ABERDEEN MONTHLY PROGRESS REPORT AUGUST, 1990
Safety
There was one first aid case reported in July. The plant received a Five Standard Star rating from the International Loss Control Institute as a result of the June audit. This is the highest rating that is available on a baseline audit._
On 7/5/90, the plant employees reached eleven years since the last lost time Injury. At month's end, the plant completed 4044 days (5,381,143 manhours) since the last lost time injury.
FY 1990 Kev Statistical Information
JulX-
Y-^T.P^
PVC Production, MM Lbs. Reactor Stream Factor, % Resin Quality, % Prime VCM Efficiency, Lbs./Lb. Flexible Compound Production, MM Lbs. Flexible Compound Quality, % Prime Rigid Compound Production, MM Lbs. Rigid Compound Quality, % Prime Plasticizer Production, MM Lbs. Plasticizer Quality, % Prime Energy Use, (EUI, %) Fixed Cost Variance, $M Variable Cost Efficiency Variance, $M
40.4 90.7 98.3 0.99805
5.8
96.6 5.7
98.7
1.1
79.1 < 1.9>
33.4 40.0
376.9 88.6 97.4
1.0010
60.2
98.1 44.4 99.4
14.7 86.5
< 7.1>
248.6 634.0
Operations
Operation in the resin unit was very smooth. Tie-ins for the cleanwall project were completed in the Old Module. An additional six railcars of low calcium 5305 were produced for Klockner.
Production was relatively low and finished inventories rose in the
flexible compound unit.
Line V operated ten days.
PLENEX
polymers development used fifty-five hours of Line I run time.
Costs
Variable costs were favorable primarily due to low VCM usage and a favorable product mix in the flexible compound unit, partially offset by an unfavorable product mix variance in the rigid compound unit.
CCR 000006454
T. H. Huffman fr/27/90
Aberdeen Monthly Progress Report - July, 1990 Page 2 OMP
1. All of the plant's natural teams met during July.
Z. Bob Seymour visited Northern Electric.
.. - .f
CCR 000006455
DISTRIBUTION
COVER LETTER
ENTIRE REPORT
Houston
J. D. Burns
X
R. T. Ferrell
X
T. H. Huffman
X
C. J. Matson
X
D. F. Harman
X
H. R. Flammer
X
R. R. Smith
X
B. J. Bean
X
R. H. Gerlach
X
-R. D. Gamblin x/w. L. McClain
X X
Austin
J. P. Stokes R. L. Poe
X
X *
H. J. Hall
X
Oklahoma Citv
H. D. Garrison
X
LCVCM Plant
R. A. Conrad
X
LCCP Plant
J. Friend
X
LCLAB Plant
J, W. Ware
X
Baltimore
L. R. Bauer
X
Hammond
J. Pavao
X
Blane
C. R. Miller
X
Premier*
P. L. Foote
X
Aberdeen
RWS/DCS (File Copy), TJA, JBA, JEB, JME, SCH, MRK, DAB, DAM, RBN, JEN, JDO, REP, BIT
CCR OOOOQ6456
SAFETY - B. L. Trego
July
Fiscal Y.T.D. 1990
Fiscal Y.T.D. 1989
First Aid OSHA Recordable
Total Injuries
14 13 _4 _9
18 22
Number of Restricted Workday Cases Number of Lost Workday Cases
Injuries bv Department
Vinyl Operations Compound Operations Maintenance Laboratory Receiving/Warehouse Office
Totals
00
05
1 11
01
00
a _L
1 18
2
4
13
1 0
JL 22
Injuries by Type
Cuts and Abrasions Eye Injuries Bums Bruises Strains/Sprains Stings Other
Totals
17
01 03
02
01
02
0 _2 1 18
4
2 6
4
4
0
JL 22
Non-Occupational Injuries
Lost Workday Cases Days Lost
18 42 179
2 ' 42
Safety Record
Last lost time injury - 7/5/79
Days since -
4,044
Employee hours since - 5,381,143
On July 31, 1990, the employees of the Aberdeen plant completed 4044 days with no lost time injury.
The major topics for July safety meetings were CPR and Off-the-Job Safety.
CCR 00006*57
SAFETY - Continued
The Vista Plant received a Five Standard Star Rating from the International Loss Control Institute as a result of its June safety audit. This Is the highest rating the plant could receive with a baseline audit.
Routine dosimetry results for the month were:
Chemical
< PEL Number Percent
VCM Lead Total Particulates
78 100.0 11 100.0-
4 100.0 -
> PEL
Number
Percent
0 0.0 0 0.0 0 0.0
Monthlv Inlurv Summarv `<_C .iJ 2 2 >"
Injury.Clasg .
*":r'Department
First Aid
Maintenance
:..o.r^v;;A . :.7o
` : - "" 'Description Abrasions to abdomen
.right forearm
o00006**a cc*
QUALITY MANAGEMENT PROCESS - T. J. Arbeiter
100% of the plant's natural teams met during the month of July.
Bob Seymour made an MBWA visit to Northern Electric, Bay Springs, MS. He was accompanied by Mark Washington.
The Plant Manager's Natural Team began planning the third annual Quality Appreciation Day to be held during September.
The Plant Manager's Natural Team'communication survey results are in. Our employees have told us the most important communication items are (in order):
1. Benefit Changes
..
2. Training and Education Available to Employees
3. Promotions, Advancements, Successful Bids
_____'
4. Customer Communications Regarding Product Quality or Service
5. Aberdeen Q-Scorecard
J
Their favored methods for receiving this information are (in order):
1. Bulletin Board
2. Newsletter
3. Calendar of Events
4. Safety Sign
- 5. Employee Meetings
The Plant Manager's Natural Team is now working on ways to measure the effectiveness of communication.
The Vinyl Operations Supervisor's Natural Team has set a goal for reducing pond resin. The plant averaged 200M pounds per month pond resin for the first nine months of FY90. The new goal for FY91 is -100M pounds per month. Achievement of this goal could increase cash flow by $200,000 per year!
The Aberdeen plant Q-Scorecard as of July 31 was 10.65. Cost control, waste minimization, and safety continue as our highest scoring line items. Our improvement areas are natural team scores, Cpk calculation and linkage.
OOOOOb^59 OCR
COST VARIANCES - D. C. Skokna
Variable Costs
Product
July. 1990 Variance. $M
Efficiency
Price
Total
PVC Flexible Compound Rigid Compound Plasticizer
Total
$59.9 74.1
< 93.6> < 0.4>
$40.0
<$394.2> < 87.2>
< 104.0>
3.6 <$581.8>
<$334.3> < 13.1>
< 197.6>
< 3.2> <$541.8>
PVC - $59.9M Favorable
Favorable VCM usage and a favorable product mix were partially offset by variance due to off-grade.
Off-grade production was <0.0165> pounds per pound versus a standard off-grade production of <0.03719> - 56% below budget.
However, lower than budget off-grade production results in a net negative efficiency variance because debox resin is credited at 28.5C pounds versus its standard production cost of 21.3C per pound. In July, we were "penalized" $71.5M due to this system quirk. Year-to-date the net negative efficiency'variance due to reducing off-grade production by 33% is $253M.
Flexible Compound - $74.1M Favorable
~'
Host of the variance is due to product mix.
Rigid Compound - 393.6M Unfavorable
Most of the variance is due to product mix.
Plasticizer - S0.4M Unfavorable
Price Variances - $581.8M Unfavorable
- VCM - Resin to Rigid Compound - Resin to Flexible Compound - Phthalic Anhydride - Calcium Stearate - TiOa - Alfol Alcohols - Natural Gas - All Other Prices Variances
Total
<$434.8>
< 110.8>
< 84.4>
< 22.3>
< 18.0>
11.2
24.4
28.1 24^8
<$581.8>
COST VARIANCES - Continued
Fixed Cost Variances - $33.3M Favorably
- Payroll andBenefits - MM&C - Miscellaneous - TI&D - Clearances
in
Total
<$ 5.6> 72.0
< 25.6> < 5.0> < 2.5>
$33.3
Payroll and Benefits This category was essentially at budget.
M. M. & C.
Low activity and delay of scheduled resin unit turnarounds caused this category to be favorable.
Miscellaneous
. ..
- Moving, Home Assistance - $24.2M Unfavorable.
.
I
- Operating Supplies - $15.2M unfavorable ($13M was mischarged and should
be in Processing Supplies.)
- Packaging Supplies - $31.OM Favorable.
ooooo^feX
cc*
VINYL J. D. Olson, J. M. Vinoski
Safety
The Vinyl Department had no first aid or OSHA recordable injuries during the month of July.
The monthly safety meeting topic was "First Aid and C.P.R".
General
1. Work continued on the BUS-80 injection system with tie-ins completed in the Old Module during the month. Early dismantling of the chem wash system began with the removal of the backflush filters which will be used on another project.
2. Another six railcars of decalcified 5305 resin were shipped to Klockner. Calcium levels were three to four ppm, slightly higher than previous shipments. Causes for this rise will be determined prior to the August shipments.
3. The resin raw materials in the 744 account were valued at $298.0M.
July
YTD
- Production, MM Lbs. - Daily Rate, M Lbs./C.D. - Capacity Utilization Factor, % - Total Reactor Charges - Charges/C.D. - Reactor Stream Factor, % - Rotary Dryer Stream Factor (#4-#8), - Fluid Bed Dryer Stream Factor, % - Resin Quality, % Prime
%
Reactor Downtime
~ 40.4 1303.2
102.2 935.0
30.2 90.7 95.8 97.1 98.3
376.9 1239.8
97.2 8833.0
29.1 88.6 82.0 92.8 97.4
Hours
Operational downtime (recovery scheduling conflicts, New Module rinse/charge water conflicts, waiting for Q.C. data before charging, 0-ring leaks, no place to dump, rinsing chem wash tanks).
423.5
- Maintenance downtime (PVA ram valve repair on D744, cooling water line repair on D500, Old Module VCM charge pump seal replacement, installation of BUS-80 charge nozzle on D700, condenser drilling on D742 and D743, condenser drilling and hydroblasting on D745) .
269.5
0ooob
VINYL - Continued
Drver Downtime
Reactor limited production.
Operational downtime (centrifuge plugs, dryer cleaning, and flameouts).
Maintenance downtime (activator and centrifuge maintenance, screw conveyor repairs).
% of Total Downtime 23.4 56.8
19.8
Kev Maintenance Work - J. B. Autrey, J. B. Hegwood
Reactors 742, 743 and 745 were shut down during the month for condenser drilling because of cooling control problems.
Number five dryer was shut down during the month for repairs to one of its Trunion rollers. The Trunion roller was re placed and the dryer was put back In service.
Reactors 700 and 745 were shut down during the month for installation of new nozzles for the new BUS-80 system, during which time the annual safety disk replacement was performed on reactor 700.
Number five centrifuge was shut down during the month for
repairs. The thrust bearing cap failed, allowing the scroll
to wear against the top flange plate. The Bird was removed
and replaced with a spare.
The damaged Bird is being
repaired for a spare.
Number five Bird centrifuge was shut down during the month for motor and starter replacement. The motor starter went to ground and burned out. The motor had to be replaced because of bad bearings and windings.
There was one major valve changed out in the reactor area during the month.
CCR 000006463
COMPOUND - J. E. Nickerson, K. G. Akins
Safety
The Compound Department worked without injury in July. The topic of the monthly safety meetings was "Off-the-Job Safety".
General
Further formulation testing for PLENEX polymers consumed fifty-
five hours on Line I. Line V operated just ten days in July to
control inventories.
Flexible compound inventories rose 338M
pounds in July.
Rigid compound rates were up 1MM pounds over June.
Screener
maintenance and rescreening a railcar of product were responsible
for fifty-seven hours of downtime.
Lower plasticizer rates in June reduced the amount of 610P avail
able for shipment and Internal usage. Due to processing problems
and an attempt to maximize 610P shipments, inventories of byproduct
intermediate grew significantly over the past two months. There
fore, in July, much more production time than normal was devoted
to VRP/RAE production.
Consequently, plasticizer rates were
reduced. Only . 88MM pounds of prime plasticizers were produced
during July. It is expected most of VRP/RAE will be recovered by
the middle of August.
