Document 7j4mZq3oQR1yOR5znLb6pm26

ra THE BADGER COMPANY, Inc. CAMBRIDGE 42. MASS. OgMAHCH SPBCXFICATK3I BOUmOBfr AID FTP05 Pages MCHSAKTO CHQCECAL CCMPAXT CHQCOIATE BAYOU TEXAS A1 PLrdfT DEPT. 30 AI7TH. 10. PioJKT 39 it sr. a. % ie.+t :*r. 44 <r <L lev. ~Sk. 2. *, 34, 3ft, 37, 41, 41, Added Sheets pit K t Ptit ttBtivw. - w mn ;, . UUe4 jfoeet 30.________ Added Sheet 30 j j|' r/,/ 1T*V Client V hf Client. APPROVED Design *.w Client CERTIFIED 9 Ch. Dv. 6113 16702 Ltorage Tnnks Cold Service Exchanger* Hot Service Exchangers $X) F and abjve Exchanger* Cold Service Pvnsp* Hot Service frmp* CrlA Sendee Valves rl>t Service Flanges hoc Service Piping Hot Sendee Piping C id Sendee Insulation sickness Tobies. Hot Service Insula'.loo 'thickness fables. Cold Service Valves v flanges Cold Service 5qulpnmt Outline Sketches fiiulpatent insulation Schedules Piping Insulation Designation Table 32,33,34,35,41.42,43,44 3h, 37,3i% 39,40 45 through o4 M44 Ihts. 45 thru SHUTS 32-44 Client's co bp Client tied ncs OKCQMai IAX0B THS BAOOSA COMPANY*. In*. , i.- -a g 6113 16703 1N52? ihbuiatich nt-r.cmcATiqi A. ,3 PXPEKi~~ hKu * * X Ltji LtLax. SCOPS OF VCRK The insulation sub-contractor shall furnish all supervision, materials, labor, tools, scaffolding, and jquijmcnt necessary to execute, construct, and finish in an expeditious, substantial and workmanlike manner all equipment and piping Insulation required for project. Any exceptions will be specifically mentioned in this specifics* uuo accompanying drawings. gWflSGS k SCHEDULES The work tc bt done la shown on drawings included in this specification, together with piping arrangement drawings and such other drawings and data, not listed, as may be necessary in the opinion of the Bndger Company to supplement information given therein. Sub-contractor will be responsible for his material quantities. Tables contained within this specification will give sub-contractor necessary information which will enable him to make his equipment material take-off. Sub-contractor will be given a complete set of piping arrangement drawings together with a schedule showing the pipe lines that will be insulated with the thickness and type of insulation to be used. The sub-contractor will be required to make his own piping insulation take-off from the information given. VCRXMAM5HIP The intent of this specification is to secure a first-class Job in all respects. The workmanship shall be cf the highest quality throughout, and sub-contractor furnish a cnopetent superintendent experienced in this class of work. Surfaces to be Insulated shall be brushed clean by sub-contractor before applying the insulation, using wire brushes if necessary. gSPBCTICB An inspector representing the Badger Company or client, shall have the right to inspect all work and material at the factory or on the site, and any work or material found to be defective or which does not meet the requirements of this specification be replaced by sub-contractor at his own expense. Such inspection shell not relieve sub-contractor from full responsibility for the quality and correctness of his materials and work. ll Approved by Client ch/u. Xart!fled z J/zr/jt* XCXISASIO CHEMICAL CCKPAHT CHOCOLATE BAXCU TEXAS THE BADGES. COMPANY, lae. CAMMUOM 4S. MAM. 1___________Smstl ''it 6113 16704 5XCTICH T GEafftAL (C< irt.) SCATYQLE6 The sub-contractor shell provide, at his cnm expense, i design and as required for his vork. He shall renow from the Job said scaffolding on completion of the work of the subcontract. ihcaticw or job 3Etb A railroad siding will be available to the sub-contractor near the Job site. Sub-contractor vill include in bis bid the necessary coat for trucking of aaterial frcm the siding to the storehouse, and fha the storehouse to various parte of the Job. STORAGE OT BBULKTIHO MATERIAL Sub-contractor