Document 7RvBkp052ZexGzJLRpQ2QqO4g
0- f f f i i
Z?' '
JUN-24-1937 0B--49
UCC CONTRACT D1U
PLAINTIFF'S EXHIBIT
DC P-159
rims - sn2U HQRK REQUESTt PRIORITY* 1 HWPi V <Y/N DATE START 1 LABOR CSTSt LONS DESCRIPTION
STATUSl PLANNER* WRK ' YPt 4
RBP Cfi ST ES SLT 61. 790 99
ENTR (CLR> PF5 (QHRB WORK REQUEST
I
cojcrndL - update UCC BUSINESS CONFIDE* |IAL
00001 too LEAOMANi 141 BLDGi lj
MILLER
NE I
INfcUL/*l RECTIFYING
100294 (HMDDYY)
OOOOOO
TOTAL EST4I OOOOOj
AND MAYBE. MORE CRAFTS TOISTRIP
AIR LEAKS. THIS IS A FRESH AIR
* ?DXbc HADLEY EXT JS31T FOR DETAILS.
.JSSU-TO (tCS IN9UL.CO. 100294. ASBESTOS
`RllANI STAT*
date writtn lOOH
; RH NUMi
DATE CLOSED
NAMfcLRHW^Ei MILLER, 5243 ' !: i
0R6j TRs 03P50 i
i|r ESTERS REMHRS ! RBP CR ST EST^tS
k>C.
OO. : 733 FS R
OO.
.insmsHnssme JVE>: PF3 (EXIT)
ADET pfi1: (CLOSE WRQ)
PF^ (CRE<| PF|2 ((
JUN 24 '97 9:38
TOTFL P.01 UCTC 00310 PAGE.002
JUN-24-1997 13;35
UCC CONTRACT DIO
P.02/18
MMIS - SM211OO0 WORK REQUEST: PW1866 PRIORITY: 3
WORKLOAD CONTROL
1ST ORD/ORIG: SUPINTENDENT:
UPDATE 00071520 HERRICK
UCC BUSINESS CONFIDENTIAL LEADMAN: 191 BLDG: 219
JE
HUP: Y (Y/N) MTAG: N <Y/N) DESCRIPTION: ASBESTOS REMOVAL
DATE START: 111196 <MMDDYY) DATE COMPLETE: 112596 (MMDDYY)
LABOR EST*: OOOOOO
MATERIAL EST*: OOOOOO
TOTAL EST*: 0000000
LONG
* REMOVE ASBESTOS INSULATION AND REINSULATE LINE ON SOUTH SID *
DESCRIPTION
E OF 219. LINE RUNS NORTH/SOUTH AND IS USED FOR TRACING ON *
TANKS IN TANK FARM. VICKNAIR HAS LOOKED AT JOB.
#
HOTSHOT EARL 10-29-96 SEND TO P.C.I. CO.
*
STATUS:
ASG;
C6P CODE:
PLAN STAT:
DATE WRITTN: 102896
PLANNER:
PROP NUM:
RM NUM:
DATE CLOSED:
URK. TYP: 2 URK CAT: RF CONTACT NAME,PHONE: LINDA 4296
ORGNTR: 05837
RSP CR ST ESTHRS REMHRS 733 IS R O. 00.
RSP CR ST ESTHRS
735 FS R
00.
n
.REMHRS 00
RSP CR ST ESTHRS REMHRS 8B0 BO R 00. 00.
JUN 24 '97 14:24
PAGE.002
UCTC 00300
Cl 5-0000002
JUN-24-1997 13:36 MMIS - SM21100
WORK REQUEST: PU9776
PRIORITY: 3 HWP: Y CY/N) HTAG: N
UCC CONTRACT DIU WUMUUHV LuitinuL
1ST ORD/ORIG: SUPINTENDENT: CY/N) DESCRIPTION:
0046423 HERRICK ASBESTOS
.. p.??r'18
LEADMAN: 191 BLDG:
JE INSULATION AT AMINES
31
DATE START: 111196 (MMDDYY) DATE COMPLETE: 122096 (MMDDYY)
LABOR EST*: OO0O0O
MATERIAL EST*: 900000
TOTAL EST*: 0900000
LONG
* REMOVE ASBESTOS INSULATION AT BUILDING SO/51 PER EARL VICKNA
DESCRIPTION
* IR'S RECOMMENDATION. HOTSHOT EARL 10-29-96. SEND TO P.C.I.
