Document 7j4mZq3oQR1yOR5znLb6pm26
ra
THE BADGER COMPANY, Inc.
CAMBRIDGE 42. MASS.
OgMAHCH SPBCXFICATK3I BOUmOBfr AID FTP05
Pages
MCHSAKTO CHQCECAL CCMPAXT
CHQCOIATE BAYOU
TEXAS
A1 PLrdfT DEPT. 30 AI7TH. 10. PioJKT 39
it
sr. a. % ie.+t :*r. 44
<r
<L lev. ~Sk. 2. *, 34, 3ft, 37, 41, 41, Added Sheets
pit K t
Ptit ttBtivw. -
w mn ;, .
UUe4 jfoeet 30.________
Added Sheet 30 j j|'
r/,/ 1T*V Client V
hf Client.
APPROVED Design *.w
Client
CERTIFIED 9
Ch. Dv.
6113 16702
Ltorage Tnnks Cold Service Exchanger* Hot Service Exchangers $X) F and abjve Exchanger* Cold Service Pvnsp* Hot Service frmp* CrlA Sendee
Valves rl>t Service Flanges hoc Service Piping Hot Sendee Piping C id Sendee Insulation sickness Tobies. Hot
Service
Insula'.loo 'thickness fables. Cold
Service Valves v flanges Cold Service 5qulpnmt Outline Sketches fiiulpatent insulation Schedules Piping Insulation Designation Table
32,33,34,35,41.42,43,44 3h, 37,3i% 39,40 45 through o4
M44 Ihts. 45 thru SHUTS 32-44
Client's co bp Client
tied
ncs
OKCQMai IAX0B
THS BAOOSA COMPANY*. In*.
, i.- -a
g
6113 16703
1N52?
ihbuiatich nt-r.cmcATiqi A. ,3 PXPEKi~~
hKu * * X Ltji LtLax.
SCOPS OF VCRK
The insulation sub-contractor shall furnish all supervision, materials, labor,
tools, scaffolding, and jquijmcnt necessary to execute, construct, and finish
in an expeditious, substantial and workmanlike manner all equipment and
piping Insulation required for
project. Any exceptions will be specifically
mentioned in this specifics*
uuo accompanying drawings.
gWflSGS k SCHEDULES
The work tc bt done la shown on drawings included in this specification, together with piping arrangement drawings and such other drawings and data, not listed, as may be necessary in the opinion of the Bndger Company to supplement information given therein.
Sub-contractor will be responsible for his material quantities. Tables contained within this specification will give sub-contractor necessary information which will enable him to make his equipment material take-off. Sub-contractor will be given a complete set of piping arrangement drawings together with a schedule showing the pipe lines that will be insulated with the thickness and type of insulation to be used. The sub-contractor will be required to make his own piping insulation take-off from the information given.
VCRXMAM5HIP
The intent of this specification is to secure a first-class Job in all respects. The workmanship shall be cf the highest quality throughout, and sub-contractor
furnish a cnopetent superintendent experienced in this class of work. Surfaces to be Insulated shall be brushed clean by sub-contractor before applying the insulation, using wire brushes if necessary.
gSPBCTICB
An inspector representing the Badger Company or client, shall have the right
to inspect all work and material at the factory or on the site, and any work or
material found to be defective or which does not meet the requirements of this
specification
be replaced by sub-contractor at his own expense. Such
inspection shell not relieve sub-contractor from full responsibility for the
quality and correctness of his materials and work.
ll Approved by Client ch/u. Xart!fled
z J/zr/jt*
XCXISASIO CHEMICAL CCKPAHT
CHOCOLATE BAXCU
TEXAS
THE BADGES. COMPANY, lae.
CAMMUOM 4S. MAM. 1___________Smstl ''it
6113 16704
5XCTICH T GEafftAL (C< irt.)
SCATYQLE6
The sub-contractor shell provide, at his cnm expense, i design and as required for his vork. He shall renow from the Job said scaffolding on completion of the work of the subcontract.
ihcaticw or job 3Etb
A railroad siding will be available to the sub-contractor near the Job site. Sub-contractor vill include in bis bid the necessary coat for trucking of aaterial frcm the siding to the storehouse, and fha the storehouse to various parte of the Job.
STORAGE OT BBULKTIHO MATERIAL
Sub-contractor shall visit the site and acquaint himself with the location and conditions of the Job. The Badger Company Job superintendent will allocate space for storage of aaterials.
If there 1 -o 1-'tiding space available, the sub-contractor vill incinrf* in
his bid 1
a )f aaterial, erecting and removal of a suitable vmrehouse to
meet hia 4-lr -eats.
CLEANUP
Contractor shall conduct his portion of the work in a manner that will
generate a minimum amount of debris, and this shall be removed by him to a
safe location, indicated by Purchaser's Construction Superintendent, before
the end of each work day. Contractor sjiall also clean equipment, machinery,
piping, structures, floors, walls, etc., of any undue or unsightly splatter resulting from his operations each day.
WELDING
Many of the vessels and equipment in this plant are fabricated of special alloys. Many arc fully stress relieved. No welding of any type shall be done on any vessel, equipment or piping for attachment of additional supports, clips, etc., without specific written approval from Badger, and this work, whan approved, will be supervised by Badger.