Operating
Compound Production
Davs
Production fM Lbs.>
a
1bi
Month
Fiscal Y.T.D
Line 1
30
Line III
30
Line V
10
Total
% Prime
Capacity Utilization Factor
Downtime
1832
61
3647
122
_212
5798
215
96. 6
.747
Hours
19701 34784
5756 60241
98.1 .771
Line I
- Product Changes - PLENEX Polymer Testing - Miscellaneous Maintenance - Quality Problems & Control
109 55 19 11
Line III
- Product Changes - Quality Problems & Control - Miscellaneous Maintenance
99 19 16
CCR 000006464
Continued
- Product Changes - Miscellaneous Maintenance - Startup/Shutdown - Werner & PfleidererMaintenance
68 14 13
9
Operating Davs
Month
Production (M Lbs.-)_______________
Avg./Day
Fiscal Y.T.D^
Rigid Compound
31.0
% Prime Capacity Utilization Factor
5653 98.7 .946
182
44360 99.4 .835
Downtime
Hours
- Product Changes - Sereener Maintenance &
Product Rescreening Miscellaneous Maintenance - Quality Problems & Control
61
57 33 33
Operating Davs
Month
Production (M Lbs . ).
Avfr./Day
Fiscal Y.T.D.
Plasticizer
31.0
% Prime
Capacity Utilization Factor
1118 79.1
.470
36
14718 86.5 .684
Kev Maintenance Work - J. B. Autrey, J. B. Hegwood
Plasticizer reactors R-l, R-2, R-3 and R-4 were shut down during the month for cleaning of their vacuum jets. The vacuum jets were cleaned because of an excessive calcium carbonate buildup.
- Plasticizer reactors R-3 and R-4 were shut down for repairs to their agitator shafts during the month. The shaft key that holds the agitator blades on is continually failing. Some modifications were made to the key to alleviate the problem.
- Line I and Line III were shut down during the month for repairs to their rotary steam joints. The rotary steam joints were replaced in both cases.
CCR 000006465
ENGINEERING - R. E. Polk, S. C. Hillman, M. R. Kane
PROJECTS IN DEVELOPMENT - GENERAL
5305 Decalcified Resin
The design and estimate have been completed for permanent ion exchange systems in each reactor module. The AFE for this project is being prepared.
Cleanvall Technology
The AFE has been approved and construction is being expedited. Startup of the system and operator training are expected to be completed in August.
Production Model Building
; ., .
' ^
r
Production model building for OASIS continues. Debbie Tollison attended meetings in Houston to resolve issues about these models. Work is beginning on building customer specific models.
FY1991 Capital Budget
.
I* -* The First Fiscal Quarter 1991 Capital Budget was submitted to
Houston on August 20. AFEs for all first quarter projects were
included. The IRR for the total budget is 18%.
New Hire
Joe Ganc from Penn State will begin as a process engineer in early September.
CCR 000006^66
:N6INRJN6 * R.E. POL*, S.C. HILLMAN, H.R. KANE
AFE NUMBER
PROJECT DESCRIPTION
ABEROEEN CHEMICAL PLANT
APPROVEO CAPITAL PROJECTS ummaiHKKtimtui
STATUS
AB5B D61B A519 A649 A909 DM? D629 D749 D849 D059 D899 fit? F699 F779 6569 6659 6719 6759 6819 6039 H769 H799 AMO D600 F 590 6560 6610 H500 H510
H520 o L530 O
ALTERNATE NATURAL 6AS PIPELINE
VINYL VALVE UP6RA0E PLANT ELECTRICAL UP6RADE VINYL CONTROL SYSTEM MODERNIZATION INERTS 8EH0VAL MODIFICATIONS PROPANE STORAGE AREA 0ELU6E SYSTEM COMPOUND REBLEND TRANSFER SYSTEM LEAD HANOIIN6 AND EXPOSURE REDUCTION COMPOUND LINE 3 SEMI-BULK LEAD HANDUN6 COMPOUND SILO BRIDGE BREAKING RAILCAR CLEANIN6 RACK COMPOUND LINE S HEATED PLASTICIZER LOU MOLECULAR NE16HT RESIN EXPANSION DRYERS NO.4 I 5 CONTAMINATION REDUCTION DRYBLEND DIV.VALVE AND CHUTE REPLACEMENT NEW DRYER BA6HOUSES COMPOUND SEWER REVISIONS HASTE OIL REDUCTION VCM SIGHT GLASS REPLACEMENT PLANT HATER RECYCLE PLANT DIVERTER VALVE REPLACEMENT HI6HNAY 25 LAND PURCHASE
REDUCED FLAME k SMOKE COMPOUND PROJECT
PLASTICIZER LOADING AND UNLOADING REVISIONS DRYBLEND TRANSFER LINE ELBONS TC SPILL CONTAINMENT TC COMPLIANCE PROJECT PLANT HATER SYSTEM NEST INCINERATOR REPLACEMENT MISCELLANEOUS CAPITAL PROJECTS < I15H FURNITURE AND OFFICE EQUIPMENT
THE SYSTEM HAS BEEN STARTED UP AND IS OPERATIONAL. PUNCHLIST ITEMS ARE IN PR06RESS. INSTALLATION IS IN PROGRESS AND PLANNED FOR COMPLETION IN OCTOBER. CONSTRUCTION IS 99X COMPLETE AND IN PROGRESS. PROJECT COMPLETION 15 PLANNED FOR AUGUST. ENGINEERING IS IN PR06RESS. CONTROL ROOM CONSTRUCTION IS IN PR06RESS WITH COMPLETION PLANNED FOR SEPTENIER. CONSTRUCTION IS (N PROGRESS HITH COMPLETION SCHEDULED FOR NOVEMBER. INSTALLATION IS COMPLETE. THE PROJECT HILL BE CLOSED TO FIELD CHARGES IN SEPTEMBER. INSTALLATION IS COMPLETE EXCEPT FOR PUNCHLIST ITEMS. INSTALLATION IS IN PR06RESS HITH COMPLETION PLANNED FOR NOVEMBER. LONG LEAD ITEMS HAVE BEEN PLACED ON ORDER. PROJECT COMPLETION IS PLANNED FOR 10/90. L0N6 LEAD ITEMS HAVE BEEN PLACED ON OROCR. COMPLETION IS PLANNED FOR 10/90. DESIGN IS IN PROGRESS. PROJECT COMPLETION IS PLANNED FOR 11/90. THE PROJECT IS COMPLETE AND OPERATIONAL. IT HILL BE CLOSED TO FIELD CHAR6ES IN AU6UST. INSTALLATION IS IN PROGRESS WITH COMPLETION PLANNED FOR AUGUST. INSTALLATION IS SCHEDULED FOR COMPLETION IN NOVEMBER. DESI6N IS IN PR06RESS. PROJECT COMPLETION IS PLANNED FOR SEPTEMBER. THE ORIGINAL SCOPE OF NORK IS COMPLETE AND THE PROJECT HILL BE CLOSED TO FIELD CHARGES IN SEPTEMBER. INSTALLATION IS IN PR06RESS HITH COMPLETION IN JULY. PUNCHLIST ITEMS ARE IN PR06RESS WITH COMPLETION PLANNED FOR SEPTEMBER. DESI6N IS IN PROGRESS. PROJECT CORPLETION IS PLANNED FOR SEPTEMBER. DES16N IS IN PROGRESS. PROJECT CORPLETION IS PLANNED FOR OCTOBER. THIS PROJECT HILL BE CLOSED TO FIELD CHAR6ES IN SEPTEMBER. AFE CANCELLED. INSTALLATION IS COMPLETE ON ALL DESIRED HODIFICATIONS TO DATE. DESIGN IS IN PR06RESS HITH COMPLETION PLANNED FOR OCTOBER. PRE-FABRICATION NORK IS IN PR06RESS. INSTALLATION IS PLANNED FOR COMPLETION IN SEPTEMBER. INSTALLATION IS IN PROGRESS HITH CORPLETION PLANNED FOR LATE AU6UST. INSTALLATION IS IN PR06RESS HITH COMPLETION PLANNED FOR LATE AUGUST. ENGINEERING IS IN PROGRESS. PROJECT COMPLETION (S PLANNED FOR HID-1991. DELIVERY OF THE INCINERATOR IS PLANNED FOR 2/91. PROJECT COMPLETION IS PLANNED FOR 5/91. ENGINEERING IS IN PR06RESS ON 32 PROJECTS. EQUIPMENT IS ON ORDER.
o o
o
o
O' O'
ENVIRONMENTAL - F. G. Jeanson
Water
All wastewater discharge parameters were met for the month of July.
A bioassay test was set up for the first week in August.
Waste
Waste shipments for the month included:
- One bulk load of floor sweep was shipped to CWM in Lake Charles, LA.
A federal appeals court ruled Alabama's law banning hazardous waste shipments to CUM's Emelle landfill is an unconstitutional restriction of interstate commerce. We still cannot ship hazardous waste to Alabama until final appeals have been made.
This ruling would apparently mean the end of a similar law passed by the
Louisiana legislature.
*
An evaluation was made of sending hazardous waste to an alternate site in Ohio and Oklahoma.
Superfund
An order was received from the State this month to do a remedial investi gation of our Superfund sites. The order requires a submittal of a remedial investigation plan to the State within thirty days of the effective date of the order (7/17/90). Conoco has DuPont Environmental Remediation Services (DERS) preparing this plan. DERS expects to have the final issue the first part of August.
A meeting will be set up in August with the State to review the remedial investigation (RI) plan.
Arrangements for Vista to pay a portion of the RI plan were negotiated.
DERS was also commissioned to write up comments on the original report issued by NUS. These comments were completed, reviewed by Conoco and Vista, and will be sent out early in August.
Air
A construction permit was received from the State for the VCSM project which includes a vinyl production increase of 40MM pounds. Our new max imum production when the VCSM project is compete is 500MM pounds.
Additional modeling will also be completed. Scott Environmental will do two additional dispersion model test cases with lower overall plant VCM emissions. These cases will be completed in August.
ooooo^6
cc*
ENVIRONMENTAL - Continued
Miscellaneous I attended a third, third landban seminar held by the CMA. The 1991 waste hauling budget was completed this month. The semi-annual SPCC plan survey was completed.
CCR 000006^69
ENERGY CONSERVATION - D. A. Moore
July. 1990
I. Energy Conservation Data
A. Unadjusted EUI
<1.5%>
B. Adjusted EUI
<1.9%>
C. BTU/Lb. Product
2498.0
D. Total Energy Consumption MMM BTU 132.43
Fiscal Y.T.D.
< 6.9%> < 7.1%>
2625.0 1314.36
II. Plant Energy Conservation Program
A. Maintenance
- ----
There were eleven energy related items completed in July, 1990. -,Ten of these items were steam leak repairs. The remaining one was steam trap repairs.
III. Boiler Operation
;
Boiler
Combustion Efficiency % July. 90 Fiscal Y.T.D^
No. 1 No. 2 No. 3
(1) 83.2% 82.9%
83.4% 83.3% 83.0%
(1) Boiler number one was not operated during the month.
CCR 000006470
1I!Ega RESOURCE REPORT
Paraonaal - J. E. Beall
RMPlOTPant
Promoti nnw^pnafera
Donald Barclay - transferred from Supply and
Transportation-Houston to Director of Administrative
Services-Aberdeen.
--
. ;*
Jack Little - transferred from Director of Administrative
Services-Aberdeen to Director of Administrative Services-Lake Charles.
Don Whatley
from Compound Operator back to Utility
(Jerry Jenkins came back to Compound Dept.).
Larry Frye - bid from P-1 Operator to Maintenance Helper.
RETiRarorrg
Hone
TERMIHAT10H8 /RE 81GHATTOHS Bobby Ward - terminated.
TO/FROM LEAVE Og ABSENCE None
qoooo6471 CCR
Aberdeen, Mississippi
Salaried Employees Hourly Employees Total Employees
Employees (Hourly) New Employees Terminations
DEPARTMENTS V .house Gen. Plant Maintenance Laboratory Compound Vinyl Plasticizer
PAR 16 13 41 24 40 33 5
80** 171 251
JULY, 1990_________________ MONTHLY PERSONNEL REPORT
Minority Employees 09 Z
Salaried
g in?
Hourly Total
65 38Z 72 29Z
Q
Hourly Min.. Hired
0
1
Z Min. Hired
0
Hourly Min.. Term.