shall visit the site and acquaint himself with the location and conditions of the Job. The Badger Company Job superintendent will allocate space for storage of aaterials. If there 1 -o 1-'tiding space available, the sub-contractor vill incinrf* in his bid 1 a )f aaterial, erecting and removal of a suitable vmrehouse to meet hia 4-lr -eats. CLEANUP Contractor shall conduct his portion of the work in a manner that will generate a minimum amount of debris, and this shall be removed by him to a safe location, indicated by Purchaser's Construction Superintendent, before the end of each work day. Contractor sjiall also clean equipment, machinery, piping, structures, floors, walls, etc., of any undue or unsightly splatter resulting from his operations each day. WELDING Many of the vessels and equipment in this plant are fabricated of special alloys. Many arc fully stress relieved. No welding of any type shall be done on any vessel, equipment or piping for attachment of additional supports, clips, etc., without specific written approval from Badger, and this work, whan approved, will be supervised by Badger. MOBAKSO CSBGCAL CCKPAXf CBQCQKAXZ BAZOO BUS TUB BADOS* COMPANY, las. 6113 16705 i SKTIOH IX M&K All aaterials shall be new; aaterials such as insulation blocks. Tip* covering, cmscnts and weatherproofing ccapounds shall be delivered to the Job site in factory sealed containers. Insulation shall be of the type and thickness specified herein* AH aaterlala necessary to complete application of ths insulation system shall be of the type specified herein. Proposals shall be based on use cf these aaterials as specified and no substitution of saterials shall be permitted in the base proposal. Alternate proposals based on the uae of aaterials other than those specified aay be nade. In such alternate proposals the subcaotractor shall state the physical and nechanical properties of all aaterials and shall furnish detailed description and drawings of acthods that differ fTc* those outlined in this specification. 1. High Tcaperaturc Block and Pips Insulation Owens-Corning Oweas-Ccrning Kaylo, or approved equal, to 1200 F. Xaylo 20, above 1200 F. 2. Lov Tegperature Block and Pipe Insulation Pittsburgh-Corning Fbaaglas, or approved equal 3* Insulating Mastic Lion oil Zcapaay K-Xote 4. Accessories for High *T>j:upcrturc Insulation 4.1 Stainless Steel Wire Wire shall be 14&16 Ga.,Type 304, cold-drawn, bright annealed stainless steel. 4.2 Stainless Steel Bands Flat 3/4 inch x 0.020 inch, ^Sype 304 stainless steel strap )>n be used on vessels and aquijmnt operating at 500 F., or less. A.J. Gerrard Kxpand-B-Strap, or aa approved equal, shall be used on vessels and equipment operating above 500 F. 4.3 Insulation Filler Material Loose insulation aatcrial tar packing cavities and expansion " spaces shall be FibrofU, a dlatoncecus ailica with long fiber __ asbestos. *aanulfectured by Johna-Nanvllle Ccapany. -- '"'T 6113 16706 M jtr SBGT'XOX II MA7ERjAl&`(gont.) 4.4 Caulking Mastic Material, used co smooth depressions and minor voids in the finished Insulation surfaces shall be caulking cczapcund, Eagle-Picker, "One-Coat'', OCF No. 110, or approved equal. 4.5 Reinforcing Membrane Membrane used to distribute stresses and rc... rce the weather coating on vessels or surfaces not covered by protective Jacketing shell be 20 x 20 aeah, asphalt impregnated glass fabric. 4.6 Weather Coating Material used as protective Jacv Seal Perm. 4.7 Protective r coating on surfaces not covered by be Lion Oil Company Fire Retardant t k Piping In Battery Limits Protective ,,<* battery Halt aluminum. v-. by Childers K 45 and 90 e or 5052 alun? . * 4.6 Protective Ja . ts, V -.laced equipment end piping inside ugated 0.016 in. thick, type 5052 -hed moisture barrier as aanufactured inj v.'o., or an approved equal. Piping 1* ' protected with pre-formed Type 1100 a factory-applied aoLsture barrier. g Off Battery Limits Material used x. L .