Horizontal 460/3/60 ASARCO ELP 0007269 Rev. No. 1 Contract M-7119 Dat' January 23, 1976 She.. 4 of 5 SPECIFICATION MSP-0487__________________ AIR HANDLING UNIT 4.0 DETAILS OF CONSTRUCTION 4.1 The Air Handling Unit shall be a low pressure draw thru type suitable for indoor installation. The unit shall be complete with rigid casing, fan and motor section, and direct expansion coils, medium capacity filter-mixing box and with return and outside air dampers and rigging brackets. 4.2 The unit casing shall be fabricated of heavy gauge galvanized steel panels, rein forced and braced with steel angle framework for maximum rigidity. 4.3 The unit shall have three large galvanized steel .gasketed, hinged and latched doors for access to fan, coil, and inlet sections. 4.4 The fan and coil section shall be insulated with 1" thick, 3/4 pound density fiber glass. All exterior surfaces shall have a primer coating for additional corrosion protection. The unit shall have an insulated drain pan beneath the fan and coil section with drain connections on both sides. 4.5 The fan shall be centrifugal multi-blade, forward curved, double width, double inlet, statically and dynamically balanced as an assembly on solid steel shaft and rated in accordance with Air Moving and Conditioning Association, Inc. (AMCA). Fan first critical speed shall be at least 125% of fan operating speed. 4.6 The fan pulley shall be adjustable. 4.7 Fan bearings snail be heavy duty, self-aligning and shall be lubricated by means of grease fittings extending outside the blower casing. 4.8 Fan and motor assembly shall be isolated from the unit casing with rubber in shear vibration isolators. 4.9 The direct expansion cooling coil shall be of copper tubes with aluminum plate fins. The fins shall be firmly bonded to the tubes by means of mechanical expansion of the tubes. The coil shall be mounted in the coil casing to be accessible for service. The coil shall be rated for 425 psig working pressure. 4.10 A4-11 ^4.,2 /\4.13 A4*14 A4*15 /K 4.16 The mixing box shall include opposed blade return and outside air dampers. The dampers shall rotate on rust proof nylon bushings. The unit shall include a mixed air temperature controller set at 60F. The damper operator shall be controlled by the mixed-air temperature controller to maintain 60F mixed-air temperature by modulating the outside and return air dampers. The outside air dampers shall be subjected to a minimum position of 32% outside air. The v-belt and pulley drive shall be enclosed in a solid sheet metal, removable belt guard. The rigging brackets shall be heavy gauge formed steel brackets with steel eye-bolts for lifting the unit. The unit shall be provided with rubber-in-shear type vibration isolators. The filters shall be of the throw-away type. The color of the external surface shall match EC 103 (Shale Gray) as defined by DuPont maintenance finishes. ASARCO ELP 0007270 Rev, Hck Contract No. M7119 Date: January 23, 1976 Sheet 5 of 5 SPECIFICATION MSP-0487 ;AIR HANDLING UNIT 5.0 QUESTIONNAIRE - See Specification M-7119 MSP-0401 - GENERAL MECHANICAL SPECIFICATION for instrucitons on how to complete this questionnaire. 5.1 Item Identification _________________________________________ 5.2 Date Questionnaire Filled In _________________________________________ 5.3- Manufacturer and Model No. ________________________ _________________ 5.4 Fan Data .1 Capacity @ site Altitude ACFM .2 External Static Pressure IN. W.G. .3 Total Static Pressure IN. W.G. .4 Motor Nameplate Data HP RPM .5 Type of Enclosure .6 Required Electric Power VOLT PHASE HERTZ 5.5 Direct Expansion Coil Data .1 Minimum Capacity MBH .2 Entering Air Temperature .3 Leaving Air Temperature FWB FWB FDB FDB .4 Suction Temperature