0
Z Min. Term.
0
# EMPLOYEES MIN. EMP. Z MIN. NEW HIRES YTD TERM. YTD TURNOVER YTD
15 8
0
000
00
16
5 31
0 0 0 0. 0 0
41
10 24
0
000
00
24
5 22
0
000
0 0.
38
26 67
0
00n
q0
33
10 30
0
00n
q0
5
2_____________
0
_Q_
0
____L
_a_
Number of Applicants:
Month
0 Year to Date ______0
APPLICANT BREAKDOWN:
Minority0 _
Z Minority
0
0female ____ 0
Z Female
0
* This total includes 2 Co-op students and 2 Summer Process Engineers.
Hires (Hourly):
Month 0
Year to Date 0
Terminations (Hourly):
Mouth
l
fear to Date___1_
Overall Turnover
. 62
Projected Annual Turnover \Z
CCR 000006472
DEPARTMENTAL HOURS ANALYSIS REPORT
DISTRIBUTION LIST RUS, JFC, JVU, DEPARTMENT HEADS, FILE
. 7/ 2m THRU 7/29/99
JULY, 1990
i;
ibr
YARD UTILITY MAINTENANCE QC LAB JANITORS
STR TIME HRS URKD
OVERTIME HOURS
OVERTIME HOURS NONCONTROL CONTROL
1 ABSENCE AS A l OF STRAIGHT TIME 1
OVERTIME
1
AS A X OF ABSENCE i
OT HER
YEAR-TO-I VACATION
STR TIME HRS LOST) SICKNESS PAID NONPAID TOTAL
DATE | HOURS
1116.99
24.00
223.50
22.18
300.60j 15.05
11.83
0.00
26.88
5.421 180.00
660.00
24.09
96.50 20.08
24.0'ii
4.00
0.90 0.00
4.60
4.27 i 48.06
4774.00
16.09
489.25
10.58
154.5ii
0.17
2.91
1.06
3.24
4.36J 672.00
2475.50
72.09
274.25
13.99
144.50i
2.42
3.39 6.02
5.B4
3.281 256.00
224.00
0.09
12.25
5.47
t.eoi
0.06
0.66 0.45
0.45
d.65|' 8B.O0
UAREHOUSE STORES
951.56 184.00
9.90 9.00
73.25 2.25
7.70 1.22
160.501 a.joj
16.82 0.06
0.00 0.00
0.05 4.35
16.87 4.35
14.601 t. 62 j
128.00 120.00
DEVELOPMENT LAB DRY BLEND COMPOUND
VINYL PLASTICIZER GENERAL HELPERS TOTAL PLANT
780.75 876.00 548B.OO 5299.50 i 672.00 !
0.00 i
23432725
13.00 24.09 24.00 150.50 24.00
0.00 371750
64.00 146.75 577.25 939.00 110.25
0.00 3692759
9.86 IB.81 10.96 20.59 19.98 0.00 1
24.251 e. oo i
200.00i 489.joi
4.toi o.eoi
14749 1510735
0.00 0.00 0.87 6.35 0.09 0.60
3731
0.00 0.00 1.97 1.84 0.00 0.06
373T
3.11 0.00 0.80 1.06 0.6O 0.00 5781
3.11 0.60 3.64 9.25 0.66 0.00 2735
0.671 . 391
4.471
136.00 128.00 612.00
2.151 340.00
3.331 148.00
0.001
0.00
3704'"2856700
TOTAL TOTAL TOTAL
PLANTHOURS FOR JURY DUTY................................................ 9.09 PLANTHOURS FOR NATIONAL GUARD/RESERVE DUTY......... 477.59 PLANTHOURS FOR DEATH IN FAMILY................................... 49.90
i i
j.i
ABERDEEN CHEMICAL PLAN! DEPARTMENT*1 4mi3 ANALYSIS REPORT DISTR1BUTIC 1ST RWS, JFC, JVU, DEPARTMENT HEADS. FILE
16/ 2/89 lrutU 7/29/90
FY 1990 Y-T-D
OVERTIME HOURS
| 1 ABSENCE AS 1\ X OF S rRAIGHT T (ME
-------------------- (OVERTIME |
STR TIME OVERTIME HOURS IAS A Z OF|ABSENCE 1
OTITER
YEAR-TO- VACATION
DEPT HRS URKD NONCONTROL(CONTROL ISTR TIME |HRS LOSII SICKNESS} PAID NPNPAID TOTAL DATE HOURS
YARD 12084.60 348.00 1 1752.75] 16.31 i 718.50i 3.73| 1.30 0.55 5.58 5.42 1268.00
UTILITY MAINTENANCE
6350.25 216.00 1144.001 21.42 1 277.751 4.35} 0.00 0.03 4.37 4.27 644.00 53385.00 355.75 7445.251 14.61 1 2317.50j 2.7?| 0.58 6.98 4.34 4.36 5536.00
QC LAB JANITORS
28876.50 3267.00
588.00 2176.OOj 9.57 I 923.00j 1.25} 1.04 6.91
0.00 110.751 3.39 I 22.00(
o.ool 0.49 0.18
3.20 0.67
3.28 1908.00 0.65 336.60
WAREHOUSE
10349.75 1
0.00 739.561 7.15 1 1476.75i 13.64] 0.23 0.39 *4.27 14.00 912.00
(STORES
2952.00 1
e.eo 68.751 2.33 i 49.001 0.27] o.ool 1.39 1.66 1.62 316.00
(DEVELOPMENT LAB i 8964.00 i 108.50 753.50( 9.62 1 61.251 0.271 o.ooi 0.42
0.68
0.67 1064.00,
j DRY BLEND
i 9954.75 | 132.00 894.25) 10.31 1 141.751 0.12] 6.96 i 0.34! 1.42
1.39' 624.O0;
iCOMPOUND
162113.50 i
WlNYL
162575.75 \
iPLASTICIZER
| 7751.25 I
(GENERAL'HELPERS I 0.00 |
676.00 6395.50} 1754.50 6486.Sol
132.00 453.50j
0.00 i
o.ool
11.38 ( 2760.25]
13.17 1 *374.75( 7.55 J 227.6-31 0.00 1 o.-:o|
2.93]
0.90| 1.55!
o.ool
e.e&i
e.45i
0.00 o.ool
0.65 i 6. B5 i 1.301 o.ool
4.44 2.20 2.93i o.ool
4.471 3564.Ooi 2.15i 3764.OOj 3.33| 776.001 o.ool o.ool
TOTAL PLANT
269424 4310.75 28420.25 12.15 10349.JO 2.43 0.64 0.77 3.84 3.84 20712.00
TOTAL PLANT HOURS FOR JURY DUTY............................... TOTAL PLANT HOURS FOR NATIONAL CUARD/RESERVE DUTY TOTAL PLANT HOURS FOR DEATH IN FAMILY....................
108.00 1025.50 596.00
ADMINISTRATIVE SERVICES - D. A. Barclay
Safety
There were no safety instances for the month of July.
Cost Savings
Savings due to competitive bidding were $5,243 for July.
Savings due to prompt payment discounts were $1,768 for July.
Training
New OASIS coding was taught, to all personnel.------
-
CCft 0006475
abirdui chuical plait
S1IPF1IG AIUIS1S mi i99i
"S11FBIIIS BT PIODOCTS-
PUBLIC
8ISIB-BDLI RISIl-PiCIAGID
21,749,649 326,365
FUIIBLI CQIPOUm-BOU
919,940
FUIIBLI C0I1MID-PACUGID 3,253,143
HOITB
IPT/1TC UCl/TOLl
9,443,990 139,500
1,159,500 127,601
174,909 0
0 0
TTD
PUBLIC
IPT/ITC IZCB/TOLl
202,053,562 94,115,000 2,138,400
2,964,885 2,026,250
0
14,273,640 10,013,130 31,337,343 1,495,271
0 0
in Bosinss
13,663
00
69,973
00
RIGID COWOOID-BOII RIGID COIPODRB-PACIAGID
3,656,470 1,046,150
109,191
0
0 0
30,598,190 9,201,500
2,034,309
261,723
0 0
TOLUIG - BULI TOLLUG - PACZA6ID
0 0 855,700 0 0 36,390
0 0 7,139,890 0 9 164,565
PUSTICIZII
260,160
0 212,020
1,564,440 2,275,010 1,683,830
Tom
30,267,812 11,907,741 1,278,020
284,916,542 119,394,684 11,118,665
-S1IFHITS BT IODI-
BSU:
UOLT*
mn
FUIIBLI CO&POOID RIGID GOIPOOID PUSTIC1ZIR
RAILCAR
COSTOBRR COHHOI PICKUP CARI1II
161 19 40 It 0 5 29 1 0
0 0 12
TOTAL
220 15 38 12
tom JOLT
200 20 65
285
MTD* USII FUIIBLI C08P0UID I16ID C0BPOOID
pusticizii
1,482 123 236
21
262 569 11 44 17 149
0 45
2,313 170 402
66
TOTH ITD
1,862
290 807
2,959
PICUGID:
tmi* RISK FUIIBLI C0HP0Q1D RIGID COBPODID PUSTICIZIR
C9ST0NI PICKUP
COBSOI CARR1II
0 16
23 76 39 00
TOFC C9ITA1III AIR/OPS
00
00 00 00
5
9 1 0
TOTAL
21 110 13
0
TOTH mi
MTDt RISII FUIIBLI COKPOBD RIGID COIPOU1D PUSTICIZII
28
101 * 0
0
30 120 0 0 226 722 5 0 17 82 0 1
0 3 00
15
69 32 2
1
144
227 1.005
102 4
CCR 000006476
TOTAL TTD
273 935 5 1 124
1,338
LABORATORY - J. M. Edwards, Jr.
A. Safety - There were no safety incidents in the Laboratory during July. The monthly safety meeting topic was "Off-the-Job Safety Training" taught by Jerald Uptain.
B. Customer Contacts - There were two customer contacts during July.
Richard Williams accompanied Eric Ingram a/id Ken Walker to Flexible
Technologies in Abbeville, South Carolina,
They successfully
trialed two cadmium-free compound formulations without having to
make significant changes to their equipment.
Jim Edwards and Richard Williams accompanied Mark Eramo to Hi-Tech Cable in Starkville to follow up on a quality complaint. They pointed out two occurrences this year when they saw I.R. values on the finished wires drop to an uncomfortable level. Austin and Aberdeen are working to regain Hi-Tech's confidence in our resin and Q.C. testing.
C. Customer Q. C. Problem Reports
7/03 Exxon. Houston. TX
Exxon reported that a tank car (NATX 78222) shipment of 610P plasticizer was very cloudy. The plant made three process changes and the lab started checking in-process samples for clarity to prevent recurrences.
7/11 Vvtron Corporation. Loudon. TX
Vytron reported stronger than normal odor from 17462 NAT 50516 causing workers to get ill. It is suspected that high alcohol con centration in VRP plasticizer caused the unusually strong odor. In-process alcohol content testing of all plasticizer batches was started to prevent recurrences.
7/18 Exxon. Argo. Illinois
Exxon reported high suspended solids content in a bulk truck of 610P plasticizer. Another process change was made to prevent recurrences and a decision was made to put temporary dedicated supervision in the plasticizer plant and retrain the operating staff.
7/24 Uniroval. Inc.. Mishawaka, IN
Uniroyal reported seeing wet clumps in the top of a 5385 truck shipment. The truck was returned. Condensation from warm resin had collected at the top of the compartment and dripped down on the resin causing the clumps.
CCR 00006477
LABORATORY - Continued
D. Requests for Corrective Action
There were no requests for corrective action during the month of July.
E. Product Waivers
Customer
Product
Reason
No.
Dayton Extruded Plastics
RP-151 WHT 145 Color
1 R/C
Exxon
610P
Clarity
1 H/T
RVCM Summarv
RVCM of In-Process Samples
The following is a summary of residual VCM results on in*
process samples.
None of the reactor daily averages
exceeded 400 ppm.RVCM during the month of July, 1990.
Reactor Slurries
_________Drier
5265
5305
Number of Samples Average RVCM, ppm
930 137
24 0.227
65 0.221
RVCM of Shipment Samples
The following is a summary of the residual VCM analysis of shipment samples for the month of July, 1990.