MOBAKSO CSBGCAL CCKPAXf
CBQCQKAXZ BAZOO
BUS
TUB BADOS* COMPANY, las.
6113 16705
i
SKTIOH IX M&K
All aaterials shall be new; aaterials such as insulation blocks. Tip* covering, cmscnts and weatherproofing ccapounds shall be delivered to the Job site in factory sealed containers.
Insulation shall be of the type and thickness specified herein* AH aaterlala necessary to complete application of ths insulation system shall be of the type specified herein. Proposals shall be based on use cf these aaterials as specified and no substitution of saterials shall be permitted in the base proposal. Alternate proposals based on the uae of aaterials other than those specified aay be nade. In such alternate proposals the subcaotractor shall state the physical and nechanical properties of all aaterials and shall furnish detailed description and drawings of acthods that differ fTc* those outlined in this specification.
1. High Tcaperaturc Block and Pips Insulation
Owens-Corning Oweas-Ccrning
Kaylo, or approved equal, to 1200 F. Xaylo 20, above 1200 F.
2. Lov Tegperature Block and Pipe Insulation
Pittsburgh-Corning
Fbaaglas, or approved equal
3* Insulating Mastic Lion oil Zcapaay
K-Xote
4. Accessories for High *T>j:upcrturc Insulation
4.1 Stainless Steel Wire
Wire shall be 14&16 Ga.,Type 304, cold-drawn, bright annealed stainless steel.
4.2 Stainless Steel Bands
Flat 3/4 inch x 0.020 inch, ^Sype 304 stainless steel strap )>n be used on vessels and aquijmnt operating at 500 F., or less. A.J. Gerrard Kxpand-B-Strap, or aa approved equal, shall be used on vessels and equipment operating above 500 F.
4.3 Insulation Filler Material
Loose insulation aatcrial tar packing cavities and expansion
" spaces shall be FibrofU, a dlatoncecus ailica with long fiber __
asbestos. *aanulfectured by Johna-Nanvllle Ccapany. --
'"'T
6113 16706
M jtr
SBGT'XOX II MA7ERjAl&`(gont.)
4.4 Caulking Mastic
Material, used co smooth depressions and minor voids in the finished Insulation surfaces shall be caulking cczapcund, Eagle-Picker, "One-Coat'', OCF No. 110, or approved equal.
4.5 Reinforcing Membrane
Membrane used to distribute stresses and rc... rce the weather coating on vessels or surfaces not covered by protective Jacketing shell be 20 x 20 aeah, asphalt impregnated glass fabric.
4.6 Weather Coating
Material used as protective Jacv Seal Perm.
4.7 Protective
r coating on surfaces not covered by be Lion Oil Company Fire Retardant
t k Piping In Battery Limits
Protective ,,<* battery Halt aluminum. v-. by Childers K 45 and 90 e or 5052 alun? . *
4.6 Protective Ja . ts,
V -.laced equipment end piping inside ugated 0.016 in. thick, type 5052
-hed moisture barrier as aanufactured inj v.'o., or an approved equal. Piping 1* ' protected with pre-formed Type 1100
a factory-applied aoLsture barrier.
g Off Battery Limits
Material used x. L .--tcctive Jacket to insulated piping off battery Halts shall be 45 pound asbestos roofing felt, as aanufactured by Johns-Manville Company, or approved equal material.
5. Accessories for Low Temperature Insulation
5.1 Vapor Barrier
Lloa Oil Company
Seal Kote Fire Retardant No Flash, Spray or Trovel Grade.
5.2 Reinforcing Membrane
Perma-Glar capany
No.105 Non-Impregnated Glass Fiber 20 x 10 Mesh, or approved equal.
II lljLz | Ayfrovad by ClUntT
H0BSA2TX) CHEMICAL CCKPAKT
CHOCOLATX BA1CO
TEXAS
THS BADGES. COMPANY, lac.
CAMMttOOS 41 MAM.
6113 16707
SECTION IX MATmTALS (Cont.)
5.3 Joint Sealer Lion Oil Coopany
5.4 Adhesive Lion Oil Coopany
5.5 Caulking Maatlc Lion Oil Coopany
5.6 Stainless Steel Banda A.J. Gerrard Coopany, or approval equal
Seal Kota Fire Retardant No Flash, stroveL Grade
Low Teap, Trovel Crada
Seal Kote Fire Retardant No Flaah, Trovel Grade
3/4" x .020" Type 304 , for veaaela and :equipment.
1/2" x .015" Type 304, for Pipe covering
6113 16708
IS*?
aacrioa m APPLICATIfK
Insulation f'-r piping and ecui-ornt 3nall be mipiled as designated on the schedule a and detail drawings incl tucu in *.his sp-' if.' cation.
1. IK t Service
Vessels, exchangers and General eauietaent, up to and including 30 Inches in dlaai ter shall be insulated vith pipe ec.cring. Over 30 Inches in ..leant'tcr ese mitred iv,3 cut .hr ilat blocks. C rveh blocks nay be used lx* eccncaicnl and available.