--tcctive Jacket to insulated piping off battery Halts shall be 45 pound asbestos roofing felt, as aanufactured by Johns-Manville Company, or approved equal material. 5. Accessories for Low Temperature Insulation 5.1 Vapor Barrier Lloa Oil Company Seal Kote Fire Retardant No Flash, Spray or Trovel Grade. 5.2 Reinforcing Membrane Perma-Glar capany No.105 Non-Impregnated Glass Fiber 20 x 10 Mesh, or approved equal. II lljLz | Ayfrovad by ClUntT H0BSA2TX) CHEMICAL CCKPAKT CHOCOLATX BA1CO TEXAS THS BADGES. COMPANY, lac. CAMMttOOS 41 MAM. 6113 16707 SECTION IX MATmTALS (Cont.) 5.3 Joint Sealer Lion Oil Coopany 5.4 Adhesive Lion Oil Coopany 5.5 Caulking Maatlc Lion Oil Coopany 5.6 Stainless Steel Banda A.J. Gerrard Coopany, or approval equal Seal Kota Fire Retardant No Flash, stroveL Grade Low Teap, Trovel Crada Seal Kote Fire Retardant No Flaah, Trovel Grade 3/4" x .020" Type 304 , for veaaela and :equipment. 1/2" x .015" Type 304, for Pipe covering 6113 16708 IS*? aacrioa m APPLICATIfK Insulation f'-r piping and ecui-ornt 3nall be mipiled as designated on the schedule a and detail drawings incl tucu in *.his sp-' if.' cation. 1. IK t Service Vessels, exchangers and General eauietaent, up to and including 30 Inches in dlaai ter shall be insulated vith pipe ec.cring. Over 30 Inches in ..leant'tcr ese mitred iv,3 cut .hr ilat blocks. C rveh blocks nay be used lx* eccncaicnl and available. Menhclcs, flanges anu stiffcaqr ~in.;c \n vessels and exchangers will not be insulated unless specifically designated tn schedules cr detail drawings. Itoae plates shall not be covered. Valves and ilanges shall :>e insulatee only in live 3tcaa lines, steam traced lines and ILnes ipc rating >. vor u.<o ?. When insulatitn is specified ftr personnel rretection, it shall be applied cnly where lines are less than f'-t>' above :r three feet from .he edge of a platx'cra or valieway. Where insulation passes over pipe supports,sub-contractor will be > required to do the necessary cutting ana weatherproofing of insulation, on high .ertical risers sub-contractor will provide insulation supports in the r m of bar -leaps made from 1 l-'U steel with the necessary bolts, 'txr clamps will be required for every .'O'-o'' of vertical rise. N- bar clnrp will le required unless the rise is at least 20' -o'. Allow fsr e>.pansi..a .n the following .quipaent: M.C.C. Badger a* Item !Io. Item IT. C1rcunfcrential Bcpassii n Space required between blocks and 3hcll fur expansion Rl-1 thru MR-101A-I Rl-b 7/16" Austenitic Stainless Steel Surfaces of equipment listed below shall b protected with a moisture barrier of Lion Oil Co. '^Seal Kote" prior to insulation. Insulation contractor shall apply a brush or spray coat of light or medium qrade mastic, t/lo" minimum dry film thickness, to a clean, dry surface. MS-303 -io2 Bo""*t CE.HTRAL FILE n Af*wlADPP_lI"102 Added Austenitic St.Stl. Approved by Client. i'.AhtctU MCSSA1S0 GBXECAXi CGMHUBT CH0CQKA3SI BAKU SZtf THX BADGES. COMPANY. Ime. 6113 16709 Hi nscTlJi III Ami':ATlc* (J at.) Cold jrrvi.ee Low temp* rit'xrc equipment and piping sj.aLL b.- iauuloted with. f_JB!glsS - Use pipe v.*. verin.* a piping ?jic equiiacat up t am including inert# la diameter. Standard curved z*'-7xn*-s *>? sutc-' l3>*s -nail be used ca larger siz- s. All valves, fittings ihd Mangos rn -la lines shall c* insulaten. Support# or attachments which pr .leot unr-ogn L.isuiati .n shall be ina'ilated f'T a distance equal to four tines the insul-iti n thi'ijvss where possible. Manholes, floated en'-o of exchanger's, and .tr.orpcints f equipment, access snail be protected with built-up insulation covering as described on detail drawings in this specification. Steam Tracing Steam tracer lines vrvo aHn^ to process Lines and fr mi process lines to traps and condensate ret'xma are to be insulated. C mplcte insulation of piping, fittings and valves is required except fer the sections at trapm froa and including strainers to and including cni ,ns bel_v traps. I nsensate lines c-vnstream fr*ia traps uischarging to setxrs r >mue shall be insulated ..niy where req'ulreu for personnel pr.