Product
Number of Samnles
Average RVCM
5265 5305 5385 5395 5415 Dry Blend Debox Pond
27 87 74
8 50 58
4 0
0.088 0.090 0.201 0.060 0.048 0.042 1.657
CCR 000006478
LABORATORY - Continued
G. Resin Process Capabilities (based on dryer "regulars")
5255
5305
5385
5395
Bulk Density Inherent Viscosity
(vs. 0.715 - 0.744) L Color
A Color B Color % on Pan
(vs. 2%, max.) % thru 140 Mesh Drytime Mets I.R.
(vs. 95% of control) Hard Particles, (% > 10) Average particle size.
microns
1.67 0.92
4.93 2.22 1.67 0.96
....
0.52
-- -- --
~*
140
1.20 2.33 1.22 1.83 4.17 2.67 0.70
--
0.63
--
....
--
WWW
1.31 0.85
2.47
2.50 0.96
....
* 1.40 1.67
.... --
12.6
1.03 1.19
13.67
5.67 0.95
--
0.72 1.67 2.02
--
0
138 ... 161 . 145
5415
1.14 1.04
4.56
6.33 2.67 0.17 3.56 1.67 3.87 1.81 0
172
H. Flexible Compound Qua 11try Summary
- - - -
--
Hardness Color Hard Particles Contamination Dicing Cross Contamination Streamers
Adiustments M Lbs.. Hi
5.0
--
....
.... --
--
<0.09> --
--
-- ....
5.0 <0.09>
Relections M Lbs.. Hi
.....
40.9 7.1
26.4 15.6
11.2 5.4
106.6
....
<0.72> <0.13> <0.47> <0.28> <0.20> <0.10> <1.89>
I. Rigid Compound Quality Summary
Rejections M Lbs (%>
Torque Rheometry Color Color & 40 Mesh
Total
12.7 4.7
34H 51.9
<0.23> <0.08> <0.6?> <0.93>
J. Miscellaneous
1. The old Instron tensile tester, donated to Mississippi State University, was installed and calibrated. Dave Cox and Bobby Jenkins trained three teachers on its use and how to maintain it.
0006^7^ CCR 00
Continued
Miscellaneous - continued 2. A database file (in Symphony) was started to store incoming
raw material analyses. This is part of the new process of checking raw material shipment certificates of analysis against Vista specifications before unloading. 3. Jim Edwards attended an all-week seminar in flexible compound technology in Austin R&D. 4. All lab personnel were certified in "Basic Life Support" by the American Heart Association Cardiopulmonary Resuscita tion and Emergency Cardiac Care. This was a four-hour course taught by Ginny Belk. 5 All six laboratory natural teams met once during the month of July.
CCR 000006480
RESIN Ship Date 7/10/90 7/10/90 7/13/90
7/16/90 7/20/90
7/20/90
SAMPLE SHIPMENTS JULY 1990
Product
5265
5305
5385 5415
5465
5265 5305 5385
5305
Amount
300 lbs.
50 lbs.
50 lbs. 50 lbs.
50 lbs.
5 lbs. 5 lbs. 5 lbs.
2 lbs.
Customer ETS HISHAM ZABIAN E. I. DuPont Rintec Corporation
Capitol Wire & Cable Azrock Industries
NATIONAL PLASTIC AND BUILDING MATERIAL INDUSTRIES
COMPOUND Ship Date 7/06/90
7/09/90 7/11/90
7/25/90 7/30/90
Product
461-119A WHT 461-119B BLK
34642 NAT
461-120A WAT CL 461-120B WAT CL
27251 BLK
18031 WAT CL
Amount
1500 lbs. 1500 lbs.
100 lbs.
1300 lbs. 1500 lbs.
100 lbs.
100 lbs.
Customer Central Plastics, Inc.
CONDUCEN Flexible Technologies
Philatron International Fiberchem Inc.
DRYBLEND Ship Date 7/24/90 7/27/90 7/31/90
Product RP-151 WHT 145 RP-151 WHT 145 378-143 BLU 170
Amount
Customer
2X2 lbs . Dayton Extruded Plastics
2X2 lbs . Dayton Extruded Plastics
100 lbs.
Pyramid Plastics
PLASTICIZER Ship Date 7/20/90
Product VHP
Sample Shipments/July 1990 Page 2
Amount 1 gal.
Customer Plasticolor Inc.
CCR 000006482
NUMBER OF NJURlES
ABERDEEN CHEMICAL PLANT INJURIES
TOTAL INJURIES
OSHA RECORDABLE
OOOOOfc^83 CCR
ABERDEEN ENERGY CONSUMPTION
BTU/LB
ei/niB
OODOO^8'* C.C*
MONTHLY
MONTH
------- 12 MONTH AVERAGE
Distribution:
Letter & Graphs
THH-RRS-CJM CJM/SS, AJW P.L. Foote N.S. Vafladis N.J. Forsa W.L. Manlon
Complete w/data
HDG RSB JJM/JGG W.L.McClain
i; E C IV E 0 SST 1 9. 90 WILLIAM L McCLAlW
(Note:
This information (particularly the narrative and tables
Identifying customers) should not be shared with customers "as is".
The intent of providing this information is hopefully to satisfy a
need by field sales for this kind of Information but more importantly
to have field sales "armed" with knowledge about the quality their
customers have been receiving and about the trends and changes in
plant operations affecting product quality before going in to the
customer. Hopefully field sales will be able to use the information
in proactive dialogue/discussion versus our historical reactive mode.
This narrative is not intended to be an exhaustive discussion or
analysis of the data.
If more detailed Information is needed
regarding the discussion, the data or how certain customers may have
been impacted, we want marketing personnel to call and talk to whomever at the OKC Plant can best answer their questions. In my
view, this is the real value of providing this information -- not
merely having SPC charts to flash on the customer.
If anyone would like to discuss this in more detail, please give me a call. Please keep in mind that manpower limitations preclude expanding the parameters analyzed or customizing charts for specific customers.
OCR 000006485
TO: DISTRIBUTION
Interoffice
Communication
FROM: DATE:
H. -Garrison September 13, 1990
SUBJECT: RAILCAR QUALITY DATA - August, 1990
Attached for your information are copies of control charts for a number of key quality parameters as measured in railcars loaded at OKC in August, 1990. A brief comparison of August results versus the three previous months is presented in the following table:
AUG 1990
JUL 19_9_Q
JUN 1990
Bulk Density (Spec . - 0.510 min.)
AVG UCL
0.572 0.605
0.567 0.605
LCL
0.538
0.529
UCL-LCL cpk
0.067 1.8
0.076 1.5
0.571 0.604 0.538 0.066 1.8
ft Moisture AVG UCL LCL UCL-LCL cpk
(Spec.
--0.30 0.13 0.17 0.09 0.08 4.0
max. 1
v 0.12
0.15 0.09 0.06
5.5
0.12 0.16 0.08 0.08 4.4
% thru 140 AVG UCL LCL UCL-LCL cpk
(Spec.
- 20.0 max> 6.4 8.8 4.1 4.7 5.9
6.8 9.0 4.5 4.5 5.9
6.8 8.4 5.1 3.3 8.1
ft on Pan (Spec. -- 5.0 max.'J
AVG
2.3
UCL
3.1
LCL
1.4
UCL-LCL
1.7
cpk
3.2
2.3 3.1 1.5 1.6 3.5
2.1 2.6 1.6 1.0 5.6
RVCM (PPM> AVG UCL LCL UCL-LCL cpk
(Spec.
--2.0 max. 0.9 1.4 0.4 1.0 2.2
Pipe/8.5 max. 0.9 1.4 0.3 1.1 2.3
sidine 0.6 1.0 0.3 0.7 3.8
MAY 1990
0.562 0.598 0.525 0.073 1.4
0.12 0.17 0.08 0.09 4.1
7.4 9.7 5.1 4.6 5.5
2.3 3.0 1.5 1.5 3.6
0.7 1.3 0.1 1.2 2.2
oooo6
cc*
RAILCAR QUALITY DATA September 13, 1990 Page 2
- August,
1990
Average results and consistency (as measured by UCL-LCL and cpk) for most parameters were for the most part very comparable to prior months. It should be noted that the control chart attached for moisture was developed using all railcar data. The out~of-control points are attributable to analyses using a different instrument and method. The tabulated data following the control chart (and the tabulated data in the cover letter) are calculated without the data having assignable causes.
H. GARRISON PLANT MANAGER
HDG/gsc ralldata.Aug
OCR 000006487
OKC PVC SHIPMENTS (X CHART)
AUGUST 1990
BULK DENSITY (S /C O )
BULK DENSITY ( 0 / 0 0 )
OKC PVC SHIPMENTS (R CHART)
AUG 1990
n wrrnuFw
CCA 000006408
OXC 1C BATA
AIK
1990
TOTAL DATA POUTS* 116.00
CPI *
1.04
bate
CA1
LOADED IUHBEB
BOli HOVJIG cumit DUS 1AIGE I BA1 1 BAR UCL I LCL I UCL 1
QIC 1C DATA
ADS
1990
TOTAL MIA POUTS* 116.00
CPI
1.84
BATE CA1
BULI H0VII6 cornii
LOADED 1DS3IS
BUS EAI6I I BA! 1 IAS UCL I LCL Z UCL 1
IMIIIII tiiitimtiiuuiiiiisittit itiuii iiiliill lumii mmit ittmti ttittita
1 1 42117
l l 44748
3 I 41895 4 1 46555 5 2 43867
6 3 43030 7 3 41650
0.563 0.561 0.585 0.584 0.585 0.567 0.575
0.002
0.024 0.001 0.001 0.016 0.006
0.572 0.572
0.572 0.573 0.572 0.572 0.572
0.013 0.013
0.013 0.013 0.013 0.013 0.013
0.605 0.605 0.60S 0.605 0.605 0.605 0.605
0.538 0.538 0.538 0.536 0.538 0.538 0.538
0.041
0.041 0.041 0.041 0.041 0.041 0.041
8 3 48039 9 3 46389 10 3 48047 11 4 41314 12 4 4652? 13 4 43671 14 4 48049 15 4 43663
16 5 46559 17 5 46393 18 5 44747
19 5 45701 20 6 46398 21 6 41097
