<194 (SOM)
o TENNECOINTER-OFFICE MEM CHEMICALS, INC
\
To E. Schwartz
pfrom
Kanzler
AT Piscataway Burlington
date June 10, 1974 copy to W C. Champion
subject in_process Gas Chromatographs
Attached is a list of suggested monitoring point relocations. While in some instances, only short distances are involved, the relocations are suggested based on the experiences we have had with OVA monitoring.
If you need any further details, please don't hesitate to call on me.
Attachment. FWK/jst
F.W. Kanzler
COLORITE 012697
\
Drawing Number D-53S D-536 D-537
D-539
D-S41
D-543 D-544 D-54S
SUGGESTED MOVES Or MONITORING POINTS
PLA-4 should be relocated near BT #2,
PLA-7 or PLA-8 should be closer to the wet cake bin. PEA-6 may not be in a good monitoring position for the homogen ization pump. PLA-15 should be closer to the BMT in the area of the stair way to the BMT. Since we don't monitor the rest of the filters (presumably because of venting), we need not to mon itor filter #1.
PLB-15 should be closer to the wet cake bin. Are there any points in "B" Plant penthouse?
Compressor #6 is missing on this drawing. There should be a monitoring point near the weigh scale.
Move CO-13 to stairway.
Move CO-5 near the location of C-2D.
C--1 should be moved to the front (north side) of the panel board.
#
*
F.W. Kanzler 6/10/74
COLORITE 012698