Document 7xgaRzrbKr9mB2EpNJr8MRvg

* rn* 1*01 gum or service tVMMl Owuar Cl t Mat vm Ini ***** J*** HOTSPRINCS ARK 9*5A NOV 26 1921 B F BAKER KEWANEE ILL 9 * HOME MONDAY EVEN INC CAN MEET ADAMS NEXT WEEK OR LATER E E BAKER 1012A i* 24646 1 Fusible Ping Smoke Box In the back head 2 inches above the top row of tubes, the boiler will be provided with a fusible plug The boiler will be provided with a smoke box..2..y....inches deep, fAl.t..i.!..il.?..*the front end of the shell opening at top for smoke outlet. Wlttl Supports On each side of boiler two heavy hanger loops will be securely riveted to the shell and will be provided weldless U-Bolts to permit boiler being suspended from overhead frame work Independent of masonry walls. The suspension equipment will consist of four __ /..!?".....inch .... QLa- ..................... pounds per f00t' "d to0rTM8-"TMil--------- ^..... .^----...columns. The beams wffl^`bi2 in pairs by means of tie bolts and separators, leaving the adjacent edges tar enough apart to accommodate the han bolts. The columns will have suitable base plates and cap plates, provided with bolt holes for connection bolts "J foundation bolts. 13 and Trimmings Front and Castings Test and Inspection Foundation bolts will be furnished by the purchaser. y y '/ The following trimmings will be furnished for each boiler: .....~......... ......Sr......... Inch pop safety valves set at ........................ _...... pounds per square inch; ............ ......................... Inch dial steam gauge with syphon and cock and graduated from 0 to.................................pounds per square inch; .....SjfcJL-...... ---------combination water column with 1% inch connections, fitted with three % inch gauge cocks and................ .................... inch water ^auge with glass and guards;_________ /.jSs.___ __ inch check and stop valves for feed water connections; ....... ............................ Inch .... ...blow-off cock. The boiler will be provided with a heavy cast iron___ *^..**M...... ..front with anchors for bolting to brickwork. This front will be furnished complete with necesssary flue doors. Are doors with perforated liners, ash doors, dead plates and fire door arch liners. o^.l........ A complete set ......................................grates................. inches wide and.. ..long will be furnished. Back arch bars of the.. hl^rtr ja...___ type and a heavy cast iron damper plate an&damper for smoke connection, access door with frame and (Anchors, .....Ct?........ .side buck stays with cross stays tor...tJIO.. setting, and through rods with diamond washers for rear wall will be furnished. During the construction of the boiler, the workmanship and material will be closely inspected by a qualified inspector. Data reports, certifying that the boiler has been constructed In accordance with the A. S. M. E. Boiler Code, also an Insurance policy for 2400 for one year in the Hartford Steam Boiler Inspection and Insurance Company will be furnished. 24649 SPECIFICATIONS 24650 K&WANE^ Smokeless Tubular Boiler FOR A~.it (x> * 'rty- o H.P. t^UL" Z ---LU ') iS / 2 r* m. p. SUBMITTED BY KEWANEE Q9ILER COMPANY KEWANEE. ILLINOIS General Down Draft Furnace Material Riveting Braces Tubes Openings Each holler is to he---------- (a...(a----------- inches In diameter and_____ L.!?.feet long, rated at...._________ Horse Power and containing.--------- /~2--....ft-----------------square feet of heating surface. The boiler will be equipped with down-draft furnace of the Kewanee type and will be set in box type steel casing in accordance with setting plans furnished by the Kewanee Boiler Company. The boiler will be built for a safe working pressure of................. LJL.JT._____ pounds per square inch, in strict accordance with the Boiler Code of the American Society of Mechanical Engineers, and will also comply with all existing state and city laws. The down draft furnace will consist of an 8 Inch pipe size front header, connected to the lower part of the shell by means of solid forged steel nozzles and 4 inch extra heavy steel pipe. The rear header will be 6 inch pipe size connected to the sheU at its horizontal center line by means of marine flanges and 4 inch extra heavy steel pipe. The water grate tubes will be 2% Inch outside diameter, expanded Into holes in front and rear headers. Open ings opposite the ends of tubes will be provided in both headers for expanding the tubes, and these openings will be provided with Key handhole caps. Material for both headers and water tubes will be seamless drawn tubing. The sheU plates and heads will be of open hearth firebox quality steel, having a tensile strength of not less than 55,000 pounds nor more than 65,000 pounds per square inch. The longitudinal seams of sheU wUl be of the butt joint..?