n 6 41616 23 7 46539 24 7 43855 25 7 46450 26 7 41310 27 7 46399 28 8 42172 29 8 41635 30 8 42153 31 8 48071 32 8 46516 33 9 46473 34 9 46580
35 9 46040
36 10 46586 37 10 73392 31 10 46410
0.580 0.575 0.575 0.586 0.581 0.562 0.568 0.566 0.566 0.575 0.587 0.550 0.548 0.567
0.559 0.562 0.574 0.582 0.575 0.573 0.589 0.582 0.569 0.571 0.S90 0.596 0.577
0.579 0.592 0.597 0.602
0.005 0.005 0.000 0.011 0.005 0.018 0.005 0.002 0.000 0.009 0.012 0.037 0.002 0.019 0.006 0.003 0.012 0.008 0.007
0.002 0.016 0.007 0.013
0.002 0.019 0.006 0.019
0.002 0.013 0.005 0.005
0.572 0.572 0.572 0.572 0.572 0.573 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572
0.572 0.572 0.572
0.372 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572
0.572 0.572 0.572 0.572
0.013 0.013 0.013 0.013 0.013 0.013
0.013 0.013
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.013 0.013 0.013 0.013 0.013
0.013 0.013 0.013 0.013
0.013 0.013 0.013 0.013
- 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605
0.605 0.60S 0.605 0.605 0.605 0.605 0.605 0.605 0.605
0.605 0.605 0.605 0.605
0.605
0.605 0.605 0.605
0.538 0.538 0.538 0.536 0.538 0.538 0.538 0.538 0.538 0.538 0.538
0.538 0.538 0.538 0.538 0.536 0.538 0.536 0.538 0.538 0.536 0.538 0.538 0.538 0.538 0.538
0.536 0.538
0.538 0.538 0.538
0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041
0.041 0.041
0.041 0.041 0.041
OOOOOfc^89 CCR
OIC 1C DATA
196
2990
TOTAL OITA POUTS* 126.00
CPI *
1.84
DATE CAE LOADED IDESEl
39 10 46561 40 11 43753 41 11 45750 43 11 46498 43 11 46558 44 11 41842 45 12 42378 46 13 43701 47 13 45889 48 13 46543 49 13 46585 50 13 46482 51 13 46478 52 13 46400 53 14 46541 54 14 46468 55 14 46462 56 15 43440 57 15 42185 56 IS 46508 59 16 46529 60 16 73404 61 16 42121 62 16 46501 63 17 46460 64 17 46560 65 17 41406 66 17 42680 67 18 48058 68 16 44296 69 18 73395 70 18 43078 71 19 73406 72 19 46540 73 19 48055 74 30 46491 75 20 48051 76 30 46549 77 20 46390 78 21 46515 79 21 46454 80 _ 31 46453 81 21 73402 82 22 73390 83 22 41275 84 22 41602 85 23 43737
SOLE E0VII6 CD11EIT DEIS IAI6E I BAS I 5AS ML I LCl 1 DCL I
0.583 0.559 0.564 0.563 0.581 0.587 0.561 0.593 0.593 0.593 0.564 0.569 0.577 0.576 0.575 0.586 0.587 0.572 0.569 0.570 0.586 0.603 0.575 0.561
0.569 0.597 0.557 0.555 0.570 0.591 0.555 0.545 0.586 0.547 O.SS3 0.550 0.590 0.556 0.566 0.555 0.579 0.585 0.570
0.564 0.546 0.555 0.564
0.019 0.025 0.005 0.000 0.018 0.005 0.025 0.032 0.000 0.000 0.029 0.005 0.008 0.002 0.001 0.011 0.001 0.015 0.003 0.002 0.016 0.017 0.028 0.014 0.008 0.028 0.040 0.001 0.015 0.021 0.036 0.010 0.041 0.040 0.006 0.003 0.040 0.034 0.010 0.011 0.034 0.006 0.015 0.006 0.016 0.007 0.008
0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.573 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.60S 0.605 0.605 0.605 -0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605
0.538 0.538 0.538 0.536 0.538 0.538 0.538 0.538 0.538 0.538 0.536 0.538 0.536 0.536 0.536 0.536 0.538 0.538 0.538 0,536 0.538 0.538 0.538 0.538 0.538 0.538 0.538 0.538 0.538 0.538 0.538 0.538 0.536 0.538 0.538 0.538 0.538 0.538 0.536 0.538 0.538 0.538 0.538
0.538 0.538 0.538 0.538
0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.042 0.041 0.042 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.Q41 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.Q41 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041
CCR 000006<*90
Hit
oic ic oxtx
HITS CXI LOWED IIISBEl
06 23 43717 17 23 46549 68 23 73411 69 23 73396 90 24 42117 91 24 46484 92 25 46569 93 25 46502 94 26 44750 95 26 46464 96 26 46467 97 27 43730 98 27 46472 99 27 46477 00 17 73397 .31 28 42172 102 3 46391 .03 28 46586
M 28 43749
105 29 46398 '96 29 48046 L07 29 48054
:os 29 46471
109 29 46404 no 30 41597 in 30 73410 in 30 46857 ;i3 31 46399 114 31 45781 115 31 43855 116 31 46466
106 1990
TOTAL BXTX POUTS* 116.00
CPI *
I'M
mi HOVII6 cornu
BBS RAISE X BU S BU OCL X LCL X UCL E
0.551 0.555 0.528 0.552 0.542 0.558 0.585 0.597
0.578 0.577 0.589 0.573
0.564 0.598 0.562 0.556 0.570
0.566 0.586 0.572 0.569 0.571
0.563 0.562 0.567 0.559 0.574 0.559 0.570 0.569 0.562
0.012 0.004 0,017
0.024 0.011 0.017 0.027 0.012 0.019 0.000 o.on
0.015 0.010 0.034 0.036 0.006 0.014
0.004 0.020
0.014 0.003 0.002
0,009
0.001 0.005 O.OOB 0.016 0.015 0.011 0.002 0.006
0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572
0.572 0.572 0.572 0.572 0.572 0.572 0.572 0.572
0.572 0.572 0.571 0.572 0.572 0.572
0.572 0.572 0.572 0.572 0.572 0.572
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.013 0.013
0.013 0.013 0.013
0.013
0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013
0.605
0.605
0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605
0.605 0.605 .0.605
0.60S 0.605 0.605 0.605 0.605 0.605
0.605 0.605 0.605 0.605 0.605 0.605 0.605 0.605
0.538 0.538 0.538 0.538 0.538 0.538 0.538 0.538 0.538 0.538 0.538 0.538 0.538 0.538
0.538 0.538 0.538
0.538 0.S38 0.538 0.538 0,538 0.538 0.538 0.538 0.538 0.538 0,538 0.538 0.538 0.538
0.041
0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041
0.041 0.041 0.041
0.041 0.041 0.041 0.041 0.041 0.041
0.041 0.041 0.041 0.041 0.041 0.041 0.041 0.041
OOOOO COR
MOISTURE (WT * )
OKC PVC SHIPMENTS (X CHART)
AUG 1990
OKC PVC SHIPMENTS (R CHART)
AUGUST 1990
MOISTURE
umtmmumttimmmmimiiimnmmmmmimmuitimmititmmii
OKC RC DATA AUG 1990
TOTAL DATA P0IHTS= 106.00
CPA :
3.98
mumiiitttmmttimtmimsmiiiiiiummimmmmimmtummmmii
DATE CAR
MOVING CURRENT
LOADED NUMBER
MOISTURE RANGE X BAR R BAR UCL X LCL X UCL R
imiiummtmimmmmmi tllfitl msim simtis imssu mmu uasm
1 42117
0,140
0.130 0.016 0.173 0.087 0.053
1 44748 1 41898 1 46355
2 43867 3 43030 3 41650
0.135 0.120
0.108
0.118 0.153 0.150
0.005 0.015
0.012
0.010 0.035 0.003
0.130 0.130
0.130
0.130 0.130 0.130
0.016 0.016 0.016
0.016 0.016 0.016
0.173 0.173 0.173
0.173 0.173 0.173
0.087 0.087
0.087
0.087 0.087 0.087
0.053 0.053 0.053
0.053 0.053 0.053
3 48039 3 46389 3 48047
0.178 0.153 0.148
0.028 0.025 0.005
0.130 0.130 0.130
0.016 0.016
0.016
0.173 0.173
0.173
0.087 0.087
0.067
0.053 0.053
0.053
4 41314 4 46527 4 43871
0.128 0.133 0.105
0.020 0.005
0.028
0.130 0.130 0.130
0.016 0.016 0.016
0.173 0.173 0.173
0.087 0.067 0.067
0.053 0.053 0.053
4 48049 4 43663
5 46559
0.135 0.123
0.103
0.030 0.013
0.020
0.130 0.016 0.130 0.016 0.130 "0.016
0.173 0.173
0.173
0.087 0.087
0.087
0.053 0.053 0.053
5 46393 5 44747
0.100 0.003 0.130 0.016 0.173 0.087 0.053 0.125 0.025 0.130 0.016 0.173 0.087 0.053
5 45701 6 46398 6 41097 6 41616
7 46539 7 43855 7 46450 7 41310 7 46399
0.098 0.130 0.148 0.140 0.135 0.130 0.173 0.155 0.143
0.027 0.033 0.017 0.007
0.005 0.005 0.043
0.018 0.012
0.130 0.130 0.130 0.130
0.130 0.130 0.130
0.130 0.130
0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016
0.173 0.173 0.173 0.173 0.173 0.173
0.113 0.173 0.173
0.087 0.087 0.087 0.087 0.087 0.087
0.087 0.067 0.087
0.053 0.053 0.053 0.053
0.053 0.053
0.053 0.053 0.053
6 42172 6 41635 8 42153 8 48071 8 46516 9 46473 9 46580 9 48040 10 46586 10 73392 10 46410 10 46561 11 43753 11 45750 11 46498 11 46558 11 41842 12 42378 12 43701 12 45869
0.133 0.145 0.140 0.106 0.125 0.133 0.113 0.113 0.126 0.128 0.105 0.108 0.115 0.105 0.125
0.103 0.110 0.130 0.120 0.125
0.010 0.013 0.005 0.033 0.018 0.008 0.020 0.000 0.015 0.000
0.023 0.003 0.008 0.010 0.020
0.022 0.007 0.020 0.010 0.005
0.130 0.130 0.130 0.130 0.130 0.130 0.130 0.130 0.130 0.130 0.130 0.130 0.130 0.130 0.130
0.130 0.130 0.130 0.130 0.130
0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016 0.016
0.016 0.016
0.016 0.016 0.016 0.016 0.016
0.173 0.173 0.173 0.173 0.173 0.173 0.173 0.173 0.173 0.173 0.173 0.173 0.173 0.173 0.173
0.173 0.173 0.173 0.173 0.173
0.087 0.087 0.087 0.067 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.087 0.067 0.067 0.08?