-teeti .n. F r rcapicte -nf.ranti -n on atema tra.i.'ig see Specificati -ns for Steam Tracing ' Sir'.*- <Jl6. Insolation centra,*-..r shall furnisr. aluminum f< il and Theraon vu.ro specific^. Insulated Instrument lines Instrument lead lines shall be insulated ns shown on instrument piping cravings. Pressure gage piping, control valves, flow indicators, etc., when installed in lines that are ina'vlatci, or traced ami insulated, shall be insula ted. CEHTRM. ntf General Care be taken that insulation does not interfere with the operation or visibility of Instruments such bs gage -lassos, sight ports, level indicators, etc., or the operation of mechanical or electrical equipment. Soacplates on 'cold equipment shall be cowr-ni ever with removable plugs of insulation or wood that e.xtend l be/und the insulation and sealed with mastic. Application sketches included in this specification are typical. Any piece of equipment not specifically described on the skotches shall be Insulated live the equipment it most resembles. I* "it'U smt c/4 vs; ll Approved by Client. SStlfii4 * a* M___ HCNSAJTTO CKMXCAL CCM*V CHOCOLASB BATCH SBM THS BAOQSR COMPANY, Ime. I F, i j Insulation on lirad asms thickness a a on ahell Secure Hocki with 3/4Hx.020* 1-304 St.Stl.insulation. Strap* < seal* .'paced 12** apart on cuc^futnce. Tbrcwel cn a 3/fl" thick coat , of caulking nestle and itherproof. for~iaethod of weatherproof ring vesaei heada a* Sbut.'2 for type 4 thickness of* aka 11 insulation sea Schedule insulation support* by wssel fabricator, for detail see .-Sect i4 3/4"x.020'Type 304 St.Stl. insul.straps & seals spaced l2"o.c.over block Insulation Bess!* issslstia* fcm ragairsd . t he iacladad fa piping laselsf for detail of fleeting flag aee Sheet ,014"c.Hlck earratattd slialaia jacket leg with moisture barrier atiacbaf. Laps in jacket to be 4" aa vertical teias 4 J" oe horizontal itsas. Apply jacket with Sto.8 1/2** long aluminum alloy sheet metal screws paccd fc'* on centers on vertical 3/V*x.020*^-304 St.Stl. insul.strapa 6 aeels at circumferential assets. For detail of "S^clipe aee Sheet i * .Manholes 4 Stiffener ringa wt il not be Insulated except where specified. Stiffener rings shall ha enegsed with aluminum flashing. Insulatn 4 finish bottom head seme an toy head, for list of manholes 4 stiffener rings sea Shaat Tjj-Top of foundatioa. CHBGECAZt ancQUis uxm TKS BAOOSK COMPANY. hw. 10 6113 16711 Surface* to be insulated shall be Clean, dry,and ires frei (rot, ruse, etc. CcmtBX blocks to vesselsurface vith a coating Of low trap adhesive. \ / Ul , , III. IIMW WWE Foengla curved blocks or wvi.!e<.' i;;s shall be 'aid up with si. butt edges and ends of outer layer (or single layer) coated with Joist scaler. Li L- For type 4 thickness o--------- " insulation ste schedule, provide contraction Joints below insulation supports by rur-- parking tightly vith Lien Oil Co. K-Kote. Add a layer of insulation over outer layerat supports. Joint sesler slip join I --. Use staggered joint cons cruetion. Nozzles shall be ,*n: Insulated per piping lnsui. schedule. TT -i JUJ..ZJL Provide iy?3 _______ / i:l rlf* / r*^ulr*d te M(*r* scrape, detail it* >- fm Apply a 1/16T thick ( 0 of Seal Kcto over the tloc. Mills still vet wipe la a layer of reiaforeis* with not less ttos J* at U seam. Seaows all wrinkles sad alx hiNilac. T-tlist sir or brash over the aostarsae s second east, 1/8' thick (vet), of *eal lets. Finish shall preseat unbroken surface aai ccnpletely hide the glsss doth. Manholes 4 nandnoles snail protected with butIc up i sulazion covering, so installed t.at It la renovable and : placeable with air.late dc.