* CO.
ft
STATUS: R ASG:
C6P CODE:
PLAN STAT:
DATE URITTN: 102996
PLANNER:
PROP NUM:
RM NUM:
URK TYP: 2 WRK CAT: Rp CONTACT NAME,PHONE: LINDA 4296
DATE CLOSED: ORGNTR: 05837
RSP CR ST ESTHRS REMHRS I RSP CR ST ESTHRS REMHRS l RSP CR ST ESTHRS REMHRS
733 18 R
00.
00. | 735 FS R 0. 00. BBO BO R 00. 00.
JUN 24 '97 14:24
PAGE.003 Cl 5-0000003
JUN-24-1997 13:36 wukii ncwue.91 uruHItU :
UCC CvOuNmT*R'AnCvT' DW I*O-V
P.04/1B
MMIS - SM21100
WORKLOAD CONTROL
WORKREQUEST: PU2987
1ST ORD/ORIG:
PRIORITY: 3
SUPINTENDENT:
HUP: N (Y/N) MTAG: N (Y/N) DESCRIPTION:
DATE START: 111394 (MMDDYY) DATE COMPLETE:
LABOR EST*: 800000
MATERIAL EST*:
UPDATE UCC BUSINESS CONFIDENTIAL
00075366 LEADMAN: 131 BLDG: 019
DA2EY
LR
STEAM LINE BUY OXOCORNER B186
111896 (MMDDYY)
000000
TOTAL EST*: 0000000
LONG
* STRIP INSULATION SEE CUZ, MILL NEED JLG AND MAY BE ASB.
*
DESCRIPTION .* REMOVE ASBESTOS INSULATION. HOTSHOT EARL 11-15-96
*
SEND TO P.C.I. CO.
*
* INSULATORS. P SHOP
STATUS: R ASG:
C4P CODE:
PLAN STAT:
DATE URITTN: 111496
PLANNER:
PROP NUM:
RM NUM:
DATE CLOSED:
URK TYP: 2 WRK CAT:
CONTACT NAME,PHONE: DAZEY 4349 4971-570 ORGNTR: 05184
RSP CR ST ESTHRS REMHRS I RSP CR ST ESTHRS REMHRS I RSP CR ST ESTHRS REMHRS
321 39 U
00.
0. I 733 18 R
0. 00. I 735 FS R
8B0 BO R 00. 00. |
/r, f
00. 00.
/
JUN 24 '97 14:25
PAGE.004
Cl 5-0000004 UCTC 00302
JUN--24-1997 15=15
UCC CONTRACT DIU
P.06/06
WORK REQUEST UPDATED !
MMIS - SM211000
WORKLOAD CONTROL - UPDATE UCC BUSINESS CONFIDENTIAL
WORK REQUEST: PU6618
1ST ORD/ORIQ: O0OO11OO LEADMAN: 161 BLDG: 115
PRIORITY: 3
SUPINTENDENT: MILLER
NE
HUP: Y (Y/N) HTAG: Y (Y/N) DESCRIPTION: INSUL/UNIT ASBESTOS REMOVAL
DATE START: 120296 (MMDDYY) DATE COMPLETE: 122096 (MMDDYY)
LABOR EST*: 000000
MATERIAL EST*: 000000
TOTAL EST*: 0000000
LONG
* NEED INSULATION SHOP SUPPORT TO REMOVE SOME OLD ASBESTOS
DESCRIPTION - INSULATION ON THE EAST END OF B-115. NEED ASBESTOS PEOPLE *
TO CONTACT JIM AUSMUS TO WALK OUT JOB. HOTSHOT EARL 11-25-96
* SEND TO P.C.I. CO.