0.087 0.087 0.087 0.087 0.087
0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053
0.053 0.053 0.053 0.053 0.053
000006^93
lurirmimtiimimmimmmmmmitimmismimmmuiiMiiiitmmm
m RC DATA AUG 1990
TOTAL DATA POINTS: 106.00
CPK :
3.96
imtimimmmmimmtmmutiiitittimtimiiimtmutmtimmumum
DATE CAR
MOVING CURRENT
LOADED NUMBER
MOISTURE RANGE X BAR R BAR UCl X ICL X UCL R
ismimtmitmimmmmtm mutt mut tmim
mum
13 46543
0.125 0.000 0.130 0.016 0.173 0.087 0,053
13 46S6S 13 46482
0.123 0.002 0.130 0.016 0.173 0.087 0.053 0.118 0.005 0.130 0.016 0.173 0.087 0.053
13 46478
0.083 0.035 0.130 0.016 0.173 0.087 0.053
13 46400 14 46541
0.083 0.000 0.130 0.016 0.173 0.087 0.053 C. t48 0.065 0.130 0.016 0.173 0.087 0.053
M 46468
0.120 0.028 0.130 0.016 0.173 0.087 0.053
14 46462 IS 43440
0.105 0.015 0.130 0.016 0.173 0.087 0.053 0.145 0.040 0.130 0.016 0.173 0.087 0.053
!5 42165 IS 46508
0.140 0.005 0.130 0.016 0.173 0.087 0.053 0.123 0.018 0.130 0.016 0.173 0.087 0.053
16 46529 16 73404 16 42121
0.173 0.150 0.158
0.050 0.023 0.008
0.130 0.130 0.130
0.016 0.016 0.016
0.173 0.173 0.173
0.097 0.087 0.087
0.053 0.053 0.053
16 46501 17 46460 17 46560 17 41406 t7 42660 16 46056 16 44296 16 73395 16 43078 19 73406
19 46540 19 48055 20 46491
0.153 0.173
0.165 0.158 0.180 0.120 0.128 0.120
0.118 0.138 0.123 0.110 0.128
0.005 0.020
0.006 0.008 0.023 0.060 0.007 0.007
0.003 0.020
0.075 0.012 0.018
0.130 0.130 0.130 0.130 0.130 0.130 0.130 0.130
0.130 0.130
0.130 0.130 0.130
0.016 -U.016
0.016 0.016 0.016 0.016 0.016 0.016
0.016 0.01$
0.016 0.016 0.016
0.173 0.173 0.173 0.173 0.173
0.173 0.173 0.173
0.173 0.173
0.173 0.173 0.173
0.087 0.087 0.097 0.087 0.087 0.087 0.087 0.087
0.087 0.087 0.087
0.087 0.087
0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053 0.053
20 48051 20 46549 20 46390
21 46515 21 46454
0.U5 0.133 0.135 0.190 0.190
0.018 0.013 0.003
0.055 0.000
0.130 0.130 0.130
0.130 0.130
0.016 0.016 0.016 0.016 0.016
0.173 0.173 0.173 0.173 0.173
0.087 0.087 0.087 0.087 0.087
0.0S3 0.053 0.053
0.053 0.053
21 46453
. 0.166 0.003 0.130 0.016 0.173 0.087 0.053
21 73402 2S 46569
0.193 0.005 0.130 0.016 0.173 0.087 0.053 0.120 0.073 0.130 0.016 0.173 0.087 0.0S3
25 46502
0.123 0.002 0.130 0.016 0.173 0.087 0.053
26 44750
0.158 0.035 0.130 0.016 0.173 0.087 0.053
26 46464
0.128 0.030 0.130 0.016 0.173 0.087 0.053
26 46467
0.128 0.000 0.130 0.01$ 0.173 0.087 0.053
27 43730
0.108 0.020 0.130 0.016 0.173 0.087 0.053
27 46472
0.118 0.010 0.130 0.016 0.173 0.087 0.053
27 46477 27 73397
0.135 0.018 0.130 0.016 0.173 0.087 0.053 0.105 0.030 0.130 0.016 0.173 0.087 0.053
28 42172 28 46391 28 46566
0.113 0,118 0.093
0.008 0.005 0.025
0.130 0.130 0.130
0.016 0.016 0.016
0.173 0.173 0.173
0.087 0.087 0.087
0.053
0.053 0.053
28 43749
0.093 0.000 0.130 0.016 0.173 0.087 0.053
o00006^9^ cca
mtmmimmutmnimimmiiiimmmumimtmimmmtimmmmiii
OKC RC OATA AUG 1990
TOTAL DATA PQINT$= 106.00
CP* =
3.98
mmmnmmmiuumiimmmmmmnmmummntmmmmmmim
DATE CAR
MOVING CURRENT
LOADED NUMBER
MOISTURE RANGE X BAR R BAR UCL X LCL X UCL R
miimiimimmtmmimmi imm tmim mmit mmtt rtttttti imiiii
29 46398 29 48046 29 48054 29 46471
0.113 0.123 0.115 0.108
0.020 0.010 0.008 0.008
0.130 0.130 0.130 0.130
0.016 0.016 0.016 0.016
0.173 0.173 0.173 0.173
0.087 0.087 0.087 0.087 '
0.053 0.053 0.053 0.053
29 46404 30 41597
0.100 0.007 0.130 0.016 0.173 0.087 0.053 0.128 0.027 0.130 0.016 0.173 0.087 J) .063
30 73410
0.125 0.003 0.130 0.016 0.173 0.087 0.053
30 46857 31 46399 31 45781 31 43855 31 46466
0.125 0.135 0.108 0.133 0.133
0.000 0.010 0.028 0.025 0.000
0.130 0.130 0.130 0.130 0.130
0.016 0.016 0.016 0.016 0.016
0.173 0.173 0.173 0.173 0.173
0.087 0.087 0.067 0.087 0.087
0.053 0.053 0.053 0.053 0.053
CCf? 0006495
W R U 140*
OKC PVC SHIPMENTS (X CHART)
AUG 1990
CUSTOMER
OKC PVC SHIPMENTS (X CHART)
AUG 1990
% THRU 140
oxc ic mi
l CA1 B IGHBE1
1 42117 1 44748 1 4189S 1 46555 a 43667 3 43030 3 41650 3 46039 3 46309 3 48047 4 41314 . 4 46537 4 43871 4 46049 4 43663 3 J$559 5 93 5 ,,/47 S 45701 6 46398 6 41097 6 41616 7 46539 7 43055 7 46450 7 41310 7 46399 8 41)73 8 41635 8 43153 8 48071 8 46516 9 46473 9 46580 9 48040 10 46586 10 73393 10 46410 10 46561 11 43753 11 45750 n `4498 u 558 n 41843 13 43376 13 43701 13 45889
106 1990
TOTAL DATA POIITS* 116.00
CPI
5.85
1 TIM B0VI16 cornii 140 U16 I BAB I 111 QCL I LCL I OCL 1
6.60 6.43 0,87 8.75 4.12 2.85 6.40 0.40 6.43 0.87 8.75 4.12 2.85 6.00 0.40 6.43 0.87 8.75 4.13 2.85 6.40 0.40 6.43 0.87 8.75 4.12 2.85 6.60 0.30 6.43 0.87 8.75 4.12 2.85 6.40 0.30 6.43 0.87 8.75 4.12 2.85 7.00 0.60 6.43 0.87 8.75 4.12 2.85 6.80 0.20 6.43 0.87 8.75 4.12 2.85 6.80 0.00 6.43 0.87 1.75 4.12 2.85 5.40 1.40 6.43 0.87 8.75 4.12 2.85 4.30 1.30 6.43 0.87 8.75 4.12 2.85 6.60 3.40 6.43 0.87 8.75 4.12 2.85 7.80 1.30 6.43 0.87 8.75 4.12 2.85 6.60 1.00 6.43 0.87 8.75 4.12 2.95 6.40 0.40 6.43 0.17 8.75 4.12 2.85 7.30 0.80 6.43 0.17 8.75 4.12 2.85 6.40 0.80 6.43 0.87 8.75 - 4,12 2.85 6.00 0.40 6.43 0.87 8.75 4.12 2.85 7.60 1.60 6.43 0.87 8.75 4.12 2.85 6.60 LOO 6.43 0.87 8.75 4.12 2.85 11.80 5.30 6.43 0.87 1.75 4.12 2.85 7.00 4.80 6.43 0.87 8.75 4.12 2.85 5.60 L40 6.43 0.87 8.75 4.12 2.85 5.60 0.00 6.43 0.87 8.75 4.12 2.85 5.60 0.00 6.43 0.87 8.75 4.12 2.85 6.30 0.60 6.43 0.87 8.75 4.12 2.85 5.80 0.40 6.43 0.87 1.75 4.12 2.85 6.40 0.60 6.43 0.87 1.75 4.12 2.85 5.80 0.60 6.43 0.87 1.75 4.12 2.85 6.60 0.80 6.43 0.87 8.75 4.12 2.85 9.00 3.40 6.43 0.87 8.75 4.12 2.85 9.60 0.80 6.43 0.87 8.75 4.12 2.85 6.60 3.30 6.43 0.87 8.75 4.12 2.65 6.80 0.30 6.43 0.87 8.75 4.12 2.85 6.40 0.40 6.43 0.87 8.75 4.12 2.85 5.60 0.60 6.43 0.87 8.75 4.12 2.15 4.80 LOO 6.43 0.17 8.75 4.12 2.85 5.60 0.80 6.43 0.87 8.75 4.12 3.85 6.30 0.60 6.43 0.87 8.75 4.12 2.65 6.60 0.40 6.43 0.87 8.75 4.12 3.85 5.60 LOO 6.43 0.87 0.75 4.12 2.85 6.60 LOO 6.43 0.87 8.75 4.12 2.65 6.60 0.00 6.43 0.87 8.75 4.12 2.85 6.40 0.30 6.43 0.87 1.75 4.12 2.65 6.60 0.40 6.43 0.87 8.75 4.12 2.85 7.40 0.60 6.43 D.07 8.75 4.12 2.65 6.60 0.80 6.43 0.87 8.75 4.12 2.85
000006^97
,, *00 ooooo *
si*t in sn WO C9*9 00*0 00*9 tn sn WO E9*9 09*1 00*9
*** IV9 sn wo cv 9 Oft on svt tn sn wo SO* 9 00*1 09*9 59" t tn sn WO tvs oe*o 09*1 sn tr sn wo EV9 ovo 08'S 5VI tn sn wo tvs 09`t OVl 5VI in sn wo EV9 OVl os*y
58*1 in sn wo tvs ovo 0V9 SVt in sn wo tvs 00*1 OVl
SVt m sn wo tvs 00*0 Of9 sn tn srs wo EV9 ovo ovs 58*1 in sn wo tvs 00*1 00*1 sn tn sn wo tvs QO'Q 00*9 5VI tn srs wo EV9 Qt'O 00*9 tn tn srs wo tvs ovo ovt SB* C m srs wo tvs ovo ovs sn tn srs wo EV9 00*0 ovs S8*t in srs wo tvs ovo ovs SVt tn sn wo tvs ovo ovt we in in W0 tvs os*o ovs SB*l m srs wo tvs 00*0 ovs sit in srs wo tvs ovo ovs sir in srs wo tvs 09*0 09*9 S8*t tn sn wo tvs 00*1 on SCt tn srs wo tvs ovo ovs sn in srs wo tvs ovo 09*9 SVt in srs wo tvs 09*0 OVl sn in sn wo CVS ovt ovs svt tn srs wo tvs ovt OO'C sn in - sn wo tvs 01*1 OVl sts tn srs wo CVS ovo 09*9 srs tn srs wo CVS ovo 0V9 see tn srs wo tvs 08*0 os*s sn in srs wo tvs 00*0 ovs sn in srs wo tvs 00*1 ovs sve in sn wo tvs 09*0 ovt sn in srs wo tvs ovo ovs set tn srs wo tvs 00*0 09*9 SVt m srs wo tvs 09*0 09*9 svt tn srs wo tvs ot*o 00*9 SI't lt*9 srs wo tvs ovo QV9 set tn sn wo CVS Ot'O 00*1 set tn srs 18*0 tvs ovo OVl sn tn SI'S wo tvs 09*0 ovs see try srs wo CVS Ot'O OVl Si*t try srs 8*0 CVS 09*0 OVl
1 130 1131 I 130 m i m i :sm 091
innao 9IIA0I mi %
osm 91 tosst St
69999 St
99999 9t
11119 9t
96EEl~ tt
imi tt
69599 tt
IUC9 tt
ACAC9 tt
10919 It
51119 tt
mu It
C09CI It
C5999 It
95999 It
S1S99 It
06199 Ot
69S99 IS089 16999
ot ot ot
55099 61
09599 61
909CI fit
810C9 81
S6CCI 81
96199 81