F .5 Face Area SQ. Ft. .6 Face Velocity FPM .7 Air Pressure Drop IN. W.G .8 Coil Connection Sizes ' IN. Type & Number of Air Filters .1 Air Filter Pressure Drop IN. W.G l/> CO Total Unit Shipping Weight Origin of Vendor's Services After Purchase of Equipment Exceptions taken to this specification ASARCO ELP 0007271 REV. NO. -- 0 DATE BY APPROVAL V 'V REASONS FOR ISSUE/REMARKS PRELIMINARY ISSUE DRAVO APPROVAL CUSTOMER APPROVAL ISSUE FOR BID i US. v 4 o$-e>3-7Z ______________ISSUE FOP. PURCHASE ORDF'R______________ IsSl>S Fee. C)K>ST7llX.Tte~\ DRAVO CORPORATION, . DENVER OPERATIONS OFFICE One Park Central Denver, Colorado 80202 Sheet I of 5 CONTRACT M-7119 COST CODE - 3410 ASARCO, INCORPORATED ANTIMONY PLANT El Paso, Texas 79999 SPECIFICATION MOC^MSP-0489^)HALL MOUNTED AIR CONDITIONER 1-0. SCOPE OF EQUIPMENT AND SERVICES TO BE FURNISHED BY VENDOR 1.1 Refer to: .1 General Mechanical Specification MSP-0401 .2 General HVAC Systems Specification MSP-0411 .3 .General Electrical Specification ESP-4001 . - 1.2 Design, fabrication, and delivery of the Wall Mounted Air Conditioner Unit as normally supplied as part of a complete unit for the safe and .satisfactory operation .of the stated equipment. These shall include, but not necessarily be limited to: .1 Compressor . .2 Evaporator and condenser coil .'3 Evaporator and condenser fans tj4 Air deflection grille .5 Casing ; .6 Controls .7 Electric Heater .8 Motors and magnetic starters ASARCO ELP 0007272 . Rev.' No. Contract M-7119 Date: January 23, 1976 Sheet 2 of 5 SPECIFICATION NO. MSP-0489WALL MOUNTED AIR CONDITIONER 2.0 EQUIPMENT AND SERVICES TO BE FURNISHED BY OTHERS 2.1 A,ll external electrical power wiring including main disconnect switch. 2.2 Structural support and wall opening. 2.3 Installation of the unit and its accessories. ASARCO ELP 0007273 Rev. -No. 1 SPECIFICATION MSP-0489________________________________ 3.0 FUNCTIONAL REQUIREMENTS 3.1 Item 3.2 /\3.3 Quantity Nom. Cooling Capacity, BTUH (Sensible Heat) /\\3A Nom. Heating Capacity, BTUH . 3.5 Air Volume ACFM 3.6 Where Required 3.7 /|\3.3 A3.9 Equipment No. Wall Sleeve Required Electric Power Available Contract No. M-7119 Date: January 23, 1976 Sheet 3 of 5 WALL MOUNTED AIR CONDITIONER Wall Mounted Air Conditioner One (1) 12,815 11,312 465 Lunch Room 58.3414 Yes 240/1/60 ASARCO ELP 0007274 Rev.`No. Contract No. M-7119 Date: January 23, 1976 Sheet 4 of 5 SPECIFICATION MSP-0489 'MALL MOUNTED AIR CONDITIONER 4.0 DETAILS OF CONSTRUCTION 4.1 The unit shall he a package type complete with compressor, evaporator and condenser coils and fans, air deflection grille, casing, controls, air filter, and electric heater. 4.2 The compresssor shall be rubber shock mounted and internally spring mounted for quiet operation and vibration isolation. The compressor shall be in a hermetically sealed steel case and sprayed with black epoxy paint. 4.3 The evaporator and condenser coi.ls shall have copper tubing as the primary surface and aluminum fins for the secondary surface. A capillary restrictor shall be the meter ing device for the refrigeration system. 4.4 The evaporator and condenser fans shall be direct driven with a common motor. The evaporator fan shall be centrifugal type and condenser fan shall be propeller type with a slinger ring for condensate removal. 4.5 The front discharge grille shall be capable of adjustment from horizontal to 70 degrees vertical. 4.6 The casing shall be a one-piece sleeve, U-channel reinforced for added strength, for wa installations. It shall be fabricated from 18-gauge zinc clad steel and shall include an outside grille. The finish on grille and casing shall be two coats of baked on epox; resin enamel. The grille and casiny shall be shipped with a closure panel at both the front and rear casing and with installation instructions on front panel. 