February 26, 1987
Mr. Eli Bell Executive Director Texas Air Control Board 6330 Highway 290 East Austin, Texas 78723
Re: Renovation Notification
Dear Mr. Bell:
This is to notify you, as required by 40 CFR 61.146, that Union Carbide Corporation, Old Ridgebury Road, Danbury, Connecticut 06817, as owner, plans to engage in renovation activities as described below:
Insulation will be removed from 520 linear feet of 3 inch steam line located north of building 56, at 3301 5th Avenue South, Texas City, Texas 77590. The equipment is approximately 19 years old.
Removal of the insulation is scheduled to start on March 23, 1987, with completion by June 30, 1987. Procedures to be employed in the handling and disposal of the asbestos material will conform to the requirements in 40 CFR 61.147 and 61.152.
All asbestos materials removed will be disposed at Gulf Coast Waste Disposal Authority, Loop 197, Texas City, Texas.
cc: Dr. E. R. Ibert - GCACD, La Marque kern/asb
UCTC 18932
Bcc: J. B. Evans - 500 R. F. Kelley _ 500 K. E. Martin R. A. Mendez L. D. Pell S. K. Phillips - 500 A. L. Welch R- E. Woodcock A-. P; Yalcinkaya
\ C'~
>
Plant Procedure 1-8-8 Attachment #1
UNION CARBIDE CORPORATION TEXAS CITY PLANT
NOTICE OF INTENTION TO DEMOLISH OR RENOVATE A STRUCTURE OR FACILITY CONTAINING ASBESTOS MATERIAL
1. Description of the facility: 70 psi Steam Line in pipe trench__________ North of building 56 at the Texas City Plant
2. Estimate of approximate amount of friable asbestos materials present: (Area In sq. ft. or linear ft.) 520 linear feet of 3 inch piping Estimation technique used: Measured linear Feet of Piping
3. Location of facility:
Texas Citv Plant- Buildinq 56
4. Scheduled startlnq day:
March 23. 1987
Scheduled completion day: June 30, 1987
5. Nature of planned demolition or renovation: Replace asbestos insulation
on a 3 inch 70 psi Steam Line with new-insulation
~:.
Method to be used: Remove metal covering on the line. Strip asbestos insulation.
6. Name of person that prepared the form: A. L. Welch
Location and telephone number:
ev, rv*
________________--
Date: Feh.ru acy ?3_, 1987--------------------
--------- -----------------------------------------------
NOTE:
This form must be completed and delivered to the EP Department (Bldg. #1) at least 30 days ahead of the scheduled starting day of the planned demolition or renovation, or as soon as possible following an emergency renovation operation.
April/1985 ID#0184s/jah
UCTC 18933
I