^uga to the Insulation. -For list of --nhnlns sheet. 3/4"x .020" st. stl. straps& seals spaced 9" O.C. to secure each layer of insulation. - Vessel skirts, legs or lugs shall be insuleced fors distance equal to four Claes the thickness of insulation or a alnlaun of 12" vbara posslbla. . Fireproofing by ledger-/ V i i /V Insulate 4 finishbottom head ssate as top head. fecal with Seal Kote and lalass cloth. t 3 pirrarr Approved fcf Giiaat '... cou mvici ||S^ - Biuay CN amacA& onocus MICK TXS BAOQrJl COMPANY, lag. ruBn^n XL Apply a (qnr or brush) Per* to 1/US" thickness fell* still wtt Labe* rolnfOTclaf"* --hrini, oswrlappiat edges It*lately apply a aeecod ttldc (ftt) of Sal Ppsnu CftiTT OTftT aetal Jscknt % Allow 1" spec* botveon block so* support to bo fills* with Insulation filler astsrial. 016" chick corrupts* slualnua Jacksc with ftoiscurc barrlor sccache*. 3/4" x .020" scsir.Un stool ..'.Sul. scrap r-.si LVTTiA- pktah. at .^JS - HOT SERVICE Flatting rln^ co bo taorl.--.ee* traat 16 ga.T-^jft Sc.Sd. ccs wits coasts* ^an., o wirss twisted co^schsr. DgTA TT. Or FLOAT INC KING For typo so* thick* nsss of Insulation sss schsOuls. NQtBABXO GmaCAL COONS aooocASB xaco nt TKS 1A0OE* COMPANY, fast. tAMSMMQ * . j/fttr-i flgjtrMilW-l Oli'* thick laalMMi <ht with lttn berrler- #4 dla-. a 1/2" 1( lluMinwi alt07 sheet Metal setews > ' O.C. 1 Mai far Inew 1 a 11 an NX \ lap r 3/4" s .w^ Type -14. fcvaf ZuUi of Shell- 7Uahla| CIKOriRgNTIAL SEAM DETAILS HUSIZOWTAL VESS 8X4 10T SERVICE 0.0. of vessel--.. Xnoulacloa -- Insulation support by vessel fabricator .016" thick corrugated -slualoua Jacket Use 3/4- a .02QT! \ 3/4- Scrag a ft 1" space between lnsul..block Ci support to be filled with loose filler. --* v. a.- <0 4 |1 . Supporting Clip ___ 3/4"*.020- type 1 J3k SS Strep DCT4X1. or CLIP Cilpe to be spaced appreetlaetely Id" opart or a mlalaum ef feer dlpe per width of sheet HOdlEONTAL SEAM DETAILS ygim,yfsua HOT SttVICI lew .per cneat * a co int. Ipprewed by Client, iertlllsd k*** tad1 caooocAss adieu wm TH* BADOSA COMPANY, Im. 6113 16714 I ~--isi>ra7W'5U?Ksrre------------------ -- ?r>l of Dlmnotoas luuliClM Tfcleknooo 1" ir 2" 2km r 4- Support Typo I tu rue* citp l- * i- iy * \\m 2" 2M 2*" * 2\m 3" 3" 3V* s 3*" 4H > 4" Support Typo XXX vutk Plot* nia 1" l- 2n3nr NOTfS XmlitlM Supports by VmmI ribvlMtir. V- 6113 16715 6113 16716 II HOT SEUVICt fw tyn **4 tktekMaa ( laMlttUt tee tcMula Maul Jaelwt 2* Gunlte or 2** Cameac aortar lual plastered - 2"x2"x#l2 SUB Calv. Fabric To* of anchor boles -----------v 2000 or 3000 lb. concrete thlcVaaoo aboil Insulae loo support furnished with t^ulpotac Pill with scrap Insulaeloo sai finish with hard finish plaster wid 3/4** htRh slab bolster to skirt about 12"* apart. Tie Cat*, faartc to slab bolster with #10 SUG anaaealed Calv. wire Skirt L^J^-2** ninlaws Fireproofing of eklrto of vessels by Badger, fktrea 4'*0W 0.0. and ana Her will be fireproofed cue alio only. 6113 16717 Jwt >< |3 >>- * * --C c^i2f<l?^ 3^j OOS u x X --cC| ub jok --:> e .2 ** *- jc > 32 --jc S c ,3 TM C d Ja Xj li t < u I --^ --4 CSw< J5?2 2 . o m mm -* b a * -o W > - U --` >*"0 _* -- -- 1i.e &e u o cw --o *m3 js 6113 16718 UM k*4 LIm pga or xxsm.. scryort ng.^! Steel piste clip* width equal ta tliA> ( lmaulatio* spaced 12" *ps_t Mul ta thickMM *f lMUlati Q.9. itell * rHitlmul ^ af teak railed itccl cad extaadiac (all l|tk at hall hath cldce sad welded ta steel piste ellM---------------------- mmssr *009 o gurffeccs to bo insulated shall bo class, dry and firso tram tract, m '9 etc. C0Bt tO VOSaol SUrffcCO with ft COfttlfflg of lev *d))siT. gosslca shall be Insulated par piping insu'*tion schedule. #Ovr roof iaauUtlon apply tw layers t 15 lb.saturated fait and one layer of 55 lb.asbestos felt roofing la asphalt napping.