Menhclcs, flanges anu stiffcaqr ~in.;c \n vessels and exchangers will not be insulated unless specifically designated tn schedules cr detail drawings. Itoae plates shall not be covered.
Valves and ilanges shall :>e insulatee only in live 3tcaa lines, steam traced lines and ILnes ipc rating >. vor u.<o ?.
When insulatitn is specified ftr personnel rretection, it shall be applied cnly where lines are less than f'-t>' above :r three feet from .he edge of a platx'cra or valieway.
Where insulation passes over pipe supports,sub-contractor will be
> required to do the necessary cutting ana weatherproofing of insulation, on high .ertical risers sub-contractor will provide insulation supports
in the r m of bar -leaps made from 1
l-'U steel with the necessary
bolts, 'txr clamps will be required for every .'O'-o'' of vertical rise. N- bar clnrp will le required unless the rise is at least 20' -o'.
Allow fsr e>.pansi..a .n the following .quipaent:
M.C.C.
Badger
a*
Item !Io.
Item IT.
C1rcunfcrential Bcpassii n
Space required between blocks and 3hcll fur expansion
Rl-1 thru MR-101A-I Rl-b
7/16"
Austenitic Stainless Steel Surfaces of equipment listed below shall b protected with a moisture barrier of Lion Oil Co. '^Seal Kote" prior to insulation. Insulation contractor shall apply a brush or spray coat of light or medium qrade mastic, t/lo" minimum dry film thickness, to a clean,
dry surface. MS-303
-io2 Bo""*t
CE.HTRAL FILE
n Af*wlADPP_lI"102 Added Austenitic St.Stl. Approved by Client.
i'.AhtctU
MCSSA1S0 GBXECAXi CGMHUBT
CH0CQKA3SI BAKU
SZtf
THX BADGES. COMPANY. Ime.
6113 16709
Hi
nscTlJi III Ami':ATlc* (J at.)
Cold jrrvi.ee
Low temp* rit'xrc equipment and piping sj.aLL b.- iauuloted with. f_JB!glsS -
Use pipe v.*. verin.* a piping ?jic equiiacat up t am including
inert# la
diameter. Standard curved z*'-7xn*-s *>? sutc-' l3>*s -nail be used ca
larger siz- s.
All valves, fittings ihd Mangos rn -la lines shall c* insulaten. Support# or attachments which pr .leot unr-ogn L.isuiati .n shall be ina'ilated f'T a distance equal to four tines the insul-iti n thi'ijvss where possible. Manholes, floated en'-o of exchanger's, and .tr.orpcints f equipment, access snail be protected with built-up insulation covering as described on detail drawings in this specification.
Steam Tracing
Steam tracer lines vrvo aHn^ to process Lines and fr mi process lines to traps and condensate ret'xma are to be insulated. C mplcte insulation of piping, fittings and valves is required except fer the sections at trapm froa and including strainers to and including cni ,ns bel_v traps. I nsensate lines c-vnstream fr*ia traps uischarging to setxrs r >mue shall be insulated ..niy where req'ulreu for personnel pr.-teeti .n.
F r rcapicte -nf.ranti -n on atema tra.i.'ig see Specificati -ns for Steam Tracing ' Sir'.*- <Jl6. Insolation centra,*-..r shall furnisr. aluminum f< il and Theraon vu.ro specific^.
Insulated Instrument lines
Instrument lead lines shall be insulated ns shown on instrument piping
cravings. Pressure gage piping, control valves, flow indicators, etc.,
when installed in lines that are ina'vlatci, or traced ami insulated,
shall be insula ted.
CEHTRM. ntf
General
Care
be taken that insulation does not interfere with the operation or
visibility of Instruments such bs gage -lassos, sight ports, level
indicators, etc., or the operation of mechanical or electrical equipment.
Soacplates on 'cold equipment shall be cowr-ni ever with removable plugs
of insulation or wood that e.xtend l be/und the insulation and sealed with
mastic. Application sketches included in this specification are typical.
Any piece of equipment not specifically described on the skotches shall
be Insulated live the equipment it most resembles.
I* "it'U smt c/4 vs;
ll Approved by Client.
SStlfii4 *
a* M___
HCNSAJTTO CKMXCAL CCM*V
CHOCOLASB BATCH
SBM
THS BAOQSR COMPANY, Ime.
I F,
i
j
Insulation on lirad asms thickness a a on ahell Secure Hocki with 3/4Hx.020* 1-304 St.Stl.insulation. Strap* < seal* .'paced 12** apart on cuc^futnce. Tbrcwel cn a 3/fl" thick coat , of caulking nestle and
itherproof.
for~iaethod of weatherproof
ring vesaei heada a* Sbut.'2
for type 4 thickness of* aka 11 insulation sea Schedule insulation support* by
wssel fabricator, for detail see .-Sect i4
3/4"x.020'Type 304 St.Stl. insul.straps & seals spaced l2"o.c.over block Insulation
Bess!* issslstia* fcm ragairsd . t he iacladad fa piping laselsf
for detail of fleeting flag aee Sheet
,014"c.Hlck earratattd slialaia jacket leg with moisture barrier atiacbaf.