^!riveted type, with double covering straps and arranged to break joints In the different courses well above the lire line. All girth seams will be lap joint, single riveted. All rivet holes wiU be punched K inch smaU and reamed to full size after plates are assembled. Each head to be thoroughly braced with weldless forged steel braces, so spaced and sufficient In number to con form to the requirements of the A. S. M. E. Boiler Code. Crow-foot type braces 114 inch in diameter will be used above the tubes. Below the tubes, through rods extending from front to rear heads will be used. At the rear head the braces wUl be attached to two 5x3xH inch angles, securely riveted to the rear head and separated from it by extra heavy pipe thimbles to allow circulation of water between the angles and the head. At the front head, the through rods wiU be upset to compensate for threading, and wiU be secured to the bead by means of nuts and washers both inside and outside the head. The boUer will contain.......................(l] J......................vSj3GUL^.....tubes.._..... ................ inches In diameter ............/...I...............feet long, set in vertical and horizontal rows, with a clear space between them horizontally and vertically of 1 inch, except the central vertical space, which will be 2 inches. Tube holes will be drilled not to exceed 1/32 inch greater than the outside tube diameter. Tubes will be set with a roller expander and beaded at each end. In the front head below tubes and In the top of shell, will be furnished 10x16 Inch manholes complete with Bteel plate, yokes, bolts and gaskets. Main steam connections will consist of one.......... ..... ........... ............................. inch Taylor forged steel nozzle, with ...^..S.:...H.Y.V(.-......5...T.Q....... drilling for companion flange. Safety valve connections wUl.be...:^..~......3i.........A--19i*rr4. ^ i * ^ A ^ ^ * |...................................................................................................... . . -- -.......... A brass feed pipe bushing will be provided In the front head for........... .........................Inch feed pipe which will extend three fifths the length of boiler from the front head and be arranged with open end to discharge the feed water over the central rows of tubes. The boiler will be provided with an extra heavy flange threaded for.......2r...........pipe and riveted to the bottom of shell about 8 inches from the rear head for blow-off connection. Necessary threaded openings for attachment of water column will also be provided. Fusible Plug In the back head 2 inches above the top row of tubes, the boiler will be provided with a fusible plug. Smoke Box The boiler will be provided with a smoke box............ 1..S............. inches deep, bolted to the front end of shell with opening at top for smoke outlet Supports On each Bide of boiler two heavy hanger loops will be securely riveted to the shell and will be provided with weldless U-Boits to permit boiler being suspended from overhead frame work Independent of masonry walls. The suspension equipment will consist of four...../.f........ inch ft-***..... weighing ........pounds per foot, and four_________ 8.::.-...iat.........columns. The beams will be assembled In pairs by means of tie bolts and separators, leaving the adjacent edges far enough apart to accommodate the hanger bolts. The columns will have suitable base plates and cap plates, provided with bolt holes tor connection bolts and foundation bolts. Trimmings Foundation bolts will be furnished by the purchaser. The following trimmings will be furnished for each boiler: .......3............. -..inch pop safety valves set at ../..A..C............. pounds per square inch; ................S./L.............inch dial steam gauge with syphon and cock and graduated from 0 to......`3r...Q...9..............pounds per square inch; .... $! combination water column with 114 inch connections, fitted with three % inch gauge cocks and............... $Si............... inch water gauge with glass and .guards;..................................... inch check and stop valves for feed water connections; .............. ......................inch blow-off cock. Front and Castings The boiler will be provided with a heavy cast iron full flush front arranged for bolting to front end of casing. This front will be furnished complete with necessary flue doors, parallel opening fire doors for upper grate, fire doors with perforated liners for lower grate, ash doors, dead plates and fire door arch liners. For the lower grate a complete set will be furnished. of theVs'5^^*....!.. Back arch bars will be furnished. _Migrates.................... &Cr.....inches wide and....6 <1.. ..long ..type and a heavy cast iron damper plate for smoke connection Casing and Insulation A sectional steel casing of No. 10 steel reinforced by heavy angles will be furnished to enclose all of the brick work except at the top of boiler. This casing will be provided with 20x24 Inch access door and necessary access doors opposite ends of water grate headers. The casing should be lined with............. ,i...!7..."