--------- Manholes shall be protected with builr up Insulation so Installed that It is r#-wva*le % replaceable with slsisui daswgge to - ans f insulation. T_ rovi.d.e _T_y_pe J_J2D_2S 3t.>U. I j / floating ring at aannoleo. | attachments,etc..where required t be laid up using Joist sealer an ftU butt edges and ends of outer layer or tingle layer* 3/4"st. 020"s t. a 11. a trapa- ftnd saals apacad 9Mo.e. shall be used to secure ! each course. S s For type and thickaeas--4 of inaulatlor see schedule / Use sca,,> ared Joint -- construe:ion. A. FroJ tv. :.ona through the laaul. :ioa shall be insulated for a distance equal .c four tiaas the thickness of iaaulatioa or a clniaua of 12 Inche. whara poaalbla. Provide contraction . Joists blov Insul.__j supports by psoklag 1 tightly with Lion Oil Co. K-fete. MULATTOS PgtAiU STORAGE TANK majana Apply a l/l" thick (wet) coat of Seal iCste ever the Insulatlan. While still vet wipe is a layer of reinforcing arnfcmc with not less [ than 3" overlap at all j scans. Rcaove all i wrinkles and air bubbles1 Iaacdiately spray or ! brush over the nt^ibraas j _ a second coat. 1/3" i I thick (vet), of Seal { | Kcte. finish shall pre- | j sent a nooth, unbroken i i surface and completely j hidne the glams cloth. jI i L>For list of aaaholeo sea Sheet l For number and also i of noasles.aee piping drawings. f ~~ Seal with joist -*|JiieeeaTle**f. Foundation loofing felt is CO ho applied over th vapor Sftftl. Asphalt sopping notarial aunt ho compatible with eho vapor saal. 6113 16720 MOBMBO QflMXGAL CCKBMCf QMOQtASB 1*300 TBCAS TXS BAD0S& COMPANY. Uc. gsMoni ;itovSiSLarVatt--^ r.'ier- Sr r: w mk r3S^ "s 1; ISX' w *$ i O S- I i * f! "T~n < a T i .- * ~1 "I i . k ^r \ _ ji ft i N1 * . f|t " f i- N .-- -- 1 ! -J __ _L 2? -L - -- 3 el * j3 1 % _LUz r& i 8jUt to -- O * > to .x2; k to 2 5]i I Sill m SIUm'i msnraw if euw. --------- TXI 1APOSE COMPANY, 1m. 3 16723 WSs i al U) awa;: rtlfUd 724 iwsujvj-i., u %?'? tr** WCTtifsim afteil leawleted mif ia lfi<f km and atone iraad liesa, end where lad* assort la the Um Table On 'lv* 2M and aaullcr use"insulating c<a*nt #f proper thickness and flat ah aa specified below. Fill la with csuUdLag autte SalId up with insulation to auit --S' j -----f- * On valvaa 25|" and larg t elded pipe lualatlaa of else and tklckaeoe. 2 loops of wire T1-- 2" lap tjt:: .i AFar piping insulationr wira, Jackat, ate.,see piping laaalatloa dataila. \ Otar Insulatlm apply a thick coat' of hard finish ce-int soft weather proof with teal Pezau Cn sixes 2" ft largar reinforce the weatherproofing atlft a layer of ralafordaf --'---- r -Hire ea insulation and jacket with e alalaua of 4 loops. Use sane sage wire ee specified for ad joining pipiag. TTFICAL VALVt "ky" cUmmi!" 6113 16726 for piping iMuUtloa, wire. jcke. ce., piping iMuUtiK 'M' ? * r **,-*. 6113 16729 iiHir--MM-- Im3*i VST M inr 4S M * 4S M a -M r M a -M a H" M M IS -15 * S* JO IS is r M M IS M 4" S9 JO 4" M 41 24 r* 4| 24 MT 4| 24 M U" 41 24 IS i*" 41 24 IS 14* 4| 24 20 w 41 24 20 nr 41 24 20 nr 41 24 20 nr 41 24 20 34" 41 24 20 9.1. 44" 41 40" 41 72" f" U0" 144" 41 41 41 41 9*9* 144* t 41 ru: 24 24 24 24 24 24 24 20 20 20 20 20 20 20 it f ** r r - r_5t * AS -2J5 20 *2 -ITS -2 - n -i -- no --ii ftS -0 -IIS -0 in -a -MO -II 1)9 -I n -MB -IIS -1 M -110 -1 -US -IT* is Ml -IS W <41 -MS -IIS UtM, tfA* 6113 16731 Insulation for PittInga, Valves, flangae, ate., shall ho prefabricated using smt notarial and thlchnoao aa adjacent piping, Fabrication shall bo la accordance with Fosnglaa Fitting Fabrication Manual. Install corona before pips Insulation. Saal joints with joint saaiar. Allow elaaranca for flanga bolt renovalr? u. Flash and saal at boonst ptsjsstl with vapor