Laps in jacket to be 4" aa
vertical teias 4 J" oe horizontal itsas.
Apply jacket with Sto.8 1/2** long aluminum alloy
sheet metal screws paccd fc'* on centers on vertical
3/V*x.020*^-304 St.Stl. insul.strapa 6 aeels at circumferential assets. For detail of "S^clipe aee Sheet i *
.Manholes 4 Stiffener ringa wt il not be Insulated except where specified. Stiffener rings shall ha enegsed with aluminum flashing.
Insulatn 4 finish bottom head seme an toy head, for list of manholes 4 stiffener rings sea Shaat
Tjj-Top of foundatioa.
CHBGECAZt
ancQUis uxm
TKS BAOOSK COMPANY. hw.
10
6113 16711
Surface* to be insulated shall be Clean, dry,and ires frei (rot, ruse, etc.
CcmtBX blocks to vesselsurface vith a coating Of low trap adhesive.
\
/
Ul , , III. IIMW WWE
Foengla curved blocks or wvi.!e<.' i;;s shall be 'aid up with si. butt edges and ends of outer layer (or single layer) coated with Joist scaler.
Li L-
For type 4 thickness o--------- " insulation ste schedule, provide contraction Joints below insulation supports by rur-- parking tightly vith Lien Oil
Co. K-Kote. Add a layer of insulation over outer layerat supports.
Joint sesler slip join
I --.
Use staggered joint
cons cruetion. Nozzles shall be
,*n:
Insulated per piping lnsui.
schedule.
TT -i
JUJ..ZJL
Provide iy?3
_______
/ i:l
rlf*
/ r*^ulr*d te M(*r* scrape,
detail it*
>-
fm
Apply a 1/16T thick ( 0
of Seal Kcto over the
tloc. Mills still vet wipe la
a layer of reiaforeis*
with not less ttos J*
at U seam. Seaows all
wrinkles sad alx hiNilac.
T-tlist sir
or brash over
the aostarsae s second east,
1/8' thick (vet), of *eal lets.
Finish shall preseat
unbroken surface aai
ccnpletely hide the glsss
doth.
Manholes 4 nandnoles snail protected with butIc up i sulazion covering, so installed t.at It la renovable and : placeable with air.late dc.^uga to the Insulation.
-For list of --nhnlns sheet.
3/4"x .020" st. stl. straps& seals spaced 9" O.C. to secure each layer of insulation.
-
Vessel skirts, legs or lugs shall be insuleced fors distance equal to four Claes the thickness of insulation or a alnlaun of 12" vbara posslbla.
.
Fireproofing by ledger-/
V
i i /V
Insulate 4 finishbottom head ssate as top head.
fecal with Seal Kote and lalass cloth. t
3
pirrarr Approved fcf Giiaat
'...
cou mvici
||S^ -
Biuay
CN
amacA&
onocus MICK
TXS BAOQrJl COMPANY, lag.
ruBn^n
XL
Apply a (qnr or brush)
Per* to 1/US" thickness fell* still wtt Labe* rolnfOTclaf"* --hrini, oswrlappiat edges It*lately apply a aeecod ttldc (ftt) of Sal Ppsnu
CftiTT OTftT aetal Jscknt %
Allow 1" spec* botveon block so* support to bo fills* with
Insulation filler astsrial.
016" chick corrupts* slualnua
Jacksc with ftoiscurc barrlor sccache*.
3/4" x .020" scsir.Un stool ..'.Sul. scrap
r-.si LVTTiA- pktah. at .^JS - HOT SERVICE
Flatting rln^ co bo taorl.--.ee* traat
16 ga.T-^jft Sc.Sd. ccs wits coasts*
^an.,
o wirss twisted co^schsr.
DgTA TT. Or FLOAT INC KING
For typo so* thick* nsss of Insulation sss schsOuls.
NQtBABXO GmaCAL COONS
aooocASB xaco
nt
TKS 1A0OE* COMPANY, fast.
tAMSMMQ *
.
j/fttr-i flgjtrMilW-l
Oli'* thick laalMMi <ht with lttn berrler-
#4 dla-. a 1/2" 1( lluMinwi alt07 sheet
Metal setews > ' O.C.
1 Mai
far
Inew 1 a 11 an
NX
\
lap
r
3/4" s .w^
Type
-14. fcvaf
ZuUi of Shell-
7Uahla|
CIKOriRgNTIAL SEAM DETAILS HUSIZOWTAL VESS 8X4 10T SERVICE
0.0. of vessel--..
Xnoulacloa --
Insulation support by vessel fabricator
.016" thick corrugated
-slualoua Jacket
Use 3/4- a .02QT!
\
3/4-
Scrag
a
ft
1" space between lnsul..block Ci support to be
filled with loose filler.
--* v. a.- <0 4
|1
. Supporting Clip
___ 3/4"*.020- type 1 J3k SS Strep
DCT4X1. or CLIP
Cilpe to be spaced appreetlaetely Id" opart or a mlalaum ef feer dlpe per width of sheet
HOdlEONTAL SEAM DETAILS
ygim,yfsua
HOT SttVICI
lew .per cneat * a co int. Ipprewed by Client,
iertlllsd
k*** tad1
caooocAss adieu wm TH* BADOSA COMPANY, Im.