}____square feet of Insulating material 1 inch thick, using 85% Magnesia, J. M. Flrefelt, Sil-O-Cel Blocks, or equal. Insulating material is not included with casing. Special Brick Special fire brick forming the lower course of the wall to be built on the rear header of the down draft grate will be furnished with the boiler. Test and Inspection During the construction of the boiler, the workmanship and material will be closely inspected by a qualified inspector. Data reports, certifying that the boiler has been constructed in accordance with the A. S. M. E. Boiler Code, also an insurance policy for J400 for one year in the Hartford Steam Boiler Inspection and Insurance Company will be furnished. 24651 a t*I; . - -- >V' v VT '^A^^r-:^.:.--, ' -.-iv w -. * /v./". ". -~.-?^Akc` ^ y - _ .. iL*^ *+f"- .11 f- fc' w '* **: n QMPANY. Stool Heating Boile rs, Tiuiks, Garbage Bumere and. Hrtiator, Power Boilers *7 west 42 street- new York Sept. 29th, 1921. Hr. 2. 2. Bator, Kerens Boiler Campany, Kewanee, XU* * Beer Hr. Betor: X here been In negoletlon with the ovnere of all the stock of the Pitsgibbons Boiler Coeipany, and hare a satisfactory option on the same that X will likely ezerolae as soon as a few little natters can be Ironed out by the owners of the stock. e -- The Fltsglbbons people hare plaoed about a thousand boilers here In Hew York, and have a very fine clientele, leaning nostly to power and high pressure stuff, though they did gat some big heating installations at very fanoy prises. The last five years, however, we have not felt thaw very nuoh In conpetltlon for heating boiler business. There is so nuoh oonblned power and heating work here In the Bast, where we have to build for working pressures up to 159#, and that you do not want, and In addi tion to where we can sell the Kewmnee heating line, that this thing ought to make s' fine acquisition for us if X can land it properly. Soon as I get far enough along so that the deal takes definite shape, will be out to see you and B. P. and talk It over with you, or should you or B. P. be coming Bast soon, we oould talk over the matter here. . * This thing if it goes through as I plan, should Inerease very materially our business on Xewanee heating boilers over this and former years, and which X have primarily in mind in acquiring the Pitsgibbons business. Yours ya^y truly. MT 24653 Tf` ->1 " 'Vi. & 4 Cct. l, ir;Li Vr Bto*r Jkddaats, i-'-'>' '. . s'?w . *.. . *> 'ftear Pin-- . ro-k City. , Answering youra or 9th -bout >jjfit*glbhen* Seller Coe*:- ny- ".V Of eour:-`.T v.nc- r.ethin- :.bcut 1 this-except *hat you tell ue in the lif 'r 'eJ^dt ore not la position to ar.7 Rethink vfrzj about It e'-c'^t th.-'.i a? rhall hr re v.fully luivlucd nbcut the i tails be'ere it the rrattrr our nv - rc-nl. The qtfcs+ion with, ue la rfceth-- e'> ccnyccT cn afferc' to sell th v reluct of another Ticteny'* Perhaps, ho^sx -c*: h: v- In Mad .taking o-er our c tcclc In the *T Verb Kr-x.-ni' Boiler ?rtrpany in ron action *v otlJ^T outoh-ve* ' **X think neither Fr> nk no" ry<*el# tl; be e'l'.t in tlv* ne-.r "tur, Ycu-c t-v.ly. % 24654 Kewanee 5iler (>*pany. |nc. Slool Iloatin^ BolU'i-.s. Tonks. Oorbn^e Burners and Radiators, l'oww Iloilors 47 WEST STBEF.- XkwYohk October 3rd, 1921. 4 Mr. S. 1. Baker, President, Kewanee Boiler Cowpeny, KmiM, m. 99 Deer Mr. Beker: Beg to acknowledge your letter of the 1st about the Pltsglbboas Boiler Company and should hare really written yon wore in ay first letter, as it la not my Intention, at all, to have this deal affeet the Kewanee Boiler Company Inc. business and the distribution of Kewanee Boilers In the territory where we now operate. -- I plan to average 50 more Kewanee Boilers In the next three years, than this and last, and should like to contreet on a basis that would give us that much more tonnage and additionally aim to double the present volume on Kewanees In five years. I, of course, must have the Kewanee name to exploit and sell them and want you with me as now. Even, If I should eonslder your offer and buy the company's stock I would like you and B. P. to stay lm with me in the same relation you now hold Just as long as the "Inc" Company Is used nearly exclusively to market Kewanee Boiler Co.'s products and Z would like to go on under your co-operation the same as now. My idea for the Fltxglbbona Boiler Company Is to have it go on as before under Mr. D. H. Pltzglbbons, Vice President and Manager, it nun for some years, making and selling their own product and where we need high pressure and power boilers (that Kewanee does not