4.7 The controls shall be factory wired and completely enclosed within the unit. An adjustable thermostat shall automatically cycle compressor to maintain space conditions The thermostat shall be of the cross-ambient type to permit cold weather starting and operation at 45F outdoor temperature when unit is on cooling cycle and shall have its sensing bulb encased in a plastic sleeve to prevent coil icing. The fan control shall be a 3-position switch for high, medium and low fan speeds for cooling and heating. The exhaust-fan control shall be a 3-position control to close the vent, exhaust air from room, or introduce fresh air to the room. 4.8 The unit shall include a removable and cleanable air filter. 4.9 The unit shall be provided with electric resistance heaters for space heating. ASARCO ELP 0007275 Rev. No. Contract No. M-7119 Date: January 23, 1976 Sheet 5 of 5 SPECIFICATION NO. MSP-0489WALL MOUNTED AIR CONDITIONER 5.0 QUESTIONNAIRE - See Specification MSP-0401 - GENERAL MECHANICAL SPECIFICATION for instructions on how to complete this questionnaire. 5.1 Item Identification 5.2 Date Questionnaire Filled In 5.3 Number Required 5.4 Manufacturer and Model No. 5.5 Total Cooling Capacity _______ btu; 5.6 Total Heating Capacity ________ KW 5.7 Supply Air Flow _______ CFM 5.8 Outlet Velocity 5.9 Air Throw 5.10 Dehumidification _______ FPM _______ FT. Pints/Hr 5.11 Electrical Nameplate Data .1 Electric Power Supply .2 Nameplate Watts (Cooling) .3 Nameplate Watts (Heating) .4 Wire Size 5.12 Required Wall Opening 5.13 Unit Shipping Weight 5.14 Physical Dimensions VPHHER WAT WAT' AUG INC LBS ATTACH DRAWING 5.15 Origin of Vendor's Services After Purchase of Equipment 5.16 Exception to Dravo's Specification ASARCO ELP 0007276 REV. NO. -- DATE 0 Z.t-7 DY APPROVAL ___________ P.ft M v> f REASONS FOR ISSUE/REMARKS PRELIMINARY ISSUE DRAVO APPROVAL CUSTOMER APPROVAL ISSUE FOR BID t ______________ISSUE FOR RURCHASF ORDFR______________ 31-70 OS J G"DT l ssue Cc> tJSTntxrns**-' 1 03 - f .DRAVO CORPORATION, DENVER OPERATIONS OFFICE One Park Central Denver, Colorado 80202 Sheet 1 of 6 CONTRACT M-7119 COST CODE - 3410 SPECIFICATION fep-~0~49jT) ASARCO, INC, ANTIMONY PLANT El Paso, Texas 79999 CEILING MOUNTED AIR CONDITION: TJ3 SCOPE OF EQUIPMENT AND SERVICES TO BE FURNISHED BY VENDOR 1.1 Refer to: .1 General Mechanical Specification MSP-0401 .2 General HVAC System Specification MSP-0411 .3 General Electrical Specification ESP-4001 .4 AC Squirrel Cage Induction Motors ESP-4002 (1/2 HP to and including 200 HP) 1.2 Design, fabrication, and delivery of all meterials and accessories required for the safe and satisfactory operation of a Ceiling Mounted Air Conditioner. These shall include but not necessarily be limited to: .1 .2 .3 . A\ .4 .5 .6 ' .7 .8 . .9 Hermetic Compressor Condensing Section, Coils and fan(s) Evaporator Section, coils and fan(s) Remote Temperature Control Center Refrigerant Casing Filters Motors and magnetic starters Electric Heating Coils ASARCO ELP 0007277 Rev. No. SPECIFICATION MSP-0490____________________________________________ 2.0 EQUIPMENT AND SERVICES TO BE FURNISHED BY OTHERS 2.1 External wiring 2.2 Installation of unit and its accessories in the field 2.3 Structural supports 2.4 Balancing of system air distribution 2.5 Outside air provisions 2.6 Return air duct system Contract NO. M-7119 Date: January 23, 1976 Sheet 2 of 6 CEILING MOUNTED AIR CONDITION ASARCO ELP 0007278 > .> Rev. No. 1 SPECIFICATION MSP-0490_________________________ 3.0 FUNCTIONAL REQUIREMENTS 3.1 Quantity Required 3.2 Equipment Number 3.3 Location 3.4 Condenser Entering Air Temperature (F) 3.5 Cooling Capacity (Sensible Heat) 3.6 Heating Capacity 3.7 Evaporator .1 Air Flow (ACFM) .2 Static Pressure (in. wg), external .3 Entering Air Temp (F) .4 Leaving Air Temp. (F) 3.8 Compressor . 