95099 81
08919 II
90919 It
0955 11
09999- IT
10599 91
ltlt9 91
909CI 91
6tS 99 91
90599 51
58119 SI
099E9 51
19999 91
99999 91
19599 91
00999 Cl
81999 El
18999 El
58599 El
E9S99 El
irani ran m JJY
srs * HD
00*911 *311104Y1M TtiOl
0661 9QY Ulfi 21 DIO
QIC 1C MU 106 1990
torn nn pouts* iu.oo
CPI *
5.15
in CU i&OZS I0SBE1
26 46464 26 46467 27 43730 27 46472 27 46477 27 73397 26 42172 26 46391 26 46566 26 43749 29 46396 29 46046 29 46054 29 46471 29 46404 20 - 41597 30 '3410 30 46657 31 46399 31 45761 31 43655 31 46466
x TfliO I0VII6 COUIIT 140 UI6Z I BU B BUI QCL I LCL X Ott I
6.00 0.00 6.43 0.67 8.75 4.12 2.85 6.20 2.20 6.43 0.67 8.75 4.12 2.85 6.60 1.60 6.43 0.87 8.75 4.12 2.85 6.20 0.40 6.43 0.87 6.75 4.12 2.85 5.40 0.60 6.43 0.87 8.75 4.12 2.85 7.60 2.20 6.43 0.87 8.75 4.12 2.65 6.60 1.00 6.43 0.87 6.75 4.12 2.85 6.40 2.20 6.43 0.87 8.75 4.12 2.85 9.40 3.00 6.43 0.67 8.75 4.12 2.65 6.00 3.40 6.43 0.87 8.75 4.12 2.85 5.60 0.20 6.43 0.87 8.75 4.12 2.65 6.20 0.40 6.43 0.87 8.75 4.12 2.65 6.60 0.40 6.43 0.67 8.75 4.12 2.85 5.20 1.40 6.43 0.87 8.75 4.12 2.65 5:60 0.40 6.43 0.87 8.75 4.12 2.85 5.60 0.20 6.43 0.87 8.75 4.12 2.65 5.00 0.60 6.43 0.87 6.75 ' 4.12 2.85 5.20 0.20 6.43 0.87 8.75 4.12 2.85 6.20 1.00 6.43 0.87 6.75 4.12 2.85 5.60 0.60 6.43 0.87 8.75 4.12 2.65 5.40 0.20 6.43 0.87 8.75 4.12 2.85 5.40 0.00 6.43 0.87 8.75 4.12 2.85
CCR 000006499
OKC PVC SHIPMENTS (X CHART)
i
zo
1 11 21 31 41 51 61 71 81 91 101 111 CUSTOMER CCR 000006500
OKC PVC SHIPMENTS (R CHART)
AUG 1990
ra irrnuF
mnmmmummmmmiiitimmmmiimiiminmimmmtitimmmit
OXC RC DATA AUG 1930
TOTAL DATA POUTS: 116.00
CPA :
3.18
DATE CAR
X OH CURRENT
LOADED NUMBER
PAH RANGE X BAR R BAR UCL X LCl X UCL R
tttmmmmmmmmimmi mmt mum mmst UtttUI mum mmti
1 42117
2.2 2.28 0.32 3.14 1.43 1.05
1 44748
2.2 0.00 2.28 0.32 3.14 1.43 1.05
1 41898
2.2 0.00 2.28 0.32 3.14 1.43 1.0$
1 46SS5
2.6 0.40 2.28 0.32 3.14 1.43 -1.05
2 43867
2.4 0.20 2.28 0.32 3.14 1.43 1.05
3 43030 3 41650
1.2 1.20 2.28 0.32 3.14 1.43 1.05 3.0 1.80 2.26 0.32 3.14 1.43 1.05
3 48039 3 46399
2.6 0.40 2.28 0.32 3.14 1.43 1.05 2.4 0.20 2.28 0.32 3.14 1.43 1.05
3 48047
2.4 0.00 2.28 0.32 3.14 f .43 1.05
4 41314 4 46527
2.0 0.40 2.28 0.32 3.14 1.43 1.05 2.0 0.00 2.28 0.32 3.14 1.43 1.05
4 43671
2.8 0.80 2.28 .0.32 3.14 1.43 1.05
4 48049 4 43663
2.4 0.40 2.28 "0.32 3.14 1.43 1.05 2.2 0.20 2.28 0.32 3.14 1.43 1.05
& 46559
2.4 0.20 2.28 0.32 3.14 1.43 1.05
5 46393
2.4 0.00 2.28 0.32 3.14 1.43 1.05
5 44747
2.0 0.40 2.28 0.32 3.14 1.43 1.05
5 45701
2.4 0.40 2.26 0.32 3.14 1.43 1.05
6 46398 6 41097 0 41616 7 46533 7 43655 1 46450 7 41310 7 46399
2.0 0.40 2.28 0.32 3.14 1.43 1.05 3.4 1.40 2.26 0.32 3.14 1.43 1.05 2.2 1.20 2.28 0.32 3.14 t .43 1.05 1.4 0.60 2.28 0.32 3.14 1.43 1.05 2.0 0.60 2.28 0.32 3.14 1.43 1.05 1.8 0.20 2.28 0.32 3.14 1.43 1.05 2.0 0.20 2.28 0.32 3.14 1.43 1.05
1.8 0.20 2.28 0.32 3.14 1.43 1.05
6 42172 8 41635
2.0 0.20 2.26 0.32 3.14 1.43 1.05 2.0 0.00 2.28 0.32 3.14 1.43 1.05
8 42153 8 46071
2.2 0.20 2.28 0.32 3.14 1.43 1.05 3.4 1.20 2.28 0.32 3.14 1.43 1.05
8 46516 9 46473 9 46580
3.8 0.40 2.28 0.32 3.14 1.43 1.05 2.2 1.60 2.28 0.32 3.14 1.43 1.05
2.2 0.00 2.28 0.32 3.14 1.43 1.05
9 48040
2.0 0.20 2.26 0.32 3.14 1.43 1.05
' 10 46586
2.0 0.00 2.28 0.32 3.14 1.43 1.05
10 73392
1.8 0.20 2.28 0.32 3.14 1.43 1.05
10 46410
2.2 0.40 2.28 0.32 3.14 1.43 1.05
10 46561
2.0 0.20 2.28 0.32 3.14 1.43 1.05
11 43753
2.4 0.40 2.28 0.32 3.14 1.43 1.05
11 45750
2.2 0.20 2.28 0.32 3.14 1.43 1.05
11 46498
2.2 0.00 2.28 0.32 3.14 1.43 1.05
11 46558
2.4 0.20 2.28 0.32 3.14 1.43 1.05
11 41842
2.4 0.00 2.28 0.32 3.14 1.43 1.05
12 42378
2.4 0.00 2.28 0.32 3.14 1.43 1.05
12 43701
2.6 0.20 2.28 0.32 3.14 1.43 1.05
" - * - -- ' -
* A*
0006501
muttmiiimmiiiummuiiiiiimmuitimimmuxitmimmitifimimm
OKC RC DATA AUG 1990
TOTAL DATA POINTS: 116.00
CP* =
3.18
mxmmmiumiiiiiiixtuimmtmmuiiiiumxtiitmtmumitmtimimsii
DATE CAR
S OH CURRENT
LOADED NUMBER
PAN RANGE X BAR R BAR UCl X LCt X UCL R
iitmmmmmuiimmmmi mtm mmit mtmx mtxxtx mum uxxmt
13 46543 13 46S8S 13 46482
2.6 0.40 2.28 0.32 3.14 1.43 1.08 2.8 0.20 2.28 0.32 3.14 1.43 1.05 2.4 0.40 2.28 0.32 3.14 1.43 1.05
13 46478
2.4 0.00 2.28 0.32 3.14 1.43 '1.05
13 4640(1 U 46541 u 46468 14 46462 IS 43440
2.6 0.20 2.28 0.32 3.14 1.43 1.05 2.2 0.40 2.28 0.32 3.14 1.43 1.05 2.2 0.00 2.28 0.32 3.14 1.43 1.05
2.2 0.00 2.28 0.32 3.14 1.43 1.0S 2.2 0.00 2.28 0.32 3.14 1.43 1.05
IS 4218S IS 46506 16 46629 16 73404 16 42121 16 46S01 17 46460 17 46560 17 41406 17 42680 18 48058 18 44296 18 73395 18 43078 19 73406 19 46S40 19 4805S 20 46491 20 48051 20 46549 20 46390 21 46S1S 21 464S4 21 46453 21 73402
2.2 0.00 2.28 0.32 3.14 1.43 1.05 2.2 0.00 2.28 0.32 3.14 1.43 1.05 2.2 0.00 2.28 0.32 3.14 1.43 1.05 2.2 0.00 2.28 ~ 9.32 3.14 1.43 1.05 2.0 0.20 2.28 0.32 3.14 1.43 1.05 2.2 0.20 2.28 0.32 3.14 1.43 1.05 2.2 0.00 2.28 0.32 3.14 M3 1.05 3.0 0.80 2.28 0.32 3.14 1.43 1.05 2.2 0.80 2.28 0.32 3.14 1.43 1.05 2.2 0.00 2.28 0.32 3.14 1.43 1.05 2.6 0.40 2.28 0.32 3.14 1.43 1.05 2.4 0.20 2.28 0.32 3.14 1.43 1.05 2.6 0.20 2.28 0.32 3.14 1.43 1.05 3.0 0.40 2.28 0.32 3.14 1.43 1.05 2.4 0.60 2.28 0.32 3.14 1.43 1.05 2.2 0.20 2.28 0.32 3.14 1.43 1.05 2.4 0.20 2.28 0.32 3.14 1.43 1.05 2.2 0.20 2.28 0.32 3.14 1.43 1.05 2.2 0.00 2.28 0.32 3.14 1.43 1.05 2.6 0.40 2.28 0.32 3.14 1.43 1.05 2.2 0.40 2.28 0.32 3.14 1.43 1.05 2.0 0.20 2.28 0.32 3.14 1.43 1.05 2.4 0.40 2.28 0.32 3.14 1.43 1.05 2.2 0.20 2.28 0.32 3.14 1.43 1.05 2.2 0.00 2.28 0.32 3.14 1.43 1.05
22 73390 22 4427$ 22 41602 23 43737 23 43717 23 46549 23 73411 23 73396 24 42117 24 46484 2S 46569 25 46502 **
2.8 0.60 2.28 0.32 3.14 1.43 1.05
2.2 0.60 2.28 0.32 3.14 1.43 1.05
2.2 0.00 2.28 0.32 3.14 1.43 1.05
2.4 0.20 2.28 0.32 3.14 1.43 1.05
2.2 0.20 2.28 0.32 3.14 1.43 1.05
1.4 0.80 2.28 0.32 3.14 1.43 1.05 2.4 1.00 2.28 0.32 3.14 1.43 1.05 2.4 0.00 2.28 0.32 3.14 1.43 1.05
2.4 0.00 2.28 0.32 3.14 1.43 1.05 2.0 0.40 2.28 0.32 3.14 1.43 1.05 2.0 0.00 2.28 0.32 3.14 1.43 1.05 2.4 0.40 2.28 0.32 3.14 1.43 1.05
a * *-'
CCR 000006502
ummmimummmuimiimmitmtmttmimumtuiuimiiimmmmt
ORC RC DATA AUG 1990
TOTAL DATA POINTS: IIS.00
CPA =
3.16
ummmmmtmutimiuntmmmmimuiiiittmnmimmiiitinimmn
OATS CAR
J ON CURRENT
LOAOEO NUN8ER
PAN RANGE X BAR R BAR UCL X LCL X UCL R
tmmmmimtiiiiiimmimi umu mum mtiisi mmtt mmu mum
26 46464
2.4 0.20 2.28 0.32 3.14 1.43 1.05
25 46467 27 43730
2.8 0.40 2.28 0.32 3.14 1.43 1.05 2.4 0.40 2.28 0.32 3.14 1.43 1.05
2? 46472
2.4 0.00 2.28 0.32 3.14 1.43 3.05
27 46477
1.6 0.60 2.29 0.32 3.14 1.43 1.05
27 73397
2.6 0.80 2.28 0.32 3.14 1.43 1.05
28 42172 26 46391
2.6 0.00 2.28 0.32 3.14 1.43 1.05 2.6 0.00 2.28 0.32 3.14 1.43 1.05
28 46586
3.2 0.60 2.28 0.32 3.14 1.43 1.05
28 43749 29 46398
2.2 1.00 2.28 0.32 3.14 1.43 1.05 1.6 0.40 2.28 0.32 3.14 1.43 1.05
29 48046 29 46054
2.0 0.20 2.28 0.32 3.14 1.43 1.05 2.2 0.20 2.26 0.32 3.14 1.43 1.05
29 46471
1.8 0.40 2.28 ''0.32 3.14 1.43 1.05
29 46404 30 41597 30 73410 30 46657 31 46399
1.8 0.00 2.28 0.32 3.14 1.43 1.05 2.2 0.40 2.28 0.32 3.14 1.43 1.05 2.0 0.20 2.28 0.32 3.14 1.43 1.05 2.0 0.00 2.28 0.32 3.14 1.43 1.05 2.4 0.40 2.28 0.32 3.14 1.43 1.05
31 45781
1.8 0.60 2.28 0.32 3.14 1.43 1.05
31 43855 31 46466
1.8 0.00 2.28 0.32 3.14 1.43 1.05 2.0 0.20 2.28 0.32 3.14 1.43 1.05
CCR 0006503
RVCM (pp**>
OKC PVC SHIPMENTS (X CHART)
AUG 1990
CC 000006504
OKC PVC SHIPMENTS (R CHART)
AUG 1990
ra tsrnuFw
RVCM (PPM)
V
tumtmimmmimmmiiiiiiimiimmmmiuitmmiimiimtmmmmt
OKC RC DATA m 1990
TOTAL DATA POINTS: 116.00
CPU =
2.23
mimimtmimitiimimmmummmmmmmztmaimuiimtmmtmM
DATE CAR
CURRENT