want) buy them at a differential from the Pltzglbbons Boiler Co. who build up to 150# W.P. 8y the way, you hardly have an idea of the fight It Is, frequently, with these eastern engineers, a lot of whom specify regularly for 125#, which has long been their custom Instead of 100# that we have tried to hold them to. 24655 Boiler (>iarf>nr^ X? <m> Mr. Beker. October 3rd, 1921 Hope the above gives you a better Idea of ay plans and Intentions and really welcome the very frankest exchange of questions on this subject with you. As soon as the thing gets Ironed out satisfactorily, Z will be out to see you, likely tills month still, and talk over the whole matter with you and get both your and B. P.'s views and advice. EW 24656 Kewanee Qomany. Jnc. Steel IIcsatiiMj Iioilors.T/uiks. Garbage Hurnci's and Hadialoi's, Power Boilt^rs +7 WEST 4 2V STeeT Xew York ter 15th, 1081 \ I. I. p i* r. i fNiUnti , YlM tealdiat li tear Birsi x Sinss v visit at Kimbn and {Tank praimutlofi af tte Flteglbbons dsal sad after sbsorvlng tha way it apporostly strwk yon, X want to foal sura that no alood hangs star as sad that sar uadsrstandlng sf sash sthsrs aotlros and psrposas is aloor. Xou know that X bars nigh goo* thru fira, both to gat lata this aarkst sad aftarward, lntarulttantly, to asks tha gradss, sad that aash af last yoar and this, as had to lay dsaa tefsrs aoat of tha largsr attraotlro installations and asarly all tha 100# sad hldwr praasurss, largaly, on aseount af c rslatiroly hsarlsr Assign sad aanatruatloa than our aastsm soapstltors protests. For paaar and hldi sraasuraa, particularly with staaa siaa anteraalts faal sad in bite tel3dings, with strong draft, x figsrad this Fitsglhbaas bailor would giro os rails? froa tha tea slosaly raaIrislad shanasls to vhlah tha praoant , r* da iBjlstiali X had or tears no thought of raplsslng say af tea fasr Kaoaasa typos as sra sailing as*, but four you sra ast so alaar so that point, no* as tefors, and psrtisularXy as attoatad by dasira af you bote to disposa of tha I,B,Co, holdings in tea lav York Coarpaay or to tern it into anotijw stylo af aorpsratiou. piano vara and ara for a biggsr x, X. lawns* Oonpany and X9d lika you Idantlflad tte it Just as no) long as it gsso by teat mbs to sail Kaosnaa Bailors, Xf you still faal, as you did tesn X vua out teora, lot ns knar on teat basis you sill aall outright or avahanga K,B*0o, Xae. for x,B,co, otoak. 24657 Nfe frtlM ditaila of mvommbI u m nay fStor and that art aotaally fair and will atrrt tt bald as together paroananll/faccordingly await your reflections. X 24658 a ?' . * t* -or. 19, i52i# gyitr m--(' 4f "*t 4ftt Street. 9f Tork 0U>, Dear ^ddos: Tor* of ths 15th forwarded to oe here* Boforo aaBvtrInf this 1 should llics to toll with tbo other officers, end, as 1 shall ho at 1M on tho S9th. ^ 111 dofor a do tailed answer until that tlao I harw no doubt that rm t'hall be a le to arrive at eons kind of a eettlorient that Mil he eatiefactor? to both ^artlef* Tours very truly. 24659 * lykant. may. mmcil. Mzgfeoj IjteM, A. B. GAINeS. PnaiDOT W. C/CHCSTCK,MMuac 'WM8M8/ . EASTMAN MOTCL A. B. OAiNC&PAcaiocM^ W. E. CMEST0t,Mwu6c> 0t 19. 1921. . ** #A * . . < A':r -- f -*> <* I'r. 3. ?. Baker, Ilewanee, 111. Dear Sir: I have a letter from Addams, of which, of course, you have a copy, and am enclosing carbon of my answer herewith. Ae I see it now, it would seer best for ua to cloee out this deal by exchanging stock, and prob ably on the ba8lB of book value as ^ired by the auditors January 1st would be about right. "!% v/111 talk it over when I get hone. I notice that Addacs says noting about the name, and we will discuss that too ge t home. a ^Tcrurw very truly. -nc A*. -4- 24660 u; I Vi in *< V 4- lov#r 2233rd, 1921. ir. L L Btkr, irliaftoa BoUl, .i Batlonal Part, Art* *r. > tha iftth* 9'of* 19th about nlna* of w# an o a goal in Buffalo, for eonaldarwblr 1 ad bualnaaa thara nazt yaw ui4 tha wrltar ahould rwally go tharo tha lattar part of met wort, 007 r tha Both, or P*ing tha waak fo llovt of* If a ooufaranaa/wowld ba moultabla, aa7 lattar part of aant wart, or drtlag tha lattar part of wart following, ao that Z oould taka la Buffalo althar going or aonlag, it would aura tlaav roner and trawal far no and wa would than go law Tort problt in an antlralr paraonal and iafofnal war. I hara thought a good daal about tout and tr* B. f*a wuggaatlan to uitwatalr ehanga tbo tltla of tha corporation and now fowl that to wran do wouldn't prora aa hartful to tha aala of Eawanaa ita an Z ponaiblp at flrwt fwarad. n ma ran and Sra. Bakar arw hawing a oat dallghtfUl Una la that wondar-land whara you ara on waaatian* aa Z holism * arw now getting naarar naarar tha atartlng point for building nomalar la Whlrt na will aabd to wort with our boat strongth and ft v^ t Barr truly yourw. Of ta r.B.P.Brtar # f a . JL..j . y** 4 24661