barriar wastic and gjaw ^loth. ^ A^ lands at M ./W/- ' fV : ' 1" OvaTlap '\ V H~L ^ j'>'7^ Cacura covers with fc" * .01SM type 304 stainless ataal bands and seals^ on 9" awiaw cantors using at least 2 bands par covar on flanges and 4 bands par cover on valves. Coat all butt adgaa and aade at outer layer (or single layer) rl1* | joint sealer. L-- Weatherproof same as piping with 1" overlap at nil Item AS-101 AS-102 AS-103 AS-104 AS-10S AS-104 AS-107 AS-108 AS-109 ML-101 A thru F MS-102AA8 >*-103 >0-103 Sw.Ticed <0-112 SCo.Tracad 10-126 10-127 KT-128 MS-129 MS-131 MS-132 MS-133,134 & 133 MS-136 MS-137 >0-139 10-140 3011 Thru-R6 30T142 30S1 30T4 30T6 30T20' 3057 30X13 3058 30S13 30516 30X22, X23.X24 30517 30S20 30T28 30X29 41A 43A tannm s&m* In* ul. Thick. 1%** Prot. IV 1%" FC IV IV t* i" i" IV A 8 . Tor Dims* loo* *u Shoot 34 4 *QV 40*0" 12" 12*1" 110*0" 3*0" for OittMloot im Shoot 32 9*7" 4.7V- 127*2" ao'4" 2'4" U* 3*7" 7*1" S'O-S/S* 103*0" 88*6" 44*6" 17" 1*9* 9" 3* (2-L*y*r) IV Froe. 2V U*lV 49*0" For OiMnslona ih 9*3-3/8" 23*0" 3 ftS 4*1" 2*3" 2" 2" l" FC lV Froe. iV rc IV Froe. IV ic 3" FC l%"Froe. 6*0" 6*0" 4'6" 2*6" 12*0" . 4'6" 3*2" 3*6" 2*0" 6*0" 6*0" 6*0" 4*0" 20*0" 11*0" 21*0" 6'0" 2*10" - . 5" 12" 10" 13" 11" 4" IV rc l|" Froe. 2" FC l%" FC 3'1-1/S" 2*6-3/8" 5'1-1/4" 3*1-1/4" 4*0" 8*0" 19'0" 19*0" 9" 7%" 13" 13" MS-303 MS-304 MT-403 MS-411 30X1 .30812 320X303 3208302 1* $ 3'0" 4*4" 4" for DlMxialon* Shoot For Diaonaloao Shoot a*-4*3/" 4*0" 3* * Allow toc elworftrwtUl nywlaw. S AmC 8. mssassm O' iiLMjuiiiiii 6113 16733 KXTIPKEMT SCHgWLK Icn TT-101A-F MOC Ho. 3011-1-6 TT-102A-F 3012-1-6 TT-106 TT-107 TT-106AM TT-112AM TT-114 Tt-119 3016 30X7 3018-142 30811-162 30112 30X16 TT-120 TT-121 TT-123 30X17 30kl8 30X20 TT-124 30X21* TT-126AM 30X23-142 TT-128 TT-139AM 30X23 30K37-162 Dws. Ho. D'Town 0-950 D'Town 0-950 H/T 1333 H/T 1334 H/T 1335AM H/T 1338AM Ho. Isq'd. 6 6 1 1 2 2 H/T 1340 D.*Town 0-943 XFCO 12951 H/T 1342 D'Town 0-944 D'Town 0-945 D'Town XX-946 D'Town 0-947 H/T 1345AM 1 1 1 l 1 Instil. Thick. 3" <2"Layers) 2%" .2" re 2" FO 2" FG iV 2" 2" l%" FG i%" FG l%" TG 2" 2* l%" FG 2%" FG P*-- A s Tor Discos ions Sh Tor Diacnslons 43 V 44V 38" 27" 23'2" 23'2" 18'4" 20*7" IA". 49" 28-3/4" 20" 18" 17*7" 8*0" 12*0" 16'4" 4'0" Sh 2 2 a 2 3 24 23 24 10 49" U'O" 2i 49" 16" 60V U'O" 4*0" 23*6" 3' 6' 2' jjaA * 1, . - -*..-,*s*-rT ' _ * : S^i^SR '0*tf LIST OF MAMBOLES AMD STIFFENBI EMC* , Ho. n Reg*d. 1 Manholes 1-21" ISO Lb. Stlffaner Fines 4-6x3*x3/8" ^ Insulation )1 1 )2 l >3 l 2-18" 3-18" 8-18" 8-18" 150 Lb. 150 Lb. 150 Lb. 150 Lb. 4-3x2%x5/16" 7-5x3x7/16" 4-3fet2%*3/*" IV Foaaias >4 1 '5 1 61 7-18" 6-18" 6-18" 150 Lb. 150 Lb. 150 Lb. 6-5x3x5/16" 10-4x3x3/8" 3-4x4x5/16" 10-3x3x3/8" 7l 6-18" 150 Lb. 10-4x4x3/8" 4l 3-18" 150 Lb. 3-2%x2%*%" 96 2-24" ISO Lb. 2-6*1%" bylo 1-48" 175 Lb. SB Kaylo W.2 2 2-18" 150 Lb. 4-6x4x3/4" 1l 1-24" 300 Lb. 71 1-18" ISO Lb. m 13 1 81 2-20" Spacial 1-18" ISO Lb. m m l%" Foaa|Ut 15 l 1* 1 17 1 20 1 1-18" 1-18" 1-18" 1-18" ISO Lb. 150 Lb. 300 Lb. ISO Lb. m l-3/8*2" i%" roangUs 3** Fohaglas IV Foaagiaa 28 1 29 l 16 1 1-18" 1-18" 1-18" 300 Lb. 300 Lb. 150 Lb. ' 2" Poonglas 1^M roatgUi lo l 7l 1-18" 300 Lb. 1-18" 300 Lb. 2M Foaaglas 2M FoaqUi 37-1,2 2 1-18" 300 Lb. 2%" Fojuaglas 20T305 1 i ; Sis* i 1.. .. W' 108 Lb. -1-1--8" 1--50 -L--b--. . m 1%" Foaaglaa iV Foaaglas 101A-F shall ba Insulated with rwaovabla aacal jacketed (20 Ga. Type 304 ) covars. Covers shall ho readily reaova^la aad replaceable, on MK-1014-F and AS-103 shall ha insulatad 4 weatherproofed. Ochar stiffener ba Insula tad hut shall ha boxad la with sluednun. aglas insulated veeeala aha 11 ho lasalatad aojtecrfbad rlicaclso sketched. 