1 Type .2 Refrigerant .3 RPM 3.9 Room Thermostat Auxiliary Selections 3.10 Electrical power available Contract No. M7119 Date: January 23, 1976 Sheet j of 6 CEILING MOUNTED AIR CONDITIONER One (1) 58.3415 OFFICE 105 25,318 BTUH 15,400 BTUH 1250 0.6 75DB*, 61 WB 53DB, 51WB HERMETIC WELDED SHELL' R-22 (FREON) 3600 "FAN," "AUTO," "OFF" 460/3/60 ASARCO ELP 0007279 Rev. No.__ 1 Contract No. M-7119 Date: January 23, 1976 Sheet 4 of 6: SPECIFICATION MSP-0490 4.0 DETAILS OF CONSTRUCTION CEILING MOUNTED AIR CONDITION 4.1 The compressor shall be internally spring isolated, have sound muffling and shall be complete with crank case heaters, service valves, suction line accumulator and full refrigerant charge. 4.2 All controls shall be factory wired and tested. 4.3 The evaporator coil shall be factory tested at 300 PSI and shall have a capillary expansion tube. 4.4 The condenser coil shall be factory tested at 425 PSI. 4.5 The air conditioner shall have low ambient temperature protection and shall be suitable for operation at an ambient temperature of 40F. 4.6 The cabinet shall be insulated and contain fi Iter racks. 4.7 The air conditioner shall be ducted using outside air as a fixed percentage of total return air. 4.8 The air conditioner shall be provided with drain pans for both the evaporator and condenser. The condenser pan shall have a drain opening. The evaporator pan shall be insulated and internally sealed with a 3/4 inch IPS drain pipe connection. 4.9 The condenser and evaporator primary surfaces shall be 3/8" OD seamless copper tubing. The secondary surfaces shall have mechanically bonded aluminum fins. /f\ 4.10 The unit shall be provided with slip-in electric heater equipped with all safety controls. 4.11 The unit shall be furnished with remote control center located in the conditioned space for selection of heating, cooling and continuous fan operation. ASARCO ELP 0007280 Rev.. No. 1 Contract No. M-7119 Date: Jc \ry 23, 1976 Sheet 5 or 6 SPECIFICATION MSP-0490.CEILING MOUNTED AIR CONDITIONER 5.0 QUESTIONNAIRE: See Specification MSP-0401 - GENERAL MECHANICAL SPECIFICATION for instructions on how to complete this questionnaire. 5.1 Vendor's Name _____________________________________________ 5.2 Questionnaire Date _____________________________________________ 5.3 Item Identification, Manufacturer and/or Model Number _____________________________________________ 5.4 Quantity _____________________________________________ 5.5 Delivery ________________________________________ WEEKS 5.6 F.O.B. Point 5.7 Origin of Vendor's Services after Purchase of Equipment ____________________________________________ _ 5.8 Physical Dimensions .1 Overall Size .2 Clearance Required for Maintenance and Repair 5.9 Weight /)\ 5.10 Cooling Capacity (Sensible Heat) /^5.11 Heating Capacity </J\5.12 Evaporator Air Flow /K 5.13 Evaporator Static Pressure ^7^5.14 Evaporator Fan Type HP RPM Z^.5.15 Evaporator Face Area /J\5.16 Condenser Air Flow /}\5.17 Condenser Fan Type HP RPM (Submit Drawings)__________________ (Describe)__________________________ __________________________________ LBS. __________________________________ BTUH __________________________________ BTUH __________________________________ ACFM INCW W ___ HP __ RPM SQ. F ACFM _HP RPM ASARCO ELP 0007281 Rev'.. No. SPECIFICATION MSP-0490 /t\ 5.13 Condenser Face Area As 1? Compressor Type HP RPM .20 Filter Size, Type AREA 5.21 Exceptions to this specification Contract No. M-7119 Date: January 23, 1976 Sheet 6 of 6 CEILING MOUNTED AIR CONDITION? SQ. FT. HP RPM SQ. IN. ASARCO ELP 0007282