STATUS: R ASG:
C6P CODE
PLAN STAT:
DATE URITTN: 111996
PLANNER:
PROP NUM:
RM NUM:
DATE CLOSED:
URK TYP: 2 URK CAT:
CONTACT NAME,PHONE: MILLER, 5245
ORGNTR: 03750
RSP CR ST ESTHRS REMHRS | RSP CR ST ESTHRS REMHRS I RSP CR ST ESTHRS REMHRS
733 16 R 00. 00. I 735 FS R 00. 00. | 8B0 BO R 0. 00.
\ Ik
I
JUN 24 '97 16:03
TOTAL P.06 PAGE.006
UCTC 00309 Cl 5-0000011
MJIUIANW-24-190S11?^1 1I 3V:V3V6
UCC CONTRACT D1U
UWLUHV LUNIHUL - UPUAIt.
P.05/18 UUC BUSINESS CONFIDENTS
WORK REQUEST: PU0328
1ST ORD/ORIG: 00073553 LEADMAN: 151 BLDG: 019
PRIORITY: 3
SUPINTENDENT: DAZEY
LR
HUP: Y < Y/N) MTAG: Y <Y/N> DESCRIPTION: STEAM LEAKS AT CLEANING RK
DATE START: 112096 (MMDDYY) DATE COMPLETE: 112796 (MMDDYY)
LABOR ESTS: 000000
MATERIAL EST$: 000000
TOTAL EST: 0000000
LONG
NEED INSULATORS,CARPENTERS 2 SCAFFOLD
DESCRIPTION
* THIS IS ASB. U44 FOR DETAILS-OR FITTERS
* REMOVE ASBESTOS INSULATION. HOTSHOT EARL 11-21-96
* SEND TO P.C.I. INSULATION CO.
STATUS: PLANNER:
ASG:
C&P CODE:
PROP NUM.
PLAN STAT: RM NUM:
DATE URITTN: 112096 DATE CLOSED:
URK TYP: 2 URK CAT:
CONTACT NAME,PHONE: DAZEY 4349 4871-57 ORGNTR: 0518
RSP CR ST ESTHRS REMHRS I RSP CR ST ESTHRS REMHRS RSP CR ST ESTHRS REMHR
731 17 R
00.
00. I 735 FS R
00.
00. 8B0 BO R
00.
00
/^. i K
JUN 24 '97 14:25
PAGE.005
Cl 5-0000005 UCTC 00303
JUN-24-1997 15:13
UCC CONTRACT DIU
P.01/08
UNION CARBIDE MAINTENANCE CONTRACT SERVICES
P.O. BOX 471 - BLDG. 199 TEXAS CITY, TEXAS 77592-0471
QS/y~' >-
/$f7
FACSIMILE TRANSMITTAL COVER SHEET
FROM:
&$-7%57
TOTAL PAGES:
(excluding cover sheet)
FAX NO. : __________ (409) 948-5748 ...............
If you do not receive all of the pages* please notify the sending operator, IRMA RODRIGUEZ at 1-409-948-5204. Thank you.
JUN 24 '97 16:01
PAGE.001
UCI>C 00304 Cl 5-0000006
JUN-24-1997 15:14
UCC CONTRACT DIU
P.05/06
WORK REQUEST UPDATED !
MMIS - SM211000
WORKLOAD CONTROL - UPDATE UCC BUSINESS CONFIDENTIAL
UOAK REQUEST: WE9440
1ST ORD/ORIG: 00024876 LEADMAN: 121 BLDG. 079
PRIORITY: 3
SUPINTENDENT: MUNSON
FE
HUP: N (Y/N) MTAG: N (Y/N) DESCRIPTION: REMOVE ASBESTOS INSULATION AND
DATE START: 10397 (MMDDYY) DATE COMPLETE: 011097 (MMDDYY)
LABOR EST: 000000
MATERIAL ESTt: 000000
TOTAL ESTS: 0000000
LONG
* REINSULATE WHEN LEAK IS REPAIRED. (SEE D. PAYNE, B-205)
*
DESCRIPTION - HOTSHOT EARL 01-06-97. BUILD ENCLOSURE AND REMOVE ASBESTOS
INSULATION. SEND TO P.C.I. INSULATION CO.