6113 16714
I
~--isi>ra7W'5U?Ksrre------------------ -- ?r>l of Dlmnotoas
luuliClM Tfcleknooo
1" ir
2"
2km r
4-
Support Typo I
tu rue* citp l- * i-
iy * \\m 2" 2M 2*" * 2\m 3" 3"
3V* s 3*"
4H > 4"
Support Typo XXX
vutk Plot* nia 1" l-
2n3nr
NOTfS XmlitlM Supports by VmmI ribvlMtir.
V-
6113 16715
6113 16716
II
HOT SEUVICt
fw tyn **4 tktekMaa ( laMlttUt tee tcMula
Maul Jaelwt
2* Gunlte or 2** Cameac aortar lual plastered -
2"x2"x#l2 SUB Calv. Fabric To* of anchor boles -----------v
2000 or 3000 lb. concrete
thlcVaaoo aboil
Insulae loo support furnished with t^ulpotac
Pill with scrap Insulaeloo sai finish with hard finish plaster
wid 3/4** htRh slab bolster to skirt about 12"* apart. Tie Cat*, faartc to slab bolster with #10 SUG anaaealed Calv. wire Skirt L^J^-2** ninlaws
Fireproofing of eklrto of vessels by Badger, fktrea 4'*0W 0.0. and ana Her will be fireproofed cue alio only.
6113 16717
Jwt >< |3 >>- * *
--C
c^i2f<l?^
3^j OOS
u
x X --cC| ub jok --:>
e .2 ** *- jc
> 32 --jc
S c ,3 TM C d Ja Xj li t < u
I --^ --4 CSw<
J5?2 2 .
o m mm -* b a * -o
W > - U --` >*"0 _* --
-- 1i.e &e u o cw --o *m3 js
6113 16718
UM k*4 LIm
pga or xxsm.. scryort ng.^!
Steel piste clip* width equal ta tliA> ( lmaulatio* spaced 12" *ps_t
Mul ta thickMM *f lMUlati
Q.9. itell *
rHitlmul ^ af teak railed itccl cad
extaadiac (all l|tk at hall hath cldce sad welded ta steel piste
ellM----------------------
mmssr
*009
o
gurffeccs to bo insulated shall bo class, dry and firso tram tract, m '9 etc.
C0Bt
tO VOSaol SUrffcCO with ft COfttlfflg of lev
*d))siT.
gosslca shall be Insulated par piping insu'*tion schedule.
#Ovr roof iaauUtlon apply tw layers t 15 lb.saturated fait and one layer of 55 lb.asbestos felt roofing la asphalt napping.---------
Manholes shall be protected with builr up
Insulation so Installed that It is r#-wva*le
% replaceable with slsisui daswgge to - ans
f
insulation.
T_ rovi.d.e _T_y_pe J_J2D_2S 3t.>U. I
j / floating ring at aannoleo. |
attachments,etc..where
required t
be laid up
using Joist sealer
an ftU butt edges and
ends of outer layer or tingle layer*
3/4"st. 020"s t. a 11. a trapa-
ftnd saals apacad 9Mo.e.
shall be used to secure !
each course.
S
s For type and thickaeas--4
of inaulatlor see
schedule
/
Use sca,,> ared Joint -- construe:ion.
A.
FroJ tv. :.ona through the laaul. :ioa shall be insulated for a distance equal .c four tiaas the thickness of iaaulatioa or a clniaua of 12 Inche. whara poaalbla.
Provide contraction . Joists blov Insul.__j
supports by psoklag 1
tightly with Lion Oil Co. K-fete.
MULATTOS PgtAiU STORAGE TANK
majana
Apply a l/l" thick (wet) coat of Seal iCste
ever the Insulatlan. While still vet wipe is a layer of reinforcing arnfcmc with not less [ than 3" overlap at all j
scans. Rcaove all
i
wrinkles and air bubbles1
Iaacdiately spray or !
brush over the nt^ibraas j
_ a second coat. 1/3"
i
I thick (vet), of Seal { | Kcte. finish shall pre- |
j sent a nooth, unbroken i
i surface and completely j
hidne the glams cloth. jI
i
L>For list of aaaholeo sea Sheet l For number and also i
of noasles.aee
piping drawings.
f ~~ Seal with joist -*|JiieeeaTle**f.
Foundation
loofing felt is CO ho applied over th vapor Sftftl. Asphalt sopping notarial aunt ho compatible with eho vapor saal.
6113 16720
MOBMBO QflMXGAL CCKBMCf
QMOQtASB 1*300
TBCAS
TXS BAD0S& COMPANY. Uc.
gsMoni ;itovSiSLarVatt--^ r.'ier-
Sr
r: w
mk
r3S^
"s 1;
ISX' w
*$ i
O
S- I i * f!
"T~n
< a
T
i
.- * ~1
"I i
. k ^r
\ _ ji
ft i N1
* . f|t " f i- N
.-- -- 1
! -J
__ _L
2?