6113 16735 I tea PP-102A,,C * rP-106AM PP-114AM * PE-119 FT-14 LAM IP-147 PP-408AM MK Ho. Pl-l-3 No. !L 3 P3-142 2 PI1-142 2 P16 1 P35-142 2 HO 1 JOT MWlift 2 I; . ptig gggpQM 4 Site Centrifugal 12 x 17 HVC Centrifugal 1% x 1 x 6/44 Centrifugal 8 x 10 x 20 PK Centrifugal 1% a 1 x 6/44 Centrifugal 10 x 17. BO Cent) lfogil 1% s l * 6/43 Centrifugal * ^ .t jr t4 tQJ _ Inaul. Thick. IV* P*ot. IV i%" ro Wm i%" pc l\m PC *% P0 '*3 i-v | i* Nunfaetunt! Pacifie Vtay| Duriron Co j Peerlaaa tn| Durtrou Co. Pacific Fungi Duriroo > .3 j . MONSANTO CHEMICAL COWANY * sum tnu4 .u 11 it mu ; ,, -.yfgpmy* p'affjyjt: mmjgp^ mm MO. 43 4t 7 116 l 20 l 22 l -28 2 53 2 -39 1 -A6 1 50 1 SA 1 -63 l -66 1 -67 1 -68 l -7A i -73 1 -79 3 -28 1 Location MI-103 M-103 *-103 AS-102 AS-103 AS-103 AS-10A AS-103 A3-106 AS-107 AS-108 AS-109 MI-126 IS-133 M8-13A MS-133 *-132 MS-136 *-131 AS-10A 48-101 AI-102 AS-103 AS-103 AS-104 AS-103 AS-104 AS-107 AS-108 48-109 IB-133 MI-L3A -iss hESksmm MOC Mo. 3091 30Si 30TA 3001 3002 (Bot.) 3008 (Top) 3003 30 DA 3003 3006 3007 3008 30T20 30T22 30T23 30T2A 30S16 - 30S17 308IS 30D3 Typo T T R R R R R 1 R R R R R T T T R 1 R Din. -A" 57- 42-7/8H 57" A2-7/8" A2-7/8" 28-3/4" 42-7/8" 37" 42-7/8" A2-7/8" A2-7/8" 42-7/8" 37" 28-3/4" 28-3/4" 28-3/4" -42-7/8" 28-3/A" 37" 37" Lgyp. cownaLLEiai wr Inoal. Tfc^cR. 2V 2" iV iV FG iV fo i%" lV IV l%" IV IV IV FO IV iV i%" IV IC IV VG 1%" FG IV life IM IbMt 45 for tftuib im Shnt 44 tagi S?W 6113 16737 34-9" I.P. SFHBM 9wUc M N lassisted ikU dry, free frba (rMt, CMt all butt edge* sad m* *f block* vlth jolat Main. Caaent blocks to surface of s coac'lng of low to itaoorcd Jolae minor voide with cMikiaf mastic. Veggies shall ho insulated far piping Insulation schedule. 1/4* s .OJO" stsla'lss stool straps as sals spaced 2* 0** apsrt rise sc otwior and attached to t*-#* diameter floating ring at bottsai of phara. for detail at support ring see Sheet42 **-0" disaster floating ring of 1/2" Stalnleaa steel rod. Support insolation oithln ring by criss-crosslag 3/4 x .020" bands. Ksnholarshall be Insulatsd with pro* fabricated cover, so installed that It is removable and replaceable vlth olniovas damage to the Insulation. Apply a 1/16" thick (vet) coat of Seal lots over the insulation, bhllt st&ll oat vips In a layar of rainforcing Membrane with not lass than 3" overlap at all ssaoa. Remove all wrinklas and air bubbles. Immediately spray or brush over the membrane a second coat, 1/S" thick (pet), of Seal Kota, finish shall present a smooth, unbroken surface and coup lately hide the glass cloth, for Insulation of supports see Shunt 41 3/4" x .020"' stainless steal straps ami la spaced not mare thaa 4'-0" apart 'm & v * . * w w n - rgi*c ueniiigi DOKwri 1. *Ytpe Um ito." specifies line* to bo insulated. All brnartan and smaller or Urgrr sections stall ta losulitsd. AU incited, oil fittings, strainers, Mpiritort, expansion Joints, etc., in etas* ltnen. It also includes valves and flanges la Sts-- a ate-- traced lines, in low temperature lines and where repaired for personnel protection. See note below. 2. Abbreviations in this table are follows: Trot." " Insulation only where required for perso (where less than 7 feet above or 3 feet of a platfore or walkway.) * Iron Pipe Size Ste-- Traced Foanglas For ste-- tracing details see SFF76-|and piping drawings Sub-contractor shall provide suitable expansion Joints in the insulation and weatherproof log of hot pipe and fittings to allow for linear and cire inferential expansion where warranted by the operating temperature. Ns. GY-104 (Z2) silencer In Line P-3 shall be inahlated with J-K No. 109 Banrec blanket, or approved equal, and weatherproofed with .014" thick a1uninun jacketing. Silencer is b'-O" dlaneter by 13*-b* B.L. to B.L* with elliptical heads and 30" flanged connections. Insulate approxi--telp J'-C" long top connection and V-0H long botton connection. For details see Piping Dwg. No. F76-2WF. 6113 16742 *3 mt**?^bBBSXSssh^b^K TNS BAOOKIl OQMFAirrr