STATUS: R ASG:
C&P CODE:
PLAN STAT:
DATE WRITTN: 010397
PLANNER:
PROP NUM:
RM NUM:
DATE CLOSED:
URK TYP: 2 URK CAT:
CONTACT NAME.PHONE: PAYNE 0 5252-4875/186 ORGNTR: 05841
RSP CR ST ESTHRS REMHRS I RSP CR ST ESTHRS REMHRS
733 18 R
00.
00. I 735 FS R
00.
00.
.RSP CR ST ESTHRS REMHRS
8B0 BO R 00. 00
9
JUN 24 '97 16:03
PAGE.005 UcTC 00308
Cl 5-OOOOOIO
JUN-24-1997 15=14
UCC CONTRACT DIU
P.03/-06
MMIS - SM2110 WORK REQUEST: UE09O2 PRIORITY: 3
WORKLOAD CONTROL - UPDATE 1ST ORD/ORIG: 0036535 SUPINTENDENT: JOHNSON
UCC BUSINESS CONFIDENTIAL LEADMAN: 111 BLDG: Oil
CU
HUP: Y (Y/N) MTAG: Y (Y/N) DATE START: 21097 (MMDDYY) LABOR EST: 000000
DESCRIPTION: REPAIR LEAK ON 600/20 FLANGE
DATE COMPLETE: 021497 (MMDDYY)
MATERIAL EST*: 000000
TOTAL EST$: 0000000
LONG DESCRIPTION
REMOVE ASBESTOS AND REPAIR LEAK ON STEAM LINE WEST SIDE OF B *
. -11
HOTSHOT EARL 01-24-97. SEND TO P.C.I. INSULATION CO *
*
*
STATUS: R ASG:
C6P CODE:
PLAN STAT:
DATE URITTN: 12397
PLANNER:
PROP NUM
RM NUM.-
DATE CLOSED:
URK TYP: 2 URK CAT:
CONTACT NAME,PHONE: MCDOUGLE 5009
ORGNTR: 04248
RSP CR ST ESTHtiS
.FSP PL
00
.8B0 BO R
00
REMHRS
.00
.00
. .RSP CR ST ESTHRS REMHRS
733 18 R
00
00
RSP CR ST ESTHRS REMHRS 735 FS P 00. 00.
JUN 24 '37 16:02'
Pfl(Jfc.0OT UCTC 00306 Cl 5-0000008
JUN-24-1997 15:14 UUKK KtWUtSI UHDAIbD
UCC CONTRACT D1U
P.04/06
MMIS - SM211000
WORKLOAD CONTROL UPDATE UCC BUSINESS CONFIDENTIAL
WORK REQUEST: PW0328
1ST ORD/ORIG: 00073553 LEADMAN: 151 BLDG: 019
PRIORITY: 3
SUPINTENDENT: DAZEY
LR
HUP: Y <Y/N) MTAG: Y <Y/N> DESCRIPTION: STEAM LEAKS AT CLEANING RK
DATE START: 112096 1MMDDYY) DATE COMPLETE: 112796 (MMDDYY)
LABOR ESTS: 000000
MATERIAL EST$: 600000
LONG
NEED INSULATORS,CARPENTERS 2 SCAFFOLD
TOTAL EST*: 0000000 *
DESCRIPTION THIS IS ASB. U44 FOR DETAILS-OR FITTERS
REMOVE ASBESTOS INSULATION. HOTSHOT EARL 11 -21-96
* SEND TO P.C.I. INSULATION CO.