-L -
--
3 el
* j3
1
%
_LUz
r& i
8jUt to
-- O *
> to .x2; k to 2
5]i I Sill
m
SIUm'i msnraw
if euw.
---------
TXI 1APOSE COMPANY, 1m.
3
16723
WSs i
al U)
awa;:
rtlfUd
724
iwsujvj-i., u %?'? tr**
WCTtifsim afteil leawleted mif ia lfi<f
km and atone iraad
liesa, end where lad* assort la the Um Table
On 'lv* 2M and aaullcr use"insulating c<a*nt #f proper thickness and flat ah aa specified below.
Fill la with csuUdLag autte
SalId up with insulation to auit
--S'
j
-----f- *
On valvaa 25|" and larg t elded pipe lualatlaa of else and tklckaeoe.
2 loops of wire
T1-- 2" lap tjt::
.i
AFar piping insulationr
wira, Jackat, ate.,see
piping laaalatloa dataila.
\
Otar Insulatlm apply a thick coat'
of hard finish ce-int soft weather
proof with teal Pezau Cn sixes 2" ft largar reinforce the weatherproofing
atlft a layer of ralafordaf --'----
r
-Hire ea insulation and jacket with e alalaua of 4 loops. Use sane sage wire ee specified for ad joining pipiag.
TTFICAL VALVt
"ky" cUmmi!"
6113 16726
for piping iMuUtloa, wire. jcke. ce., piping iMuUtiK
'M' ? * r
**,-*.
6113 16729
iiHir--MM--
Im3*i VST
M
inr 4S M * 4S
M a -M
r M a -M a
H" M M IS -15
* S* JO IS is
r M M IS M 4" S9 JO
4" M 41 24
r*
4| 24
MT 4| 24 M
U" 41 24 IS
i*" 41 24 IS
14* 4| 24 20
w 41 24 20
nr 41 24 20
nr 41 24 20
nr 41 24 20
34" 41 24 20
9.1.
44" 41
40"
41
72" f" U0"
144"
41
41
41
41
9*9* 144* t 41
ru:
24
24
24 24 24 24
24
20 20 20 20 20 20
20
it f
** r
r
-
r_5t * AS
-2J5 20 *2
-ITS -2
- n -i
-- no --ii
ftS -0
-IIS -0
in -a -MO -II
1)9 -I
n -MB -IIS -1
M -110 -1 -US -IT*
is
Ml -IS
W <41 -MS -IIS
UtM,
tfA*
6113 16731
Insulation for PittInga, Valves, flangae, ate., shall ho prefabricated using smt notarial and thlchnoao aa adjacent piping, Fabrication shall bo la accordance with Fosnglaa Fitting Fabrication Manual.
Install corona before pips Insulation.
Saal joints with joint saaiar.
Allow elaaranca for flanga bolt renovalr?
u.
Flash and saal at boonst ptsjsstl with vapor barriar wastic and gjaw ^loth.
^ A^
lands at
M ./W/- ' fV : '
1" OvaTlap
'\ V H~L ^ j'>'7^
Cacura covers with fc" * .01SM type 304 stainless ataal bands and seals^ on 9" awiaw cantors using at least 2 bands par covar on flanges and 4 bands par cover on valves.
Coat all butt adgaa and aade at
outer layer (or single layer) rl1*
| joint sealer.
L-- Weatherproof same as
piping with 1" overlap at nil
Item AS-101 AS-102 AS-103 AS-104 AS-10S AS-104 AS-107 AS-108 AS-109
ML-101 A thru F
MS-102AA8 >*-103 >0-103
Sw.Ticed <0-112 SCo.Tracad 10-126 10-127 KT-128 MS-129 MS-131 MS-132 MS-133,134
& 133 MS-136 MS-137
>0-139 10-140
3011 Thru-R6 30T142 30S1
30T4
30T6 30T20' 3057 30X13 3058 30S13 30516 30X22, X23.X24 30517 30S20 30T28 30X29
41A 43A
tannm s&m*
In* ul. Thick. 1%** Prot. IV 1%" FC IV IV
t*
i" i" IV
A 8 . Tor Dims* loo* *u Shoot 34
4 *QV
40*0"
12"
12*1"
110*0"
3*0"
for OittMloot im Shoot 32
9*7"
4.7V-
127*2"
ao'4"
2'4"
U*
3*7"
7*1" S'O-S/S*
103*0" 88*6" 44*6"
17" 1*9* 9"
3* (2-L*y*r) IV Froe. 2V
U*lV
49*0"
For OiMnslona ih 9*3-3/8" 23*0"
3
ftS
4*1" 2*3"
2"
2" l" FC lV Froe. iV rc IV Froe. IV ic 3" FC l%"Froe.
6*0"
6*0" 4'6" 2*6" 12*0" . 4'6" 3*2" 3*6" 2*0"
6*0"
6*0" 6*0" 4*0" 20*0" 11*0" 21*0" 6'0" 2*10"
-
.