LOADED NUMBER
RVCN RANGE X BAR R BAR UCL X LCL X UCL R
mmmmmummitmmim mam aaaataai musts tiaaataa tamati uataiti
1 42117 1 44748 1 41895 1 46555 2 43867 3 43030 3 41650 3 48039
3 46389 3 48047 4 41314
0.90 0.87 0.19 1.38 0.36 0.62 1.40 0.50 0.87 0.19 1.38 0.36 0.62 1.20 0.20 0.87 0.19 1.38 0.36 0.62 1.20 0.00 0.87 0.79 1.38 0.36 ` 0.62 0.80 0.40 0.67 0.19 1.38 0.36 0.62 0.70 0.10 0.67 0.19 1.38 0.36 0.62
0.70 0.00 0.87 0.19 1.38 0.36 0.62 0.80 0.10 0.87 0.19 1.38 0.36 0.62 0.80 0.00 0.87 0.19 1.38 0.36 0.62 0.60 0.00 0.87 0.19 1.38 0.36 0.62 1.10 0.30 0.87 0.19 1.38 0.36 0.62
4 46527
4 43871 4 48049 4 43863 5 46559 5 46393 5 44747 5 45701 i 46398 6 41097 8 41616 7 46539 7 43855 7 46450 7 41310 7 46399
a 42172
8 41635 8 42153 8 48071 8 46516 8 46473 3 46560 3 48040
10 46586
10 73392 10 46410 10 46561
11 43753 11 45750 11 46498 11 46558 11 41842 12 42378 12 43701
if nnn
0.89 0.30 0.67 0.19 1.36 0.36 0.62
1.10 0.30 0.67 ~ 0.19 1.38 0.36 0.82
1.00 0.10 0.67 0.19 1.38 0.38 0.62
1.00 0.00 0.67 0.19 1.38 0.36 0.62
0.50 0.50 0.87 0.19 1.38 0.36 0.62
0.60 0.10 0.87 0.19 1.38 0.36 0.52
0.60 0.00 0.87 0.19 1.38 0.36 0.62
0.40 0.20 0.87 0.19 1.38 0.36 0.62
0.80 0.40 0.87 0.19 1.38 0.36 0.62
0.90 0.10 0.87 0.19 1.38 0.36 0.62
0.80 0.10 0.87 0.19 1.38 0.36 0.62
0.90 0.10 0.87 0.19 1.38 0.36 0.62
0.90 0.00 0.87 0.19 1.38 0.38 0.62
1.30 0.40 0.87 0.19 1.36 0.38 0.62
0.80 0.50 0.87 0.19 1.38 0.36 0.62
0.80 0.00 0.87 0.19 1.38 0.36 0.62
0.60 0.20 0.67 0.19 1.38 0.36 0.62
0.70 0.10 0.87 0.19 1.38 0.36 0.62
0.70 0.00 0.87 0.19 1.36 0.36 0.62
1.00 0.30 0.87 0.19 1.38 0.36 0.62
1.00 0.00 0.87 0.19 1.38 0.36 0.62
0.90 0.10 0.87 0.19 1.38 0.36 0.62
0.50 0.40 0.87 0.19 1.38 0.36 0.62
0.80 0.30 0.87 0.19 1.38 0.36 0.62
0.80 0.00 0.87 0.19 1.36 0.36 0.62
0.80 0.00 0.87 0.19 1.38 0.36 0.62
0.90 0.10 0.87 0.19 1.36 0.36 0.62
0.90 0.00 0.87 0.19 1.38 0.36 0.62
1.20 0.30 0.67 0.19 1.38 0.36 0.62
0.80 0.40 0.67 0.19 1.36 0.36 0.62
1.20 0.40 0.87 0.19 1.38 0.36 0.62
1.00 0.20 0.87 0.19 1.38 0.36 0.62
0.70 0.30 0.87 0.19 1.38 0.36 0.62
1.20 0.50 0.87 0.19 1.36 0.36 0.62
1.40 0.20 0.87 . 0.19 1.38 0.36 0.62
-- * **
*
000065o5
uiimmmimimiimiimmmtmimmiitmmiiniitimuimmumiitiiit
OKC RC DATA AUG 1990
TOTAL DATA POINTS* 116.00
CPX *
2.23
mmmiiimiuummtmmmmmmmmmuimimiumimmmmimia
DATE CAR
CURRENT
LOADED NUMBER
RVCN RANGE X BAR R BAR UCL X LCL X UCL R
timimmmmmimimmm mm* ******** ******** ******** mt**x* ********
13 46543
1.10 0.10 0.87 0.19 1.38 0.36 0.62
13 46585
1.00 0.10 0.67 0.19 1.38 0.36 0.62
13 46482 13 46478
1.00 0.00 0.87- 0.19 1.38 0.36 0.62 1.10 0.10 0.87 0.19 1.38 0.36 .0.62
13 46400 U 46541
1.00 0.10 0.87 0.19 1.38 0.36 0.62 1.30 0.30 0.87 0.19 1.38 0.36 0.62
u 46466 14 46462 IS 43440 15 42185 IS 46508
1.40 0.10 0.87 0.19 1.38 0.36 0.62 1.90 0.50 0.87 0.19 1.38 0.36 0.62 0.50 1.40 0.87 0.19 1.38 0.36 0.62 0.60 0.10 0.87 0.19 1.38 0.36 0.62 0.50 0.10 0.87 0.19 1.38 0.3$ 0.62
IS 46529
1.10 0.60 0.67 0.19 1.38 0.36 0.62
16 73404 18 42121
1.00 0.10 0.87 0.19 1.36 0.36 0.62 1.00 0.00 0.87 " 0.19 1.38 0.36 0.62
16 46501
1.10 0.10 0.87 0.19 1.36 0.36 0.62
17 46460 17 46560
0.90 0.20 0.87 0.19 1.38 0.36 0.62 1.04 o.u 0.87 0.19 1.38 0.36 0.62
17 41406 17 42680 16 48058
0.90 o.u 0.87 0.19 1.38 0.36 0.62 0.80 0.10 6.87 0.19 1.38 0.36 0.62 0.80 0.00 0.87 0.19 1.38 0.36 0.62
18 44296
0.90 0.10 0.87 0.19 1.38 0.36 0.82
18 73395
0.90 0.00 0.87 0.19 1.38 0.36 0.62
18 43078 13 73406
0.90 0.00 0.87 0.19 1.38 0.36 0.62 0.96 0.06 0.87 0.19 1.38 0.36 0.62
19 46540
0.87 0.09 0.67 0.19 1.36 0.36 0.82
19 48055 20 46491
1.01 O.U 0.67 0.19 1.38 0.36 0.62 0.70 0.31 0.67 0.19 1.38 0.36 0.62
20 48051 20 46549 20 46390
0.80 0.10 0.87 0.19 1.38 0.36 0.62 0.70 0.10 0.87 0.19 1.38 0.36 0.62 0.90 0.20 0.67 0.19 1.38 0.36 0.62
21 46515
0.70 0.20 0.87 0.19 1.36 0.36 0.62
21 48454
1.00 0.30 0.87 0.19 1.38 0.36 0.62
21 46453
0.80 0.20 0.B7 0.19 1.38 0.36 0.62
21 73402
0.80 0.00 0.87 0.19 1.38 0.36 0.62
22 73390
0.60 0.20 0.87 0.19 1.38 0.36 0.62
22 41275
0.70 0.10 0.87 0.19 1.38 0.38 0.62
22 41602
0.70 0.00 0.87 0.19 1.38 0.36 0.62
23 43737
0.60 0.10 0.87 0.19 1.38 0.36 0.62
23 43717
0.90 0.30 0.87 0.19 1.38 0.36 0.62
23 46549
0.60 0.30 0.87 0.19 1.38 0.36 0.62
23 73411
0.70 0.10 0.87 0.19 1.38 0.36 0.62
23 73396
0.60 0.10 0.87 0.19 1.38 0.36 0.62
24 42117
1.00 0.20 0.87 0.19 1.38 0.36 0.82
24 46484
0.90 0.10 0.67 0.19 1.38 0.36 0.62
25 46569
1.10 0.20 0.87 0.19 1.38 0.36 0.62
25 46502
0.90 0.20 0.87 0.19 1.38 0.36 0.62
--, .ft- Ui.
ft ------L-UL----- O-Uu ft *ft
00006506
titmmimmmimimuummiimmimiiKtmmmmitiiiiiiiimiimmti
OKC RC DATA AUG 1990
TOTAL DATA MINTS= 116.00
CPK =
2.23
iismnimimiuummmimmmimimmmmiuimmmmntmmmmi
DATE CAR
CURRENT
LOADED NUKBER
RVCH RANGE X BAR R BAR UCL X LCL X UCL R
immmumutmmtimmm mim itmm tmtm itmm mmtt mmti
26 46464
1.40 0.40 0.87 0.19 1.38 0.36 0.62
26 46467 27 43730
1.00 0.40 0.87 0.19 1.38 0.36 0.62 0.80 0.20 0.87 0.19 1.38 0.36 0.62
27 46472
0.70 0.10 0.87 0.19 1.38 0.36 ' 0,62
27 46477 27 73397
0.80 0.10 0.87 0.19 1.38 0.36 0.62 0.80 0.00 0.67 0.19 1.38 0.36 0.62
26 42172
0.70 0.10 0.87 0.19 1.38 0.36 0.62
26 46391 26 4658$
0.70 0.00 0.87 0.19 1.38 0.36 0.62 0.50 0.20 0.87 0.19 1.38 0.36 0.62
26 43749
0.40 0.10 0.87 0.19 1.36 0.36 0.62
29 46398
0.60 0.20 0.87 0.19 1.38 0.36 0.62
29 48046
0.70 0.10 0.87 0.19 1.38 0.36 0.62
29 48054 29 46471
0.60 0.10 0.87 .0.19 1.38 0.36 0.62 0.80 0.20 0.87 0.19 1.38 0.36 0.62
29 46404 30 41597 30 73410
0.70 0.10 0.87 0.19 1.38 0.36 0.62 0.60 0.10 0.87 0.19 1.38 0.36 0.62 0.60 0.00 0.87 0.19 1.38 0.36 0.62
30 46857 31 46399
0.80 0.20 0.87 0.19 1.38 0.36 0.62 1.20 0.40 0.87 0.19 1.38 0.36 0.62
31 45781
0.20 1.00 0.87 0.19 1.38 0.36 0.62
31 4385S 31 46466
1.00 0.90 0.87 0.19 1.38 0.36 0.62 1.10 0.10 0.67 0.19 1.38 0.36 0.62
000006507 OCR
imiiummmi
DATE CAR
loaded mm
mtmi mnim
CUSTOMER
LOAD CAR DATE HUN
HOD-OA TNX CAP-AR PRE CAP-AR RIN-SA UDC UDC CRA CRA HlH-GA HU-6A
ipa
CRA CRA CRA IPX IPA XRA IPK CAP-AR IPA TNX IPA CAP-AR CON-CT IPA IPA IPA HU-GA HlM-GA CAP-AR
CAP-AR PRE NOD-OX
IPA IPA XRA CRA CAP-AR CRA CRA CRA
t 42117 1 44748 1 41899 1 46558 l 43867 3 43030 3 41650 3 48039 3 46389 3 48047 4 41314 4 48527 4 43871 4 48049 4 43863 5 46559
5 46393 5 44747 5 45701 . 6 46398 $ 41097 6 41616 7 46539 7 43855 7 46450 ? 41310 7 46399 e 42172 8 41635 8 42153 8 48071 a 46516
9 46473 9 46580 9 48040 10 46586 10 73392 10 46410 10 46561 11 43753 11 45750 11 46498 11 46556
OOOOO65O0 Ct*
CRA
CAP-IL SIL SlL CAP-AR
SIl
CRA CRA
HP PVP TNX CAP-AR
JET CRA CAP-ID CAP-IR CAP-AR
m
KRO SIL SIL
SIL
TDK HU-6A
SIL SIL
ntttiiumimii
DATE CAR LOADED DUMBER umm iiimm
24 mu
25 46569 25 46502 26 44750 26 46464 26 46467 27 43730 27 46472 27 46477 27 73397 26 42172 26 46391 24 46586 26 43749 29 46398 29 48046 29 48054 29 46471 29 46404 30 41597 30 73410 30 46857 31 46399 31 45781 31 43855 31 46466
CCR 000006509
CRA
1PH THX CON-CT
IPX IPX IPX MOD-OX CAP-AR
XRA CAP-Aft HU-GA HU-GA HU-GA
IPX HU-GA
CON-CT
KROV IPX CRA CON-CT PRE CRa
JET CAP-AR
XRA SIL SIl CRA CRA XRO CAP-AR THX JET CAP-AR CAP-AR JET COH-CT PIP
HOD COH-CT IPX PIP CAP-IN JET JET CRA
tmimimmui
DATE CAR
LOADED NUMBER iimui immii
It 41842
12 42376 12 43701 12 46089
13 46542 13 46565 13 46462 13 46478 13 46400 14 46541 U 46468 t* 46462 IS 43440 IS 42185 IS 48508 16 46529 16 73404
16 42121 16 46501 17 46460 17 46560 17 41406 17 42680 16 48058 IB 44296 16 7339S 18 43078 13 73406
19 46540 19 480S5 2D 46491 20 48051 20 46549 20 46390 21 46515 21 46454 21 46453 21 73402 22 73390 22 41275 22 41602 23 43737 23 4371 7 23 46549 23 73411 23 73396 24 42117
CCR 000006510