STATUS: R ASG:
C&P CODE:
PLAN STAT:
DATE URITTN: 112096
PLANNER:
PROP NUM:
RM NUM:
DATE CLOSED:
URK TYP: 2 WRK CAT:
CONTACT NAME,PHONE: DAZEY 4349 4871-570 ORGNTR: 05184
.RSP CR ST ESTHRS REMHRS
731 17 R 00. 00
RSP CR ST ESTHRS REMHRS I RSP CR ST ESTHRS REMHRS 735 FS R 00. 00. i 8B0 BO R 00. 00.
/^. : K
JUN Z4 '37 16:02
PAGE. 0U3
VCTC 00307 Cl 5-0000009
JUN-24-1997 15:13
UCC CONTRACT DIU
P.02^06
WUKK KbUUkSr UPDATED
MM IS - SM21100
WORKLOAD CONTROL - UPDATE UCC BUSINESS CONFIDENTIAL
UORK REQUEST: UE4394
1ST ORD/ORIG: 00001200 LEADMAN: 161 BLDG: 114
PRIORITY: 3
SUPINTENDENT: MILLER
NE
HUP: Y (Y/N) MTAC: Y <Y/N) DESCRIPTION: UNIT MAINTENANCE
DATE START: 031797 (MMDDYY) DATE COMPLETE: 040497 (MHDDYY)
LABOR ESTi: OOOOOO
MATERIAL EST*: 00000
TOTALEST*: 0000000
LONG
* NEED FSG SUPPORT ON SEVERAL JOBS AT B-114. ASBESTOS .IN...S...U..LAT- *
DESCRIPTION ION REMOVED IN SEVERAL SPOTS & SOME SPOTS REINSULATED. SOME #
* LABELING 6 STENCIL I.D. UORK DONE. SOME OLD PIPE REMOVED.
*
* HOTSHOT EARL 03-06-97 SEND TO P.C.I.INSULATION CO.
*
STATUS:
ASG:
C&P CODE: PT PLAN STAT:
DATE URITTN: 030597
PLANNER: 10 PROP NUM'
RM NUM:
. DATE CLOSED:
URK TYP: 2 URK CAT:
CONTACT NAME,PHONE: MILLER, 5245
ORGNTR: 03750
.RSP CR ST ESTHRS REMHRS
733 18 R 00. 00
RSP CR ST ESTHRS REMHRS I RSP CR ST ESTHRS REMHRS
735 FS P
00.
00. I 761 PL P
00.
00.
8B0 BO) R 00. 0.
n
JUN 24 '97 16:02
PASE.002
UCTC 00305 Cl 5-0000007
ENTR (CLR)
PF1 (HELP)
PF2 (RETRIEVE) F'F3 (EXIT)
PF4 (CREATE)
PF5 (QWRQ ??) PF9 (UPDATE) PF10 (CASCADE) PF11 (CLOSE WRQ) PF12 (CHRG BK)
WORK REQUEST UPDATED f
MMIS - SM211000
WORKLOAD CONTROL - UPDATE UCC BUSINESS CONFIDENTIAL
-- WORK REQUEST: WE9727
1ST ORD/ORIG: 00022105 LEADMAN: 111 BLDG: 009
PRIORITY: 3
SUPINTENDENT: JOHNSON
CW
HWF': Y (Y/N) MTAG: Y (Y/N) DESCRIPTION:
REMOVE ASBESTOS
DATE START: 041097 (MMDDYY) DATE COMPLETE: 041097 (MMDDYY)
LABOR EST*: 000000
MATERIAL EST*: 000000
TOTAL EST$: 0000000
LONG
* REMOVE ASBESTOS FROM CONDENSATE PIPE THAT WAS REPLACED.
*
DESCRIPTION
* PIPE IS WEST OF B-45 BENEATH PIPE RACK *
* *
* HOT SHOT PHIL 041197. SEND TO PCI INSULATION CO. ASBESTOS.