5" 12" 10" 13" 11" 4"
IV rc l|" Froe. 2" FC l%" FC
3'1-1/S" 2*6-3/8" 5'1-1/4" 3*1-1/4"
4*0" 8*0"
19'0" 19*0"
9" 7%" 13" 13"
MS-303 MS-304 MT-403 MS-411
30X1 .30812 320X303
3208302
1*
$
3'0"
4*4"
4"
for DlMxialon* Shoot
For Diaonaloao Shoot
a*-4*3/" 4*0"
3*
* Allow toc elworftrwtUl nywlaw. S AmC 8.
mssassm
O'
iiLMjuiiiiii
6113 16733
KXTIPKEMT SCHgWLK
Icn TT-101A-F
MOC Ho. 3011-1-6
TT-102A-F 3012-1-6
TT-106 TT-107 TT-106AM TT-112AM
TT-114 Tt-119
3016 30X7 3018-142 30811-162
30112 30X16
TT-120 TT-121
TT-123
30X17 30kl8
30X20
TT-124
30X21*
TT-126AM 30X23-142
TT-128 TT-139AM
30X23 30K37-162
Dws. Ho. D'Town 0-950 D'Town 0-950 H/T 1333 H/T 1334 H/T 1335AM H/T 1338AM
Ho. Isq'd.
6
6
1 1
2 2
H/T 1340 D.*Town 0-943 XFCO 12951 H/T 1342 D'Town 0-944 D'Town 0-945
D'Town XX-946 D'Town 0-947 H/T 1345AM
1 1
1 l 1
Instil. Thick. 3" <2"Layers)
2%"
.2" re 2" FO 2" FG
iV
2" 2"
l%" FG i%" FG l%" TG
2"
2*
l%" FG
2%" FG
P*--
A s
Tor Discos ions
Sh
Tor Diacnslons
43 V 44V
38"
27"
23'2" 23'2"
18'4"
20*7"
IA".
49"
28-3/4"
20" 18"
17*7"
8*0"
12*0"
16'4"
4'0"
Sh
2
2 a 2
3 24
23 24 10
49"
U'O"
2i
49" 16"
60V
U'O"
4*0"
23*6"
3'
6'
2'
jjaA *
1,
. - -*..-,*s*-rT ' _ * :
S^i^SR '0*tf
LIST OF MAMBOLES AMD STIFFENBI EMC*
, Ho.
n
Reg*d. 1
Manholes 1-21" ISO Lb.
Stlffaner Fines 4-6x3*x3/8" ^
Insulation
)1 1 )2 l >3 l
2-18" 3-18" 8-18" 8-18"
150 Lb. 150 Lb. 150 Lb. 150 Lb.
4-3x2%x5/16" 7-5x3x7/16" 4-3fet2%*3/*"
IV Foaaias
>4 1 '5 1 61
7-18" 6-18" 6-18"
150 Lb. 150 Lb. 150 Lb.
6-5x3x5/16" 10-4x3x3/8"
3-4x4x5/16"
10-3x3x3/8"
7l
6-18" 150 Lb.
10-4x4x3/8"
4l
3-18" 150 Lb.
3-2%x2%*%"
96
2-24" ISO Lb.
2-6*1%"
bylo
1-48" 175 Lb.
SB
Kaylo
W.2
2
2-18" 150 Lb.
4-6x4x3/4"
1l
1-24" 300 Lb.
71
1-18" ISO Lb.
m
13 1 81
2-20" Spacial 1-18" ISO Lb.
m m
l%" Foaa|Ut
15 l 1* 1 17 1 20 1
1-18" 1-18" 1-18" 1-18"
ISO Lb. 150 Lb. 300 Lb. ISO Lb.
m
l-3/8*2"
i%" roangUs
3** Fohaglas
IV Foaagiaa
28 1 29 l 16 1
1-18" 1-18" 1-18"
300 Lb. 300 Lb. 150 Lb.
'
2" Poonglas 1^M roatgUi
lo l 7l
1-18" 300 Lb. 1-18" 300 Lb.
2M Foaaglas 2M FoaqUi
37-1,2
2
1-18" 300 Lb.
2%" Fojuaglas
20T305
1
i ; Sis* i 1.. ..
W' 108 Lb. -1-1--8" 1--50 -L--b--.
. m
1%" Foaaglaa iV Foaaglas
101A-F shall ba Insulated with rwaovabla aacal jacketed (20 Ga. Type 304
) covars. Covers shall ho readily reaova^la aad replaceable,
on MK-1014-F and AS-103 shall ha insulatad 4 weatherproofed. Ochar stiffener
ba Insula tad hut shall ha boxad la with sluednun.
aglas insulated veeeala aha 11 ho lasalatad aojtecrfbad
rlicaclso sketched.
6113 16735
I tea PP-102A,,C * rP-106AM PP-114AM * PE-119 FT-14 LAM IP-147 PP-408AM
MK
Ho.
Pl-l-3
No.
!L
3
P3-142
2
PI1-142
2
P16
1
P35-142
2
HO 1
JOT MWlift
2
I; .
ptig gggpQM
4 Site Centrifugal 12 x 17 HVC Centrifugal 1% x 1 x 6/44 Centrifugal 8 x 10 x 20 PK Centrifugal 1% a 1 x 6/44
Centrifugal 10 x 17. BO Cent) lfogil 1% s l * 6/43
Centrifugal
*
^ .t
jr t4 tQJ _
Inaul. Thick.