*
STATUS: R ASG:
C&P CODE:
PLAN STAT:
DATE WR1TTN: 041097
PLANNER:
PROP NUM:
RM NUM:
DATE CLOSED:
WRK TYP: 2 WRK CAT:
CONTACT NAME.PHONE: MCDOUGLE 5009
ORGNTR: 0424S
R3P CR ST ESTHRS REMHRS I RSP CR ST ESTHRS REMHRS I RSP CR ST ESTHRS REMHR3
733 13 R
00.
00. | 735 FS R
00.
00. I 8B0 BO R
00.
00.
I I
VCTC 00046
C-12-0000001
U0AR REQ0E^Su76O9
WOP PL
p^?gv 6^gSTS2 HEM?"??? cBC5?e?Ial
PRIORITY: 3
SUPINTE NDENT: JOHNSON
CU
HUP: Y (Y/N) MTAG: Y (Y/N) DESCR L: ' LON : REPAIR 70* STM Ll< 3RD & C PR
DATE START: 051298 (MMDDYY) DATE CO H?LETE: 051298 (MMDDYY)
LABOR EST$: OOOOOO
HATER I A L EST$: GOOOOO
TOTAL EST*: 0000000
LONG
* REPAIR 70* STEAr lE ak IN THE MAIN PIPERACK 3RD U C____
*
DESCRIPTION
* NEED SCAFFOLD, ASBE STOS STRIPPED, PROBABLY GASKET BLOWN, MAY *
* BE CUT FLANGE____ HA VE LEAK REPAIR FOR CONTINGENCY... ONLY HAV *
E 8 TO 10 HOURS SH. r DOWN TIME UNTIL START AFFECTING UNIT.
STATUS: R ASG:
C&P CODE: pr FLAN STAT:
DATE WRITTN: 050898
PLANNER:
PROP NUM:
RM NUM:
DATE CLOSED:
WRK TYP: 4 URK CAT:
CONTACT NAME PHONE: BILL WILKINS 4875-072 ORGNTR: 42727
RSP CR ST ESTHRS
FIC IC
GO.
761 PL
AO.
REMHRS GO.
x-vGG.
.I RSP CR ST ESTHRS
I 713 00
00
<trI 8B0 BO R
GO.
REMHRS
.00
.00
RSP CR ST ESTHRS REMHRS 735 FS P 00. 00.
UCTC 00112
Contract No. 0515-013104 Code 3510
MAINTENANCE CONTRACT
INCLUSIVE RATE
THIS CONTRACT, made and entered into, and effective, as of the 1* day of October, 1996 by and between UNION CARBIDE CORPORATION, a New York corporation, whose address is 3301 Fifth Avenue South, Texas City, TX 77590 (P.O. Box 471 Texas City, TX 77592-0471) (hereinafter called "Owner"), party of the first part, and Performance Contracting, Inc., a Kansas corporation, whose address is 9408 North Loop East, Houston, TX 77029 (hereinafter called ("Contractor"), party of the second part.
WITNESSETH:
That for and in consideration of the mutual covenants and agreements hereinafter set forth, the parties to this Contract (sometimes hereinafter referred to individually as "Party" and collectively as "Parties") covenant and agree as follows:
ARTICLE I - THE WORK: TERMS AND CONDITIONS: CONFLICTS
(1) Contractor, as an independent contractor, shall perform the work described below (hereinafter called the "Work") at the facilities described below:
Insulation and related scaffolding services within Owner's Plant and Marine Terminal located in Texas City, Texas.
The Work shall be requested by Owner from time to time during the term of this Contract by means of work releases described in Article II of this Contract, (said work releases being hereinafter in the singular called "Work Release" and in the plural "Work Releases"). Owner shall not be obligated to request any particular amount of work hereunder, and the amount ofwork, if any, requested shall be at Owner's sole discretion.
(2) Except as otherwise provided in this Contract, Contractor shall provide and furnish, in connection with its performance of the Work, all personnel and services and all materials, equipment and other things which are required for its performance of the Work (which materials, equipment and other things are sometimes hereinafter referred to in the singular as "Thing" and in the plural as "Things"). Materials, equipment, and other things
4o. UC 334-160 (6/95)
UCTC 00131
Cl 5-0000012