IV* P*ot. IV
i%" ro
Wm
i%" pc
l\m PC *% P0
'*3 i-v | i*
Nunfaetunt! Pacifie Vtay|
Duriron Co j
Peerlaaa tn|
Durtrou Co.
Pacific Fungi
Duriroo
> .3 j .
MONSANTO CHEMICAL COWANY
* sum tnu4
.u 11 it mu
; ,, -.yfgpmy* p'affjyjt:
mmjgp^
mm
MO.
43 4t 7 116 l 20 l 22 l -28 2
53 2 -39 1 -A6 1 50 1 SA 1 -63 l -66 1 -67 1 -68 l -7A i -73 1 -79 3 -28 1
Location MI-103 M-103 *-103 AS-102 AS-103 AS-103 AS-10A AS-103 A3-106 AS-107 AS-108 AS-109 MI-126 IS-133 M8-13A MS-133 *-132 MS-136 *-131 AS-10A
48-101 AI-102 AS-103 AS-103 AS-104 AS-103 AS-104 AS-107 AS-108 48-109 IB-133
MI-L3A
-iss
hESksmm
MOC Mo. 3091 30Si 30TA 3001 3002 (Bot.) 3008 (Top) 3003 30 DA
3003 3006 3007
3008 30T20 30T22 30T23 30T2A 30S16 - 30S17
308IS 30D3
Typo T T R R R R R 1 R R R R R T T T R
1 R
Din. -A" 57-
42-7/8H 57"
A2-7/8" A2-7/8" 28-3/4" 42-7/8" 37"
42-7/8" A2-7/8" A2-7/8" 42-7/8" 37" 28-3/4" 28-3/4" 28-3/4" -42-7/8" 28-3/A"
37" 37"
Lgyp. cownaLLEiai
wr
Inoal.
Tfc^cR.
2V 2" iV iV FG iV fo i%" lV
IV
l%"
IV IV IV FO IV iV i%"
IV IC IV VG
1%" FG
IV
life IM IbMt 45
for tftuib im Shnt 44
tagi
S?W
6113 16737
34-9" I.P. SFHBM
9wUc M N lassisted ikU dry, free frba (rMt, CMt all butt edge* sad m* *f block* vlth jolat Main. Caaent blocks to surface of s coac'lng of low to
itaoorcd Jolae minor voide with cMikiaf mastic. Veggies shall ho insulated far piping Insulation schedule. 1/4* s .OJO" stsla'lss stool straps as sals spaced 2* 0** apsrt rise sc otwior and attached to t*-#* diameter floating ring at bottsai of
phara. for detail at support ring see Sheet42 **-0" disaster floating ring of 1/2" Stalnleaa steel rod. Support insolation oithln ring by criss-crosslag 3/4 x .020" bands. Ksnholarshall be Insulatsd with pro* fabricated cover, so installed that It is removable and replaceable vlth olniovas damage to the Insulation. Apply a 1/16" thick (vet) coat of Seal lots over the insulation, bhllt st&ll
oat vips In a layar of rainforcing
Membrane with not lass than 3" overlap at all ssaoa. Remove all wrinklas and air bubbles. Immediately spray or brush over the membrane a second coat, 1/S" thick (pet), of Seal Kota, finish shall present a smooth, unbroken surface and coup lately hide the glass cloth, for Insulation of supports see Shunt 41 3/4" x .020"' stainless steal straps ami
la spaced not mare thaa 4'-0" apart
'm & v * . * w w n -
rgi*c ueniiigi DOKwri
1. *Ytpe Um ito." specifies line* to bo insulated. All brnartan and smaller or Urgrr sections stall ta losulitsd. AU incited, oil fittings, strainers, Mpiritort, expansion Joints, etc., in etas* ltnen. It also includes valves and flanges la Sts-- a ate-- traced lines, in low temperature lines and where repaired for personnel protection. See note below.
2. Abbreviations in this table are
follows:
Trot." " Insulation only where required for perso (where less than 7 feet above or 3 feet of a platfore or walkway.)
* Iron Pipe Size
Ste-- Traced Foanglas
For ste-- tracing details see SFF76-|and piping drawings
Sub-contractor shall provide suitable expansion Joints in the insulation and weatherproof log of hot pipe and fittings to allow for linear and cire inferential expansion where warranted by the
operating temperature.
Ns. GY-104 (Z2) silencer In Line P-3 shall be inahlated with J-K No. 109 Banrec blanket, or approved equal, and weatherproofed with .014" thick a1uninun jacketing. Silencer is b'-O" dlaneter by 13*-b* B.L. to B.L* with elliptical heads and 30" flanged connections. Insulate approxi--telp
J'-C" long top connection and V-0H long botton connection. For details
see Piping Dwg. No. F76-2WF.
6113 16742
*3
mt**?^bBBSXSssh^b^K
TNS BAOOKIl OQMFAirrr